Identification and Traceability
Identification and Traceability
Revision
Edition
C ONTENTS
1.PURPOSE...............................................2
2.SCOPE....................................................2
3.DEFINITION............................................2
4.REFERENCE...........................................2
5.RESPONSIBILITIES................................2
6.PROCEDURE..........................................3
7.DOCUMENTS, RECORDS.......................5
8.APPENDIX..............................................5
Page 1 of 5
DMF0003(0)
Revision
Edition
1. PURPOSE
The purpose of this procedure is to establish an identification and traceability system
for the materials, equipment and products, which are used in production process from
receiving until delivery and installation.
2. SCOPE
1
This procedure shall be applied to the identification and traceability of the materials,
equipment, and products, which are used for shipbuilding and shiprepair in DMHI.
3. DEFINITION
3.1. Traceability the aptitude to reconstitute the history, application and location of a
product by means of records.
4. REFERENCE
4.1. Procedure Control of quality records, code DMPS - 16
4.2. Procedure Steel plates and profiles identification, code DMPA - 303
1
5. RESPONSIBILITIES
5.1. The QA/QC Office Director has responsibility for:
(1) Establishment and revision of this procedure.
1
5.2. The Design and Technical Shiprepair Departments managers have responsibility
for preparation of the drawings and specifications that contain the needful
information for product identification and traceability.
5.3. The production departments managers have responsibility for:
(1) Application of this procedure.
(2) Maintenance of the records required for products identification and traceability
comply with the procedure Control of quality records, code DMPS -16.
5.4. The procurement departments managers have responsibility for:
(1) Application of this procedure.
Page 2 of 5
DMF0003(0)
Revision
Edition
6 6. PROCEDURE
(1) Design and Technical Shiprepair Departments issue Purchase Order Requisition
(POR) and give an identification code for the materials to be used for project.
(2) Procurement Department issues the Purchase Order (PO) which shall contain
the identification code of materials from POR.
(2) The certificates of steel plates and profiles are kept comply with the
procedure Registration and delivery of steel plates and profiles certificates,
code DMPA - 373.
6.2. Control of piping materials
6.2.1. Receiving
1
The piping materials are received by the Material Control Department comply
with the procedure Materials and equipments receiving, code DMPA -124.
6.2.2. Identification and storage
(1) The pipes shall be stored in special assigned areas.
(2) Material Control Department shall assure a suitable storage of the
pipes for an easy identification.
For this, the pipes are put on the pallets, grouped on lots by diameters
and pipe TYPE (Carbon steel, Stainless Steel, Cu-Ni, etc.) and material
grade. Each lot has label and/or identification marking.
(3) The pipes certified with Class Societies have in plus beside of
identification marking according point (2) the stamp of the
Classification Society, on the steel label of the lot.
6.2.3. Cutting and fabrication
(1) Outfitting Departments transport the
fabrication drawing to the cutting place.
pipes
specified
in
pipe
(2) The pipe is cut and processed at proper length on based of the
fabrication drawing.
(3) The identification data from fabrication drawing (project number, pipe
code and position from fabrication drawing) are punched if the pipe
must be galvanized or marked with marker if it is black pipe on
flange/sleeve to each manufactured pipe. If manufactured pipe does
not have sleeve or flange on the ends, the marking is make by
punched/marked on one of the pipe ends.
Page 3 of 5
DMF0003(0)
Revision
Edition
(4) For the class pipes (class I and II) the class of pipe and heating no.
shall be punched on flange outer surface.
6.2.4. Installation
Outfitting Department installs the pipe after confirmation of the
identification marking, punched/marked on the flange.
6.2.5. Control of pipe remains
Classification criteria of the pipe remains are the followings:
Classification
Useful
remains
Unuseful
remains
Steel pipes
Nonferrous
pipes
Steel pipes
Nonferrous
pipes
Sizes
Remarks
Control
register
Page 4 of 5
DMF0003(0)
Revision
Edition
(1) The material quality and pipe class shall be marked with marking pen
on the useful pipe remains.
(2) Useful pipe remains are stored in containers, sorted by quality and class.
(3) A person in charge from the cutting team shall maintain a control
register of the useful remains.
(4) The useful remains shall be use with approval of an assigned person.
6.3. Control of forging and castings
1
The laminated steel bars are stored in special places, grouped on lots
by material quality and dimensions and having attached the identification tag
on every lot.
(2)
Material Control Department shall verify the data, which are contained
in quality certificate and the suppliers marking.
(3)
When the laminated steel are divide in more parts, for processing, the
identification marking of the bar shall be transferred on every component
part.
Page 5 of 5
DMF0003(0)
Revision
Edition
(1) Receiving inspection of equipment are carried out in accordance with the
procedure Materials and equipments receiving, code DMPA-124.
(2) The Material Control Department attaches to each supplied equipment, a tag
with the equipment denomination and project number of the ship.
(3) Department which installs the equipment compare the information from the
tag with the specification and installs the equipment to adequate project
number.
7. DOCUMENTS, RECORDS
The quality certificates and the drawings which have records for traceability are kept
comply with the procedure Control of quality records, code DMPS - 16 and specific
procedure, by the production departments.
8. APPENDIX
8.1. Flowchart no.1
8.2. Flowchart no.2
Page 6 of 5