Advantages: Modular Design
Advantages: Modular Design
Advantages: Modular Design
Issue 1 COVER
STORY
Modular Design
The
Advantages
for Contractors
By Ryan Cantu
churches, healthcare facilities, sales and retail offices, fast food restaurants and ticket offices.
In addition, modular construction allows for buildings to be increased
or reduced in size by adding or removing modules without altering the
basic construction. The same process can be utilized to create changes
in functionality. So an office building can be built for a company that
plans to expand in the future; and as the need arises to add more offices
and conference areas, additional modules can be added to the existing
building. Access points are created and the expansion becomes seamless with little interruption to the companys operation.
The same can be true for an organization that is downsizing. Modules
can be removed, and if designed properly, can be sold off as a separate,
11
Issue 17
TRENDS
amount of material is always available at the
facility, nearly eliminating construction delays
and theft of building materials from the site.
Green Advantages
The ease of the modular construction process allows for flexible design and reuse and
strengthens its position as a resource efficient,
inherently greener way to build. Renovated
reuse can provide advantages in sustainability
and cost savings while still being as architecturally alluring as buildings constructed by
more traditional methods.
smaller building. By adding or removing modules or moving the building to another location and
altering the architectural design, another user can change the purpose of a building.
Construction Process
Modular components are typically constructed within a large indoor facility on assembly lines
that utilize tracks to move the modules from one workstation to the next. Independent building
inspectors are on-site to supervise the construction and ensure that all building codes are adhered
to during assembly.
The completion of the modules can take between one to three months, while the actual construction on-site can take as little as 10 days once the pieces of the building have been transported.
Sometimes a crane is brought in to set the modules, but often they are simply rolled onto the
foundation using trans-lifts, a piece of equipment with tracks that a building can actually be set
on and moved a short distance. Assembling the modules generally can take several hours or a
few days, with the final product being indistinguishable from typical site-built construction.
Advantages
Manufacturers cite the following reasons for the typically higher Return on Investment (ROI) of
modular buildings: the speed of construction, indoor construction, favorable pricing from suppliers, the ability to service remote locations, low waste and its a more environmentally friendly
construction process.
Modular buildings are cost-effective to builders and consumers because of their factory construction and because units are constructed in enclosed facilities the weather is not a factor in the construction timeline. In addition, material delivery fees are also out of the equation because ample
12
Issue 17 TRENDS
Issue 1 COVER
STORY
The opportunities that accelerated construction brings to the construction industry are limitless and worth noting. Not only are modular buildings
inherently green due to their flexibility and reusability factors, making it a
good choice for owners; but new techniques and material options are making it a viable choice for contractors wanting to streamline the construction process, minimize safety liability and improve their profit margins by
decreasing costs.
~Michael Wilmot, president, Wilmot Modular Structures, Inc.
Installation Methods
Project size, scope, site conditions, and schedule requirements will be deciding factors on
how the buildings can be ultimately assembled
and erected.
It is important to assemble and bring in the
team of professionals earlier rather than later
in the design phase of the construction project. When this is done, it will allow for better
collaboration up front and help shape the most
cost effective and efficient available options
for the end users consideration.
The Future of Modular Construction
Building Strength
Modular buildings are designed to be initially
stronger than traditional homes, with techniques like replacing nails with screws and
adding glue to joints to help them maintain
their structural integrity during transportation
to the construction site. Despite manufacturer
claims, it is difficult to predict the final building strength since modular structures endure
transportation stresses that traditional homes
never experience.
When FEMA studied the destruction wrought
by Hurricane Andrew in Dade County, Florida,
they concluded that modular and masonry homes
fared best compared to other construction.
The opportunities that accelerated construction brings to the construction industry are
limitless and worth noting. Not only are modular buildings inherently green due to their
flexibility and reusability factors, making it a
good choice for owners; but new techniques
and material options are making it a viable
choice for contractors wanting to streamline
the construction process, minimize safety liability and improve their profit margins by decreasing costs, states Michael Wilmot, president of Wilmot Modular Structures, Inc.
The Modular Building Institute, an international group of businesses involved in different aspects of modular construction, believes
it is not necessary for an entire project to be
completed by a modular manufacturer. To
capitalize on the advantages of modular construction, architects, general contractors and
owners should communicate with modular
manufacturers prior to a project to determine
if certain components of the project lend themselves to off-site prefabrication and realize efficiencies immediately.
Shipping of Modules
The maximum allowable shipping heights,
widths, and lengths for modules will be determined by the location where they are being fabricated and the route to the destination
where they are being delivered. Accessibility
to the jobsite is another factor that also needs
Limitations
Surfaces and Finishes
Modular buildings can be assembled on top of
multiple foundation surfaces, including a crawl
space, stilts (for areas that are prone to flooding), full basements or standard slab at grade.
They can also be built to multi-story heights in
the form of barracks, dormitories, and motels.
The height that a modular structure can reach
depends on jurisdiction, but in a number of
countries, especially Asia, modular structures
are allowed to be built to 24 floors plus.
13