Boq
Boq
PROJECT :
R & E VILLA
OWNER :
RACHMAD
EDDY LOEKITO
LOCATION :
QUANTITY SURVEYOR :
head office :
Jl. Merpati no. 15 Tuban - Kuta
Telp : +62 361 - 765310
Fax : +62 361 - 765310
R & E VILLA
BILL OF QUANTITY
JL. DEWI SRI KUTA - BALI
BIDDER NAME :
DATE OF TENDER :
No.
Description
Quantity
FINAL SUMMARY
1.0.
PRE ELEMINARY
1.00
ls
2.0.
EARTHWORKS
1.00
ls
3.0.
VILLA TYPE A
2.00
unit
4.0.
VILLA TYPE B
2.00
unit
5.0.
VILLA TYPE C
2.00
unit
6.0.
LOBBY / OFFICE
1.00
ls
1.00
1.00
ls
ls
1.00
ls
7.0.
COMMON AREA
CARPORT / STEPPING
BOUNDARY WALL
8.0.
9.0.
10.0.
LANDSCAPE
1.00
ls
11.0.
1.00
ls
Note :
Contractor should not modify the items & quantity / volume in this BOQ
Should there any scope of work(s) and or quantity correction not yet in this BOQ,
contractor should submission in the separate page(s) as additional page(s).
Unit Rate
(Rp)
Total Rate
(Rp)
l design"
Description
Quantity
GENERALLY
The following Bills of Quantities are a guide
only. It is the responsibility of the Tenderer to
measure and satisfy themselves as to the
accuracy of all quantities for works requiring
payment. The descriptions provided herein are
for a guide only as to
1.0.
2
2.1
2.2
2.3
PRELIMINARIES
General Cost
- Stationery
- Computer
- Printer
- Job conferences "consumption"
- Documentation "Print photo"
- Shop drawing
- As build drawing
- Healty for worker (P3K)
- Contractor all risk (insurance)
- Retribution to local government "KIPEM"
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
ls
unit
unit
ls
ls
ls
ls
ls
ls
ls
Temporary Building
Temporary fence "L"
Temporary building for worker
Site office and storage
1.00
1.00
1.00
ls
ls
ls
Construction plant
- Genset
- Concrete mixer
- Bar cutter
- Water tank temporary
- Scaffolding
- Oil fuel
- Mobilitation and demobilitation material and
plant
- Others equipment (small tool etc)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
ls
ls
ls
ls
ls
ls
ls
ls
1.00
ls
Cleaning of site
1.00
ls
1.00
ls
1.0.
PRELIMINARIES
Rate
(Rp)
Total Rate
(Rp)
R & E VILLA
BILL OF QUANTITY
JL. DEWI SRI KUTA - BALI
No.
Description
Quantity
GENERALLY
The following Bills of Quantities are a guide
only. It is the responsibility of the Tenderer to
measure and satisfy themselves as to the
accuracy of all quantities for works requiring
payment. The descriptions provided herein are
for a guide only as to
2.0.
EARTHWORKS
2.1
1
2
3
EARTHWORKS
Site clearance incl. removal of grass, trees, top
200
mmland
thick
Cutting
tovegetable
leveling soil; dispose off site.
Filling using ex excavated material "Limestone"
as specified in bulk in the open to form
platform including compaction
2.1
2.2
1
2
3
5
6
7
2.2
m2
m3
m3
m3
EARTHWORKS
RETAINING WALLS
Excavation for foundation
Backfilling with excavated material to build up
platform
Relocation material ex excavation to filling land
including compaction
Compacted sand bed
50 mm thick compacted sand layer under
foundation
Masonsry works
300mm thick Loose foundation under stone
foundation
Rock Stone Foundation (1 pc : 5 sand)
Make good surface of stone masonry "Siaran"
RETAINING WALLS
m3
m3
m3
m3
m3
m3
m2
Collection
2.1
EARTHWORKS
2.2
RETAINING WALLS
2.0.
EARTHWORKS
Rate
(Rp)
Total Rate
(Rp)
R & E VILLA
BILL OF QUANTITY
JL. DEWI SRI KUTA - BALI
Ref
Description
Quantity
GENERALLY
VILLA TYPE A
3.1
1
SUBSTRUCTURE
Preliminary
Bouwplank
93.00
m1
2
3
Excavation
Excavation for foundation
Backfilling with excavated material to build up platform
75.02
15.00
m3
m3
96.88
m3
4
5
1.00
ls
8.91
m3
Termite prevention
Termiban or equal approved termite protection applied
to building platform and surfaces of excavation
1.00
ls
8
9
Masonsry works
300mm thick Loose foundation under rock stone
foundation
Rock Stone Foundation (1 pc : 5 sand)
3.1
SUBSTRUCTURE
3.2
CONCRETE WORKS
Lean concrete
50 mm thick concrete under Floor Slab
25.01
31.68
m3
m3
10.06
m3
3.13
1.83
m3
m3
4
5
6
7
Concrete
Concrete
Concrete
Concrete
Beam (150/250)
Plat Level 80mm thick
Plat roof 100mm thick
base bathtub, washtafel & kithen zink
3.2
CONCRETE WORKS
3.3
WOOD WORKS
3.13
0.67
4.16
0.38
m3
m3
m3
m3
1
2
3
4
2
3
4
5
6
7
8
41.08
32.00
4.54
29.00
32.00
4.54
114.70
114.70
53.00
53.00
114.70
m1
m1
m1
m1
m1
m1
m2
m2
m1
m1
m2
3.3
WOOD WORKS
3.4
1
2
MASONRY
Red brick / Hollow block masonry, laid in stretcher bond
with 1:5 cement mortar including lintel beams and
control joints.
Masonry with red brick 100 mm wide
Masonry with Hollow block for fence wall
260.47
105.74
m2
m2
3
4
732.42
520.94
m2
m2
3.4
MASONRY
3.5
ROOF
Roof covering with Roof Tile including installation,
1
2
3
3.5
114.70 m2
34.20 m1
41.64 m2
3.6
FINISHES
Wall finishes
260.47
260.47
41.64
m2
m2
m2
4
5
8.72
211.48
m2
m2
25.20
3.24
m2
m2
5.72
21.93
4.00
m2
m2
m2
54.48
16.49
12.00
m2
m2
m2
9.00
5.20
m2
m2
Expose Coulomn
Floor Bale
Natural stone 30mm thk size random "Candi Black
Stone" including mortar, adhesive and grout as
specified to
11
12
13
Expose Gate
Steping
Shower
Floor finishes
600 x 600 mm Granito including mortar, adhesive and
grout as specified to
Floor Bedroom
Floor Bathroom
Floor Dining Room
14
15
8
9
10
23.00
m2
17
88.92
m2
18
19
2.00
2.00
Timber Finishes
Prepare and apply Ultran Politur finishes or equal to
ls
ls
20
21
3.6
FINISHES
114.70
m2
m2
3.7
1
2
3
4
5
6
7
3.7
3.8
IRONMONGERY
Supply and install the following ironmongery including
all accessories; Ex MULLER / DECKSON / SOLID or as
approve architect
Sliding door 3 m
Flush pull plate handle
Escutcheon
Lockcase sliding door
Double cylinder
Top rel
Bottom rel
Accessories
Double swing door
Pull handle
Escutcheon
Lockcase pelor
Double Cylinder
Door Hinges
Door stop
Flush bolt
10mm thk tempered door
Glass door handle
Shower hinge
Glasses Window
Pull handle
Lockcase pelor
Window Hinges
Window Hook
Single swing door
Pull handle
Escutcheon
Lockcase pelor
2.00
no
1.00
no
2.00
no
6.00
1.00
1.00
1.00
no
no
no
no
4.00
2.00
2.00
2.00
2.00
2.00
2.00
4.00
4.00
4.00
6.00
6.00
4.00
4.00
2.00
2.00
6.00
6.00
6.00
12.00
12.00
1.00
1.00
1.00
no
set
set
set
set
set
set
ls
no
set
set
set
set
set
set
set
no
set
set
set
set
set
set
set
no
set
set
set
Door Hinges
Door stop
Flush bolt
2.00
1.00
1.00
set
set
set
3.8
IRONMONGERY
3.9
SANITARY FIXTURES
Supply and install the following sanitary wares and
faucets
including
all associated
and accessories;
Complete
Toilet Toto
CW 824 PJfittings
complete
as
Jetspecified
spray Toto THX 20 MCRB
Paper holder Toto "Curio" TX 703 AC
Floor drain Toto TX 1 BV1
Head shower Toto TX 488S
Diverter for shower Toto TX 484 SE
Semi Recessed Lavatory Toto LW 641 J complete w/
Lavatory Faucet TX 119 LEC, stop valve and waste
fitting
Enameled cast iron bathtub w/ anti slip Toto FBY 1710
CPE / 9008L
Bath filler & mixer Toto TX 467 SEC
1
2
3
4
5
6
7
2.00
2.00
2.00
2.00
2.00
2.00
2.00
no
no
no
no
no
no
no
2.00
no
2.00
no
2.00
no
2
3
2.00
2.00
no
no
Bale 'Gazebo'
1.00
no
8
9
3.9
SANITARY FIXTURES
3,10.
ACCESSORIES
MIRRORS
6mm thick mirror, including 12mm thick plywood
backing, wood frame, mastic adhesive, sealant,
accessories etc.; as specifed and shown drawing
1950 wide x 1200mm high mirror to Lavatory
BENCH
Timber and Blockboard with teakonsit laminate and
finishes with 3 coated Ultran Politur with accesoris and
3,10.
ACCESSORIES
3,11.
SWIMMING POOL
SUBSTRUCTURE
Preliminary
Bouwplank
28.00
m1
2
3
Excavation
Excavation for Plunge pool and pump room
Remove surplus ex excavation
61.48
1.00
m3
m3
1.00
m2
Termite prevention
Termiban or equal approved termite protection applied
to
buildingworks
platform and surfaces of excavation
Masonsry
5
6
7
Hollow block 1 : 5
25 mm thick rendered plaster (1:5)
Smooth finish to walls
CONCRETE WORKS
49.20
49.20
49.20
m3
m2
m2
Lean concrete
50 mm thick concrete under slab Plunge pool and pump
room
1.68
m3
5.03
7.38
1.01
m3
m3
m3
48.00
m2
1
2
24.00
28.00
m2
m2
3
4
20.00
12.00
m1
m1
1.00
no
METAL WORKS
Fabricate, deliver to site including cutting, welding,
1
2
3
4
5
6
7
1.00
1.00
1.00
1.00
1.00
6.00
1.00
no
no
no
no
no
no
no
8
9
1.00
1.00
no
no
10
11
12
13
14
1.00
1.00
1.00
1.00
1.00
no
no
no
no
no
15
16
17
3,11.
Material Plumbing
Material Electrical
Instalation
SWIMMING POOL
Collection
3.0.
VILLA TYPE A
3.1 SUBSTRUCTURE
3.2 CONCRETE WORKS
3.3 WOOD WORKS
3.4 MASONRY
3.5 ROOF
3.6 FINISHES
3.7 DOORS AND WINDOW
3.8 IRONMONGERY
3.9 SANITARY FIXTURES
3,10. ACCESSORIES
3,11. SWIMMING POOL
3.0.
VILLA TYPE A
1.00
1.00
1.00
no
no
no
Rate
(Rp)
Amount
(Rp)
R & E VILLA
BILL OF QUANTITY
JL. DEWI SRI KUTA - BALI
Ref
Description
Quantity
GENERALLY
VILLA TYPE B
4.1
1
SUBSTRUCTURE
Preliminary
Bouwplank
93.00
m1
2
3
Excavation
Excavation for foundation
Backfilling with excavated material to build up platform
72.18
25.66
m3
m3
91.63
m3
4
5
1.00
ls
5.47
m3
Termite prevention
Termiban or equal approved termite protection applied
to building platform and surfaces of excavation
1.00
ls
8
9
Masonsry works
300mm thick Loose foundation under rock stone
foundation
Rock Stone Foundation (1 pc : 5 sand)
4.1
SUBSTRUCTURE
4.2
CONCRETE WORKS
Lean concrete
50 mm thick concrete under Floor Slab
33.81
42.83
m3
m3
9.48
m3
4.23
2.19
m3
m3
4
5
6
7
Concrete
Concrete
Concrete
Concrete
Beam (150/250)
Plat Level 80mm thick
Plat roof 100mm thick
base bathtub, washtafel & kithen zink
4.2
CONCRETE WORKS
4.3
WOOD WORKS
4.23
3.83
0.36
m3
m3
m3
m3
1
2
3
4
2
3
4
5
6
7
8
43.00
38.50
32.00
34.00
5.90
125.40
125.40
55.00
55.00
125.40
m1
m1
m1
m1
m1
m1
m2
m2
m1
m1
m2
4.3
WOOD WORKS
4.4
1
2
MASONRY
Red brick / Hollow block masonry, laid in stretcher bond
with 1:5 cement mortar including lintel beams and
control joints.
Masonry with red brick 100 mm wide
Masonry with Hollow block for fence wall
285.12
65.00
m2
m2
3
4
646.24
570.24
m2
m2
125.40
35.90
m2
m1
38.25
m2
4.4
MASONRY
4.5
ROOF
Roof covering with Roof Tile including installation,
1
2
3
4.5
4.6
FINISHES
Wall finishes
285.12
285.12
38.25
m2
m2
m2
4
5
8.72
130.00
m2
m2
4.00
m2
m2
5.72
2.16
4.00
m2
m2
m2
50.00
17.00
22.75
m2
m2
m2
4.20
m2
m2
Expose Coulomn
Floor Bale
Natural stone 30mm thk size random "Candi Black
Stone" including mortar, adhesive and grout as
specified to
11
12
13
Expose Gate
Steping
Shower
Floor finishes
600 x 600 mm Granito including mortar, adhesive and
grout as specified to
Floor Bedroom
Floor Bathroom
Floor Dining Room
14
15
8
9
10
17.21
m2
17
88.26
m2
18
19
2.00
2.00
Timber Finishes
Prepare and apply Ultran Politur finishes or equal to
ls
ls
20
21
Timber structure
Lambersering ceiling expose
4.6
FINISHES
125.40
m2
m2
4.7
1
2
3
4
5
6
7
4.7
4.8
IRONMONGERY
Supply and install the following ironmongery including
all accessories; Ex MULLER / DECKSON / SOLID or as
approve architect
Sliding door 3 m
Flush pull plate handle
Escutcheon
Lockcase sliding door
Double cylinder
Top rel
Bottom rel
Accessories
Double swing door
Pull handle
Escutcheon
Lockcase pelor
Double Cylinder
Door Hinges
Door stop
Flush bolt
10mm thk tempered door
Glass door handle
Shower hinge
Glasses Window
Pull handle
Lockcase pelor
Window Hinges
Window Hook
4.8
IRONMONGERY
4.9
SANITARY FIXTURES
2.00
no
no
2.00
no
4.00
no
no
no
no
1.00
4.00
4.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
3.00
2.00
2.00
2.00
2.00
4.00
4.00
8.00
8.00
no
set
set
set
set
set
set
ls
no
set
set
set
set
set
set
set
no
set
set
set
set
set
set
set
1
2
3
4
2.00
2.00
2.00
2.00
no
no
no
no
5
6
7
2.00
2.00
2.00
no
no
no
2.00
no
2.00
no
2.00
no
2
3
2.00
2.00
no
no
Bale 'Gazebo'
1.00
no
8
9
4.9
SANITARY FIXTURES
4,10.
ACCESSORIES
MIRRORS
6mm thick mirror, including 12mm thick plywood
backing, wood frame, mastic adhesive, sealant,
accessories etc.; as specifed and shown drawing
1950 wide x 1200mm high mirror to Lavatory
BENCH
Timber and Blockboard with teakonsit laminate and
finishes with 3 coated Ultran Politur with accesoris and
4,10.
ACCESSORIES
4,11.
SWIMMING POOL
SUBSTRUCTURE
Preliminary
Bouwplank
28.00
m1
2
3
Excavation
Excavation for Plunge pool and pump room
Remove surplus ex excavation
61.48
1.00
m3
ls
4
5
6
7
Termite prevention
Termiban or equal approved termite protection applied
to
buildingworks
platform and surfaces of excavation
Masonsry
Hollow block 1 : 5
25 mm thick rendered plaster (1:5)
Smooth finish to walls
CONCRETE WORKS
Lean concrete
50 mm thick concrete under slab Plunge pool and pump
room
1.00
ls
49.20
49.20
49.20
m3
m2
m2
1.68
m3
5.03
7.38
1.01
m3
m3
m3
48.00
m2
1
2
24.00
28.00
m2
m2
3
4
20.00
12.00
m1
m1
1.00
no
1.00
1.00
1.00
1.00
1.00
6.00
1.00
no
no
no
no
no
no
no
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
no
no
no
no
no
no
no
no
no
no
METAL WORKS
Fabricate, deliver to site including cutting, welding,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
4,11.
SWIMMING POOL
Collection
4.0.
VILLA TYPE B
4.1 SUBSTRUCTURE
4.2 CONCRETE WORKS
4.3 WOOD WORKS
4.4 MASONRY
4.5 ROOF
4.6 FINISHES
4.7 DOORS AND WINDOW
4.8 IRONMONGERY
4.9 SANITARY FIXTURES
4,10. ACCESSORIES
4,11. SWIMMING POOL
4.0.
VILLA TYPE B
Rate
(Rp)
Amount
(Rp)
R & E VILLA
BILL OF QUANTITY
JL. DEWI SRI KUTA - BALI
Ref
Description
Quantity
GENERALLY
VILLA TYPE C
5.1
1
SUBSTRUCTURE
Preliminary
Bouwplank
2
3
Excavation
Excavation for foundation
Backfilling with excavated material to build up platform
4
5
Termite prevention
Termiban or equal approved termite protection applied
to building platform and surfaces of excavation
8
9
Masonsry works
300mm thick Loose foundation under rock stone
foundation
Rock Stone Foundation (1 pc : 5 sand)
5.1
SUBSTRUCTURE
5.2
CONCRETE WORKS
Lean concrete
50 mm thick concrete under Floor Slab
108.00
m1
72.90
22.68
m3
m3
96.03
m3
1.00
10.06
1.00
ls
m3
ls
39.91
50.56
m3
m3
4.99
m3
4.99
m3
3
4
5
6
7
Concrete
Concrete
Concrete
Concrete
Concrete
Column CP (130/130)
Beam (150/250)
Plat Level 80mm thick
Plat roof 100mm thick
base bathtub, washtafel & kithen zink
5.2
CONCRETE WORKS
5.3
WOOD WORKS
1.76
4.99
0.70
3.98
0.43
m3
m3
m3
m3
m3
41.00
37.50
32.00
32.00
5.50
115.07
115.07
53.00
53.00
115.07
m1
m1
m1
m1
m1
m1
m2
m2
m1
m1
m2
1
2
3
4
2
3
4
5
6
7
8
5.3
WOOD WORKS
5.4
1
2
MASONRY
Red brick / Hollow block masonry, laid in stretcher bond
with 1:5 cement mortar including lintel beams and
control joints.
Masonry with red brick 100 mm wide
Masonry with Hollow block for fence wall
252.72
104.08
m2
m2
3
4
713.60
505.44
m2
m2
115.07
34.20
m2
m1
39.75
m2
5.4
MASONRY
5.5
ROOF
Roof covering with Roof Tile including installation,
1
2
5.5
ROOF
5.6
FINISHES
Wall finishes
4
5
252.72
252.72
39.75
m2
m2
m2
m2
m2
Expose Coulomn
Floor Bale
28.80
4.00
m2
m2
5.72
18.00
4.00
m2
m2
m2
50.00
13.00
12.25
m2
m2
m2
10.50
6.50
m2
m2
11
12
13
Expose Gate
Steping
Shower
Floor finishes
600 x 600 mm Granito including mortar, adhesive and
grout as specified to
Floor Bedroom
Floor Bathroom
Floor Dining Room
14
15
8
9
10
30.50
m2
17
93.66
m2
18
19
2.00
2.00
Timber Finishes
Prepare and apply Ultran Politur finishes or equal to
ls
ls
20
21
Timber structure
Lambersering ceiling expose
5.6
FINISHES
115.07
m2
m2
5.7
1
2
3
4
5
6
7
5.7
5.8
IRONMONGERY
Supply and install the following ironmongery including
all accessories; Ex MULLER / DECKSON / SOLID or as
approve architect
Sliding door 3 m
Flush pull plate handle
Escutcheon
Lockcase sliding door
Double cylinder
Top rel
Bottom rel
Accessories
Double swing door
Pull handle
Escutcheon
Lockcase pelor
Double Cylinder
Door Hinges
Door stop
Flush bolt
10mm thk tempered door
Glass door handle
Shower hinge
Glasses Window
Pull handle
Lockcase pelor
Window Hinges
Window Hook
Single swing door
Pull handle
Escutcheon
Lockcase pelor
2.00
no
1.00
no
2.00
no
6.00
1.00
1.00
1.00
no
no
no
no
4.00
2.00
2.00
2.00
2.00
2.00
2.00
4.00
4.00
4.00
6.00
6.00
4.00
4.00
2.00
2.00
6.00
6.00
6.00
12.00
12.00
1.00
1.00
1.00
no
set
set
set
set
set
set
ls
no
set
set
set
set
set
set
set
no
set
set
set
set
set
set
set
no
set
set
set
Door Hinges
Door stop
Flush bolt
2.00
1.00
1.00
set
set
set
5.8
IRONMONGERY
5.9
SANITARY FIXTURES
Supply and install the following sanitary wares and
faucets
including
all associated
and accessories;
Complete
Toilet Toto
CW 824 PJfittings
complete
as
Jetspecified
spray Toto THX 20 MCRB
Paper holder Toto "Curio" TX 703 AC
Floor drain Toto TX 1 BV1
Head shower Toto TX 488S
Diverter for shower Toto TX 484 SE
Semi Recessed Lavatory Toto LW 641 J complete w/
Lavatory Faucet TX 119 LEC, stop valve and waste
fitting
Enameled cast iron bathtub w/ anti slip Toto FBY 1710
CPE / 9008L
Bath filler & mixer Toto TX 467 SEC
1
2
3
4
5
6
7
2.00
2.00
2.00
2.00
2.00
2.00
2.00
no
no
no
no
no
no
no
2.00
no
2.00
no
2.00
no
2
3
2.00
2.00
no
no
Bale 'Gazebo'
1.00
no
8
9
5.9
SANITARY FIXTURES
5,10.
ACCESSORIES
MIRRORS
6mm thick mirror, including 12mm thick plywood
backing, wood frame, mastic adhesive, sealant,
accessories etc.; as specifed and shown drawing
1950 wide x 1200mm high mirror to Lavatory
BENCH
Timber and Blockboard with teakonsit laminate and
finishes with 3 coated Ultran Politur with accesoris and
5,10.
ACCESSORIES
5,11.
SWIMMING POOL
SUBSTRUCTURE
Preliminary
Bouwplank
28.00
m1
2
3
Excavation
Excavation for Plunge pool and pump room
Remove surplus ex excavation
61.48
1.00
m3
ls
Termite prevention
Termiban or equal approved termite protection applied
to
buildingworks
platform and surfaces of excavation
Masonsry
1.00
ls
5
6
7
Hollow block 1 : 5
25 mm thick rendered plaster (1:5)
Smooth finish to walls
CONCRETE WORKS
49.20
49.20
49.20
m3
m2
m2
Lean concrete
50 mm thick concrete under slab Plunge pool and pump
room
1.68
m3
5.03
7.38
1.01
m3
m3
m3
48.00
m2
1
2
24.00
28.00
m2
m2
3
4
20.00
12.00
m1
m1
1.00
no
METAL WORKS
Fabricate, deliver to site including cutting, welding,
1
2
3
4
5
6
7
1.00
1.00
1.00
1.00
1.00
6.00
1.00
no
no
no
no
no
no
no
1.00
no
9
10
11
12
13
1.00
1.00
1.00
1.00
1.00
no
no
no
no
no
14
15
16
17
5,11.
5.0.
VILLA TYPE C
5.1 SUBSTRUCTURE
5.2 CONCRETE WORKS
5.3 WOOD WORKS
5.4 MASONRY
5.5 ROOF
5.6 FINISHES
5.7 DOORS AND WINDOW
5.8 IRONMONGERY
5.9 SANITARY FIXTURES
5,10. ACCESSORIES
5,11. SWIMMING POOL
5.0.
VILLA TYPE C
1.00
1.00
1.00
1.00
no
no
no
no
Rate
(Rp)
Amount
(Rp)
R & E VILLA
BILL OF QUANTITY
JL. DEWI SRI KUTA - BALI
Ref
Description
Quantity
GENERALLY
LOBBY / OFFICE
6.1
1
SUBSTRUCTURE
Preliminary
Bouwplank
42.00
m1
2
3
Excavation
Excavation for foundation
Backfilling with excavated material to build up platform
51.30
20.52
m3
m3
59.40
m3
4
5
1.00
ls
6.16
m3
Termite prevention
Termiban or equal approved termite protection applied
to building platform and surfaces of excavation
1.00
ls
8
9
Masonsry works
300mm thick Loose foundation under rock stone
foundation
Rock Stone Foundation (1 pc : 5 sand)
6.1
SUBSTRUCTURE
6.2
CONCRETE WORKS
Lean concrete
50 mm thick concrete under Floor Slab
17.10
53.87
m3
m3
3.30
m3
2.48
m3
3
4
5
6
Concrete
Concrete
Concrete
Concrete
Column CP (130/130)
Beam (150/250)
Plat Wall Lotus Pond 100mm thick
base bathtub, washtafel & kithen zink
6.2
CONCRETE WORKS
6.3
WOOD WORKS
1.40
2.03
2.52
0.07
m3
m3
m3
m3
34.00
25.00
20.00
28.00
5.50
131.00
131.00
42.40
42.40
131.00
m1
m1
m1
m1
m1
m1
m2
m2
m1
m1
m2
1
2
3
4
2
3
4
5
6
7
8
6.3
WOOD WORKS
6.4
MASONRY
Red brick / Hollow block masonry, laid in stretcher bond
with 1:5 cement mortar including lintel beams and
control joints.
Masonry with red brick 100 mm wide
111.00
m2
3
4
222.00
222.00
m2
m2
131.00
25.00
m2
m1
6.4
MASONRY
6.5
ROOF
Roof covering with Roof Tile including installation,
1
2
3
6.5
m2
6.6
FINISHES
Wall finishes
Prepare and apply two finishing coats Dulux emulsion
paint to
1
2
111.00
111.00
m2
m2
54.58
m2
m2
22.40
4.32
2.88
m2
m2
m2
35.70
9.00
16.50
m2
m2
m2
8.10
m2
m2
m2
Expose Coulomn
Floor Bale
Natural stone 20mm thk size random "Candi Black
Stone" including mortar, adhesive and grout as
specified to
5
6
7
8
9
10
Lotus Pond
Garden
Steping 30 mm
Floor finishes
600 x 600 mm Granito including mortar, adhesive and
grout as specified to
Floor Lobby
Floor Bathroom
Floor Office
11
12
13
15.76
14
15
1.00
1.00
ls
ls
Timber Finishes
Prepare and apply Ultran Politur finishes or equal to
16
6.6
FINISHES
6.7
131.00
m2
2.00
no
4.00
no
3
4
6.7
1.00
2.00
no
no
6.8
IRONMONGERY
Supply and install the following ironmongery including
all accessories; Ex MULLER / DECKSON / SOLID or as
approve architect
Single swing door
Pull handle
Escutcheon
Lockcase pelor
Double Cylinder
Door Hinges
Door stop
Flush bolt
10mm thk tempered door
Glass door handle
Shower hinge
Glasses Window
Pull handle
Lockcase pelor
Window Hinges
Window Hook
6.8
IRONMONGERY
6.9
SANITARY FIXTURES
Supply and install the following sanitary wares and
faucets
including
all associated
and accessories;
Complete
Toilet Toto
CW 824 PJfittings
complete
as
specified
Jet spray Toto THX 20 MCRB
Paper holder Toto "Curio" TX 703 AC
Floor drain Toto TX 1 BV1
Semi Recessed Lavatory Toto LW 641 J complete w/
Lavatory Faucet TX 119 LEC, stop valve and waste
fitting
Urinouir complete
Seamersible Pump for Lotus Pond
1
2
3
4
5
6
6
6.9
SANITARY FIXTURES
6,10.
ACCESSORIES
MIRRORS
6mm thick mirror, including 12mm thick plywood
backing, wood frame, mastic adhesive, sealant,
accessories etc.; as specifed and shown drawing
1500 wide x 1200mm high mirror to Lavatory
4.00
4.00
8.00
8.00
no
set
set
set
set
set
set
set
no
set
set
set
set
set
set
set
2.00
2.00
2.00
2.00
2.00
no
no
no
no
no
3.00
2.00
no
no
1.00
no
1.00
no
2.00
2.00
2.00
2.00
3.00
2.00
2.00
2.00
2.00
BENCH
Timber and Blockboard with teakonsit laminate and
finishes with 3 coated Ultran Politur with accesoris and
2
3
4
1.00
1.00
no
no
4
5
6,10.
6.0.
LOBBY / OFFICE
6.1 SUBSTRUCTURE
6.2 CONCRETE WORKS
6.3 WOOD WORKS
6.4 MASONRY
6.5 ROOF
6.6 FINISHES
6.7 DOORS AND WINDOW
6.8 IRONMONGERY
6.9 SANITARY FIXTURES
6,10. ACCESSORIES
6.0.
LOBBY / OFFICE
1.00
1.00
no
no
Rate
(Rp)
Amount
(Rp)
R & E VILLA
BILL OF QUANTITY
JL. DEWI SRI KUTA - BALI
Ref
Description
Rate
(Rp)
Quantity
GENERALLY
The following Bills of Quantities are a guide only. It is
the responsibility of the Tenderer to measure and
satisfy themselves as to the accuracy of all quantities
for works requiring payment. The descriptions provided
herein are for a guide only as to
7.0.
COMMON AREA
7,1.
CARPORT / STEPPING
1
2
4
5
Excavation
Excavation for leveling
Remove surplus ex excavation
Compacted sand bed
50 mm thick compacted sand layer under foundation
and slab
Finishes
Concrete block Paving including setting bed and grout
Carport
Steping
7,1.
CARPORT / STEPPING
7,2.
BOUNDARY WALL
Excavation
Excavation for foundation
Backfilling with excavated material to build up platform
Relocation material ex excavation to filling land
including compaction
1
2
3
5
6
1.00
1.00
ls
ls
2.86
m3
45.00
12.20
m2
m2
99.58
16.60
1.00
m3
m3
ls
6.22
m3
37.34
68.46
m3
m3
7
8
9
5.19
1.22
5.19
m3
m3
m3
10
Wall works
Batako wall masonry
276.60
m2
11
553.20
m2
12
553.20
m2
7,2.
BOUNDARY WALL
carried to collection
Collection
7.0.
COMMON AREA
7,1.
CARPORT / STEPPING
7,2.
BOUNDARY WALL
7.0.
COMMON AREA
Amount
(Rp)
MEP WORKS
PROJECT :
R & E VILLA
OWNER :
RACHMAD
EDDY LOEKITO
LOCATION :
QUANTITY SURVEYOR :
head office :
Jl. Merpati no. 15 Tuban - Kuta
Telp : +62 361 - 765310
Fax : +62 361 - 765310
R & E VILLA
BILL OF QUANTITIES MEP WORKS
Bidder name
:
Date of Tender :
NO
DESCRIPTION
Quantity
MEP WORKS
SUMMARY
1.0.
2.0.
VILLA A
2.00
unit
3.0.
VILLA B
2.00
unit
4.0.
VILLA C
2.00
unit
Amount (Rp.)
in this BOQ,
R & E VILLA
BILL OF QUANTITY - MEP
PECATU - BALI
Ref.
1.0
1.1.
1.A
1
2
3
4
5
6
7
Description
Qty
1.00
1.00
6.00
12.00
4.00
1.00
2.00
ls
Unit
Point
Point
Point
Point
Point
6.00
6.00
6.00
2.00
Nos
Nos
Nos
Nos
4.00
6.00
1.00
1.00
4.00
Nos
Nos
Nos
Nos
Nos
1.00
1.00
1.00
1.00
1.00
1.00
Nos
Nos
Nos
Nos
Nos
Nos
1.C
1
2
3
4
5
1.1.
ELECTRICAL WORKS
1.2
1
2
3
4
5
6
TELEPHONE WORK
Instalation Telepon ITC 2X2X0.6 mm+HIC
Telephone Handset PABX
RJ 11, Telephone Socket outlet
Instalation Internet WiFi Hotspot
Instalation MATV Coaxial 75 ohm 5C
TV Socket outlet
1.2
TELEPHONE WORK
1.3.
3.B
1
PLUMBING WORK
Water plumbing
PVC AW dia. 6" Main Line
80.00
Mtr'
2
3
4
5
6
7
8
9
10
11
12
13
1.3.
PLUMBING WORK
1.4
1
2
1.4
1.0
INFRASTRUCTUR
1.1.
ELECTRICAL WORKS
1.2
TELEPHONE WORK
1.3.
PLUMBING WORK
1.4
1.0
INFRASTRUCTUR
10.00
15.00
10.00
10.00
10.00
10.00
2.00
1.00
1.00
1.00
1.00
1.00
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
Nos
Nos
Nos
Nos
Lot
Lot
1.00
1.00
Unit
lots
Amount (Rp.)
R & E VILLA
BILL OF QUANTITY - MEP
PECATU - BALI
Ref.
Description
Qty
1.00
1.00
18.00
21.00
10.00
2.00
ls
Unit
Point
Point
Point
Point
13.00
15.00
2.00
8.00
10.00
Nos
Nos
Nos
Nos
Nos
1.C
1
2
3
Nos
Nos
Nos
TELEPHONE WORK
Instalation Telepon ITC 2X2X0.6 mm+HIC
Telephone Handset
RJ 11, Telephone Socket outlet
Instalation MATV Coaxial 75 ohm 5C
TV Socket outlet
2.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Nos
1
2
3
30.00
25.00
25.00
Mtr'
Mtr'
Mtr'
4
5
6
7
8
9
10.00
1.00
1.00
2.00
1.00
1.00
Mtr'
Nos
Nos
Lot
Lot
Lot
45.00
55.00
25.00
2.00
1.00
1.00
1.00
Mtr'
Mtr'
Mtr'
Nos
Nos
Lot
Lot
2.00
2.00
Unit
lots
TELEPHONE WORK
2.0. VILLA A
Amount (Rp.)
R & E VILLA
BILL OF QUANTITY - MEP
PECATU - BALI
Ref.
Description
Qty
1.00
1.00
18.00
21.00
10.00
2.00
ls
Unit
Point
Point
Point
Point
13.00
15.00
2.00
8.00
10.00
Nos
Nos
Nos
Nos
Nos
1.C
1
2
3
Nos
Nos
Nos
TELEPHONE WORK
Instalation Telepon ITC 2X2X0.6 mm+HIC
Telephone Handset
RJ 11, Telephone Socket outlet
Instalation MATV Coaxial 75 ohm 5C
TV Socket outlet
2.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Nos
1
2
3
30.00
25.00
25.00
Mtr'
Mtr'
Mtr'
4
5
6
7
8
9
10.00
1.00
1.00
2.00
1.00
1.00
Mtr'
Nos
Nos
Lot
Lot
Lot
45.00
55.00
25.00
2.00
1.00
1.00
1.00
Mtr'
Mtr'
Mtr'
Nos
Nos
Lot
Lot
2.00
2.00
Unit
lots
TELEPHONE WORK
3.0. VILLA B
Amount (Rp.)
R & E VILLA
BILL OF QUANTITY - MEP
PECATU - BALI
Ref.
Description
Qty
1.00
1.00
18.00
21.00
10.00
2.00
ls
Unit
Point
Point
Point
Point
13.00
15.00
2.00
8.00
10.00
Nos
Nos
Nos
Nos
Nos
1.C
1
2
3
Nos
Nos
Nos
TELEPHONE WORK
Instalation Telepon ITC 2X2X0.6 mm+HIC
Telephone Handset
RJ 11, Telephone Socket outlet
Instalation MATV Coaxial 75 ohm 5C
TV Socket outlet
2.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Nos
1
2
3
30.00
25.00
25.00
Mtr'
Mtr'
Mtr'
4
5
6
7
8
9
10.00
1.00
1.00
2.00
1.00
1.00
Mtr'
Nos
Nos
Lot
Lot
Lot
45.00
55.00
25.00
2.00
1.00
1.00
1.00
Mtr'
Mtr'
Mtr'
Nos
Nos
Lot
Lot
2.00
2.00
Unit
lots
TELEPHONE WORK
4.0. VILLA C
Amount (Rp.)