ITP All
ITP All
ITP All
Test Type
Product Type
SN
Component
Applicable Standard
(Procedure)
Frequency
1. RAW MATERIAL
1.1
Reactivity
(QC-1)
Each lot
Viscosity
(QC-2)
Each lot
Visual
N/A
Each lot
Textural
(QC-10)
Each lot
1.5
Moisture Content
(QC-5)
Each lot
1.6
Sieve Analysis
(QC-3)
Each lot
Moisture Content
(QC-4)
Each lot
Resin
1.2
1.3
On Receipt
Raw Material
1.4
Glass Reinforcement
Silica Sand
1.7
Resin
Gel Time
(QC-1)
Each Production
2.2
Wall Thickness
2.3
Pipe Laminate
Laminate Thickness
ASTM D3567
Each production
2.4
Spigot Dimensions
Each Pipe
2.5
Pipe Visual
100%
2.6
Pipe Dimensions
Dimensions Control
2.7
Barcol Hardness
Resin Curing
100%
2.8
Impact Test
Impact Resistance
BS 5480 (QC-24)
1 in 30 Pipes or in a Shift
2.9
Hydrostatic Pressure
Pressure Test
BS 5480 (QC-13)
2. 10 Material Composition
Loss on Ignition
1 in 30 Pipes or in a Shift
2.11
Hoop Flexural
Stiffness
1 in 30 Pipes or in a Shift
2.12
Hoop Tensile
1 in 30 Pipes or in a Shift
2.13
Axial Strength
1 in 30 Pipes or in a Shift
2.14
Stenciling
Marking
QP-5
100%
2.15
Visual
Visual
100%
In-Process
Pipe & Coupling Pipe
NonDestructive
Pipe
Pipe
Final Product
3. FITTINGS
PreFabrication
Pipe
3.1
Visual
Visual
100%
3.2
Length
Dimensional
100%
3.3
Dimensional
100%
Dimensional
100%
3.5
Resin Curing
100%
3.6
Stenciling
Marking
100%
3.7
Final Dimensional
Dimensional
100%
3.4
Final Product
Fitting
3. MANHOLE LINERS
In-Process
Manhole Liner Pipe
NonDestructive
Destructive
Cover Slab
In-Process
Lamination
Final Product
Manhole Liner
4.1
Resin
Gel Time
(QC-1)
Each production
4.2
Wall Thickness
4.3
Pipe Laminate
Laminate Thickness
ASTM D3567
Each production
4.4
Inside Diameter
Dimensional
Each Production
4.5
Pipe Visual
100%
4.6
Length
Dimensional
4.7
Barcol Hardness
Resin Curing
100%
4.8
Material Composition
Loss on Ignition
1 in 30 Pipes or in a Shift
4.9
Visual
4.10
Dimensions
4.11
Barcol Hardness
4.12
4.13
4.14
Visual
4.15
Barcol Hardness
4.16
Length
Resin Curing
Resin Curing
Visual
100%
Dimensional
100%
100%
Bond Length
100%
Visual
100%
4.17 Stenciling
Marking
Note: QC-1 to 17 and QP-5 are internal work instructions documented in the Quality System Manual
311396406.xls
100%
Thickness
100%
100%
100%
1 of 2