Material Log Status
Material Log Status
Material Log Status
SUBMITTAL
SUBMISSION DATE
REFERENCE
DESCRIPTION
ACTUAL
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
DATE OF
ACTUAL
CODE
INSTALLATION
REMARKS
NO.
PLAN
RCG-DDTKI-SRF-ST-001
24-Jul-15
N/A
N/A
N/A
N/A
Design Mix
11-Sep-15
Approved
RCG-DDTKI-SRF-ST-002
6-Aug-15
N/A
N/A
N/A
N/A
Design Mix
11-Sep-15
Approved
RCG-DDTKI-SRF-ST-003
11-Aug-15
N/A
N/A
N/A
N/A
Design Mix
11-Sep-15
Approved
RCG-DDTKI-SRF-ST-004
20-Aug-15
24-Aug-15
N/A
N/A
N/A
7-Oct-15
Approved
RCG-DDTKI-SRF-ST-005
20-Aug-15
Construction Requirement
N/A
N/A
N/A
7-Oct-15
Approved
RCG-DDTKI-SRF-ST-006
26-Aug-15
N/A
N/A
N/A
7-Oct-15
Approved
RCG-DDTKI-SRF-ST-007
26-Aug-15
N/A
N/A
N/A
7-Oct-15
Approved
RCG-DDTKI-SRF-ST-008
26-Aug-15
N/A
N/A
N/A
7-Oct-15
Approved
RCG-DDTKI-SRF-ST-009
26-Aug-15
N/A
N/A
N/A
7-Oct-15
Approved
10
RCG-DDTKI-SRF-ST-010
26-Aug-15
N/A
N/A
N/A
7-Oct-15
11
RCG-DDTKI-SRF-ST-011
26-Aug-15
N/A
N/A
N/A
N/A
Design Mix
7-Oct-15
12
RCG-DDTKI-SRF-ST-012
4-Sep-15
4-Sep-15
13
RCG-DDTKI-SRF-ST-013
7-Sep-15
14
RCG-DDTKI-SRF-ST-014
7-Sep-15
15
RCG-DDTKI-SRF-ST-015
10-Sep-15
Page 1 of 24
PLAN
ACTION
NO.
SPECS.
SHOP
DRAWINGS
N/A
N/A
N/A
N/A
7-Oct-15
N/A
N/A
N/A
N/A
Design Mix
7-Oct-15
Approved
N/A
N/A
N/A
N/A
7-Oct-15
N/A
N/A
N/A
7-Oct-15
ITEM
SUBMITTAL
SUBMISSION DATE
REFERENCE
DESCRIPTION
NO.
NO.
PLAN
ACTUAL
SPECS.
16
RCG-DDTKI-SRF-ST-016
14-Sep-15
14-Sep-15 Cutting list C1 GL A5-4 & E5-4, C2 GLA5-4 & E3-5, C3 BCD4-5
17
RCG-DDTKI-SRF-ST-017
16-Sep-15
18
RCG-DDTKI-SRF-ST-018
17-Sep-15
19
RCG-DDTKI-SRF-ST-019
20
RCG-DDTKI-SRF-ST-020
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
PLAN
ACTION
DATE OF
ACTUAL
CODE
INSTALLATION
REMARKS
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Company Profile
7-Oct-15
Approved
Construction Requirement
N/A
N/A
N/A
N/A
Company Profile
7-Oct-15
17-Sep-15
26-Oct-15
N/A
N/A
N/A
N/A
Design Mix
12-Nov-15
15-Sep-15
21-Oct-15
N/A
N/A
N/A
N/A
Design Mix
7-Nov-15
Approve as noted
N/A
N/A
N/A
N/A
3-Nov-15
N/A
N/A
N/A
N/A
MF1 Construction
Methodology
shop drawing
16-Oct-15
N/A
N/A
N/A
Construction
Joint
Methodology
Shop Drawing
29-Oct-15
Approve as noted
N/A
N/A
N/A
Varied Concrete
Streght
Methodology
3-Nov-15
6-Nov-15
6-Nov-15
N/A
N/A
N/A
Varied Concrete
Streght
Methodology
3-Dec-15
28-Sep-15
30-Sep-15
21
RCG-DDTKI-SRF-ST-021
28-Sep-15
22
RCG-DDTKI-SRF-ST-022
29-Sep-15
23
RCG-DDTKI-SRF-ST-023
29-Sep-15
24
RCG-DDTKI-SRF-ST-024
29-Sep-15
24A
RCG-DDTKI-SRF-ST-024A
25
RCG-DDTKI-SRF-ST-025
1-Oct-15
26
RCG-DDTKI-SRF-ST-026
30-Sep-15
N/A
N/A
N/A
N/A
16-Oct-15
26a
RCG-DDTKI-SRF-ST-026a
22-Jan-16
22-Jan-16
N/A
N/A
N/A
N/A
27-Feb-16
27
RCG-DDTKI-SRF-ST-027
1-Oct-15
1-Oct-15
N/A
N/A
N/A
N/A
28
RCG-DDTKI-SRF-ST-028
13-Oct-15
13-Oct-15
N/A
N/A
N/A
N/A
28-Oct-15
29
RCG-DDTKI-SRF-ST-029
13-Oct-15
13-Oct-15
N/A
N/A
N/A
Company Profile
3-Nov-15
30
RCG-DDTKI-SRF-ST-030
13-Oct-15
13-Oct-15
N/A
N/A
N/A
N/A
3-Nov-15
Approved
31
RCG-DDTKI-SRF-ST-031
15-Oct-15
15-Oct-15
N/A
N/A
N/A
N/A
3-Nov-15
32
RCG-DDTKI-SRF-ST-032
14-Oct-15
14-Oct-15
N/A
N/A
N/A
N/A
7-Nov-15
See comments
33
RCG-DDTKI-SRF-ST-033
14-Oct-15
15-Oct-15
Column Cutting List C2 GLA/5, C11 GLB/5, C9 GL C/5 & D/5, C8 GL E/5
N/A
N/A
N/A
N/A
7-Nov-15
Approved as noted
34
RCG-DDTKI-SRF-ST-034
14-Oct-15
14-Oct-15
N/A
N/A
N/A
N/A
11/315
Approved
Page 2 of 24
ITEM
NO.
SUBMITTAL
NO.
SUBMISSION DATE
PLAN
REFERENCE
DESCRIPTION
ACTUAL
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
PLAN
ACTUAL
ACTION
DATE OF
CODE
INSTALLATION
REMARKS
35
RCG-DDTKI-SRF-ST-035
20-Oct-15
20-Oct-15
N/A
N/A
N/A
N/A
07-Nov-15
36
RCG-DDTKI-SRF-ST-036
20-Oct-15
20-Oct-15
N/A
N/A
N/A
N/A
07-Nov-15
37
RCG-DDTKI-SRF-ST-037
21-Oct-15
22-Oct-15
N/A
N/A
N/A
N/A
07-Nov-15
38
RCG-DDTKI-SRF-ST-038
22-Oct-15
23-Oct-15
39
RCG-DDTKI-SRF-ST-039
23-Oct-15
23-Oct-15
40
RCG-DDTKI-SRF-ST-040
23-Oct-15
23-Oct-15
41
RCG-DDTKI-SRF-ST-041
26-Oct-15
26-Oct-15
42
RCG-DDTKI-SRF-ST-042
28-Oct-15
29-Oct-15
43
RCG-DDTKI-SRF-ST-043
28-Oct-15
29-Oct-15
N/A
N/A
N/A
N/A
25-Nov-15
N/A
N/A
N/A
Company Profile
12-Nov-15
N/A
N/A
N/A
N/A
12-Nov-15
N/A
N/A
N/A
N/A
25-Nov-15
N/A
N/A
N/A
12-Nov-15
N/A
N/A
N/A
N/A
23-Nov-15
44
RCG-DDTKI-SRF-ST-044
29-Oct-15
29-Oct-15
N/A
N/A
N/A
N/A
25-Nov-15
45
RCG-DDTKI-SRF-ST-045
30-Oct-15
2-Nov-15
N/A
N/A
N/A
N/A
5-Dec-15
46
RCG-DDTKI-SRF-ST-046
2-Nov-15
2-Nov-15
N/A
N/A
N/A
N/A
25-Nov-15
47
RCG-DDTKI-SRF-ST-047
3-Nov-15
3-Nov-15
N/A
N/A
N/A
N/A
23-Nov-15
48
RCG-DDTKI-SRF-ST-048
4-Nov-15
5-Nov-15
N/A
N/A
N/A
N/A
3-Dec-15
49
RCG-DDTKI-SRF-ST-049
5-Nov-15
5-Nov-15
N/A
N/A
N/A
N/A
3-Dec-15
50
RCG-DDTKI-SRF-ST-050
5-Nov-15
N/A
N/A
N/A
N/A
3-Dec-15
51
RCG-DDTKI-SRF-ST-051
10-Nov-15
3-Dec-15
N/A
N/A
N/A
N/A
3-Dec-15
approved
52
RCG-DDTKI-SRF-ST-052
10-Nov-15
N/A
N/A
N/A
N/A
3-Dec-15
Page 3 of 24
ITEM
SUBMITTAL
SUBMISSION DATE
REFERENCE
DESCRIPTION
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
DATE OF
ACTUAL
CODE
INSTALLATION
REMARKS
NO.
NO.
PLAN
ACTUAL
53
RCG-DDTKI-SRF-ST-053
10-Nov-15
10-Nov-15
N/A
N/A
N/A
N/A
22-Dec-15
54
RCG-DDTKI-SRF-ST-054
11-Nov-15
11-Nov-15
N/A
N/A
N/A
N/A
3-Dec-15
55
RCG-DDTKI-SRF-ST-055
11-Nov-15
12-Nov-15
Termination detail Bet. Beta & Gamma (Slab on grade & retaining wall )
DDTKI-RCG-2015-SD-ST-004-00
N/A
N/A
N/A
N/A
5-Dec-15
56
RCG-DDTKI-SRF-ST-056
12-Nov-15
Cutting list: C3-GL:E/5, C11-GL:B5, C9-GL:C&D5 , C2-GL:A/5 (DDTKI12-Nov-15 RCG-SD-ST-2015-13 Resubmit-A) resubmit due to change in elevation
and splice connection proposal
N/A
N/A
N/A
N/A
10-Dec-15
57
RCG-DDTKI-SRF-ST-057
12-Nov-15
13-Nov-15
N/A
N/A
N/A
N/A
22-Dec-15
Cutting list Shearwall SW6 & SW7( DDTKI-RCG-2015-SD-CL-ST-13Resubmit)- B- due to splice connection proposal
PLAN
ACTION
N/A
N/A
N/A
N/A
27-Feb-16
N/A
N/A
N/A
N/A
22-Dec-15
approved
N/A
N/A
N/A
N/A
10-Dec-15
approved
N/A
N/A
N/A
N/A
21-Jan-16
20-Nov-15
N/A
N/A
N/A
N/A
22-Nov-15
RCG-DDTKI-SRF-ST-062
20-Nov-15
23-Nov-15
N/A
N/A
N/A
N/A
22-Dec-15
63
RCG-DDTKI-SRF-ST-063
21-Nov-15
N/A
N/A
N/A
Company Profile
22-Dec-15
approved
64
RCG-DDTKI-SRF-ST-064
23-Nov-15
23-Nov-15
N/A
N/A
N/A
N/A
22-Dec-15
65
RCG-DDTKI-SRF-ST-065
23-Nov-15
N/A
N/A
N/A
N/A
22-Dec-15
66
RCG-DDTKI-SRF-ST-066
24-Nov-15
24-Nov-15
N/A
N/A
N/A
N/A
67
RCG-DDTKI-SRF-ST-067
25-Nov-15
N/A
N/A
N/A
N/A
21-Jan-16
68
RCG-DDTKI-SRF-ST-068
28-Nov-15
1-Dec-15
N/A
N/A
N/A
N/A
21-Jan-16
21-Jan-16
57A
RCG-DDTKI-SRF-ST-057A
10-Feb-16
58
RCG-DDTKI-SRF-ST-058
14-Nov-15
59
RCG-DDTKI-SRF-ST-059
14-Nov-15
60
RCG-DDTKI-SRF-ST-060
16-Nov-15
16-Nov-15
61
RCG-DDTKI-SRF-ST-061
62
Cutting list- Column C2- GL: A/5, C11-GL:B/5, C9-GL: C5 & D/5, C3-GL:
E/5 (DDTKI-RCG-2015-CL-ST-22) Upper B4- Upper B2
Cutting list- Column C1- GL: A/1', C8-GL: B1,C8-GL B1, C8-GL: C/1'
(DDTKI-RCG-2015-CL-ST-19) Resubmit due to splice proposal
69
RCG-DDTKI-SRF-ST-069
28-Nov-15
1-Dec-15
70
RCG-DDTKI-SRF-ST-070
1-Dec-15
1-Dec-15
71
RCG-DDTKI-SRF-ST-071
1-Dec-15
72
RCG-DDTKI-SRF-ST-072
73
74
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Company Profile
1-Dec-15
N/A
N/A
N/A
Company Profile
22-Dec-15
Approved
1-Dec-15
1-Dec-15
Universal Steel Smelting Co., Inc. Rebar test Result 12,16, 25,
28, 32, 36
N/A
N/A
N/A
N/A
22-Dec-15
approved
RCG-DDTKI-SRF-ST-073
2-Dec-15
2-Dec-15
N/A
N/A
N/A
N/A
5-Jan-16
RCG-DDTKI-SRF-ST-074
5-Dec-15
7-Dec-15
Cutting list- Column-C4GL: A/4, C-7 GL: E/4 (DDTKI-RCG-2015-CL-ST027) Basement 4-1
N/A
N/A
N/A
N/A
5-Jan-16
Cutting list- Column C5- gl: E/3, C5-gl:e/2, C6-gl:A/3, C4-gl: A/2 (DDTKIRCG-2015-CL-ST-28) Basement 4-1
75
RCG-DDTKI-SRF-ST-075
9-Nov-15
11-Dec-15
76
RCG-DDTKI-SRF-ST-076
10-Dec-15
Summit sigma (RMC) trial mix result 7 days, 14 days and 28 days, 3000
10-Dec-15 Psi G1, 5000 Psi 3/4 &3/8, 6000 Psi 3/4 & 3/8, 7000 Psi 3/4 and 3/8, 8500
Psi 3/4 and 3/8
Page 4 of 24
N/A
N/A
N/A
N/A
5-Jan-16
N/A
N/A
N/A
N/A
21-Jan-16
ITEM
NO.
SUBMITTAL
NO.
SUBMISSION DATE
PLAN
REFERENCE
DESCRIPTION
ACTUAL
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
PLAN
ACTUAL
ACTION
DATE OF
CODE
INSTALLATION
REMARKS
77
RCG-DDTKI-SRF-ST-077
11-Dec-15
N/A
N/A
N/A
N/A
5-Jan-16
78
RCG-DDTKI-SRF-ST-078
15-Dec-15
N/A
N/A
N/A
N/A
21-Jan-16
N/A
N/A
N/A
N/A
27-Jan-16
5-Jan-16
N/A
N/A
N/A
N/A
21-Jan-16
4-Jan-15
5-Jan-16
N/A
N/A
N/A
N/A
5-Jan-16
5-Jan-16
N/A
N/A
N/A
N/A
12-Jan-16
30-Jan-16
Cutting list - Cutting list Beams and girder basement 3 (DDTKI-RCG2015-CL-ST-31)- Resubmit
N/A
N/A
N/A
N/A
5-Jan-16
5-Jan-16
N/A
N/A
N/A
N/A
12-Feb-16
RCG-DDTKI-SRF-ST-084
6-Jan-16
6-Jan-16
Universal Steel Smelting Co., Inc. (Rebar Test Result) 16, 28, 32
N/A
N/A
N/A
N/A
27-Jan-16
approved
RCG-DDTKI-SRF-ST-085
6-Jan-16
6-Jan-16
Pagasa Steel (Rebar Test Result) 10, 12, 16, 20, 25, 32
N/A
N/A
N/A
N/A
27-Jan-16
approved
RCG-DDTKI-SRF-ST-086
6-Jan-16
6-Jan-16
N/A
N/A
N/A
N/A
27-Jan-16
79
RCG-DDTKI-SRF-ST-079
17-Dec-15
18-Dec-15
80
RCG-DDTKI-SRF-ST-080
4-Jan-15
81
RCG-DDTKI-SRF-ST-081
82
RCG-DDTKI-SRF-ST-082
82a
RCG-DDTKI-SRF-ST-082a
83
RCG-DDTKI-SRF-ST-083
84
85
86
N/A
N/A
N/A
N/A
27-Jan-16
N/A
N/A
N/A
Company Profile
12-Feb-16
approved
8-Jan-16
Azenda Corporation- wire mesh for construction joint- Hi Rib 1/2x3/8 #26
N/A
N/A
N/A
Company Profile
27-Feb-16
9-Jan-16
11-Jan-16
CMI Concrete Compressive Test Result 7days, 14 days and 28 days 5000
Psi PCD, 5000 Psi 3/4
N/A
N/A
N/A
N/A
12-Feb-16
18-Jan-16
18-Jan-16
N/A
N/A
N/A
N/A
27-Feb-16
87
RCG-DDTKI-SRF-ST-087
6-Jan-16
6-Jan-16
88
RCG-DDTKI-SRF-ST-088
7-Jan-16
7-Jan-16
89
RCG-DDTKI-SRF-ST-089
8-Jan-16
90
RCG-DDTKI-SRF-ST-090
91
RCG-DDTKI-SRF-ST-091
92
RCG-DDTKI-SRF-ST-092
12-Jan-16
14-Jan-16
93
RCG-DDTKI-SRF-ST-093
13-Jan-16
13-Jan-16
Methodology
N/A
N/A
N/A
N/A
17-Feb-16
N/A
N/A
N/A
N/A
27-Feb-16
Approved
N/A
N/A
N/A
N/A
12-Feb-16
N/A
N/A
N/A
Company Profile
27-Feb-16
27-Feb-16
94
RCG-DDTKI-SRF-ST-094
14-Jan-16
14-Jan-16
Cutting list- Column C4-GL: A/4, C-7 GL: E/4 (DDTKI-RCG-2015-CL/ST35) Basement 2 to 2nd floor
95
RCG-DDTKI-SRF-ST-095
19-Jan-16
19-Jan-16
96
RCG-DDTKI-SRF-ST-096
20-Jan-16
20-Jan-16
N/A
N/A
N/A
N/A
23-Jan-16
Proposed Cutting list of Translab 9th floor to 37th floor and Proposed
Fabrication drawing of Translab 9th floor, CG9-01 to CG9-54 (1/23/16)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
27-Feb-16
N/A
N/A
N/A
N/A
27-Feb-16
N/A
N/A
N/A
N/A
5-Feb-16
97
RCG-DDTKI-SRF-ST-097
23-Jan-16
98
RCG-DDTKI-SRF-ST-098
25-Jan-16
99
RCG-DDTKI-SRF-ST-099
27-Jan-16
100
RCG-DDTKI-SRF-ST-100
2-Feb-16
101
RCG-DDTKI-SRF-ST-101
4-Feb-16
N/A
N/A
N/A
101a
RCG-DDTKI-SRF-ST-101a
5-Feb-16
N/A
N/A
N/A
Page 5 of 24
ITEM
SUBMITTAL
SUBMISSION DATE
PLAN
REFERENCE
DESCRIPTION
ACTUAL
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
NO.
NO.
102
RCG-DDTKI-SRF-ST-102
3-Feb-16
Ground floor body plans mezzanine level body plan vehicle ramp 1 body
plans (2/3/16)]
N/A
N/A
N/A
N/A
103
RCG-DDTKI-SRF-ST-103
5-Feb-16
N/A
N/A
N/A
N/A
103a
RCG-DDTKI-SRF-ST-103a
N/A
N/A
N/A
N/A
104
RCG-DDTKI-SRF-ST-104
6-Feb-16
N/A
N/A
N/A
N/A
Cutting list- shearwall SW-1, SW-2, SW-3, SW-4, SW-5, SW-8 to basement
2 second floor
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Company Profile
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
105
RCG-DDTKI-SRF-ST-105
11-Feb-16
106
RCG-DDTKI-SRF-ST-106
107
RCG-DDTKI-SRF-ST-107
108
RCG-DDTKI-SRF-ST-108
15-Feb-16
109
RCG-DDTKI-SRF-ST-109
109a
RCG-DDTKI-SRF-ST-109a
3-Mar-16
110
RCG-DDTKI-SRF-ST-110
111
RCG-DDTKI-SRF-ST-111
18-Feb-16
112
RCG-DDTKI-SRF-ST-112
N/A
N/A
N/A
N/A
Cutting list Column C10- GL: B/1 & C3-GL: E/1 Basement 2 to 5th floor
19-Feb-16
(2/19/16)
19-Feb-16 Cutting list Column C4-GL: A/4, C-7- GL:E/4 2nd floor to 5th floor
Cutting list- Column C5-GL: E/3; C5-GL: E/2, C6-GL:A/3 (Basement 3 to
24-Feb-16
5th floor); C4-GL:A/2 (Basement 2-5th floor)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
DATE OF
ACTUAL
CODE
INSTALLATION
27-Feb-16
15-Feb-16
4-Mar-16
4-Mar-16
3-Mar-16
REMARKS
Sir Joshua
113
RCG-DDTKI-SRF-ST-113
114
RCG-DDTKI-SRF-ST-114
115
RCG-DDTKI-SRF-ST-115
116
RCG-DDTKI-SRF-ST-116
28-Feb-16
117
118
RCG-DDTKI-SRF-ST-117
RCG-DDTKI-SRF-ST-118
1-Mar-16
3-Mar-16
119
RCG-DDTKI-SRF-ST-119
3-Mar-16
120
121
122
123
124
125
126
RCG-DDTKI-SRF-ST-120
RCG-DDTKI-SRF-ST-121
RCG-DDTKI-SRF-ST-122
RCG-DDTKI-SRF-ST-123
RCG-DDTKI-SRF-ST-124
RCG-DDTKI-SRF-ST-125
RCG-DDTKI-SRF-ST-126
3-Mar-16
3-Mar-16
3-Mar-16
3-Mar-16
3-Mar-16
3-Mar-16
3-Mar-16
Seismic Gap Supplier and Installer- Norfolk International Inc. Note: with
2 pcs of CD
Note:
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
PLAN
ACTION
Page 6 of 24
SUBMITTAL
SUBMISSION DATE
REFERENCE
DESCRIPTION
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
OTHERS
NO.
NO.
PLAN
ACTUAL
RCG-DDTKI-SRF-AR-01
21-Jan-16
21-Jan-16
New touchstone MDSG with sample of Door and windowa frame sample
N/A
N/A
Company Profile
RCG-DDTKI-SRF-AR-02
4-Feb-16
Dalkia Incorporated
Note: with 1 sample of Door and window frame sample
N/A
N/A
Company Profile
2A
RCG-DDTKI-SRF-AR-02A
12-Feb-16
N/A
N/A
Company Profile
RCG-DDTKI-SRF-AR-03
N/A
Company Profile
RCG-DDTKI-SRF-AR-04
3-Mar-16
N/A
N/A
N/A
N/A
Company Profile
RCG-DDTKI-SRF-AR-05
3-Mar-16
Supply and installation of glass and aluminum (morning sun aluminum &
glass Contractor)
N/A
N/A
Company Profile
RCG-DDTKI-SRF-AR-06
3-Mar-16
N/A
N/A
N/A
N/A
Company Profile
Note:
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Page 7 of 24
ACTION
DATE OF
ACTUAL
CODE
INSTALLATION
5-Feb-16
REMARKS
SUBMITTAL
SUBMISSION DATE
PLAN
ACTUAL
REFERENCE
DESCRIPTION
NO.
NO.
RCG-DDTKI-SRF-ME-01
6-Feb-16
RCG-DDTKI-SRF-ME-02
Black Iron Pipe Schedule 80 Note: for fuel pipe line supplier and brand:
22-Feb-16
Regan Industrial Sales Inc. note: with sample
RCG-DDTKI-SRF-ME-03
RCG-DDTKI-SRF-ME-04
RCG-DDTKI-SRF-ME-05
RCG-DDTKI-SRF-ME-06
RCG-DDTKI-SRF-ME-07
RCG-DDTKI-SRF-ME-08
RCG-DDTKI-SRF-ME-09
10
RCG-DDTKI-SRF-ME-10
11
RCG-DDTKI-SRF-ME-11
12
RCG-DDTKI-SRF-ME-12
13
RCG-DDTKI-SRF-ME-13
14
RCG-DDTKI-SRF-ME-14
15
RCG-DDTKI-SRF-ME-15
SPECS.
SHOP
DRAWINGS
Page 8 of 24
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
N/A
N/A
N/A
N/A
N/A
N/A
APPROVAL DATE
OTHERS
PLAN
ACTUAL
ACTION
DATE OF
CODE
INSTALLATION
REMARKS
N/A
N/A
ITEM
SUBMITTAL
NO.
NO.
SUBMISSION DATE
PLAN
ACTUAL
REFERENCE
DESCRIPTION
SPECS.
Note:
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Page 9 of 24
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
PLAN
ACTUAL
ACTION
DATE OF
CODE
INSTALLATION
REMARKS
SUBMITTAL
SUBMISSION DATE
REFERENCE
DESCRIPTION
NO.
NO.
PLAN
ACTUAL
RCG-DDTKI-SRF-EE-01
3-Nov-15
4-Nov-15
1A
RCG-DDTKI-SRF-EE-01A
14-Jan-16
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
9-Nov-15
10-Dec-15
N/A
N/A
N/A
N/A
12-Nov-15
10-Dec-15
See comments on
Drawing
20-Nov-15
5-Dec-15
approved
3-Mar-16
approved as noted
3-Mar-16
approved
9-Nov-15
RCG-DDTKI-SRF-EE-04
12-Nov-15
RCG-DDTKI-SRF-EE-05
16-Nov-15
20-Nov-15
N/A
N/A
N/A
RCG-DDTKI-SRF-EE-06
8-Jan-16
11-Jan-16
N/A
N/A
N/A
N/A
RCG-DDTKI-SRF-EE-07
12-Jan-16
14-Jan-16
N/A
N/A
N/A
18-Jan-16
N/A
N/A
N/A
12
RCG-DDTKI-SRF-EE-12
13
RCG-DDTKI-SRF-EE-13
14
RCG-DDTKI-SRF-EE-14
15
RCG-DDTKI-SRF-EE-15
16
RCG-DDTKI-SRF-EE-16
17
RCG-DDTKI-SRF-EE-17
18
RCG-DDTKI-SRF-EE-18
Page 10 of 24
Revised and
resubmit
25-Nov-15
6-Nov-15
RCG-DDTKI-SRF-EE-11
4-Nov-15
RCG-DDTKI-SRF-EE-03
11
24-Nov-15
N/A
RCG-DDTKI-SRF-EE-10
4-Nov-15
N/A
4-Nov-15
10
CODE
4-Nov-15
RCG-DDTKI-SRF-EE-09
REMARKS
ACTUAL
RCG-DDTKI-SRF-EE-02
INSTALLATION
PLAN
N/A
RCG-DDTKI-SRF-EE-08
DATE OF
ACTION
ITEM
SUBMITTAL
NO.
NO.
19
RCG-DDTKI-SRF-EE-19
20
RCG-DDTKI-SRF-EE-20
SUBMISSION DATE
PLAN
ACTUAL
REFERENCE
DESCRIPTION
SPECS.
Page 11 of 24
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
PLAN
ACTUAL
ACTION
DATE OF
CODE
INSTALLATION
REMARKS
ITEM
NO.
SUBMITTAL
NO.
SUBMISSION DATE
PLAN
REFERENCE
DESCRIPTION
ACTUAL
SPECS.
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Prepared by :
Verified by :
Noted by:
Page 12 of 24
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
PLAN
ACTUAL
ACTION
DATE OF
CODE
INSTALLATION
REMARKS
SUBMITTAL
SUBMISSION DATE
REFERENCE
DESCRIPTION
NO.
NO.
PLAN
ACTUAL
RCG-DDTKI-SRF-FP-01
10-Nov-15
10-Nov-15
RCG-DDTKI-SRF-FP-02
18-Jan-16
18-Jan-16
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
N/A
N/A
N/A
N/A
N/A
N/A
3/7/2016
3/7/2016
N/A
N/A
N/A
RCG-DDTKI-SRF-FP-04
N/A
N/A
N/A
N/A
RCG-DDTKI-SRF-FP-05
N/A
N/A
N/A
RCG-DDTKI-SRF-FP-06
N/A
N/A
N/A
Page 13 of 24
3-Dec-15
N/A
17-Feb-16
Noted by:
INSTALLATION
N/A
RCG-DDTKI-SRF-FP-03
Verified by :
CODE
Prepared by :
ACTUAL
RCG-DDTKI-SRF-FP-02A
DATE OF
N/A
2A
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
PLAN
ACTION
REMARKS
Approved
Disapproved
forllow as per
specs
Disapproved
forllow as per
specs
SUBMITTAL
SUBMISSION DATE
REFERENCE
DESCRIPTION
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST OTHERS
Sample
BROCHURES DATA
APPROVAL DATE
DATE OF
ACTUAL
CODE
INSTALLATION
24-Nov-15
REMARKS
NO.
NO.
PLAN
ACTUAL
RCG-DDTKI-SRF-PL-01
30-Oct-15
2-Nov-15
N/A
N/A
N/A
N/A
1A
RCG-DDTKI-SRF-PL-01A
14-Jan-16
15-Jan-16
N/A
N/A
N/A
N/A
RCG-DDTKI-SRF-PL-02
20-Oct-15
4-Nov-15
N/A
N/A
N/A
N/A
24-Nov-15
RCG-DDTKI-SRF-PL-03
10-Nov-15
10-Nov-15
N/A
N/A
N/A
24-Nov-15
approved
RCG-DDTKI-SRF-PL-04
12-Nov-15
N/A
N/A
N/A
4-Dec-15
Disapproved
RCG-DDTKI-SRF-PL-05
13-Nov-15
13-Nov-15
N/A
N/A
N/A
N/A
5-Jan-16
approved
RCG-DDTKI-SRF-PL-06
13-Nov-15
N/A
N/A
N/A
N/A
24-Nov-15
RCG-DDTKI-SRF-PL-07
16-Nov-15
20-Nov-15
N/A
N/A
N/A
N/A
5-Dec-15
approved
RCG-DDTKI-SRF-PL-08
3-Dec-15
3-Dec-15
N/A
N/A
N/A
17-Dec-15
RCG-DDTKI-SRF-PL-09
4-Dec-15
7-Dec-15
N/A
N/A
N/A
17-Dec-15
we already approved
other brand (use one
brand only)
10
RCG-DDTKI-SRF-PL-10
4-Dec-15
9-Dec-15
N/A
N/A
N/A
N/A
1/8/2016 /
3/4/16
disapproved (follow
as per specs
11
RCG-DDTKI-SRF-PL-11
4-Dec-15
7-Dec-15
N/A
N/A
N/A
5-Jan-16
approved
12
RCG-DDTKI-SRF-PL-12
5-Jan-16
6-Jan-16
N/A
N/A
N/A
13
RCG-DDTKI-SRF-PL-13
7-Jan-16
8-Jan-16
N/A
N/A
N/A
Page 14 of 24
PLAN
ACTION
ITEM
SUBMITTAL
SUBMISSION DATE
NO.
NO.
PLAN
14
RCG-DDTKI-SRF-PL-14
12-Jan-16
15
REFERENCE
DESCRIPTION
ACTUAL
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST OTHERS
Sample
BROCHURES DATA
N/A
N/A
N/A
RCG-DDTKI-SRF-PL-15
N/A
N/A
N/A
16
RCG-DDTKI-SRF-PL-16
N/A
N/A
N/A
N/A
17
RCG-DDTKI-SRF-PL-17
N/A
N/A
N/A
18
RCG-DDTKI-SRF-PL-18
N/A
N/A
N/A
N/A
19
RCG-DDTKI-SRF-PL-19
29-Feb-16
N/A
N/A
N/A
N/A
20
RCG-DDTKI-SRF-PL-20
1-Mar-16
N/A
N/A
company
Profile
21
RCG-DDTKI-SRF-PL-21
2-Mar-16
N/A
N/A
N/A
N/A
22
RCG-DDTKI-SRF-PL-22
3-Mar-16
N/A
N/A
N/A
N/A
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Prepared by :
Verified by :
Noted by:
Page 15 of 24
APPROVAL DATE
PLAN
ACTUAL
4-Mar-16
ACTION
DATE OF
CODE
INSTALLATION
REMARKS
disapproved
SUBMITTAL
SUBMISSION DATE
REFERENCE
DESCRIPTION
NO.
NO.
PLAN
ACTUAL
RCG-DDTKI-SRF-CSD-01
4-Nov-15
4-Nov-15
RCG-DDTKI-SRF-CSD-02
10-Nov-15
RCG-DDTKI-SRF-CSD-03
26-Nov-15
2-Dec-15
RCG-DDTKI-SRF-CSD-04
1-Feb-16
2-Feb-16
SPECS.
SHOP
DRAWINGS
SUBMITTAL REQUIREMENTS
CATALOG/
TEST
Sample
BROCHURES DATA
APPROVAL DATE
OTHERS
PLAN
ACTION
DATE OF
ACTUAL
CODE
INSTALLATION
REMARKS
N/A
N/A
N/A
N/A
24-Nov-15
Revised and
resubmit
N/A
N/A
N/A
N/A
3-Dec-15
N/A
N/A
N/A
N/A
21-Jan-16
N/A
N/A
N/A
N/A
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Prepared by :
Verified by :
Noted by:
Page 16 of 24
RFI-DDTKI-RCG-2015-ST-001
SUBMISSION DATE
PLAN
9-Sep-15
ACTUAL
10-Sep-15
RFI-DDTKI-RCG-2015-ST-002
1-Oct-15
1-Oct-15
RFI-DDTKI-RCG-2015-ST-003
12-Oct-15
12-Oct-15
REFERENCE
QUESTION/CLARIFICATION
Subject
1. the quality of ties(conf. reinf. & joint reinf.) on the column types detail is not
the same quantity on the schedule of reinforced Concrete Column. Pls. specify
the correct quantity on the schedule. 2. the size of column on Column type
detail (layout) is 900mmx1600mm but in the concrete columnis
1000mmx1600mm,which data will govern. if in the schedule will govern pls.
provide the details. 3. there's no details of ties/ spiral for column types "J", "K",
"L", (8-12@150mm) (7-12@150)
SPECS.
PLAN
ACTUAL
FCD rawing
S-RCGI-301
(see attached
drawing)
Please provied the structural detail of the following: 1. Top slab details (saump
pit & fuel storage Tank) 2. Structural framing plan of ram and area w/ storage
Drawing Sbelow (including Archl layout for storage below) 3. Location of slab Schedule
RGCI-701
found in structural FCD S-RCGI-701 4. Seismic gap dimension (between RC
Beta and RC Gamma
Date Received
Please provied the structural detail of the following: 1. Retaining wall 2 (RW-2)/
RNF-2, 2. Beam schedule for B3G-19A, B3G 9A, etc.- typical to all basement. Drawing S(see attached drawing) 3. UGW-4 (as per revised CB-01, there is no detail for RGCI-701
these RC wall. Please Provide
REMARKS
See comment
12-Oct-15
RFI-DDTKI-RCG-2015-ST-004
22-Oct-15
22-Oct-15
RFI-DDTKI-RCG-2015-ST-005
11-Nov-15
11-Nov-15
Drawing
DDTKI-RCG2015-RFAST-002-01;
Revised CB1
May we request for the structural detail of the following elevator pit. 1. elevator
pits on grade (PE-1, PE-2, FML-1) 3. Commercial Elevator pit, Moreso, please Architectural
provide adjustment of Commercial elevator due to its conflict with girder (B2G- FCD A-45
16, B1G-16) see attached drawings for reference
Refere to CB#4
17-Dec-15
Page 17 of 24
RFI-DDTKI-RCG-2015-ST-006
7-Jan-16
7-Jan-16
RFI-DDTKI-RCG-2015-ST-007
25-Jan-16
25-Jan-16
Please provide the beam and girder schedule for the following: 1. B2CG,
B2CG-4 @ basement 2, 2. GB-15a @ ground floor, 3. MCG-1, MCG-5, MG26, MB-18, MB-19, MB-20, MB-15A @ mezzanine level MCB-1. Moreso,
FCD-S54/Splease also provide us the details for the commercial elevator (C-1)
503/A-47
located @GL 3/A. 1. Adjustment for the beam conflict GL 3/A. Affected
floors are from B-1 to 2nd floor. 2. Elevator pit details.
RFI-DDTKI-RCG-2015-ST-008
25-Jan-16
25-Jan-16
Machine Room (above service deck) Framing plan and beam &
girder schedule
Please provide the machine room (above service deck) framing plan and
beam and girder schedule
RFI-DDTKI-RCG-2015-ST-009
4-Feb-16
4-Feb-16
Please provide the structural detail of O/G tank of STP where there is
suspended slab and RC wall reflected. See attached highlighted drawing for
your references
10 RFI-DDTKI-RCG-2015-ST-010
11
RFI-DDTKI-RCG-2015-ST-011
12 RFI-DDTKI-RCG-2015-ST-012
4-Feb-16
4-Feb-16
11-Feb-16
Updated STP
drawing
7-Jan-16
Consultant's response:
yes, just make sure to
follow the given
parameters &
specification (execution)
required shoring, etc,
Kindly ensure that no
breaking works to be done
near the concreted
structure within the
concrete settlement period
19-Feb-16
19-Feb-16
23-Feb-16
This is to clarify the area at mezzanine level (GL A/5 & A/1) where the structural
framing plan reflects no slab and beam whereas the architectural plan shows
that there is a slab. (see attached drawings) Moreso, upon checking the revise
CB-ST 06
beams and girders schedule, there are schedule for cantilever beams and
girders along GL A/1-5 that is not provided. Please provide us the complete
schedule for the Cantilever beams and girders
Plumbing and
sanitary plan
Please slarify if it is possible to install/place pipes inside the stairwell
(P-4) Fire
pressurization duct/ducting. Because as per plan ther are pipes located ninside Protection
the duct in mechanical chase. Please confirmed
plan(FPS-4)
Mechanical
Plan (ME-8)
Sir joshua
Page 18 of 24
23-Feb-16
see correction
Page 19 of 24
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Prepared by :
Verified by :
Noted by:
Page 20 of 24
NO.
NO.
RFI-DDTKI-RCG-2015-PL-001
SUBMISSION DATE
PLAN
ACTUAL
3-Dec-15
3-Dec-15
REFERENCE
QUESTION/CLARIFICATION
Subject
SPECS.
Plumbing and
Please clarify if the discharged pipe to be used at STP
sanitary plan
is 110 mm PVC Blue Pipe. Please confirm.
P-4
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Prepared by :
Verified by :
Noted by:
Page 21 of 24
Date Received
PLAN
ACTUAL
11-Dec-15
REMARKS
shoulb be pressure
pipe
NO.
NO.
RFI-DDTKI-RCG-2015-ME-001
SUBMISSION DATE
PLAN
REFERENCE
QUESTION/CLARIFICATION
ACTUAL
18-Feb-16
Subject
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Prepared by :
Verified by :
Noted by:
Page 22 of 24
SPECS.
Date Received
PLAN
ACTUAL
REMARKS
RFA-DDTKI-RCG-2015-ST-002
RFA-DDTKI-RCG-2015-ST-002-01
RFA-DDTKI-RCG-2015-ST-003
RFA-DDTKI-RCG-2015-ST-004
RFA-DDTKI-RCG-2015-ST-005
SUBMISSION DATE
PLAN
ACTUAL
REFERENCE
QUESTION/CLARIFICATION
Subject
SPECS.
Date Received
PLAN
ACTUAL
REMARKS
see comments.
24-Sep-15 Please submit final
drawing
28-Sep-15
see comments,
resubmit as per
5-Oct-15 confirmed pit depth
of elevators (FML),
4.00 meters
11-Nov-15
10-Dec-15
23-Sep-15
Page 23 of 24
10-Dec-15
SY^2: verify
architectural layout;
Requirement; see
comments
no response
Disapproved
with special remarks/ Approved
Revised and resubmit
Prepared by :
Verified by :
Noted by:
Page 24 of 24