De-119895 Offshore Reporting

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

REVISION CERTIFICATION

(DCC) NO.:

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

SPECIFICATION FOR
CONSTRUCTION OF OFFSHORE
PLATFORMS AND PIPELINES

DISCIPLINE
ENGINEER

OFFSHORE REPORTING
REQUIREMENT

Date:

PROJECT
ENGINEER

Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY

Date:

OPERATIONS

Date:

REPORTING REQUIREMENT

SPECIFICATION FOR OFFSHORE

ARABIAN GULF

DWG. TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

1
of
16

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

By:
Date:

CONTROL NUMBER

EDSD
VERIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

1.0 GENERAL

2.0 DAILY PROGRESS REPORT

3.0 REPORT ATTACHMENTS

4.0 THE DAILY FILE

5.0 DAILY CHECK SHEET

6.0 DOCUMENT TRANSMITTAL BY FACSIMILE MACHINE

7.0 FUEL AND FRESH WATER CONSUMPTION REPORT

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

TABLE OF CONTENTS

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR OFFSHORE
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)


GENERAL
1.1

This Specification outlines specific instructions to follow when compiling the


Daily File for work being performed offshore. It describes the Daily Progress
Facsimile Report, the required attachments, and methods by which this file is
to be compiled and conveyed to the SAUDI ARAMCO Project Management
Team (PMT).

1.2

It is the sole responsibility of CONTRACTOR to implement this reporting


system in accordance with the instructions set forth in this Specification.

1.3

CONTRACTOR shall assign the responsibility for completing the Daily File to
persons totally conversant with the compensation provisions of the Contract.
This duty should be delegated to at least one person for each spread or barge.

1.4

This Specification does not release CONTRACTOR from his obligation to


prepare any other report that may be required by SAUDI ARAMCO.

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

1.0

DAILY PROGRESS REPORT


2.1

The format for the Daily Progress Report is shown in Appendix A. The Daily
Progress Report shall be used for all spreads engaged in offshore
construction work. The Daily Progress Report requires a description of the
operational activities, the spread, associated vessels, and the manpower
breakdown from 0001 hours to 2400 hours on the date given.

2.2

The Daily Progress Report is to be completed by CONTRACTOR and


concurred by the SAUDI ARAMCO Representative on board prior to
transmittal to CONTRACTOR's main onshore base (office).

2.3

The Daily Progress Report shall be compiled using information from


CONTRACTOR's own work logs, vessel logs, inspection reports, diving logs,
force account time sheets, and so forth.

2.4

One Daily Progress Report shall be made for each distinct spread. For the
purposes of this Specification, a spread is any collection of vessels that
normally operate as a unit for which CONTRACTOR has a published spread
rate (for example, hydrotest spread, grout spread).

2.5

The content of the Daily Progress Report shall be verified by the on-site
SAUDI ARAMCO Representative prior to its incorporation into the Daily File.

2.6

The Daily Progress Report has a fixed format and specific guidelines for
completion that shall be divided into nine sections as follows:

REV.
NO.

DATE

2.0

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:

SPECIFICATION FOR OFFSHORE


(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)

Weather: Based on actual site conditions as agreed with the SAUDI


ARAMCO Representative at 0600, 1200, 1800, and 2400 hours,
showing wind direction and velocity, visibility, and sea state (height of
the waves) for each period.

2.6.2

Activity: The type of compensation involved is broken-down into


seven possible methods (as defined by the Contract and listed
below):

Lump Sum Work (bid).

Contract Spread Rate (hourly work within the Contract scope,


thus requiring a FWD). Itemize by the listed activity (weather,
SAUDI ARAMCO standby, other delays, and so forth.)

Contract Unit Rate (Unit Rate work within the Contract scope
requiring an FWD).

Extra Work - Spread Rate performed at CONTRACTOR's Spread


Rate requiring a Change Order.

Extra Work - Unit Rate for which there is a Contract Unit Rate
requiring a Change Order.

Extra Work - Rental Rate performed at CONTRACTOR's


itemized rental rates requiring a Change Order.

Non-reimbursable activities including remedial work, and so forth.

ENGG
REV.
NO.

DATE

JOB/EWO

DESCRIPTION

NOTE: Field Work Directives (FWDs) or Change Order numbers


shall be referenced, as applicable.

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

The time involved (decimalized) is to be shown against whichever


type of compensation is relevant.

Date:

CONSTRUCTION
AGENCY

All items shown under the Compensation Breakdown shall be


clearly indicated in the log for verification of times.

Date:

OPERATIONS

Activity Analysis: An analysis of each activity showing the percent


completed today and the percent completed to date.

2.6.4

Activity Timings: The timing of the Activity Breakdown, showing nondecimalized (actual) timings of the various types of activity, as shown
on the Activity Breakdown for the 24 hour period covered in the Daily
Progress Report.

By:
Date:

CONTROL NUMBER

2.6.3

SPECIFICATION FOR OFFSHORE


(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

2.6.1

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)

Remarks: A general narrative of the work progress, description of


any deviation and any other remarks. The SAUDI ARAMCO
Representative has the right to add SAUDI ARAMCO comments to
this section of the report.

2.6.6

Tower Log: A detailed log of the work progress as per the Tower
Log, itemized by time from 0001 hours through 2400 hours. A copy
of the logs shall be submitted to the SAUDI ARAMCO
Representative daily.

2.6.7

Supporting Equipment: The name, type, and activity of each


supporting vessel.

2.6.8

Crew: The number of personnel on hand broken down by


classification (U.S., U.K., third country national (TCN), and so forth),
sub-contractors (named), SAUDI ARAMCO personnel, the total
number of personnel, and personnel movements.

2.6.9

Contract Reimbursable Materials Consumed: The type of material


and the quantity of material used that day.

ENGG

DESCRIPTION
JOB/EWO
DATE
REV.
NO.

3.0

REPORT ATTACHMENTS
3.1

Date:

PROJECT
ENGINEER

3.2

Date:

CERTIFIED BY

The Daily Progress Report shall be compiled from all the various logs, reports,
manifests, and time sheets CONTRACTOR has at his disposal. Copies of
these documents will support the information given on the Daily Progress
Report and shall be included in the Daily File.
The following is a list of the minimum number of documents that shall be
included in the Daily File for each day:
3.2.1

CONTRACTOR's Daily Progress Report.

3.2.2

CONTRACTOR's Daily Barge Crew List showing the classification of


each crew member and the number of crew members for each
classification, broken down into U.S., U.K., TCN, and subcontractor.
The list shall also include all SAUDI ARAMCO personnel on board.

3.2.3

CONTRACTOR's Vessel Logs (including all supporting tugs and


work boats).

3.2.4

CONTRACTOR's Survey Reports.

3.2.5

CONTRACTOR's Daily Diving Report including CONTRACTOR's


Diving Supervisor's Logs.

3.2.6

Quality Assurance/Quality Control (QA/QC) Report.

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:

SPECIFICATION FOR OFFSHORE


(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

2.6.5

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)

CERT

3.2.8

Coated Pipe Tally Sheets (pipe laying spreads only).

3.2.9

CONTRACTOR's Work Orders (in response to SAUDI ARAMCO


FWDs).

3.2.10

Any other correspondence, such as internal correspondence,


memos, minutes of meetings held on the barge, and so forth.

3.2.11

CONTRACTOR's Weekly Safety Meeting Report and shift meeting


reports.

3.2.12

Force account sheets

3.2.13

Marker buoys installed or removed during the reporting period and


total numbers to date. Shall also include a breakdown of surface
deployed and tied on marker buoys.

JOB/EWO
REV.
NO.

DATE

4.0

THE DAILY FILE


4.1

CONTRACTOR shall be responsible for preparing a Daily File for each


distinctive spread, from which he shall file the Daily Progress Report and all
associated attachments.

Date:

4.2

The left-hand side of the inside file cover shall be used to file the Daily
Progress Report and all the associated attachments outlined in Section 3.0 of
this Specification. The Daily Progress Report and each attachment shall be
separated within the file by a blank divider. Each blank divider shall be
tabbed, showing its contents (such as Daily Progress Report, CONTRACTOR
Survey Report, and so forth).

4.3

In addition to the above, two blank dividers shall be tabbed showing


CONTRACTOR's Daily Progress Facsimile and CONTRACTOR's Invoice.
These will be filed by SAUDI ARAMCO PMT on receipt in Dhahran, Saudi
Arabia.

4.4

The right-hand side of the inside file cover shall be similarly separated with
blank dividers as outlined in Section 4.2 above and will be for SAUDI
ARAMCO use only. Each blank divider will be tabbed as follows:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

By:
Date:

CONTROL NUMBER

SAUDI ARAMCO Daily Construction Log

SAUDI ARAMCO Daily Barge Report

Field Work Directives

Change Orders

Other Correspondence

SPECIFICATION FOR OFFSHORE


(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

Material Receipts/Shipping Manifests.

DESCRIPTION

3.2.7

ENGG

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)

DESCRIPTION

ENGG

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

5.0

4.5

The outside edge of the file cover shall show the relevant date of the Daily
File.

4.6

The outside front cover of the file shall show the barge (or primary vessel)
name and Contract number.

4.7

The size of the Daily File shall be 9 inches by 14 inches. A sample shall be
submitted to SAUDI ARAMCO for approval.

4.8

The Daily File, as described herein, shall be submitted to the SAUDI


ARAMCO Representative for his concurrence on the morning following the 24
hour period covered. CONTRACTOR shall insure that sufficient quantities of
files, folders, dividers and other similar items are onboard each spread.

DAILY CHECK SHEET

From CONTRACTOR, show the file contents by attaching to the top of the first
blank divider on the LEFT hand side of the inside cover the Daily Check Sheet.
Each item is to be "ticked-off" as being inserted. In the case of any report not
being inserted, (example: CONTRACTOR'S Work Order or other correspondence)
the INSERTED column is to be left blank.

From SAUDI ARAMCO, show the file contents (filed by the SAUDI ARAMCO
Representative onboard) by attaching to the top of the first blank divider on the
RIGHT hand side of the inside cover of the Daily Check Sheet.

REV.
NO.

DATE

JOB/EWO

The Daily Check Sheet, shown in Appendix B, shall have two parts as follows:

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER

6.0

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTRACTOR Daily Progress Reports (as shown in Appendix A)

Field Work Directives (when issued)

FUEL AND FRESH WATER CONSUMPTION REPORT

By:
Date:

CONTROL NUMBER

Fuel Consumption Report

Vessel Log and Sounding Report/Log

Fresh Water Consumption Report

A separate report for each barge/vessel shall be provided, and the report shall be
concurred by the SAUDI ARAMCO Representative onboard, as shown in Appendix C.

SPECIFICATION FOR OFFSHORE


(DCC) NO.:

EDSD
VERIFICATION

7.0

CONTRACTOR shall be responsible to provide the following reports on a weekly basis:

Date:

REVISION CERTIFICATION

DOCUMENT TRANSMITTAL BY FACSIMILE MACHINE


On the morning following the 24 hour reporting period, CONTRACTOR shall transmit by
facsimile to SAUDI ARAMCO PMT main office the following:

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)


PMT

CONTRACTOR'S DAILY PROGRESS REPORT

DESCRIPTION

ENGG

APPENDIX A

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

CONTRACTOR:

SUPERINTENDENT:

BARGE:

COMPANY REPRESENTATIVE:

DATE:

LOCATION:

JOB NUMBER:

CONTRACT NUMBER:

WEATHER
JOB/EWO

0600 HOUR:

DATE

1800 HOUR:

REV.
NO.

1200 HOUR:
2400 HOUR:

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER

HOURS (DECIMALIZED)
HOURS
HOURS TO
TODAY
DATE

ACTIVITY

Date:

CERTIFIED BY

LUMP SUM WORK


CONTRACT SPREAD RATE WEATHER

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTRACT SPREAD RATE SAUDI ARAMCO STANDBY


CONTRACT SPREAD RATE OTHER DELAYS
CONTRACT UNIT RATE WORK
EXTRA WORK SPREAD RATE
EXTRA WORK RENTAL RATE

By:
Date:

CONTROL NUMBER

EXTRA WORK UNIT RATE


NON-REIMBURSABLE MECHANICAL DOWNTIME
NON-REIMBURSABLE CONTRACTOR CAUSED DELAY
OTHER (SPECIFY)

SPECIFICATION FOR OFFSHORE


(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)


PMT

CONTRACTOR'S DAILY PROGRESS REPORT

ENGG

APPENDIX A (Cont.)

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ACTIVITY ANALYSIS
PERCENT
COMPLETE
TODAY

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

PERCENT
COMPLETE
TO DATE

DISCIPLINE
ENGINEER

DESCRIPTION

Date:

START

COMPLETED

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR OFFSHORE
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

ACTIVITY TIMING

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)

REVISION CERTIFICATION

(DCC) NO.:

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

PMT

APPENDIX A (Cont.)

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

CONTRACTOR'S DAILY PROGRESS REPORT

REMARKS

TOWER LOG

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER

Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY

Date:

DIVING LOG

OPERATIONS

Date:

REPORTING REQUIREMENT

SPECIFICATION FOR OFFSHORE

ARABIAN GULF

DWG. TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

10

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

By:
Date:

CONTROL NUMBER

EDSD
VERIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)


PMT

CONTRACTOR'S DAILY PROGRESS REPORT

ENGG

APPENDIX A (Cont.)

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

SUPPORTING EQUIPMENT
TYPE

ACTIVITIES

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

NAME

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY

MARKER BUOY STATUS


TIED-ON

Date:

OPERATIONS

By:
Date:

CONTROL NUMBER

PREVIOUS TOTAL

TOTAL TO DATE
* Give Name of Vessel Performing Work

SPECIFICATION FOR OFFSHORE


(DCC) NO.:

EDSD
VERIFICATION
REVISION CERTIFICATION

SURFACE DEPLOYED

INSTALLED
DURING
REPORTING PERIOD*

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

11

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)

REVISION CERTIFICATION

(DCC) NO.:

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

PMT

APPENDIX A (Cont.)

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

CONTRACTOR'S DAILY PROGRESS REPORT

CREW
CLASSIFICATION

NAME

SPECIFICATION FOR OFFSHORE

ARABIAN GULF

U.S.

REPORTING REQUIREMENT

DWG. TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

JOB#

U.K.
TCN

DRAWING NO.

DE-119895

OTHER

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER

Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY

Date:

OPERATIONS

Date:

TOTAL

SHT. NO. REV. NO.

12

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

By:
Date:

CONTROL NUMBER

EDSD
VERIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)


PMT

CONTRACTOR'S DAILY PROGRESS REPORT

ENGG

APPENDIX A (Cont.)

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

CONTRACT REIMBURSABLE SAUDI ARAMCO MATERIAL CONSUMED


AMS
STOCK
NUMBER

ISSUE
UNIT

QUANTITY

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

DESCRIPTION

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR OFFSHORE
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

13

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)


PMT

APPENDIX B

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

CONTRACTOR'S DAILY CHECK SHEET (LEFT SIDE)

ENGG

BARGE

DATE

DESCRIPTION

DESCRIPTION

INSERTED

NOT INSERTED

DAILY PROGRESS REPORT


DAILY PROGRESS FACSIMILE
CREW LIST
VESSEL LOG

JOB/EWO

SURVEY REPORT
DAILY DIVING REPORT

DATE

DIVING SUPERVISOR'S LOGS

REV.
NO.

MATERIAL RECEIPTS/SHIPPING MANIFESTS


CONTRACTOR'S WORK ORDER

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER

COATED PIPE DAILY TALLY SHEET


(PIPE LAYING SPREAD ONLY)
OTHER CORRESPONDENCE
CONTRACTOR'S INVOICE

Date:

CERTIFIED BY

SAFETY REPORT
FUEL AND FRESH WATER REPORTS

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR OFFSHORE
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

QA/QC REPORT

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

14

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)


PMT

APPENDIX B (Cont.)

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

SAUDI ARAMCO DAILY CHECK SHEET (RIGHT SIDE)

ENGG

BARGE

DATE

DESCRIPTION

DESCRIPTION

INSERTED

NOT INSERTED

DAILY CONSTRUCTION LOG


DAILY BARGE REPORT
FIELD WORK DIRECTIVES/C.Os

REV.
NO.

DATE

JOB/EWO

OTHER CORRESPONDENCE

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR OFFSHORE
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

15

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)


PMT

APPENDIX C

CERT

OPERNS.

SAUDI ARABIAN OIL COMPANY

FUEL AND FRESH WATER CONSUMPTION REPORTS

ENGG

VESSEL:

WEEK ENDING:

CONTRACT NUMBER:

DESCRIPTION

FUEL CONSUMPTION
AMOUNT OF FUEL

DAY

AT MOBILIZATION

RECEIVED
FROM SAUDI
ARAMCO

CONSUMED

TRANSFERED
TO*

BALANCE
ON
BOARD

AT
DEMOBILIZATION

SAT

JOB/EWO

MON

DATE

WED

REV.
NO.

SUN

THU

TUE

DISCIPLINE
ENGINEER

FRESH WATER CONSUMPTION

Date:

PROJECT
ENGINEER

AMOUNT OF FRESH WATER

Date:

CERTIFIED BY

DAY

AT
MOBILIZATION

RECEIVED
FROM
SAUDI
ARAMCO

CONSUMED

TRANSFERED
TO*

BALANCE
ON
BOARD

AT DEMOBILIZATION

SAT
Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

SUN
MON
TUE
WED

FRI

By:
Date:

CONTROL NUMBER

THU

CONTRACTOR REPRESENTATIVE
ON BOARD VESSEL

SAUDI ARAMCO REPRESENTATIVE


ON BOARD VESSEL

* Give Name of Vessel

SPECIFICATION FOR OFFSHORE


(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

FRI

DWG. TYPE PLANT NO. INDEX

REPORTING REQUIREMENT

ARABIAN GULF

DOC

SAUDI ARABIA

A
JOB#

DRAWING NO.

DE-119895

SHT. NO. REV. NO.

16

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119895 Offshore
Reporting\Sep 97\bjp

Saudi Aramco 2616-ENG. (03/99)