Net Smelter Return
Net Smelter Return
Net Smelter Return
Originating
Author:
Dr. George
McIsaac
sources of information for each as a function of the design stage. The concept of the NSR factor is
presented, along with its uses, applications and limitations.
A complete example of the calculations for a polymetallic ore is worked through and discussed.
An excel file also is also provided so that the reader can review the equations in detail.
Contents
[hide]
3.1 Example:
4 References
Recovery factor of the metal at the mill - to know what proportion of the metal sent to the
mill is actually sold.
Transport cost - from the gate at the mine site to the smelter. Associated costs are
charged for loading and representation at port facilities.
Payable metals - to establish the base quantity of metal that the smelter will use to
determine payment. Some deductions are fixed, while others are based on a sliding
scale as a function of the grade of the metal in the concentrate.
Treatment charges - to determine the cost of processing one tonne of concentrate at the
smelter.
Penalties - the extra cost of processing deleterious elements present in the concentrate.
Price participation - a proportional escalator cost to capture large metal price variations
during the contract period.
Refining charges - to determine the cost of refining the metal recovered at the smelter.
At the scoping level, most information can be estimated from spot prices discussed in press releases.
At the Pre-feasibility study level, smelter availability may become an issue and discussions must be
held with a few smelters. Detailed contracts terms are not necessarily determined through these
discussions, but better estimates can be made. Contracts must be discussed with specific smelters
at the feasibility level. Table 1 presents the best information sources for calculating components at
each
of
these
three
stages
of
mine
design.
Scoping
Pre-feasibility
Feasibility
Treatment charges
Spot prices
Negotiated contract
Refining charges
Spot prices
Negotiated contract
Negotiated contract
Transport costs
Spot prices
Negotiated contract
Estimate rapidly the value of every block in the resources and reserves models by
multiplying the grades by the factors. The blocks can easily be sorted as required.
Calculate the value of broken mineralization in the mine to decide whether to send it to
the mill or to waste.
The value of reserves can be quickly compared to the applicable costs to determine
their viability; cut-off grades become cut-off NSRs.
At the design stage, spreadsheets can be used to quickly identify economical reserve
blocks.
During the extraction of a sector, its value can be quickly estimated by comparing the
reconciled grades to the design.
This approach tends to smooth out the statistical distribution of the block values. This
will happen if the metal recovery at the mill is proportional to the feed grade. This way,
lower grade blocks are over-valued and higher grade blocks are undervalued.
This approach is valid only within the operating parameters of the mill.
Example:
Lets assume that chalcopyrite and sphalerite produced in the mine are sent to a mill with copper and
zinc flotation circuits, and that the copper concentrate is sold to two smelters and that the zinc
concentrate is sold to a zinc smelter. The detailed calculations can be found in the Excel file NSR
calculations.xlsx.
Figure
1:
The
milling
process
In this example, the mill feed is 275,000 tonnes grading 2.32% Cu, 2.55 g/t Au, and 5.69% Zn. This
mill feed can represent three months or a years production from the mine, or is the grade of a sector
on which an economical study is conducted. Either way, the NSR factors calculated for this feed can
be
applied
to
every
individual
reserve
blocks
or
stopes
to
calculate
their
value.
As shown in Table 2, copper and gold are recovered in the copper concentrate and zinc and minor
gold are recovered in the zinc concentrate. The copper concentrate grades 21% and the zinc con
grades
53%.
Values
marked
in
yellow
are
given
and
others
are
calculated.
Table
2:
Metallurgical
balance
Table 3 details the steps to calculate the value of the copper and gold in the copper concentrate sold
to smelter A. In the case of copper:
The treatment charge is equal to $75 per tonne of concentrate. Transport, with loading
and representation, cost $39 per tonne.
The refining charges are equal to $0.075 per pound of payable copper.
As for gold:
The metal deduction is equal to 2.5 grams. This deduction can be based on a sliding
scale set as a function of the concentrate gold grade.
No treatment or transport costs are applied. This is a judgment call on the part of the
user to decide if the costs apply or not and in which proportions they do. In the example,
it is assumed that this is the amount of gold present (or absent) in the ore and
concentrate will have no influence on the treatment and transport costs of the copper
concentrate and that therefore the gold should not have to pay for that portion of costs.
As a result, the copper and gold net smelter returns for copper concentrate sold to Smelter A are
equal to $511 and $515 per tonne of concentrate, or $48.01 and $48.37 per tonne of ore. When
these numbers are divided by the mill feed grade, the copper and gold NSR factors are equal to
$20.69
per %
Cu
and
$18.97
per
gram
of
gold.
Table 3: Estimation of the value of metals in the copper concentrate sold to smelter A
The exercise is repeated for copper concentrate sold to smelter B and zinc concentrate sold to
smelter
C,
and
the
results
are
combined
in
Table
4.
These factors can be used to estimate the value of reserve blocks, stopes, daily production, or the
average
value
of
the
mill
feed,
as
shown
in
Table
5.
References
Goldie, R. A. (1992). Net smelter return models and their use in the exploration, evaluation and
exploitation of polymetallic deposits. Ore Deposit Models V. II, Geoscience Canada Reprint Series
6, (pp. 63-75). This reference gives clear information on the components included in the equations
for many metal concentrates.
Goldie, R. J. (1996). The dollar: An economic geologist's most important unit of measurement. CIM
Bulletin , 89 (997), pp. 39-41.
Lafleur, P.-J. (1988, November ). Statistical Geology. The Northern Mining Magazine, 25-29. This
reference gives an example of an NSR factor calculation for a polymetallic ore.