Gantt-Chart Example

The document outlines an energy audit project plan with tasks grouped into domains over several months. It includes collecting building information through inspection and testing, evaluating the collected data, and determining improvement measures.

Uploaded by

Benjabenja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
195 views

Gantt-Chart Example

The document outlines an energy audit project plan with tasks grouped into domains over several months. It includes collecting building information through inspection and testing, evaluating the collected data, and determining improvement measures.

Uploaded by

Benjabenja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Abdi Rodriguez

A&R Company

Today's Date:

7/3/16

lunes

(vertical red line)

Project Lead: Abdi Rodriguez Audit


Start Date: 1/1/15

jueves

1/6/15

1/9/15

0%

Walk around the exterior and interior of the building

1/6/15

1/9/15

0%

1.2.2

Look for holes, chimneys, gutters, roof vents, peeling paint, structural damage

1/6/15

1/9/15

0%

1.2.3

Identify hidden rooms or spaces

1/6/15

1/9/15

0%

1.2.4

Identify Hazardous materials in the building

1/6/15

1/9/15

0%

1.2.5

Detect unusual odors

1/6/15

1/9/15

0%

Collect electrical base load data

1/9/15

1/13/15

0%

1.3.1

Conduct a lighting audit

1/9/15

1/13/15

0%

1.3.2

Count the number of people in the house

1/9/15

1/13/15

0%

1.3.3

Determine if dishwasher is present

1/9/15

1/13/15

0%

1.3.4

Meter the refrigerator

1/9/15

1/13/15

0%

1.3.5

Collect electrical system information

1/9/15

1/13/15

0%

Collect building measurements

1/13/15

1/18/15

0%

1.4.1

Measure walls

1/13/15

1/18/15

0%

1.4.2

Measure roofs

1/13/15

1/18/15

0%

1.4.3

Measure windows

1/13/15

1/18/15

0%

1.4.4

Measure doors

1/13/15

1/18/15

0%

1.4.5

Measure perimeters

1/13/15

1/18/15

0%

1.4.6

Measure foundation height

1/13/15

1/18/15

0%

1.4.7

Measure area and volume of the building envelope

1/13/15

1/18/15

0%

Collect mechanical ventilation data

1/18/15

1/19/15

0%

1.5.1

Review manufacturers spedcifications for exhaust fans

1/18/15

1/19/15

0%

1.5.2

Determine the volume of the affected space

1/18/15

1/19/15

0%

1.5.3

Determine condition of the ventilation ductwork/ piping

1/18/15

1/19/15

0%

1.5.4

Calculate volume

1/18/15

1/19/15

0%

Collect door data

1/19/15

1/19/15

0%

1.6.1

Identify door type and swing

1/19/15

1/19/15

0%

1.6.2

Measure door area

1/19/15

1/19/15

0%

1.6.3

Count number of doors

1/19/15

1/19/15

0%

1.6.4

Identify door conditions

1/19/15

1/19/15

0%

1.6.5

Identify condition of door sweep and weather stripping

1/19/15

1/19/15

0%

1.6.7

Identify door hardware condition

1/19/15

1/19/15

0%

Collect window data

1/19/15

1/19/15

0%

1.7.1

Identify window type

1/19/15

1/19/15

0%

1.7.2

Identify Window frame type

1/19/15

1/19/15

0%

1.7.3

Identify window glazing type

1/19/15

1/19/15

0%

1.7.4

Measure window area

1/19/15

1/19/15

0%

1.7.5

Count number of windows

1/19/15

1/19/15

0%

1.7.6

Identify window orientation

1/19/15

1/19/15

0%

Identify general window conditions

1/19/15

1/19/15

0%

Collect wall data

1/20/15

1/20/15

0%

1.8.1

Identify wall type

1/20/15

1/20/15

0%

1.8.2

Identify wall areas

1/20/15

1/20/15

0%

1.8.3

Identify cavity depth

1/20/15

1/20/15

0%

1.8.4

Identify framing method

1/20/15

1/20/15

0%

1.8.5

Identify infiltration points

1/20/15

1/20/15

0%

1.8.6

identify signs of pest / vermin infestation

1/20/15

1/20/15

0%

1.8.7

Identify source and signs of any water damage

1/20/15

1/20/15

0%

Identify orientation of the wall

1/20/15

1/20/15

0%

Collect foundation data

1/21/15

1/21/15

0%

1.9.1

Identify foundation type

1/21/15

1/21/15

0%

1.9.2

Identify foundation materials

1/21/15

1/21/15

0%

1.9.3

Measure floor areas

1/21/15

1/21/15

0%

1.9.4

Identify infiltration points

1/21/15

1/21/15

0%

1.9.5

Measure exposed walls

1/21/15

1/21/15

0%

1.9.6

Measure

1/21/15

1/21/15

0%

1.3

1.4

1.5

1.6

1.7

task 3

task 4

task 5

task 6

task 7

1.7.7
1.8

task 8

1.8.8
1.9

task 9

Domain 2

Testing The Building for an Energy Audit

1/22/15

1/27/15

0%

2.1

task 1

Preparing for the test(s)

1/22/15

1/23/15

0%

Determining the test

1/22/15

1/23/15

0%

2.1.1

Gantt Chart Template by Vertex42.com

17 - ago - 15

10 - ago - 15

27 - jul - 15

03 - ago - 15

20 - jul - 15

13 - jul - 15

06 - jul - 15

29 - jun - 15

22 - jun - 15

15 - jun - 15

08 - jun - 15

01 - jun - 15

25 - may - 15

Conduct a physical/visual inspection

1.2.1

1.2

18 - may - 15

11 - may - 15

27 - abr - 15

0%

04 - may - 15

20 - abr - 15

1/6/15

13 - abr - 15

1/4/15

task 2

06 - abr - 15

Obtain annual fuel delivery information

1..1.2

30 - mar - 15

23 - mar - 15

16 - mar - 15

0%

09 - mar - 15

23 - feb - 15

0%

1/3/15

02 - mar - 15

1/2/15

16 - feb - 15

Days Remaining

0%

1/5/15

Obtain 12 months of client utility bills

1.1.1

End

09 - feb - 15

Days Complete

1/2/15

Start

02 - feb - 15

Working Days

1/6/15

Document energy consumption

26 - ene - 15

% Complete

1/2/15

task 1

19 - ene - 15

Duration (Days)

Collecting Information about The Building for an Energy Audit

1.1

Task
Lead

12 - ene - 15

Tasks
Domain 1

29 - dic - 14

WBS
1

05 - ene - 15

First Day of Week (Mon=2):

[42]

2008 Vertex42 LLC

Abdi Rodriguez
A&R Company

Today's Date:

7/3/16

lunes

(vertical red line)

Project Lead: Abdi Rodriguez Audit


Start Date: 1/1/15

jueves

2.3

task 3

perform HVAC distribution tests

1/27/15

1/27/15

Domain 3

Evaluating Collected Energy Audyt Data

1/27/15

3/12/15

45

0%

33

45

3.1

task 1

Evaluate the HVAC system

1/27/15

1/31/15

0%

3.2

task 2

Evaluate the mechanical ventilation

2/1/15

2/5/15

0%

3.3

task 3

Evaluate the energy use base loads

2/6/15

2/10/15

0%

3.4

task 4

Evaluate the foundation

2/11/15

2/15/15

0%

3.5

task 5

Evaluate the walls

2/16/15

2/20/15

0%

3.6

task 6

Evaluate the doors

2/21/15

2/25/15

0%

3.7

task 7

Evaluate the windows

2/26/15

3/2/15

0%

3.8

task 8

Enter the data into energy modeling software

3/3/15

3/8/15

0%

3.8.1

Gather all information and data pertainig to the audit

3/3/15

3/8/15

0%

3.8.2

Enter the data into energy modeling software

3/3/15

3/8/15

0%

3.8.3

Analyze the output from the software

3/3/15

3/8/15

0%

3.8.4

Produce a cost and savings report

3/3/15

3/8/15

0%

task 9

Determine the work scope

3/8/15

3/12/15

0%

3.9.1

Determine the energy measures

3/8/15

3/12/15

0%

3.9.2

Provide analysis reports

3/8/15

3/12/15

0%

3.9.3

Create reports

3/8/15

3/12/15

0%

3.9.4

Create work specifications

3/8/15

3/12/15

0%

3.9

17 - ago - 15

0%

10 - ago - 15

27 - jul - 15

1/27/15

03 - ago - 15

1/24/15

20 - jul - 15

Verify usage with the appliance manufacturers chart

13 - jul - 15

2.2.4

06 - jul - 15

29 - jun - 15

22 - jun - 15

0%

15 - jun - 15

0%

08 - jun - 15

1/27/15

01 - jun - 15

1/27/15

1/24/15

25 - may - 15

1/24/15

Document findings with pictures/forms

18 - may - 15

plug appliances into the watt hour meter

2.2.3

11 - may - 15

2.2.2

27 - abr - 15

04 - may - 15

20 - abr - 15

0%

13 - abr - 15

06 - abr - 15

1/27/15

30 - mar - 15

1/24/15

23 - mar - 15

Inspect appliances for test accesibility

16 - mar - 15

2.2.1

09 - mar - 15

23 - feb - 15

02 - mar - 15

0%

16 - feb - 15

09 - feb - 15

0%

1/27/15

02 - feb - 15

Days Remaining

0%

1/24/15

task 2

End

26 - ene - 15

Days Complete

1/23/15

Evaluate the appliances

2.2

Start

19 - ene - 15

Working Days

1/23/15

1/23/15

2.1.4

Task
Lead

12 - ene - 15

% Complete

1/22/15

Prepare the building for testing based upon manufacturers test equipment specification

Tasks

29 - dic - 14

Duration (Days)

Inform the client of the test

WBS
2.1.2

05 - ene - 15

First Day of Week (Mon=2):

[42]

Summary is in the next document.

Gantt Chart Template by Vertex42.com

2008 Vertex42 LLC