The document discusses defining and managing BIM uses on construction projects. It makes the following key points: 1. A BIM use should have a clear purpose and outcome, and specific parties responsible for performing and receiving the use. 2. BIM uses can be categorized based on whether they are within a discipline, between disciplines on a team, or between different project teams. 3. Level of development (LOD) specifications should not dictate authorized BIM uses. Instead, LOD tables should indicate model progression, and BIM uses should reference required LODs. 4. BIM uses should be decided based on what project participants want to perform, not what model authors permit. Owners

Uploaded by

dmlinux
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
462 views30 pages

Practical BIM

The document discusses defining and managing BIM uses on construction projects. It makes the following key points: 1. A BIM use should have a clear purpose and outcome, and specific parties responsible for performing and receiving the use. 2. BIM uses can be categorized based on whether they are within a discipline, between disciplines on a team, or between different project teams. 3. Level of development (LOD) specifications should not dictate authorized BIM uses. Instead, LOD tables should indicate model progression, and BIM uses should reference required LODs. 4. BIM uses should be decided based on what project participants want to perform, not what model authors permit. Owners

Uploaded by

dmlinux
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 30

11

mais Prximoblog

Criarumblog Login

practicalBIM
PracticaltipsonmakingBIMwork.
29January2016
SubscribeviaRSS

HowtodefineBIMUse
Forthosethatdon'tknow,aBIMUseisatask,outcomeordeliverablethataBIMmodelis
usedfor.ForexamplewhenaBIMmodelisusedforstructuralanalysis,ortocreateadoor
schedule,orprovidedataforanFMsystem.
WhentalkingaboutBIMUsewemean"BuildingInformationModels"(actualdigitalmodels),
notasin"BuildingInformationModelling"(BIMprocesses).Becauseofthissomecallit
ModelUse,butIshallsticktoBIMUse,asthereisaworldbeyondBIMwithothertypesof
models.

Subscribe viaemail:

BlogArchive
2016(1)
January(1)
HowtodefineBIMUse
2015(8)
2014(6)
2013(16)
2012(18)

BIMUseisatthecoreofBIM.ThebasicconceptofBIMisthatdatacreatediscapturedina
formandformatthatcanbedirectlyusedasaresourceforotherpurposes.
Sodoorsarecreatedinsuchawaythatadoorschedulecanbeproduceddirectlyfrom
thosedoors.Thatmodelledstructuralelementsbehaveinawaythatallowsforstructural
analysis.
YetthereseemstobemassiveconfusionaroundBIMUse.Whatshouldbesimpleismade
incrediblycomplicatedbyBIMstandards,BIMcontractclausesandBIMtheorists.
I'vewrittenbeforeaboutBIMUseandhowitisbeingappliedtoLOD,inmypostsLOD,are
wethereyet?andWhatistheuseofBIMUse.Butthosepostsdon'tofferasolution.
Unfortunatelywhenconfrontedwithsomethingunintelligibleandunworkablewetendto
avoidthewholething.ButBIMUsecannotbeignored.IfwearegoingtoreallydoBIMwe
havetohaveaworkablewayofmanagingBIMUse.

ThepurposeofaBIMUse
Letusstartwiththebasics.WhyhaveaBIMUse?
AparticularBIMUsemusthaveausefulrealworldoutcome.Itshouldonlybelistedasa
BIMUseforaprojectifthereisaspecificreasontodoitaspecificpartywhowilldoita
specificpartywhowillreceivetheresultsaspecificoutcomethataidsthedesign,buildingor
operationoftheprojectfacility.
ThissoundssoobviousyetismissingfrommostdefinitionsofBIMUse.Discussionalways
seemstobearoundwhatispossible,ratherthanwhatisrequired,letalonepractical.

WhoemploysBIMUses
BIMUseisinvariabletalkedaboutastheusesofexternalparties.TypicallyusesbytheBIM

AboutMe
AntonyMcPhee
Registeredarchitectsince1986,I
havebeenaprojectarchitecton
projectsrangingfromlarge
commercialandculturaldevelopments
tohouseextensions.DevelopingCAD
systemssince1988,involvedinBIM
since2001.Nowrunningasmall
architecturalpracticeandconsultingto
architecturalpracticesonIT,BIMand
practicemanagement.Myparticular
skillisbridgingITbasedprocesses
withpracticedeliverables.
Viewmycompleteprofile

modelauthorareignored.
Apparentlyifastructuralengineerusesthearchitect'sBIMmodelforstructuralanalysisthat
isaBIMUse,iftheyusetheirownitisnot.
Isuspectthisisbecausenocrossorganisationagreement(ordemand)isrequireditisnot
consideredpartof"BIMProcess".
TheproblemistheseinhouseBIMprocessesarethennotconsideredwhenagreeingon
otherBIMUses.ThiscancreateproblemswhenexternallyrequiredBIMUsescompromise,
orcompletelyprevent,anauthor'sownBIMUses.
TocapturewhoisdoingwhatitisusefultodefineBIMUsesagainstwhotheyarebetween:
1.Withinadiscipline
e.g.schedulesfrommodel
2.Betweendisciplineswithinateam(e.g.architect,engineer,QSetc.)
e.g.energyanalysis
3.Betweenteams(e.g.design,construction,operation,etc)
e.g.assetmanagement
4.Acrossdisciplines
e.g.estimates
5.Acrossteams
e.g.clashdetection
DoingthisnotonlyensuresallBIMUsesareconsideredbutalsorevealswhatcontractual
requirementsmightbeornotbeneededfortheproject.

LODisnotBIMUse
ForaparticularBIMUsetobeachievabletheBIMmodelmusthavecertainrequirements.
CurrentlytheserequirementsaredescribedviaLODdescriptions.TypicallyanLODhas
certainBIMUsesassociatedwithit.ThisistheAIA[US]approach.FromtheirE203guide:
"TheE202'sModelElementTableprovidesavehiclefordefiningAuthorized
Uses,ModelelementbyModelelementandmilestonebymilestone."
Butinpracticehowdoyoudefine"AuthorizedUses,ModelelementbyModelelementand
milestonebymilestone."?
Consideringthereareliterallyhundredsofdifferentpossible"AuthorizedUses"arewereally
expectedtolistthemnotonlyagainsteachModelElement,butagainsteachModelElement
ateachMilestone?
ThemostpracticalLODguidecreatedthusfar,BIMForum'sLODspecification,hastriedto
dealwiththisstipulationbykindofwhitewashingit.Fromtheir2015edition:
"BecauseBIMisbeingputtoaneverincreasingnumberofuses,thegroup
decidedthatitwasbeyondtheinitialscopetoaddressallofthem.Instead,the
definitionsweredevelopedtoaddressmodelelementgeometry,withthreeof
themostcommonusesinmindquantitytakeoff,3Dcoordinationand3D
controlandplanning.Thegroupfeltthatintakingthisapproachthe
interpretationswouldbecompleteenoughtosupportotheruses."

ButtheAIA[US]approachisfundamentallyflawed,itisthewrongwayround.
BIMUsesshouldbelistedwiththerequiredLODagainstthem,notLODwithallowedBIM
Uses.
WhatLODtablesactuallydoistodefinethelevelofdevelopmenteachelementistohaveas
theprojectprogresses,ateachmilestone.
Thisisareflectionofrealityprojectinformationprogressesattherateitisgathered,
decidedandcreated.Youcan'tmakeinformationanddecisionsmagicallyappearbecause
youneeditforaBIMUse,andhaveputitagainstanLODtableinacontract.
LODspecifications,matrices,tables,whateveryouwanttocallthem,needtoremove
referencestoBIMUse.Itjustconfusesandcomplicatesthem.
AproperLODtableisanindicationofmodelprogression,whenwhichpartswillhavewhat
informationavailable,basedonwhatisrealisticallyachievable.
BIMUseshouldbeacompletelyseparatelist,referencingLOD'stodescribewhatis
requiredforthemtobedone.BycomparingBIMUserequirementswithLODinclusionsand
progressionarealisticassessmentofwhatBIMUsesarefeasible,andwhentheycanbe

undertaken,ispossible.
ThecurrentprocessofusingLODdefinitionstodeterminewhat"AuthorizedUses"are
possibleisdelusional,itwillneverworkinpractice.

WhodecidesBIMUses?
AnotherproblemwiththeAIA[US]approachisthatitdefineswhatBIMUsesare"permitted",
notwhatusesarenecessaryorevendesired.AgainfromE203:
"ThetermAuthorizedUsesreferstothepermittedusesofDigitalData"
Wouldn'tabetterapproachbetodefineBIMUsesonaprojectbywhatusesparticipants
wanttoperform?NotwhataBIMauthorsaystheyarepermittedtoperform?
IntheE203guideitstatesthatthe"usualapproach"istotaketheposition"becausesomeof
theinformationisnotreliabledon'trelyonanyofit".AndthattheirintentinE203isto
changethatto"becausesomeoftheinformationisnotreliableyoucanonlyrelyonthe
informationthatIexplicitlysayyoucan."
Nowthatseemsasensibleapproach.Ifanarchitecttellsyouthewallsintheirmodelare
LOD200thenignoreanymaterialsinthosewalls.
TheproblemiswhenLOD200alsomeansthearchitectissayingthesewallsaresuitablefor
aparticularBIMUsebysomeotherdiscipline.Becausethenwehavegonefromthe
traditional"weprovideourinformationtoyouatyourownrisk"to"wewillprovideyou
sufficientinformationforyoutoperformyourprofessionalresponsibilities."
TheresultofthiscanbetheBIMauthorallowsnoAuthorizedBIMUsesatall,whichisno
betterthanprovidingitatreceiver'srisk.
OrtheauthorclaimsinformationisadequateforanAuthorizedUsebutitisnot(andthey
refusetorectifyit),becausetheyhavenoideaofwhatisactuallyrequired.
OrathirdscenariowheretheBIMauthorispenalized(orsued)becausethemodelthey
providedwasdemonstrablynotsuitableforanAuthorizedUsetheypermitted(orwere
forcedtopermitundertheircontract).
EitherwaythoseattemptingtousetheBIMmodelforalegitimateBIMUseareleftinthe
lurch,andBIMauthorsareleftatrisk.

AsbadaslettingBIMauthorsdecidedwhocandowhatis,thereisanother,worse,(and
verycommon)approachtodecidingBIMUses.Thatistheassumptiontheownershoulddo
it.Notonlythat,buttheownershoulddoitattheverybeginningoftheprojectbeforethe
variousexpertsrequiredareengaged.
OfcourseitislegitimatethattheownermakedecisionsontheirownBIMUsesfacilities
management,buildingcontroletc.,andBIMUsesthatmayeffecttheirdecisionmakingand
builtqualitycrowdflowsimulation,3Dvisualizationetc.
ButaskingownerstolistallBIMUsesfortheirprojectisabsurd.Therealityisthemajorityof
BIMUsesarebythedesignandconstructionteams,toassistthemperformtheirwork,the
worktheownerhasengagedthemtoberesponsiblefor.
Normallyyouwouldexpecttheownertoselectdesignandconstructionprofessionalsthat
havetheskillstodothethingstheywouldlikedone.Idon'tunderstandwhywhenitcomes
toBIMtheexpectationisthatbysimplylistingaBIMUseinadocumentiswillmagicallybe
donebywhoevergetsengaged,nomatterwhattheirskills.
Iknowownersaretheonesthatpayeveryone,andsocantelleveryonewhattodo,butthat
doesn'tbydefinitionmakethemthebestqualifiedtomakedecisionsaboutallBIMUsesona
project.Expectingthemtodosoisdelusional.

WhataboutStandards
Forsomethingsofundamentalthereisasurprisingdearthofstandardsthatdirectlyaddress
BIMUse.MaybeitistoomuchlikehardworktobesospecificaboutparticularBIMUses.
BIMExcellence.orghasstartedalistofBIMUsedefinitions,125listedsofar,althoughnotall
haveactualdefinitions.Agoodstart,toavoidduplicationandstandardizeterminology.
AtfirstsightCOBiecouldbeconsideredakindofBIMUsestandard.Althoughitsetsoutthe
requiredoutputitdoesn'tdirectlydescriberequiredmodelprogression,andittakesno

accountoftheLODconcept.Forexampleitmakesnodistinctionbetweendatanever
applicableorjustnotavailableyetanyemptyfieldsmustcontain"n/a"inaCOBie
deliverable.
ArealBIMUsestandardwouldsetoutwhatLODrequirementsareformodelelementsto
achievetheuse.
TheBIMforumLODSpecificationisprobablytheonlyrealBIMUsestandard.Itclearlysets
outLODrequirementsforquantitytakeoff,3Dcoordinationand3Dcontrolandplanning.
ButitshouldberenamedtheBIMforumBIMUseSpecificationfor:Quantitytakeoff3D
coordination3Dcontrolandplanning.

(withapologiestoBIMForum)

AsBIMUseisinvariablyperformedbysoftwareyouwouldthinksoftwarevendorswould
haveaninterestinestablishingstandardsthatoptimisetheirsoftwareperformance.
Althoughcompetingsoftwarespecificstandardsarenotnecessarilythebestapproach.
IFCiskindofinthisspace.MVD(ModelViewDefinitions)defineelementsrequiredfor
specificviewsofamodel,whichcouldthembeusedforaBIMUse.ButIFCisreallyabout
softwarestandards,notsoftwareuseorBIMprocessesperformedbyhumans.
IbelievesomestandarddefinitionsaroundBIMUsewouldbereallyuseful.Currentlybeyond
askingspecificpeopleonmyprojectsIhavenowayofknowingwhatisrequiredforaBIM
UseIdon'tparticipatein.
Althoughstandardscanbepartofthesolutiontheycanneverbetheonlysolution.The
expectationthateveryBIMuseforeverydisciplineorteamforeveryprojectwillbecovered
byastandardisdelusional.Andwhatdowedowhilewaitingforstandardstobeauthored,
discussedandagreed?
WhatweneedareprocessesthatestablishBIMUseprotocols.

CurrentBIMUseprocess
Theprocessdoesn'thavetobecomplicated.Let'sthinkaboutitfromfirstprinciples:
1.Someonewantstousesomethingforaspecificpurpose.
2.Theysaywhatthatisandwhattheyrequireforthemtodoit.
3.Whoeverisbestplacedtoprovidethatisidentified.
4.Negotiationsoccurbetweentheprovideranduser.
5.Agreementisreachedonwhatprocesseswillbefollowed.

ButintheworldofBIMplanningtheprocedureis:
1.AnauthorityfiguredecideswhatBIMUseeveryonewants.
2.TheyguesswhatisrequiredtoachievetheseBIMUses
(orusea"BIMexpert"toguess).
3.Theyimposetheserequirementsoneveryone.
4.BIMauthors,nottheowner,decidewhatspecificinformationtheywillprovidefora
BIMUse.

WhenconfrontedwiththeobviousimpracticalitytheusualsnakeoilresponsefromBIM
evangelistsisthat"theBIMExecutionPlanisalivingdocumentthatcanbechanged."That

mightbeamethodtofiximpracticaloutcomesbutitdoesn'tjustifywhythereisan
impracticalprocessinthefirstplace.

AbetterBIMUseProcess
Thatsaidnegotiationisstillthebestmethod.Itnotonlyensureseveryoneisdoingthings
theyarehappy(ish)about,itprovidesanopportunityforeveryonetohavetheirsay.
Butnegotiationshavetooccurinaframeworkthatisrealistic.Pretendingtheycanoccur
beforeeveryoneisappointed(orthateveryonebeappointedattheverybeginningofa
projectasinIPD),orthatpartieswillagreewhenthereisnoincentivetodoso(whenonly
authorsdecidewhat"AuthorizedUses"arepermissible),isdelusional.
Theownershouldbetheonetosetuptheframework,projectparticipantsthenegotiating.
Thereforetheprocessforowneris:
1.TheownerliststheBIMUsestheyintendtodo.
e.g.FM,budgetmanagement,etc.
2.TheownerlistspossibleBIMUsesthatothersmaydo,andaredesirableforthe
project.
BIMUsesthatmayormaynotbeusedontheprojectthatparticipantsmaybecalled
upontoprovideBIMmodelscapableofbeingutilizedfor.
3.Theowneractsasarbitratorinparticipantnegotiations.
Thenaseachprojectparticipantisengagedtheymusthaveshowntheabilitytosatisfythe
relevantowner'sBIMUses,andthecapabilitytosatisfythetherelevantpossibleBIMUses.
AstheexactrequirementsofthepossibleBIMUsesareunknown,andmaynotevenoccur,
feesdonotneedtospecificallyallowforthem,ensuringownersarenotpayingfor
somethingtheymayneverneed,orthatsomeoneelse(theBIMUserecipient)maypayfor.
Aseachprojectparticipantbecomesinvolvedintheprojecttheyarerequiredbeinvolvedin
aBIMUseidentificationandnegotiationprocess:
1.BIMUserequest.
AparticipantnominateswhattheyintendtouseBIMmodelsfor(includingusesthat
theownermayhaveengagedthemspecificallytodo).
2.Defineandcommunicatedatarequired.
ForeachoftheirBIMUsesclearlydescribewhatdatatheyrequireandatwhat
stages.
3.Identifysource/authorofdata.
Basedondatarequired,andthroughnegotiation,identifywhowillbegeneratingthe
data,orwhoisbestplacedtocreatethedata.
4.Agreeonextent/format/formofdatathatwillbeprovided.
Negotiatewiththatpartyonwhatdatatheycanprovide,and/orarewillingtoprovide.
5.Agreeonprocesstosupplydata.
Negotiatetiming,degreeofreliance(LOD)andchecking&rectificationprocedures.
Theownermaybecomeinvolvedatpoint3ifthereisdisputeoverwhotheappropriate
authoris,andatpoint4ifagreementonextentofdatacannotbereached.
Ifitisdeterminedextradataisrequiredtheproviderandrecipientcanexchangeservices
(youscratchmyback,I'llscratchyours)therecipientpays(becauseitsavesthemmoney)
ortheownerpays(itaddsvaluetotheownerand/orproject).Oritisnotdoneasthereisno
measurablebenefit.

Thereyouhaveit.
Thereisobviouslyalotofnuancearoundthedetailbuttheaboveprocessis,tome,amore
realisticwayofapproachingBIMUsemanagement.
Itisnotaradicalproposal,nothingunfamiliarisintroducedtoBIMExecutionPlanning.
IndeedmostcurrentBIMPlanningguideswouldonlyrequireslightadjustmenttoformalize
thisapproach.
Let'stakeBIMfromthetheoristsandmakeitgenuinelypractical.

PostedbyAntonyMcPheeat16:50

Nocomments:

Recommend this on Google

Labels:BIMPlans,Management,Standards

30October2015

ShouldOwnersaskforBIM?
ThereisthisideaintheBIMevangelistcommunitythatowners,theoneswhocommissiona
facility,shouldspecifywhatBIMistobeusedonaproject.NotjustwhatBIMwillbe
deliveredtothem,buthowBIMwillbeusedbyeveryoneinvolvedintheproject.
Tomeitmakesnosense.Doyoutellyourdentistwhatinstrumentstouse,youraccountant
whichsoftware(orcalculator)touse,yourlawyerwhichcaselawtotakeheedof?
AndIsuspectownersarejustasperplexed.Whyaretheybeingaskedwhetherthe
structuralengineershouldusetheBIMmodelforstructuralanalysis,whetherthecontractor
shoulduse4D,5D,fieldBIM?Aren'ttheypayingtheseexpertstomakethosedecisions?
ActuallyIknowtheyarejustasperplexed.I'vesatinmeetingsandworkshopswherethe
owner'srepresentativesarebombardedwiththesetypesofquestions,andnotsurprisingly
theydon'twanttoanswerthem.They'resmartpeople,itnotthattheydon'tunderstandBIM,
itisthattheydon'tseethemselvesastheonesresponsibleforit.
YetthatishowBIMevangelistseeit.Intheireyestheproblemisownersdon'tunderstand
BIM.Afteralltheowner,astheonewiththemoney,istheonlypartywhohascontrolover
thewholeteam.Therefore,theevangelistssurmise,theyaretheONLYoneswhocan
enforceBIMonaproject.Thefacttheyareunqualified,uninterestedanddon'tseewhythey
shouldtakeonthatriskarewilfullyignored.
Besidestheabsurdimpracticallyofit,whatalsobothersmewiththisapproachistheidea
thatBIMmustbeenforced.ThatBIMisonlypossibleifallparticipantsarecoercedto
engageinit.IfthatisthecaseitsuggestsBIMisonlybeneficialtoafew,thatothershaveto
beforcedastheygainnothing.Thisissofarfromthetruth.BIMprocessesimprove
efficiencyandeffectivenessofallparticipants.Sureittakesmoneyupfronttoinvest,timeto
learnnewways.Butafterthatinvestmentyoucandomorewithlesseffort.Astheysay,work
smarter,notharder.
Soifyouareanowner,shouldyouaskforBIM?

APPROACHESTOASKINGFORBIM
ThereareanumberofwaysanownercanapproachBIMonaproject.Theapproachused
willinformwhatprocessesneedtobeputinplacefortheprojecttobesuccessful(inaBIM
sense).
IgnoreBIM
TotallyignoreBIM,assumeitdoesn'texistandmakenoconcessionsforittooccur.
AllowBIM
AcceptBIMcanoccurandnotstandinitsway.Makeconcessionsforittohappen.
EncourageBIM
AppreciateBIMisworthwhileandactivelyencourageitsuse,butnotdirectlyengageinBIM
processes.
ParticipateinBIM
IntegrateyourownBIMprocessesintotheBIMprocessesofothers.
DemandBIM
EnforceBIMofyourowndesignonallprojectparticipants.
Allarevalidapproachesanddependontheparticularcircumstancesoftheprojectandthe
availablepeople.Butwhatiscriticalisthatthereishonestyintheapproachtaken.Don't
pretendyouareencouragingBIMwheninfactyouareignoringit,don'tdemandBIMwhen
allyouneedistoparticipateinit.
Beforedecidingwhichapproachseemsrightlet'sdebunksomemythsaboutBIMforowners.

BIMISNOTJUSTFM

Oneofthemisunderstandinggoingaround(sometimesIthinkwilfully)isthatBIMis
equivalenttofacilitiesmanagement.ThattheonlythingBIMmeansistheuseofa3Dmodel
connectedtoadatabasetomanagethemaintenanceofafacility.
Attheextremeendofthisviewyouhavepeoplewhothinkthatifyougetthedesignand
constructionteamstouseBIMyouwillhaveafullyfunctionalBIMFMsystemattheendof
theproject.
Idon'tunderstandhowanyonecouldthinkthiswastrue.WhywouldaBIMmodelcreatedto
design,analyse,andcoordinateabuilding,oronetocostandprogramitbesuitablefor
facilitiesmanagement?YetIhavehadclientssaytheywantourRevitmodelprovidedto
them,completewithpaintmodelled,sotheycanuseitdirectlyforfacilitiesmanagement.
Alessor,butnonethelessjustasmistakenview,isthattheBIMdoneduringdesignand
constructionisjusttheretoprovidethedatafortheFMsystem.Andfurther,thatifBIMisnot
usedduringdesignandconstructionitisnotpossibletohaveaBIMbasedFMsystem.
Letsthinkaboutthisabit.TouseBIMforfacilitiesmanagementyouneedagraphical3D
modelandadatabaseofinformation.Youcouldpaysomeonetocreatethemodeland
populatethedatabasewhenyousetuptheFMsystem.Oryoucouldgetthewholedesign
andconstructionteamtochangetheywaytheydotheirworkjustsotheyproducea3D
modelandpopulateddatabaseatthecompletionoftheirwork.
Doesthatsecondmethodreallysoundsensible?Whywouldyoucompromiseamuchbigger
process(thedesignandconstructionofafacility)toreducetheeffortofasmallerprocess
(populateanFMdatabase)?BIMevangelistsgoonabouthowmuchlargerthecostof
runningafacilityiscomparedtobuildingit.ButdesignandconstructionBIMcanonlyever
contributetotheinitialsetupoftheFMdatabase,ithasnothingtodowiththeongoing
operation.
ButBIMisnotjustFM.Itisusedformuchmorethanthat.Andoncethatisrealisedthe
benefitscanbecaptured.
IfdesignprofessionalsuseBIMfortheirprocesses,theywillhavealotofdata,including3D
graphicaldata.Thecontractorcanutilizethisdatafortheirpurposesandadddatatheyuse.
Thisdatawon'tbestructuredtosuitFM,afterallithasbeencreatedforotherpurposes.But
thereisafairbitthatcanbeusedforFM.ThecostofrestructuringthisdatatosuitFMis
theoreticallylessthancompletelyrecreatingit.ThatisthebenefitofBIM.

Sodon'taskforBIMiftheonlyreasonistoprovidecompleteddataforyourFMsystem.
Theremaybecheaperwaysofdoingit.
Anddon'taskforBIM,orBIMdeliverables,ifyouhaveapaperbasedratherthanBIMbased
FMsystem(Iknow,kindofobvious,butsurprisinglycommon).
DoaskforitifyouwanttoaccesstoBIMdatacreatedforotherpurposesforyourFM
system.

DON'TKILLTHEGOLDENGOOSE

OfcourseyoumaynothaveaBIMbasedFMsystem,norintendtoimplementone.That'sa
commercialdecisionfortheowner.
Ifyoudon'tneedBIMforFM,whyhaveBIMontheprojectatall?
BIMisatool,atooltodorealworldthingsmoreefficientlyandeffectively.Itisusefulfor
anyonewhousesitproperlyandfortherightreasons.
IfyourdesignandconstructionteamsuseBIMonyourprojectthereisanopportunityforthe
projecttobedonemoreefficientlyandeffectively.You,astheowner,benefitsfromaproject
thatislesslikelytosufferdelays,islesslikelytospringsurpriseadditionalcosts,andwill
resultinabuildingwithahigherqualityofdesignandworkmanship.
SoifyouwantawellrunprojectyouwillwantBIMtobeused.
Buttheownerisnotresponsiblefortiming,costoverrunsandbuildingquality.Thedesign
andconstructionteam,viatheircontracts,havetheseresponsibilities.Andiftheowner
instructsthemonhowtodotheirjob,howtoundertaketheirresponsibilities,theownertakes
onsomeofthoseresponsibilities.

ENCOURAGINGBIM
ThebestwayanownercanensureBIMisusedistonotdictate,notenforce,butto
encourageBIM.Howmightthisbedone?

SELECTION
ThefirststepinencouragingBIMistoengageBIMcapableprofessionals,toincludeBIM
capabilitiesinbidrequirements.
BythatIdon'tmeanadescriptionofwhatBIMprocessesabiddermustundertake,buta
requestthebiddersprovideadescriptionoftheBIMprocessestheyalreadydo.Inthisearly
periodofBIMtakeupyoumayextendthistoincludeBIMprocessesbiddersintendorare
preparedtoimplement.
Theaimistogetthemtomakeanoffer,fortheuseofBIMtobetheirresponsibility.
ButkeepinmindBIMisbutoneaspectofwhyyouselectaparticularbidder.Professionals
areprimarilyengagedfortheircapabilitiesintheirareaofexpertise,andservice
performance.BIMisonlyatool,itwon'tcompensateforlackofexpertiseorpoorservice.

AGREEMENTS&CONTRACTS

ThesecondstepistoensureagreementsandcontractualarrangementsallowBIM
processestoworkfreely.AsmentionedaboveallBIMprocesses(exceptfacilities
management)arebetweenthedesignandconstructionteams.Thisisachallengeforthose
drawingupandapprovingagreements.Traditionallycontractshavebeendesignedtobe
betweenthepersonpayingandtheonedoingthework.BIMcapableagreementsrequire
additionalclausesthatsetouthowthosebeingpaidwillinteractwiththirdpartiesother
projectparticipants.
Obviouslythereareawholeraftofissuestoconsider,andthetypeofBIMprocesses
undertakenwillinfluencewhatspecificrequirementswillbe.Whichisanothercomplication.
TheownerisnotaparticipantintheseBIMprocesses(withtheexceptionoffacilities
management),noraretheexactBIMprocessesknownatthebeginningofaprojectbefore
everyoneissignedup.
TheBIMevangelist'sansweristoignorerealityandassumetheownerHAStobeaBIM
participant,andthateveryoneHAStobesignedupattheverybeginningofaproject(as
evidencedbythepushforIntegratedProjectDeliverytypecontracts).
Butitdoesn'thavetobethisway.Contractsneeddonomorethanensurethefreeflowof
informationinBIMtypeformat.Thatis,BIMinformationcreatedbyprojectparticipantsmust
befreelyavailabletoallotherprojectparticipants.Soundssimplebutthereisaparanoia
abouttheftofintellectualpropertythroughouttheindustry.Thedefaultpositionistowithhold
information.Contractsneedtospecificallyoverridethisposition.
Tiedinwiththisisthatallinformationindeliverablesmustmatch.Thatinformationon
drawingsandschedulesmatchinformationinBIMmodels.AndthatrecipientsofBIMmodels
canrelyontheinformationinthosemodels.Itmustalsobespecifiedthisonlyappliesto
informationaparticipantwouldordinarilyprovide.Ifanarchitectincludessomeductsintheir
modelforcontext,thatdoesn'tmakethemresponsibleforthecompletenessandaccuracyof
thoseducts.
ContractscouldbefurtherextendedtobeBIMfriendly.Forexampleallowingforproject
participantstodomodellingforothersparticipants,whilstresponsibilityisretainedbythe
requestingparty.Sothearchitectsmightmodelductworkforthemechanicalengineers(or
subcontractor)buttheengineersorsubcontractormustcheckandapprovethatmodelling
work.
BIMcapableagreementsandcontractsareintheirinfancyandnoonecanpredictwhattheir
eventualformwillbe.ButIbelieveifweapproachthemwithaviewtoencouraging,or
allowingBIM,ratherthanenforcingBIM,wewillendupwithmuchmoreusefulagreements
andthereforeBIMworkflows.

EVIDENCEOFBIM
RatherthandemandingdirectBIMdeliverablestheywillneveruseownersshouldlookat
requestingevidenceofBIM.RequestingevidencealsomeansthatevenifspecificBIMisnot
definedbyownerstheycanstillinfluencetheuseofitontheirproject.
ThereisnothingwrongwithrequestingevidenceofBIMprocessesasdeliverables.The
ownermaynotparticipateinthecreationofaBIMManagementPlan,buttheycanincludeit
asadeliverable.Theymaynotattendclashcoordinationmeetingsbutminutesofoutcomes
canberequested.
HoweverevidenceofBIMshouldneverbeprovidedfor'approval'.Notonlydoesthispass
someresponsibilitybackontotheapprover(theowner)buthasthepotentialtoholdupthe
project.
Thepurposeispurelytoensurewhathasbeenpromised(seeSELECTIONsectionabove)
isbeingdone.AnownermayrejectaBIMManagementPlanasbeingincompleteor
inadequate,butshouldnever'approve'it.

REMUNERATION
BIMisoftentoutedas'costingmore'.ButresearchhasshownoverallaprojectusingBIM
processesismorecostefficient.Itmaybedirectlycheaperand/orquickertobuild,oramore
complexresultisachievableforthesametimeandmoney.
Theproblemisthatnotallparticipantssharethesecostsavingsequally.Whichiseasyto
seewhenyoulookathowBIMworks.BIMmodelsarecreatedearlyinaprojectandpassed
ontoparticipantsthroughthetermoftheproject.Thearchitectmodelsthebuilding,the
mechanicalengineerusesthatmodeltodoenergycalculations,themechanicalengineer's
modelispassedontothemechanicalsubcontractorwhousesitasabasisforshop
drawingandCAM,thismodelispassedtothefacilitiesmanagertopopulatetheirenergy

managementsystem.Thefurtherupthechainthemorecompletethemodelisandgreater
thesavingsintimeandeffort.Andofcoursetheownerisatthetopofthischain.
Anotherissueissomeparticipantsarerequiredtodomorethantheyhavepreviouslydone.
Engineerstraditionallyproducediagrammaticdrawingsandperformancerequirementsfor
equipment.WithBIMtheyhavetomodeltheirworkaccuratelyandselectspecific
components(otherwiseyoucan'tmodelthem).Ofcoursepayingthemextratodothiswork
isnottheonlysolution.Butsomeonehastodoit,andnooneisgoingtodoitforfree.
BIMalsorequiresmoreworkupfront.Themechanicalengineercan'tdoanenergyanalysis
onahalfmodelledbuilding.IfthepointofBIMistocreateacompletevirtualbuildingtotest
itsbuildabilitythenithastobecompletelydesignedandmodelledbeforeconstructionstarts.
BIMmay'costmore'forsome,butoverallitdoesnot.Soitisnotnecessarilyaboutspending
more(althoughthatwillcertainlybolsteruseofBIM!).ToencourageBIMthereneedstobe
arethinkofwhereandwhenmoneyisspent.Moremoneyisrequiredatthepre
constructionBIMmodelcreationstage.
Thismaybeintheformofextrafordesignprofessionals,theappointmentofadditional
professionals,orbringingforwardengagements(e.g.servicessubcontractors).
Andwithinthoseengagementspaymentschedulesneedtoberevised.Feesarenormally
brokenupintostages.WithBIMmoreworkisdonemorehoursexpendedinearlystages
thantraditionalworkmethods.
Idon'tbelieveasimilarconcessionisrequiredatconstructionasBIMprocessesbring
enormouscostbenefitstocontractors.InfactIbelieveownersneedtobecarefultheyare
notpayingforBIMefficienciesthatthecontractorwillpocket.AnyBIMfromthedesignteam
shouldbetreatedasanassetthatbenefitsthecontractor.

DIRECTENCOURAGEMENT
AndofcourseownerscandirectlyencourageuseofBIM.Notbydemandingit,butbyhaving
astrongexpectationthattheteamwilluseBIMprocesses.Ownersdon'tneedtohave
intimateknowledgeofthoseprocesses,buttheycanexpecttheirdesignandconstruction
professionalsdo.

CONCLUSION
Sowhatistheanswer,shouldownersaskforBIM?
Asisthecasewithmostquestions,thatdepends.Butherearesomerecommendations.

IgnoreBIM
Notrecommended.Ifyoudon'tunderstandBIMordon'twantitdon'tstandinthewayof
thosethatdo.Thefactothersuseitwillnotcostyoumore,norwillitincreaseyourworkload.

AllowBIM
Ifyouareunsureanddon'treallyunderstandmuchaboutBIMthisisavalidapproach.It
providesanopportunitytolearnfromothers.

EncourageBIM
EncouragingBIMisthebestapproachiftheownerdoesnothaveaBIMbasedFMsystem.
ItallowsthedesignandconstructionteamtomakebestuseofBIMfortheirpurposes.Italso
createsawealthofBIMdata.ItisnotstructuredforFMuse,butcanstillbeminedforuseful
FMdata.

ParticipateinBIM
AtrulyBIMprojecthaseveryoneparticipatinginBIM,includingtheowner.Ownerscan
participatebyhavingtheirownproperlysetupFMsystemthatusesBIM.
Havingskininthegame,sotospeak,meansBIMdeliverablescanbeproperlyvaluedasto
theirworth.AndifeveryoneisaparticipantBIMplanningcanbeundertakenwithconfidence,
andresultinevengreaterbenefitsthanindividualuseofBIMbrings.

DemandBIM
Notrecommended.Unlessyouareaconglomeratewitharchitects,engineersand
contractorsallunderthesameroofyoushouldnotbedictatingwhatBIMisdone.Eventhen
caremustbetakentoensuresomeparticipantsarenotworkinginefficientlyforquestionable
benefitselsewhere.

PostedbyAntonyMcPheeat10:48

3comments:

+4 Recommend this on Google

Labels:BIM,Management

29August2015

EverydayBIM
Thismonth3yearsago,August2012,IstartedthepracticalBIMblog.
MyoriginalintentionwastoblogaboutpracticalwaystomakeBIMwork.ButwhenIstarted
reviewingtheliteratureonBIMIbecamealarmedatthemisunderstandingsanddirection
BIMwasheading.Itsoonbecameapparentthataswellasthingsthatshouldbedoneto
makeBIMwork,therearealsothingsthatshouldNOTbedonetomakeBIMwork(orat
leastnotmoreworkthanitneedstobe).
ItseemstomethemisuseofBIMstemsfromsomebasicconceptualmisunderstandings,(or
intentionalmisconstructions)ofBIM.IfIbelievethesepeoplearemistaken,whatismy
conceptionofBIM?Howandwhyisitdifferent?
SoonthisanniversaryIthoughtittimelytodoapostsettingoutmyviewsonBIMnot
special,worldchangingBIM,justordinaryEverydayBIM.
FirstsomethoughtsonwhatBIMisnot.

BIMisnotAUTOPIA

BIMisasetofprocessesthatmanagescertaintechnologies.Itis,andalwayswillbe,
changing.Asnewtechnologiesbecomepossiblenewprocesswillevolve.Anditwill
eventuallybesupersededbyanewacronymforadifferentapproach,justasBIM
supersededCAD.
Thereisnoend,nopointinthefuturewhereBIMwillbeperfectedandstabilized.
Whyisthisimportanttoappreciate?IfyouareadoptingBIMundertheassumptionitisaone
offexercisethatleadstoanamazingoutcomeyouwillbesorelydisappointed.Ifyouare
waitingforBIMtoreachperfectionbeforeadoptingityouwillbewaitingforever.
Therewillbeimprovements,buttheperfectionpromisedwillneverarrive,andtheneedfor
furtherchangeswillnotevaporate.
BIMisnotanendinitself.Itisaprocessofcontinuingimprovement.

BIMisnotANEXCUSEFORSOCIALENGINEERING

ThereisamythaparticulartypeofcontractualarrangementisrequiredforBIMtowork,so
calledIntegratedProjectDelivery.Thisisalliedwithaworkarrangementbeingcalled
"ProjectTeamIntegration".
ThereisnothingwrongwithIntegratedProjectDelivery,itsaimsofsharedresponsibility,risk
anddecisionmakingislaudable.Butjustasyoudon'tneedtouseBIMtoachievethese
aims(e.g.TheNationalMuseumofAustraliausedCAD),usingBIMdoesn'trequireIPD.
TheinsistencethattheconstructionindustrymustmovetoIPDtypecontractsandwork
arrangementsforBIMisanakedattempttouseBIMasadrivertoimprovethewaytheway
theindustryworks.ThisisgreatforbetteringtheAECOindustrybutdetrimentaltoBIM
adoption.BIMisnottheonly,andcertainlynotthemostcritical,driverintheselectionof
contractualarrangements.MakingtheassumptionIPDisnecessaryforBIMleadstoBIMnot
beingconsideredforprojectsthatrequireothercontractualarrangementsforreasonsother
thanBIM.

BIMisnotRESTRICTEDTOALLINONESOLUTIONS

ThereisanunderlyingassumptionthataBIMmodelmustbecomeasingleunified'thing'
("IntegratedDataEnvironment"),andthatallBIMprocessesmustbeunderthecontrolof
oneentity.
ThisviewispromotedbytheUKLevelsofBIMMaturity(aspertheBewRichardsdiagram),
where'Level3'BIMisanintegratedwebbasedsolution(socalled'iBIM').

Theonlyrealisticwaythiscanhappenisifallparticipantsusethesameplatform,orall
rigorouslycomplytothesameStandards,(assumingmultipleplatformswillbeableto
communicateviadatathatadherestoStandards).
Whilstitistruegreaterefficienciesaretheoreticallypossiblebytightintegrationofallaspects
ofdesign,constructionandoperation,thereareconsequencesofthisapproachthatare
beingignored.
Forcingallparticipantsusethesameplatformwillleadtoinefficienciesamongstindividual
parties.Eachofusmakechoicesabouttechnologiesandprocessesthatarethemost
efficientatfulfillingourresponsibilities.Andbecauseofcompetitionthebestavailablecomes
intocommonuse.Theseindividualactionsadduptoanefficientandcosteffectiveoverall

process.Any'allinone'platformwillnevercontainthebestinbreedacrossalldisciplines.
Theresultofthisapproachwillbethedominanceofproprietarysoftwaremonopolies,a
situationallthesoftwarehousesarecurrentlyscramblingtotakeadvantageof.
Therequirementforsuchtightintegrationwillalsoencouragetheascendancyoflargemulti
disciplinaryfirmsandverticalintegrationintoAECOconglomerates.Saygoodbyetothe
bespokearchitecturaldesignfirm,mediumsizecontractorsandspecialistsubcontractors.
TheexpectationthatiBIMwillbepossiblethroughtheuseofStandardsisjustafantasy,
moreonthatbelow.
ThewholeideaofiBIMisanalogoustoacommandeconomy.Intheoryafullymanaged
economywithcentralizeddecisionmakingshouldbemoreefficient.Butinpracticeamarket
whereindividualsmakethedecisionsismoreefficient.Blatantlydemonstratedwhenthe
USSRcollapsed,andmorerecentlytheproblemsinVenezuela.
BIMisasetofprocessesthatmanagescertaintechnologies.Thereisnoreasonthose
processescannotbetailoredtosuitwaysofworkingthatmaintaintheefficienciesofa
marketapproach.
ThatisnottosayiBIMisnotarealisticprospect,northatitwillneverhappen.Theproblem
iswhenitisassumeditwillbetheONLYfutureforeffectiveBIM.

BIMisnotABUNCHOFSTANDARDS

ThereisanenormousexpectationthatStandardswillmakeBIMnotjustmoreefficient,but
inthemindsofmanyBIMwillnotbetrulypossibleuntilStandardsareinuniversaluse.
Now,IbelieveStandardsareagoodthing,whichiswhyIfollowtheirdevelopmentso
closely.Buttheyarenotthepanaceatheyareportrayedtobe.Andthemainreasonsare
inherentinhowStandardsarecreated.
Standardstakealongtimetobedevelopedandagreed.MostworkonStandardsaround
theworldisdoneforfreebyvolunteers.TheprocessforapprovingStandardsisalsounpaid
andrequiresmanypeople,oftenfromwidelydispersedplaces,tocometogether.Thisis
particularlypertinentfortechnologydependentprocesseslikeBIMwhereStandardstrail
currentpracticenotbyyearsbutbydecades.
BecauseStandardcreationandagreementislargelyunrewardedthebestandbrightest,
mostexperienced,arenotattractedtoparticipate.Althoughitdoestendstoattract
academics,wheretheirparticipationdoesbringreputationalrewards.Theymaybethe
brightest,butlackpracticalexperienceandtendtocreateobtusedocumentsnooneelse
butfellowacademicscancomprehend.
SoStandardsinvariablydocumentoutofdatepracticesinamannerthatcannotbe
understoodbythosewhoaresupposedtofollowthem.
Idon'tseehowitwilleverbepossibletoentirelyrelyonStandardsandtheiradherenceto
deliverBIM.Processesandconventionsdevelopedbyindividualpeople,firmsandproject
teamswillalwayspayamajorroleinBIM.Justasproprietarysoftwareandformatswill
alwaysbeattheforefrontofBIMtechnology.
StandardsdevelopmentshouldfocusonsupportingmarketdrivenBIM,notbeputforward
asBIMitself.

BIMisnotAWAYTOGETOTHERSTODOYOURWORK

BIMisoftenportrayedasaprocesswheresomeonewillprovidesomeoneelsewitha
productthatreducesthatpersonswork.Forexampleafacilitiesmanagerwhoreceivesa
BIMmodelwillgainarecordoftheconstructedbuildingthatcanbeusedtomanageit.
Whilstthisisbroadlytrue,thisisinterpretedtomeanthattheproviderwilldotheworkofthe
receiver.Thatifthefacilitiesmanagercan'tdirectlyusetheBIMmodel,useBIMdatato
populatetheirFMdatabase,theproviderhasnotdonetheirjobproperly.
ThisispropagatedbythemyththataBIMmodelcanbeusedforanypurpose,evenif
createdforaspecificpurpose.AnarchitectcreatesaBIMmodeltocommunicatewhatisto
beconstructed,nottomanageabuiltfacility(inanycasetheywouldn'tknowhowto
architectsarenotfacilitymanagers).
AndifaBIMmodelcanbeusedforanypurpose,thereisnorequirementtopaysomeone
tomakeitfitforparticularpurpose.Sothereisanexpectationthisworkbeingdoneonthe
receiver'sbehalfisfree.
Icanseenojustificationforthisbelief,yetissurprisinglycommonamongowners.Itisoften
aroadblocktoBIMadoption.AnownerwantsBIM,butdoesn'texpecttopayforit.Whena
costisputonitbytheAECOparticipantsBIMgetsdroppedinitsentirety.Theproject
becomesa'nonBIM'projectandBIMisactivelydiscouraged.

SowhatisBIM?

BIMisACONCEPT

AtitscoreBIMisaconcepttheideathatthephysicalbuilding,systemswithinitand
processesusedtorealizeitaremodelledbeforeabuildingisbuilt.
Thissoundssimplebutisaparadigmshiftfromhowmostarchitectsandengineersview
theirdeliverables.Thenormistoprivilegedrawingsthatthefirm'soutputaredrawings.Of
coursetheirrealoutput,andwhateveryoneelseexpects,isinformation.Drawingsmerely
communicatethisinformation,theyarenothingmorethanatool.
WhentrainingCADuserstouseBIMsoftwarethebiggesthurdleistogetthemto
understandthatthedrawingisnotthemostimportantaspect.Togetthemtostopobsessing
overlineweightsandconcentrateonensuringwalldefinitionsreflectwhatthewallistobe
constructedfrom.
Oncepeoplegetitthattheirjobistomodel,nottodraw,everythingbecomesmucheasier.
Andifyoudon'tunderstandthis,youwillneveruseBIMtoitsfullpotential.

BIMisTECHNOLOGY

ThedegreeBIMispossibleisdependentonavailabletechnologiessoftwareandhardware.
WhenIfirststartedusingAutoCADinthe1980'sIgotexcitedwhenIsawyoucoulduse
layernamestodescribewhatelementsrepresented.Backthenthatwasallwehad
available,butitwasstillaformofBIM.
ItisoftensaidthatBIMisprocess,notsoftware.WhilstthisistrueBIMisprocessthat
managessoftwares.ThereforeBIMprocessesarelimitedtowhatsoftwarecando.
ItispointlessdevelopingBIMprocessesandStandardsthatareindependentofavailable
technology.Pointlessbecausenoonecanuseactuallythem,orareforcedtoinvent
elaborateandtimeconsumingworkaroundsthatmimicthoseimpracticalprocesses.
BIMisinpracticaltermstechnology.Ignorethisfactandyouwillsoonpaintyourselfintoa
corner.

BIMisPROCESSES

BIMisasetofprocessesthatmanagesAECOtechnologies.Individualprocessesthatcan
belinkedtoandlinkedfromotherprocesses.Processesthatworkinparallel,branchoffand
havedifferentoutcomes,abitliketheywayamoleculeisstructured.BIMisnotonesingle
linearprocessthatwillonlyworkifallpartsareinuse.
Anypartofthedesign,constructionoroperationsofabuildingcanuseBIM.Itdoesn'thave
tobeusedallthetimeforeverytask.
Whileitistruesomeprocessesaren'tpossibleifotherprocessesarenotbeingused,itdoes
notnecessarilyfollowthatoneprocessjustifiestheimplementationofallitsprecursor
processes.
NoristhefactaparticularBIMprocessisnotbeingusedreasonenoughtonotuseother
BIMprocesses.
BIMentailsmultipleprocesses,eachofwhichshouldbejustifiableforitsownsake.

BIMisOPPORTUNITY

TheoriginalintentofBIMwasthatbycapturingworkinadigitalformatitwouldbemore
usefultothosethatutilizedtheresultsofthatwork.
ItwasneverintendedtomeanthatBIMisanew,additionaltaskthatproducestherawdata
requiredbyotherstodotheirwork.ThatBIMdataprovidedwillbestructuredtosuitthework

processesofothers.
TheworkflowenvisagewasthatsomeoneprovidedtheirBIMmodeltosomeoneelse,who
thenextractedandrestructuredtheinformationtheyrequired.Theproviderremains
responsiblefortheirdatathatitrepresentstheirareaofexpertiseanddeliverables,but
theyarenotaccountableforitsusebyothersforpurposesoutsideoftheirresponsibilities.
AservicesengineerprovidesaBIMmodelofductworktothecontractor,whichthe
contractormayusetocreatefabricationBIM.Ifthereisanerrorinthefabricationmodelitis
nottheservicesengineer'sresponsibility,butifthereisanerrorinthecapacitysizing
provideditis.Ifarchitectsmodelabuildingin3D,andthestructuralandservicesengineers
dothesame,thenthisprovidessufficientinformationtousesoftwaretocheckforclashes.
ProvidingsomeonewithBIMdatagivesthatpersontheopportunitytouseitfortheir
purposes.Itmayrequirevalidationandadjustment,butitisstillusableanduseful.
WhatBIMdoesisprovideanopportunityforimprovedefficiencyandqualityofoutcome
throughtheavailabilityofdata.Andthisisbestdonethroughfosteringcooperationand
collaboration,notrigiddemands,especiallyfromthoseoutsidetheimmediateprocess.

EVERYDAYBIM
Howmightthisapproachbeusedeverydayforrealprojectsintherealworld?
Somegeneralsuggestions:

OWNERS:
RestrictBIMdemandstothingsyouneeddirectly(e.g.assetmanagement),andtoensure
generalBIMproficiency(e.gwithindisciplineexpectationslikedrawingandschedules
generatedfromBIM).
Don'tmakeBIMdataadeliverableifyoudon'tneedityourself,insteadincludeengagement
contractclausesthatallowfortheexchangeofdatabetweenprojectparticipants.

DESIGNPROFESSIONALS:
UseBIMcapablesoftwareinthewayitisdesignedtobeused.
Documenthowyoustructureyourdataandmakeboththedescriptionanddataavailableto
others.

CONTRACTORS:
TakeadvantageoftheBIMdataavailableonaproject.
FosterBIMprocesses,alongwithcooperationandcollaborationacrossprojectparticipants.

TRADES:
EmbodyBIMprocessesinsupplychainandworkmanagement.Tailorthoseprocessesto
takeadvantageofavailableBIMdata.
Allowotherstousethedatayouproduce.

FACILITYMANAGEMENT:
DevelopFMsolutionsthattakeadvantageofavailableBIMdata.
Becomeinvolvedbeforefacilityhandoversoyoucanmakeyourrequirementsknownto
others.

NoticeIhaven'tmentionedStandards.ThatisnotbecauseStandardsareneverusefulor
don'thaveaplace.ItisbecauseStandardsshouldonlybeusediftheyarebeneficialifthey
assistinachievingtheunderlyingaims.ThedecisiontouseStandardshastocomefrom
projectparticipants,theoneswhocreateanduseBIMdata,theonlyoneswhocanassess
theirusefulness.

Ihopeyoufindthesegeneralsuggestionshelpful,eveniftheyareperhapstoobrieftobe

trulypractical,somethingIwillaimtoameliorateinfutureposts.

PostedbyAntonyMcPheeat13:14

4comments:

+13 Recommend this on Google

Labels:BIM,Management,Standards

28July2015

ProcuringBIMPAS11922andacifPTI
IfeelsorryforownersandmanagerswhoneedtomakedecisionsaboutBIMonaproject.
Theinformationavailableisvagueitishardtoextractpracticaladvicethatcanbeacted
upon.Andconfusing,mixingupBIMissueswithmanagementpracticesthathavenothingto
dowithBIM.

PAS11922
IrecentlyworkedmywaythroughtheUKPAS11922:2013.Fulltitle:Specificationfor
informationmanagementforthecapital/deliveryphaseofconstructionprojectsusing
buildinginformationmodelling.
Itisa"PubliclyAvailableSpecification",whicharedocumentscreatedforasponsorby
theBritishStandardsInstitution(BSI).InthiscasethesponsorwastheUKConstruction
IndustryCouncil(CIC).NotthattheBSIdoallthework.ThePASisdoneviaconsultation
andanumberorganizationshavebeeninvolved(24areacknowledged).Itwaspublishedin
February2013andis68pages.
Itsaudience"includesbusinessesandthoseresponsiblefortheprocurement,design,
construction,delivery,operationandmaintenanceofbuildingsandinfrastructureassets."
WhatinterestedmeisthatPAS11922isanattempttoholisticallycaptureBIMprocesses
frombeginningtoendofaconstructionproject.Itisoneofthefewexampleswhichtriesto
proscribehowtocommenceaBIMproject,howtocreateaBIMbrief.

acifBIM&PTI
TheotherdocumentsIrecentlysloggedthroughwereaseriesonBIMbytheAustralasian
ConstructionIndustryForum(aciftheypreferlowercase),apeakbodyofpeakbodies,
includingthelikesofThePropertyCouncil,EngineersAustralia,MasterBuilders,Facilities
ManagementAssociationtonameafew.TheBIMdocumentsareauthoredbytheStrategic
ForumfortheAustralasianBuildingandConstructionIndustry,abodywithintheacif
thatthat"bringstogetherkeystakeholders".

Documentsinclude:
AFrameworkfortheAdoptionofProjectTeamIntegration&BIM,publishedDecember
2014,acknowledges11participants,andis60pages.
BuildingandConstructionProcurementGuide:ProjectTeamIntegrationandBuilding
InformationModelling(BIM),publishedJune2015,acknowledges8participants,56pages.
Thesedocumentsessentiallycoverthesameground,withthelateronecontaining
marginallymorespecific'advice'.
Thefirst"isdesignedtoguideandassistindustrystakeholdersintheadoptionand
implementationofPTIandBIM."
Thelater"istoprovideassetownersandprojectprocurerswithanoutlineofpotential
procurementpractices,processesandstepswhichmightbefollowedindevelopingeffective
procurementstrategiesforimplementationofBuildingInformationModelling(BIM)and
ProjectTeamIntegration(PTI)onspecificprojectswithinthebuiltenvironment."
TherearealsotwodocumentsonProjectTeamIntegration(PTI):TheCaseforProject
TeamIntegrationandProjectTeamIntegrationWorkbook
DespitetheirtitlesandselfdescriptionsalloftheacifdocumentsaremoreBIMandIPT
salespitchesthanpracticaladviceorstructuredworkflows.

ItisinterestingtolookatthesedocumentssidebysideastheUKisheadingformandatory
BIM,whereasAustraliais,well,onitsown.Thecurrentfederalgovernmentdoesn'tbelieve
anythingneedstobedoneaboutglobalwarming,soBIMiswaytooavantgardeforthemto
evencomprehend,letalonemandate.
Butgovernmentschange,andwhattheacifisspruikingmayendupintheformthatPAS
11922takes,orindeedthewholesaleimplementationofanunchangedPAS11922.
Sohowdotheystackup?

ANEASYREAD?
Inaword,no.
PAS11922isacronymcity.Ihadtospendalotoftimememorizingthemyriadof
abbreviations:
BEP,TIDP,MIDP,RM,PlM,PIP,SCCS,SMP,CPix,EIR,Capex,Opex,CDEgates,RACI,
WIP,AIM,CDM,andnotonlyLODbutalsoLOI.
AlthoughPAS11922hasaglossary,noteveryacronymislisted.Itwasn'tuntilpage13that
IfoundoutwhatPASstoodfor.

Terminologyvariestoafrustratingextent.Youkindofexpectsomevariances,particularlyas
PAS11922isfromtheUK,acifdocumentsfromAustralia.Buttheauthorsseemtorevelin
creatingtheirownuniqueterms.TheOwneriscalled"Employer"inPAS11922,"Project
Sponsor"inacifdocuments.acifhaveinventedanewtermforIntegratedProjectDelivery
(IPD)"ProjectTeamIntegration"(PTI).TheyexplainthatPTIisamoregenericterm,IPD
beingaformofcontractratherthanadescription.Idon'tseeit.IPDisalreadyaterminuse
inAustralia,andperfectlyadequate.Whyinventanewone?
PAS11922isadocumentyoustudytakenotes,rereadsections,drawyourown
diagrams,googlealot(tofindoutwhattheacronymsmean).Justreadingitwillleaveyou
confusedandbeofnopracticalbenefit.Alotofthoughthasgoneintoit,butgolly,doesBIM
havetobethiscomplicated?
Theacifdocumentsareeasiertoreadifyoucanstayawake.Thesamethingsare
constantlyrepeated,notjustwithindocuments,alsoacrossdocuments.Thereisreallyno
pointreadingtheFrameworkdocument,thesameinformationisrepeatedintheBuilding
andConstructionProcurementGuide.
Buttobefairalldocumentsofthesetypesaretedioustoread.Bothsetsofdocumentsare
extremelywellstructured,havegoodcontentspages,glossariesanddefinitions.And
unfortunatelyrepeatinginformationisderigueurforthesetypesofreferencedocuments.

REALISTICWORKFLOWS,OBJECTIVES?
PAS11922describesworkflows,theacifdocumentsreallydescribesobjectives,andnow
andagain,ifyouknowwhattolookfor,actionstoachieveobjectives.
GenerallybothhaveagoodgraspofBIM,withinklingsofevidencethereareatleastsome
peopleinvolvedwithdirectexperience.ButtherearesomeareasthatIbelievepushthe
boundsofpracticality.

PRETENDERBIMPLAN
TherequirementforapretenderBIMplaninPAS11922isunrealistic.Idon'tseehowthis
isevenpossibleunlessthetenderprocessisseverelylimitedtoonlyseekingbidsfrom
consortiums.ABIMplanneedsallpartiestogettogethertoagreeonaplan.Howcanthis
bedoneattenderorRFTstagewhenmultiplepartiesarebiddingforthesamework?Ifitis
enforceditsetsupanenvironmentwherecollusioncouldrunrife.Allthosetendersgetting
togetherandjustdiscussingBIM?
Unless,thatis,PAS11922reallymeanssomethingotherthanatraditionalBIMplan.I
searchedforthispossibilitybutcouldfindnothingthatsuggestedotherwise.
ButIsmellarat.AlthoughPAS11922explicitlystatesitissuitableforallcontracttypesthe
underlyingassumptionthatcomesthroughisthatonlyIPD(IntegratedProjectDelivery),
AllianceandothercombinedriskcontractsaresuitableforBIM.
Thisassumptionisalsoexplicitintheacifdocuments.Theirintroductionofanewacronym
IPT,(IntegratedProjectTeam),andthetimespentextollingitsvirtuesbelietheirunderlying
intent.Moreonthatbelow.

GATEWAYSORBLOCKAGES
PAS11922includes"Gateways",whereBIMdataisapprovedbeforethedataisreleased
forusebyothers.ThisisnotanewinventionbroughtaboutbyBIM,manyQAprocesses
alreadycontainsuchprocedures.
Holdandreviewpointsaregoodintheory,butifnotstructuredandmanagedcarefullycan
endupbeingblockagepointsinstead.Inmyexperiencetherealitydoesnotalwaysmatch
theintent:
Addingreviewpointsshouldextendtheprogram,butthisneverseemstohappen
(whatownervolunteerstoextendthecompletiondateforthesakeofa
technology?).Insteadworkprogramsarecondensedtounrealisticlevelstothe
pointthatworkcontinuesintothereviewperiod,leadingtopoorworkand
inadequatechecking.
Owners,ormoreusuallythepoorsodstheyappointtooverseeallthischecking,
don'twanttotakeanyadditionalresponsibility(norworkload)sorefuseto,or
dragtheirfeetinofficiallysigningoffonanything.Soworkcontinueson,asithas
to,usingunapproveddeliverables.
Yourbossseescheckingasanonproductiveuseoftime,soifsomeoneelseis

doingitwhyareyoudoingit?Leadingtouncheckeddocumentsleavingthe
office.
Anyreviewpointisanopportunityfordesignersto"tweak"thedesign,leadingto
rushedreworking.
Theseproblemscanbeaddressed,butPAS1192seemsambitiouswhenitcomestosign
offatGateways(whichitadmitsmaybedifficultfor"somecontracts").
TheprobleminPAS11922issignoffisassumedtomeanashiftofresponsibilityfrom
authortoapprover.Anymistakesbecomethefaultofthecheckerfornotpickingthemup.
Whichmeansthecheckermusthaveexpertiseintheareatheyarechecking.Soanowner
needstoappointasecondarchitecttochecktheprimaryarchitect'swork,structural
engineer,servicesengineeretc.Notveryefficient.
Thereisatradeoffbetweenmistakefreedocumentsandprojectprogression.Toensure
comprehensiveandmistakefreedocumentstakesconsiderabletimeateachcheckpoint.
Amorepracticalapproachwouldbetocheckonlyforcompleteness,theprofessionalrisk
stillbeingcarriedbytheauthor.

VOLUMES
PAS11922hasaconceptitcalls"Volumes".Theideaisthattheprojectisbrokenupintoa
numberofvolumes(3Dspaces)thatareallocatedtodifferentprojectteammembers.The
exampleofarailtunnelisillustratedwithlinearvolumesfordifferentservices.

ThismayworkforsimpleinfrastructurebutIdon'tseehowitworksonaevenmoderately
complexbuilding.Differentservicesoftensharethesamespace(e.g.ceilingspace).
Allocatingspecificspacefordifferentpurposesispossible,butisgenerallynotthemost
efficientwaytodesignabuilding.
Further"allmembersofthedesignteamshallagreevolumesasfullyaspossibleatthestart
oftheproject".Howcanyoudothisbeforedesigningthebuilding?Theallocationofspaceis
ahugepartofdesign,mostofwhatanarchitectdoes.DoesPAS11922assumethe
architect'sworkiscompletebeforeBIMisstarted?
Itwouldn'tsurpriseme.ThereisapervasivebeliefthatBIMonlystartsonceacontractor
getsinvolved.PartoftheabsurdpushforIPD(akaPTI):thatBIMisonlypossibleifthe
contractorisinvolvedduringdesign.
Howabouttheacifdocuments?
Thesedocumentsaremostly'motherhood'statementswithasprinklingofusefuladvice.
Forexampleonpage31oftheFrameworkdocumentoutof15objectives
3aregeneralstatements("thedismantlingoftraditionalbarriersorsilosofeffort")
3arenotrelevanttoaprojectbuttotheindustryasawhole("further
developmentofnationaltemplates,contentandStandards")
2arerepeatsofissuesalreadystated.

Sojustoverhalfarenotuseful.Onewonderswhytheydidn'thavetwolistsofobjectives,
oneforindustryandoneforpractitioners.
Recommendationsmadeyearsagoreappear,like"undertakingpilotprojectstodisplaythe
benefitsofBIM."Notmorepilotprojects!HowmanymoreBIMeventsmustwesitthrough
whereallyougetaresyrupypresentationsof(apparently)extraordinarilysuccessfulBIM
projects.
Andtherearecontradictions.UnderAssetManagement"ProposedActivitiestodeliveron
Objective"one'activity'suggestsanotherisnotpossible.
Howcan:
"Acontractualobligation(clause)bindingonallpartiesfrominitiationofabuilt
projectforthedevelopment,transferandmaintenanceofanassetregister
acrosstheassetlifecycle."
beachieveduntil:
"Theasset/facilitiesmanagementindustrymustdefinedatasetsand
informationassetregisteroutcomerequirementstoenablethetransitionfrom
designandconstructiontooperationinaBIMenvironment."
Itisaclassicchickenandeggsituation.HowcanAECteammembersprovidesomething
thatisundefined?

THECOST
Thereisquiteabitofextraworkforowners("Employers")inPAS11922.Frombeing
responsibleforproscribingtheentireBIMprocesstocheckingithasbeencompliedwith.To
followPAS11922ownerswillhavetobeefuptheirprojectmanagementteams,notjustin
trainingandexpertise,butinbodiesonthegroundtodotheadditionalwork.
PAS1192alsointroducesaraftofextrarequirementsfortenders.Althoughtheownermay
notdirectlypayeachtenderersfortheadditionalwork,theindustryasawholewillneedto
recoupthoseaddedcosts.
COBiedeliverablesandassignationofUniclassclassificationcodesaremandatory,even
thoughtheremaybenooneusingtheseontheproject.WhyprovideCOBieifanFM
solutionispartoftheconstructioncontractanddatacanbeplaceddirectlyintothechosen
FMsystem?Sure,preferenceCOBieandUniclasscodingwhereFMdataandcostcoding
arerequired,butonlyifteammembershavenoviablealternative.
AsIhavewritteninearlierposts,bothoftheseimpostscreateadditionalwork.Workthat
needstobepaidfor,whetherdirectlypaidforbytheownerorasacosttotheindustryasa
whole.
SureBIMmaybringsavingselsewhere,butstrictcompliancetoPAS19922willbean
additionalcost.Thereforebewaryofstatementslike"mustcomplywithPAS11922".
Ownersmakingstatementslikethisareaddingpossiblyunnecessarycoststotheirprojects,
otherswithitintheircontractsneedtomakesuretheyhaveallowedfortheextraworkin
theirbids.
Theacifdocumentsarenotproscriptiveenoughtoidentifywheretheremightbeadditional
costs.AstheyareprimarilyaboutintroducingBIMthemostobviouscostisineducationand
training.Althoughtheimplicitassumptionthroughouttheirdocumentsthatownersmusttake
abiggerroleinBIMisapotentialadditionalcostforowners.

DOESBIMDRIVETHEFORMOFCONTRACT?
Buildingcontractsarestructuredtoachievemanyoutcomes,andattempttocreate
agreementonmanyissues,BIMisonlyone,andisbynomeansthemostimportant.Yet
bothPAS11922andtheacifdocumentsassumethatBIMprocessescanonlybeachieved
underonecontractualarrangement.
InterestinglybothPAS11922andtheacifdocumentsspecificallystatethattheyare
contractneutral,acifdocumentsevenwarningthatowners("ProjectSponsors"):
"...needtobecarefulthatchangingcontractualarrangementsforBIMdoesn't
leadtoadegradationofotheraspectslikedesign,innovativeconstruction,
innovativeengineeringsolutions."
Butwhenyoureadthedocumentsasawholeitbecomesobvioustheonlywaythe

requirements(PAS11922)andobjectives(acifdocuments)canbemetiswithanIPDtype
contract.
Intheacifframeworkdocumentthereisagooddescriptionofdifferentcontracttypes,
includingexisting"traditional"contracts.Thenthereisatablecomparingcontracttypeswith
theireffectonBIMImplementation.Excepttheylumpedallexistingcontracttypestogether
andcomparedthemtoalliancing("partnering")andconsortium("financing")contracts.What
wouldhavebeenfarmoreinteresting,andactuallyuseful,wouldbetocompareBIM
implementationbetweeneachoftheexistingcontracttypes(Construct,D&C,Managed
Contract,ConstructionManagementetc.).
ldon'tunderstandwherethisideacomesfromthatonlycertaintypesofcontractsare
suitableforBIM.AnycontracttypecanuseBIM.Thetruthis(asmentioned,but
contradictedelsewhereinacifdocuments)theformofBIMissetbythetypeofcontract,not
theotherwayround.

BIMASSOCIALENGINEERING
AsmentionedPTI(ProjectTeamIntegration)isasubstantialpartoftheacifdocuments.
ThereistalkofPTIProtocolsbutIcouldn'tfindanywherethatlistsordescribeswhatthese
protocolsare.Thereisalistoftheirpurpose,andwhytheyareimportantbutnotwhatthey
are.Aretheytalkingaboutspecificexistingprotocols,futureprotocols,aprotocol,oraseries
ofprotocols?
IgotexcitedwhenIfoundtheacifProjectTeamIntegrationWorkbook.Aworkbook,
somethingpractical,somethingthatshouldtellmewhatPTIis.
SadlyIwasmistaken.Itisaseriesof18tablesofgenericprojectmanagementtopics,like
"EnvironmentandCulture","ProjectLeadership","WastedEffort".Eachisdividedinto5
colourcodedcolumns,redisbad,blueisexemplary.

Youguessedit,existingcontracttypesonlyappearintheredcolumn,PTItypecontracts
dominatestheblue.Amazing,doingPTI(whateverthatentails)willmiraculouslymake
everyoneabettermanager!
ChoosePTIandyourprojectgoes
from"ThisistheworstprojectI'veeverworkedonin30years"
to"ThisisthebestprojectI'veeverworkedon."
from"We'reatwar.Theclient'stheenemy"
to"Wehavethegreatestrespectandadmirationforourclient.Heleadswithout
interfering."
Hallelujah,praisetothegodofBIM.Allmanagementsinswillbewashedawaybyaccepting
thewisdomofPTI.

WHATISTHISPTI?
IntheacifFrameworkdocumentsectionheaded"AgreeddefinitionofPTIandBIM"itstates:
"PTIisaprocesstofacilitateintegrationandencouragecollaborativebehavior..."
Butwhatisthisprocess?Italsostates:

"PTIisaprojectdeliveryapproachthatencouragesclientstoengageateam
(includingdesignconsultantsandbuildingcontractors)attheearlieststagesof
aprojecttoenhancethelevelofintegrationbetweenthem."
OK,theteamgetstogetherearly.Butwhatexplicitlydotheydothatisdifferent,tomakeit
PTIinsteadofbusinessasusual?Besidesmoremotherhoodstatementslike"reducewaste"
and"optimiseprojectoutcomes"thereisnothingaboutwhatspecificproceduresconstitutes
a"process".
Thegiveawayistheword"collaborative".Thisisnothingmorethananotherversionofthe
"wemustcollaborate"mythIhavewrittenaboutinotherposts.Idonotknow,andhave
beensearchingfor,whatIshouldbedoingbeyondwhatI,andthepeopleIworkwith,
alreadydotoachievethis"collaboration".TheonlylogicalthingIcangetafirmgriponisthe
ideathatweshouldbeprovidingadditionalinformationforotherstouse,whichIcallforwhat
itis,exploitation,notcollaboration.
ButIdon'tbelievethatiswhatisbehindtheacifdocuments.Ithinktheyareunderthe
impressiontheycanfosterarevolutioninthequalityofconstructionprojectmanagement
throughtheadoptionofBIM.MysuspicionswerereinforcedwhenIreadthe
acknowledgementsintheacifPTIWorkbookdocument.TherearenopractitionersofBIM
mentioned,anditisbasedona2001publicationbytwoacademics:"ProjectsasWealth
Creators".
I'msuretheirideasforbetterprojectmanagementarefantasticandworthadopting,butthey
aretryingtohijackBIMtopushforunrelatedissues.Usinganewtechnologytojustifyacall
forsocialchange,otherwiseknownassocialengineering.
BIMisnotgoingtochangethewaypeoplebehave.Anownerwhotriestosqueeze
everyone'spricesandgoadthemintoextraworkisstillgoingtodothat.Thisisalready
happeningwithBIMintheattemptsbyownerstogettheAECteamtoprovideFMdataina
formatoftheirchoosingatnoadditionalcost.
Anditsimplywon'twork.Nomanagerthinkswhattheydoispoorpractice.Whentheyread
somethinglikeBIMrequires"awellinformedclientwhoknowswhattheywant"theynever
thinkitappliestothem.Statementslikethatachievenothing.
WhatshouldbeexplainedisthatanyonecanutilizeBIM,itisjustthatbettermanagerswill
reapbetterrewards.Thatthosewhoareopentoadjustingtheirmanagementstylewill
benefitmorethanthosethatdon't.Tosaytoamanageryoumustthrowouthowyouhave
donethingsinthepasttouseBIMisnotonlyuntrue,butcounterproductive.

SUMMARY
Tosummarizemymaincriticisms:

PAS11922
EMPLOYER(Owner)
Assumesallisknownabouttheprojectbeforeitstarts.
Expectsemployertodefinehowprofessionalsconducttheirbusiness.
Expectsemployertohaveexpertisetocheckandapproveprofessionalswork.
PROCESS
Assumesdesignteamallengagedatsametime.
AssumesRFTfromconsortiumhowelsedoesa"precontractBEP"getdone?
AssumesIPDtypecontracts(eventhoughsaysitdoesn't).
Assumesbuildinghasbeendesigned(e.g.expectationof"volume"definitions)
DELIVERABLES
InsistsUniclasscodesallocatedtoBIMobjectsevenifnotusedbytheprojectteam.
InsistsonCOBieevenwhentheremaybenoreasontouseCOBie

acifDOCUMENTS
Doesn'texplorehowBIMcanbeusedonexistingcontracts.
Mixesprojectspecificobjectiveswithindustrywideobjectives.
Manyobjectivesarenotactionable.
NodecisivedescriptionofPTIprotocols.
Inconsistent:adviceisoftencontradictedbyotherpartsofthedocument.

CONCLUSION
Youmay,bynow,havenoticedthispostisnotaprecisofthedocumentsreviewed,buta
criticalreviewthatcarefullyavoidsspoilers(sorry,youaregoingtohavetoreadthem
yourself).
ButhavingreadthemIbelievebothPAS11922andtheacifdocumentsareworthwhile
additionstoBIMliterature.
Mycriticismsarebornofafrustration,thattheyaresoclosebutmissthemark.
Mybeliefisthatthereisenoughknowledgeouttheretocreateuseful,practicalBIMguides.
Thereasonswhythisrarelyhappenslieelsewhere.Youcanliterallyseethetusslebetween
theBIMpractitionersandBIMevangelistsasyoureadtheacifBIM&PTIdocuments.
Agoodeditcleaningoutthemythsandrearrangingthetruthswoulddowondersforthese
documents.
IbelieveallPAS11922needssometimeintherealworldgettingpracticalexperienceto
seewhatworksandwhatdoesn't.Somepartsprobablyneedtobewatereddownbutthe
underlyinglogicandworkflowsaresound.
SomyadviceistomakeuseofPAS11922forguidanceonsettingupaBIMprocurement
process,andtheacifdocumentsforanoverviewofpossibleBIMprocurementmethods,
withsomegemsofpracticaladvice.
Justdon'tevermandatethatPAS11922'shall'befollowed,andapproachtheacif
documentswithadoseofskepticism,mineitforthegemsandleavethetailingsbehind.

PostedbyAntonyMcPheeat16:14

5comments:

+21 Recommend this on Google

Labels:Management,Standards

26June2015

ClassificationnotsoEasy
IhavewrittenaboutaddingclassificationnumberstoRevitbefore.BackthenIthoughtit
goodpracticetoincludethem,evenifyoudidn'thaveaspecificneedforthem.
ThatwasbeforeIdidsomediggingandfounditisnotassimpleasitsounds.
BeforeyougetboredandgobacktolookingatkittensonYouTubeorBIMporn,Iappreciate
youareprobablynotinterestedinclassificationsystems.Icertainlyamnot.SoI'llputthe
practicalinformationfirst,thenatleastyoumightknowsomethingusefulbeforeyoureyes
startglazingover.

HOWTODEALWITHCLASSIFICATION
QUESTIONTHENECESSITYFORCLASSIFICATION
Classificationcodes(seehereforadescription)arepromotedbysomeasapanaceaforall
BIMuses.Thetruthistheyaremostlyusedforcostingandspecifications.Theyarenotthat
usefulforFacilitiesManagementasaclassificationcodemighttellyouathingisadoor,but
itdoesn'ttellyouwherethedooris.
Ifyoudoestimatingandwilluseclassificationcodes(theyarenottheonlymethodtoidentify
components)thenyes,theyarenecessary.Ifyouusethemforspecificationpurposesthen
theyarealsonecessary,althoughagain,theyarenottheonly,orevenmostcommon,way
ofmanagingspecifications.
Ifyoudon'tdoestimatingandarerequestedtoincludeclassificationcodesinyourmodels
askwhy.
Areyoudoingitsothecostconsultantorcontractordoesn'thaveto?Ifsowhyareyoudoing
itandnotthem?Whowillpayyoutodotheirwork?

Ifthereisnospecificreason,ifitisexplainedas"necessaryforBIM",orsimply"good
practice",putapriceonitandseeifitisstillarequirement.
Orposeaseriesofquestionsaboutthespecificsofwhatitistheyrequire(readtothe
bottomofthispostforammunition).
Asalastresort,iftheystillinsist,becomfortedinthefactthattheyhavenoideawhatthey
willbereceiving,willneveruseit,andwillneverknowifyouhavedoneitproperlyornot
(whatever"properly"means).

DEFINEYOURSCOPE
Ifyoucan'tgetoutofprovidingclassificationcodes,andyouhavenocleardirectiononwhat
isexpected,youneedtodefinewhatyouwilldeliver.
1.Whichclassificationsystemwillbeused.
IfyouareintheUSAorUKtheanswerwillbeobvious,possiblyevenmandated.Inother
countries(likeAustraliaandmanyAsiapacificcountries)itmaynotbesoobvious.
Ifitisnotclearusewhicheveroneiseasiestforyoutoaccessanduse.
2.Whichversionwillbeused.
Classificationsystemsareprettymuchconstantlyunderreview,andeverynowandagaina
newversionisreleased.
Astherearelegacyworkpracticesandsoftwaresthatrelyonoldversionstheseoldversions
tendtostillbeinusewellafteranewversionisreleased.
Alsodraftversionsexistforyearsandmaybeusedonrealprojectsastheyaretheonly
optionavailable(asAutodeskdidseebelow).
Keepinmindwhoeveryouareprovidingclassificationcodestomaynotnecessaryrequire
thelatestversion,ormayrequireyoutouseadraftversion.
Youcouldoffertoprovidetheversionmostconvenientforyoutoaccomplish,whichisnot
necessarilythelatest(moreonthatbelow).Howeverifwhoeveryouareprovidingittohas
notstatedwhattheyrequireyoumayhavetroublearguingthatanoldversionis'fitfor
purpose'.
Bestpracticeistoaskwhichversionisrequired.Ifthatisnotpossibleexplicitlystatewhich
versionyouwillprovide.
3.Whichtableswillbeused.
Omniclasshas15tables,Uniclass2015has11,youdon'twanttocommittoproviding
relevantcodesfromeverytabletoallobjects.
Offertoprovidecodesfromonetable:OmniclassTable21Elements,orUniclass2015
TableSsSystems.
4.NumberofCodesperobject.
Classificationtablesdescribedifferentthingsthatmightapplytothesameobject.Alsoour
BIMobjectsoftencontainmultiplethingsthatmightattractaclassificationcode(e.g.adoor
hasmanycomponentslocks,handles,closers,hingesetc).
Restrictyouroffertoasinglecodeperobject,thatis,asingleclassificationparameterper
object.
5.DepthofCodes.
OmniclassTable23is7levelsdeep,Uniclass2015TableSsis4levelsdeep.Thedeeper
thelevelthemorespecifictheinformation.Themorespecifictheinformationthemore
objectsrequiredinyourmodel.Ifyouprovidecodesdowntothelevelofdoorlocks,youwill
needanobjectforeachlocktoholdthecode(asopposedtoadoorparameterthat
describesthetypeoflock).
Onlyoffertoprovidecodestothefirstleveloftheclassificationsystem.

Now,allthissoundscomplicated,butcanbecapturedinonesentence:

Omniclass:
We[normally/can/may/offerto/will]provideasingleclassificationcodetoeachappropriate
objectinourmodelsconformingtoOmniformat2012,Table21Elements,toalevelof
detailequaltoLevel2.

Uniclass:
We[normally/can/may/offerto/will]provideasingleclassificationcodetoeachappropriate
objectinourmodelsconformingtoUniclass2015,tableSsSystems,toalevelofdetail
equaltoSubgroup.
Youcanofcourseprovidemorethanthis,thatisyourcommercialdecision.My
recommendationsareabaseline,aminimumthatisreasonable.Thepointistoplacea
valueonprovidingclassificationcodesforotherstomakeuseof.Classificationdataentry
takestimeandeffortandshouldbepaidfor.

WORKOUTHOWYOUAREGOINGTODOIT
Beforeembarkingonthetaskofassigningclassifications,includingprepopulating
componentfamilies,establishthemethodsyouwilluse.Poorchoicesanddecisionscanturn
thetaskintoajobthateatsuphundredsofmanhours.
Don'tassumeanything.Testeverystep,andverifyeveryresult.
Inparticularmakesureyouareawareoftheabilitiesandlimitationsofthesoftwareyou
intendtouse.
I'veonlyinvestigatedRevit(whichIwillgointomoredetailbelow).AmongstotherthingsI
foundthat:
ThedefaultOmniclassTable23ProductsdatainRevitisWRONG(kindof,seebelow).
ThedefaultOmniclassTable21ElementsdatainRevitisOUTOFDATE
Thisdoesn'tmeanyoucan't,orshouldn't,useRevit.Theseissuescanberesolved.Butonly
ifyouknowaboutthem.Softwarevendorsnevertakeresponsibilityfortheresultstheir
softwareproduces(readanyT&Cs),sodon'ttrustfilesprovidedbyvendorscontaining
datayouareresponsiblefor.Checktheyarecorrect.

THEBORINGDETAILS
Ifyoureallydon'tcareaboutclassificationsystemsyoucanstopreadingnow.Perhaps
comebackwhenyourclientorbossrequiresyoutobecomeadataentryoperatorplugging
inclassificationcodes.

WHATARECLASSIFICATIONSYSTEMS?
ByclassificationsystemsImeanOmniclassfromtheUSA,andUniclassfromtheUK.There
areothernonenglishclassificationsystemswhichIamnotfamiliarwith,noreverhopeto
be.Therearealsovariousstandards,butI'mnotgoingtogothereeither.
Classificationsystemsarehierarchicalnumberingsystems(althoughsomecontainletters)
thatattempttoprovideauniquenumberforeverythingthatneedstobedescribedinthe
buildingprocess.
AnexamplefromOmniclassTable21Elements:
21031030InteriorDoors
2103103010InteriorSwingingDoors
2103103020InteriorEntranceDoors
2103103030InteriorSlidingDoors
AnexamplefromUniclass2015TableSsSystems:
Ss2530Doorandwindowsystems
Ss253020Door,shutterandhatchsystems
Ss25302016Collapsiblegateandgrilledoorsetsystems
Ss25302025Doorsetsystems
Ss25302030Frameanddoorleafsystems
Ss25302032Framelessglassdoorsystems

Bothsystemsaremadeupofanumberoftables.Uniclasshas15,althoughUniclass2015
has11(maybe10nowseebelow).Icounted15inOmniclassbutthelastoneisnumbered
49.Idon'tknowifthisisbecausethereareyettobereleasetables,existingtableshave
beendeletedorthenumbersarejustnotsequential.

Sometablescomefrompreexistingclassificationsystems,OmniclassTable21from
Uniformat,OmniclassTable22fromMasterFormat.
Oh,andtherearetwoUniformats,plainoldUniformatandUniformatII.
AndthereisUniclass,Uniclass2andUniclass2015.Uniclassistheoriginaldevelopedbefore
BIM,Uniclass2wasgoingtobethenewversionwithbetterintegrationbetweentables.That
partiallycompletesystemhasnowbeenrebrandedasUniformat2015bytheUKNBSwho
areworkingonitaspartoftheirgovernmentcontracttocreatea"BIMToolkit".
Whichclassificationsystemisbest?Whoknows(orcares).IfanarticlefromtheUK
NBS:Omniclass:acritiqueisanythingtogobyUniclass2isbetterstructuredforBIMthan
Omniclass.
ExceptUniclass2015(remember,Uniclass2isnowcalledUniclass2015)isincomplete,only
fourtablesareavailable(Ihesitatetosay'published',theyarestilldraft),somayormaynot
beusable,dependingwhetherthebityouneedissufficientlycompletetobeuseful.
Itseemsthatmosttablesgrewfromcostestimatingrequirements,withtheexceptionofthe
WorkResulttableswhichseemtocomefromspecificationssystems.OmniclassTable22is
basedonMasterFormat,andUniclassTableJ(TableWRinUniclass2)isbasedonCAWS
(CommonArrangementofWorkSectionsforbuildingworks)classification.
ExceptthatUniclass2015TableWRhasnowbeenwithdrawn.Apparentlyisisredundantas
"ithasbecomeclearthatthistableisconfusing(whyhaveobjectsgottwonearidentical
codes?),redundant(objectsonlyneedonecode)andunnecessarilyrestrictiveontheother
tables(thenumberoflevelswaslimitedineverycase)."
Isupposetheyknowwhattheyaredoing.

WHOUSESCLASSIFICATIONCODES?
Asmentionedabovehistoricallyclassificationcodeshavebeenusedforcostestimatingand
specificationwriting.
Sometimestheyareusedforclassifyingproductlibraries,ornamingsystemsinCADand
BIMsoftware.Attemptsatthelatterarerarelysuccessful.Notmanypeopleknowthat2103
1030meansinteriordoor,buteveryknowswhat"DoorInterior"means.Ihaveseenthesad
remnantsofmisguidedattemptstointroducenamingbasedonopaqueclassificationcodes
inanumberofarchitecturaloffices.
Soitisthecostestimatorswhomainlyuseclassificationcodes,workingfortheowner,the
contractororasaconsultanttoowners,designprofessionals,orcontractors.
Classificationcodesmaypossiblybeusedforspecificationsbuttheyaretheprovidenceof
designprofessionals,thereisnoneedtopassthatinformationontootherswithinaBIM
model.
Classificationcodesarehardlyinformationthatisrequiredbyallparticipantswithinthe
AECOworkchain.

ARECLASSIFICATIONSYSTEMSNECESSARYFORBIM?
Whencomputersstartedtobeuseditwasfoundclassificationcodesandtheirtableswere
notaslogicalaseveryoneassumed,henceallthisreworkingandnewversions.
Butthereseemstohavebeenakneejerkreactionthatclassificationsystemsarenecessary,
evencritical,forBIMtowork.
Idon'tseeit.BIMsoftwarebringsitsownstructuringofdatathatcanbeutilizedforcosting
andspecifications.Idon'tseethatitisabsolutelynecessarytoaddanotherlayerof
informationthatduplicatesexistingdata.
Particularlywhenexistingclassificationsystemsdonotprovideenoughcoverage.The
UniformatcodesproducedforAutodesk(seebelow)haveanextra3levelsofnumbers.
PresumablybecauseUniformatdidnothaveenoughcodestocoverallthethingsthatRevit
canmodel.
AndwheredoesIFCfitintoallthis?
IFCisa'schema',itnotonlyidentifiesobjectsbutalsolocatestheminrelationtoother
objects.SoIFCnotonlyknowssomethingisadoor,itknowswhichwallitisin,whichrooms
arearoundit,whichlockithas.
WhichraisesthequestionofwhyhaveIFCandclassification?Orwhycan'tclassification
codesbebuiltintoIFC?MatchIFCattributestoclassificationcodeswithinIFCsoftwareso

usersdon'thavetomanuallyenterthem.
Ofcourseitisnotthatsimple,ormoreprecisely,practical.
WhilstUniclass2015hasawholelotofcodesfordoorhardware,therearenodefinitionsfor
doorhardwareinIFC.Bothareincomplete,butindifferentways.
Andthelogicalstructureisdifferent.Classificationsystemgrewfromasystemdesignedfor
humanstouse,IFCisforsoftwaretouse.Istheefforttomakethemalignworthit,willit
produceapracticalresult?Somethingthatwillactuallyachieveusefuloutcomesinthereal
world?
I'mnotadvocatingthatclassificationsystemsbeabandonedaltogether.Itisjustthatthey
are'nicetohave'ratherthananecessity.Don'tbefooledintothinkingtheyarecriticalpartof
BIM.

ADDINGCLASSIFICATIONCODES
Apparentlyitisreallysimple.Youjustaddtheappropriateclassificationcodetoparameters
attachedtoobjectsinyourBIMmodel.
Toputthisinperspective,theappropriatecodefromachoiceof6,905codesinOmniclass
Table23achoiceof6,470inUniclass2015TablePr.Addedtoparametersineachofthe
thousandsofobjectsinatypicalBIMmodel.
But,Ihearyousay,weuseBIM,thesoftwarewilldoitforus.Yesandno.
I'llrestrictmydiscussiontoRevit,becausethatiswhatIuse.AndbecauseIcouldn'tbe
botheredrespendingthetimeIwasteddiscoveringhowthingsdon'tworkinRevitonother
softwares.
Revithastwobuiltinplacesforclassificationvalues,andathirdthatcanberepurposedto
doit.Thefourthwayistomanuallycreatecustomparameters.
Eachfamilyfile(componentslikedoors,furniture,etc)hasafilebasedparametercalled
OmniclassNumber.ThisisforOmniclassTable23Products.Whenthisparameteris
selectedRevitprovidesadialogueboxwhereyoucanselecttheappropriatecodefroma
dropdownlistthatcanbesortedbyRevitcategory.SoifyouareinaDoorfamilyonlycodes
appropriatetoDoorsareofferedforselection.RevitalsofillsintheOmniclassTitle
parameterautomatically.Nice.
AlltypesofobjectsalsohaveaparametercalledAssemblyCode.Thisisnotfilebasedso
categoriesthatdon'texistasseparatefiles,likewalls,floors,ceilings,roofshavethis
parameter.ItworksthesamewayastheOmniclassparameters,theuserisoffereda
selectionfromOmniclassTable21Elementsthatonlyappliestothecategoryoftheobject.
RevitautomaticallyfillsintheAssemblyDescriptionparameter.
ThethirdwayistousetheKeynoteparameter.Alltypesofobjectshavethisparameter.
WhenKeynoteisselectedauserdefinedtabdelimitedtextfileisreadthatliststhecode
oppositeitstitle.Theuserselectsfromthelist.SomeorganisationshavecreatedKeynote
filesforusewiththeirclassificationsystems.InAustraliaNatSpechasdonesofortheir
specificationcodes(getithere).NotethattheonethatcomeswithoutoftheboxRevitin
Australiaisnotthelatestversion.

TheOmniclassNumberandAssemblyCodevaluesalsocomefromtabdelimitedtextfiles
(althoughformatteddifferently).
OmniclassNumbervaluesareinOmniClassTaxonomy.txt.Thisfileislocatedinbowelsof
windowsoneachuserslocalcomputerat%APPDATA%\Autodesk\Revit\<productnameand
release>.
AssemblyCodevaluesareinafilecalledUniformatClassifications.txt.Acopycanalsobe
foundinthebowelsofwindows,butyoucanchangethepathtothisfile,andevenpathtoa
differentfile.
ThecommandtodothiscanbefoundundertheManagetab>AdditionalSettings>
AssemblyCode.Inthiscommandthereareanumberofwaysthedefinitionfilecanbe
pathed,oneofwhichisrelativetheLibrarysetinOptions.ItseemsAutoDeskassume
AssemblyCodevaluesmaybeassociatedwithparticularcomponentlibraries.
ThepathandfiletotheAssemblyCodedefinitionfileissetineachfile.Soindividual
projects,andindividualfamily(component)files,canbelinkedtodifferentAssemblyCode
definitions.

TheautomaticassigningofAssemblyDescription(andOmniclassTitle)onlyhappensifthe
correctfilesareassociatedwiththefileyouarein.
RevitalsoprovidesakeynotefilebasedonOmniclassTable22WorkResults(aka
Masterformat).
BecauseRevitusesseparatetextfilesitispossibletoreplacethosefileswithdifferentones
adifferentclassificationversion,orcompletelydifferentclassificationsystem.Aslongasthe
filesareformattedcorrectly.Whichissortofgreat.
ExcepttoreplaceOmniClassTaxonomy.txtyouneedtoreplaceitforeveryuseronevery
individualcomputer.AnditwillthenapplytoALLprojectsandfamilyfilesusedbythatuser
onthatcomputer.Itisanofficewidechange,notanindividualprojectchange.Andyouwill
needtodoiteverytimethereisanewversionofRevit.Youcan'tchangethefilename
either,ithastobeOmniClassTaxonomy.txt,whichmakesithardtoidentifywhatthefile
contains.
UniformatClassifications.txtisalittleeasier.Asdescribedaboveyoucanchangethepath
andfilenameviaamenucommand.Althoughitisabittediousifyouwanttoassociatea
differentdefinitionfiletofamily(component)files,asyouhavetoopen,makethechange,
andthensaveeveryindividualfamilyfile.

ALTERNATIVECLASSIFICATIONFILES
Whywouldyouneedtochangethefiles?ObviouslyifyouneedtouseUniclass(moreon
thatbelow),butalsoifyouintendtouseOmniclass.

OMNICLASS
AsmentionedabovethedefaultfilesthatcomewithoutoftheboxRevitarenotcorrect.
ThedefaultOmniClassTaxonomy.txtisbasedona2006draftversionofOmniclassTable
23Products.Therearevalidhistoricalreasonsforthis,Autodeskarenotbeing
belligerent.TheyintroducedOmniclassforfamiliesfilessotheycoulduseittoclassifythem
intheirwebbasedcomponentlibraryAutoDeskSeek.Itwasnevertheirintentiontosupport
Omniclassforgeneralusers.
AnewerversionbasedonOmniclass2012isavailablefromAutodeskatUpdateOmniClass
TaxonomyFile.Howeverthenewfiledoesn'tassociateOmniclassvalueswithRevit
categories.I'mnotsurewhy,thereisnotechnicalreasonitcouldn't.I'malsonotsurewhy
Revit2016stillshipswiththedraftversionofOmniclass.
IfyouusetheOmniclassNumberparameteritisimportantyoumakeadecision,because
Omniclassvaluesforthe2006draftareDIFFERENTfromOmniclass2012.
DefaultOmniclassInteriorDoors:23.30.10.00
Omniclass2012InteriorDoors:23.15.11.15

ThedefaultUniformatClassifications.txtfileisamodifiedversionofUniformatII.Itwas
createdforAutodeskbyRSMeans,aUSAcostingdataprovider.Theymodifieditbyadding
uptoanextra3levelsforamaximumdepthof7levels,whereasUniformathasamaximum
of4levels.
AutodesknowalsoprovidewithoutoftheboxRevittheUniformatClassifications_2010.txt
file.ThisisanupdatedversionofUniformat.
Again,therearedifferencesinthenumberingbetweenthetwoversions:
UniformatClassification.txtInteriorDoors:C1020
UniformatClassification_2010.txtInteriorDoors:C1030
YoucouldalsomakeyourownOmniClassTaxonomy.txtorAssemblyNumberdefinitionfile
frompubliclyavailableexcelfilesofOmniclasstables.Althoughyouwillhavetoreverse
engineerthefilestructurefromRevit'sfiles.

UNICLASS
Icouldn'tfindanyUniclassequivalentsofOmniClassTaxonomy.txtor
UniformatClassifications.txt.Ididfindsomepeoplewhohavecreatedtheirown,soitis
possible,althoughyouwillhavetoreverseengineerthefilestructure.

SomeUniclass2015tablesareavailableasexcelfilesfromtheNBSBIMToolkitsite(scroll
tothebottomofthearticle).
Butthereisadeeperproblem.Uniclass2015isnotcomplete,itisstillbeingdeveloped.
Admittedlythetablesyouaremostlikelytouse,SsSystemsandPrProductsaremore
developedthansomeothertables.Butnoonewillguaranteetheywon'tchange.Infactthe
downloadableexcelfileshaveasuffixof'latest'.Doesn'texactlyinstilconfidence.Iwonderif
theydon'tfinishthisyeartheywillstillcallitUniclass2015.

CONCLUSION
Classificationsystemsareprobablyuseful,tocertainpeopleincertaincircumstances.But
theyarenotarequirementforBIMtowork.
Althoughmycommentsaboutthelackofcompletenessmayhavecomeacrossascaptious,
myviewisthatitisalwaysworthwhilemakingimprovements.Theprocessisdisruptivebutif
wedon'tconstantlystrivetoimprovewewillbestuckwithimpracticalsystems.Imagine
havingtousetheRomannumberingsystem!Iencouragethoseworkingonupdating
classificationsystemstocontinuetheirgoodwork.
Butthereappearstobequiteawaytogo.Notonlydoweneedthetheclassification
systemstobeBIMfriendly,completeandstable,theyneedtobeavailableinaconsistent
anddurablewaysothatsoftwarehousescanaccessthemforintegrationintotheir
softwares.
Tobehonest,Idon'tseehowanyonecantakethemseriouslyuntilthishappens.The
journeyIhadtotakejusttoidentifywhichcodesIshouldapplytoourinhousecomponent
libraryhasbeenridiculous.TimeinmylifeI'llnevergetback.

Ifyouhavemanagedtogetdowntohere,welldone.Younowknowabitmoreabout
classificationsystems.Noteverythingmindyou,thereareevenmoreboringthingsyou
couldbeabreastof.
AndofcourseeverythingIhaveexplainedmaynotbe100%correct.Ifyouseeanything
wrong,ormisinformed,pleasecomment.I'mquitehappytobeprovedwrong,butdon't
expectmetocare.

PostedbyAntonyMcPheeat13:46

1comment:

Recommend this on Google

Labels:Management,Standards