PREFACE
This operating manual for FCC Naphtha HydroTreater Unit (Unit No.-75) of
Visakh Refinery Clean Fuel Project for HPCL Visakh Refinery has been prepared
by M/s Engineers India Limited for M/s Hindustan Petroleum Corporation Limited.
The objective of FCC Naphtha Hydrotreating Unit is to process FCC
Gasoline to obtain product streams (Light gasoline and Heavy Hydrotreated
gasoline) with targeted qualities of octane number, sulphur content, benzene
content and olefins content. This manual contains process description and
operating guidelines for the unit and is based on documents supplied by the
Process Licensor (Axens). Hence the manual must be reviewed /approved
by the licensor before the start-up /operation of the unit. Operating
procedures & conditions given in this manual are indicative. These should be
treated as general guide only for routine start-up and operation of the unit. The
actual
operating
parameters
and
procedures
may
require
minor
TABLE OF CONTENTS
SECTION- 1
INTRODUCTION.................................................................................................................................9
1.1
INTRODUCTION.....................................................................................................................................................10
1.2
UNIT CAPACITY....................................................................................................................................................10
1.3
ON-STREAM FACTOR............................................................................................................................................10
1.4
TURNDOWN RATIO...............................................................................................................................................10
1.5
FEED CHARACTERISTICS......................................................................................................................................10
1.5.1
FCC Gasoline
1.5.2
1.5.3
Hydrogen
12
1.5.4
Lean Amine
13
1.5.5
13
1.6
10
PRODUCTS SPECIFICATION....................................................................................................................................14
1.6.1
14
1.6.2
1.6.3
Benzene Heartcut
15
1.6.4
17
1.6.5
17
1.6.6
Rich Amine
17
1.6.7
Stabilizer purge
18
1.7
1.8
1.9
MATERIAL BALANCES..........................................................................................................................................20
1.9.1
1.9.2
1.10
1.10.1
Catalyst
21
1.10.2
22
1.10.3
Inert balls
23
1.10.4
Chemicals
24
1.11
1.12
UTILITY SPECIFICATION:.........................................................................................................................27
1.13
1.13.1
Start-up requirement
1.13.2
1.14
EFFLUENT SUMMARY:.....................................................................................................................................31
SECTION- 2
2.1
28
PROCESS DESCRIPTION...............................................................................................................33
UNIT DESCRIPTION...............................................................................................................................................34
2.2
SELECTIVE HYDROGENATION..............................................................................................................................34
2.3
SPLITTER SECTION...............................................................................................................................................35
2.4
HDS SECTION......................................................................................................................................................36
2.5
2.6
STABILIZER SECTION........................................................................................................................................37
2.7
SECTION- 3
PROCESS PRINCIPLE.....................................................................................................................40
3.1
3.2
GENERAL.............................................................................................................................................................41
3.3
3.4
SPLITTER (75-C-01).............................................................................................................................................42
3.5
3.6
3.6.1
Objective
3.6.2
3.6.3
3.6.4
3.6.5
Chemical reactions
3.6.6
Hydrogenation of diolefins 45
3.6.7
Isomerization of olefins
47
3.6.8
Hydrogenation of olefins
47
3.6.9
3.6.10
3.6.11
Sulfur reaction
3.7
43
45
48
3.7.1
Reactor Temperature
3.7.2
3.7.3
Reactor pressure
50
3.7.4
51
3.8
49
3.8.1
Chemical reactions
51
3.8.2
Hydrorefining
52
3.8.3
Hydrogenation of olefins
53
3.9
3.9.1
3.9.2
Temperature
3.9.3
3.9.4
Space velocity
54
56
UTILITY DESCRIPTION.................................................................................................................57
INTRODUCTION...............................................................................................................................................57
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
NITROGEN
60
4.1.7
LP STEAM SYSTEM
60
4.1.8
MP STEAM SYSTEM
60
4.1.9
61
4.1.10
61
4.2
58
EFFLUENT SYSTEM........................................................................................................................................61
SECTION- 5
5.1
GENERAL..........................................................................................................................................................64
5.2
PRE-COMMISSIONING ACTIVITIES.............................................................................................................64
5.2.1
Inspection / Checking
65
5.2.2
Inspection of equipments
65
5.2.3
66
5.2.4
Instruments
66
5.2.5
Relief Valves
66
5.2.6
Rotary Equipment
66
5.2.7
Drainage System
66
5.3
5.4
PRE-COMMISSIONING...........................................................................................................................................67
5.4.1
Commissioning of Utilities 68
5.4.2
5.4.3
5.4.4
5.4.5
70
5.5
INSTRUMENTS CHECKING.....................................................................................................................................76
5.6
5.7
5.8
5.9
TIGHTNESS TEST..................................................................................................................................................80
5.10
5.11
SECTION- 6
START-UP PROCEDURE.................................................................................................................84
6.1
INTRODUCTION...............................................................................................................................................84
6.2
6.3
FIRST START-UP....................................................................................................................................................86
6.3.1
6.3.2
Purging of air
6.4
87
6.4.1
Unit status
6.4.2
6.4.3
6.5
90
6.5.1
Unit status
6.5.2
6.5.3
6.6
95
6.6.1
6.6.2
6.6.3
Sulphiding Procedure
6.7
98
UNIT START-UP..................................................................................................................................................100
6.7.1
UNIT Status
6.7.2
6.7.3
6.7.4
103
6.7.5
104
SECTION- 7
100
7.1
7.2
INTRODUCTION.............................................................................................................................................107
7.3
OPERATING PARAMETER............................................................................................................................108
7.4
ALARMS:.........................................................................................................................................................115
7.5
7.6
EQUIPMENT LIST...........................................................................................................................................120
7.6.1
Pumps
120
7.6.2
Vessels
120
7.6.3
Columns
121
7.6.4
Reactors
121
7.6.5
7.7
LIST OF INSTRUMENTS................................................................................................................................123
7.7.1
Control Valves:
123
7.7.2
ON-OFF Valves
125
Safety valves
126
7.8
7.9
7.10
7.10.1
Operating parameters
133
7.10.2
Reactor temperature
133
7.10.3
other parameter
135
7.10.4
7.10.5
7.10.6
Feed quality
SECTION- 8
8.1
139
SHUTDOWN PROCEDURES........................................................................................................141
8.1.1
introduction
8.1.2
8.1.3
General procedure
143
8.1.4
143
8.1.5
145
8.1.6
8.2
UNIT RESTART....................................................................................................................................................148
SECTION- 9
9.1
142
9.1.1
general
9.1.2
9.1.3
Loss of feed
153
9.1.4
155
9.1.5
9.1.6
Loss of Amine
155
9.1.7
155
9.1.8
156
9.1.9
Steam failure
156
9.1.10
156
9.1.11
Power failure
156
9.1.12
157
9.1.13
SECTION- 10
10.1
151
TROUBLE SHOOTING..................................................................................................................160
TROUBLE SHOOTING..............................................................................................................................161
10.1.1
10.1.2
10.1.3
Octane losses
SECTION- 11
162
11.1
GENERAL....................................................................................................................................................164
11.2
SAMPLING PROCEDURE.........................................................................................................................164
SECTION- 12
SAFETY PROCEDURE...................................................................................................................170
12.1
INTRODUCTION........................................................................................................................................171
12.2
12.2.1
General
171
12.2.2
Emergency shutdown
171
12.2.3
Overpressure protection
171
12.2.4
12.2.5
12.2.6
High pressure
172
12.2.7
Reactor protection
172
12.2.8
Personnel protection
172
12.3
SAFETY OF PERSONNEL.........................................................................................................................175
12.4
12.5
12.6
12.6.1
General procedure
12.6.2
12.6.3
12.6.4
12.7
180
12.7.1
SECTION- 13
187
13.1
GENERAL....................................................................................................................................................190
13.2
CENTRIFUGAL PUMPS............................................................................................................................190
13.3
HEAT EXCHANGERS................................................................................................................................193
13.3.1
General
193
13.3.2
Air coolers
193
13.3.3
Exchangers
193
SECTION- 1 INTRODUCTION
Rev. A
Page 10 of 182
1.1 INTRODUCTION
Hindustan Petroleum Corporation Limited (HPCL), Visakh is in the process of
augmenting the capacity of the existing refinery by revamping the existing
primary units and installing additional facilities required to meet the product
specifications.
The objective of this Unit is to process FCC gasoline to produce a blend of two
streams (LCN+HCN), Maximise the octane number while meeting pool
specifications in term of sulphur content, benzene content and olefins content.
Three different feeds considered for the design of the FCC Naphtha Hydrotreater
unit: are NITCASE, AM (Arab Mix) CASE, BH (Bombay High) CASE
1.2 UNIT CAPACITY
The unit capacity is 893 330 T/yr for all three cases
1.3 ON-STREAM FACTOR
The unit is designed for a stream factor of 8000 hours/annum.
1.4 TURNDOWN RATIO
The unit is capable of a turndown of 50% of hydrocarbon flow.
1.5 FEED CHARACTERISTICS
Three operating cases, AM CASE, BH CASE and NIT CASE are selected for the
design of the unit.
1.5.1
FCC GASOLINE:
Characteristics
Max Available Rate,
t/hr
St m3/hr
Density at 15C, g/cc
Total Sulfur, wppm / RSH
RON
Template No. 5-0000-0001-T2 Rev A
AM
BH
NIT
CASE
111 666
152.3
0.7334
2400/720
93
CASE
111 666
156.0
0.716
180/90
93
CASE
111 666
152.8
0.731
1133/229
91.4
Copyrights EIL- All rights reserved
Page 11 of 182
AM
BH
NIT
CASE
80.6
CASE
81.6
CASE
81.2
29.5
35.5
29.2
38.5
24.35
54.47
(Diolefins wt %)
Naphthenes, vol %
Aromatics, vol %
(2.0)
10.7
24.3
(2.0)
10.3
22.0
(2.0)
7.01
14.17
(Benzene, vol%)
Distillation (ASTM-D86), C
IBP
10 % vol
30 % vol
50 % vol
70 % vol
90 % vol
95 % vol
FBP
(1.8)
(1.9)
(0.38)
46.1
56.1
75.5
95.5
124.4
155
167.7
180
46.1
56.1
75.5
95.5
124.4
155
167.7
180
40
57.6
70.6
92
123.2
156.4
168.2
187
Characteristics
MON
PONA (vol %)
Paraffins, vol %
Olefins, vol %
1.5.2
Rev. A
BH case
NIT case
Methyl mercaptan
Ethyl mercaptan
C3 mercaptan
C4 mercaptan
(ppm wt)
0.5
200
138
22
(ppm wt)
0.5
25
17
3
(ppm wt)
0.5
118
81
13
C5 mercaptan
C6+ mercaptan
Carbonyle disulfide
Dimethyl sulfide
Methyl ethyl sulfide
Methyl-t-butyl sulfide
Thiophene
C1 thiophene
Tetra hydro thiophene
C2 thiophene
C3+
thiophene
and
263
97
0.5
2
2.0
5
236
360
51
262
773
33
12
0.1
0.2
0.2
0.5
12
24
5
12
37
12
5
0.5
1
1.0
3
100
200
20.0
128
451
benzothiophenes
Total
2400
180
1133
Sulphur components
1.5.3
Rev. A
Page 12 of 182
HYDROGEN
Components / Origin
H2, mol%
C1, mol%
2.3
C2, mol%
2.2
C3, mol%
1.7
iC4, mol%
0.3.
nC4
0.3
C5+, mol%
0.2
Total
100
Origin:
Start-up H2
99.9
balance
100
Normal
Impurities: H2S
1.5.4
Start-up
Nil
HCl
CO
COS
Water:
Olefins:
10 ppm wt
Nitrogen:
1 ppm wt
LEAN AMINE
Properties / Case
Type
All cases
Di-EthanolAmine (DEA)
Rate, kg/h
10 000
Amine Content, % wt
25
1.5.5
Specification
Required 2 x unit volume
Volume, m3
<5
< 0.5
Rev. A
Page 13 of 182
Specification
between 0.725 and 0.850
Specific Gravity
between 5 and 70
D86 5%vol, C
D86 95%vol, C
PRODUCTS SPECIFICATION
1.5.6
AM
BH
CASE
49027
CASE
32000
CASE
32000
73.8
49.0
49.5
664
654
647
MW, kg/kmol
74.3
74.1
73.9
Sulfur, wppm
240
270
15
RON (estimated)
94.6
94
94
MON (estimated)
81.8
81.1
82
RVP (kpa)
100
120
122
Paraffins, vol %
34.4
52.2
50.7
Olefins, vol %
61.2
43.2
45.5
(Diene Value)
(0.0)
(0.0)
(0.0)
Naphthenes, vol %
2.9
2.4
1.6
Characteristics
Max Available Rate,
t/hr
ST m3/hr
PONA (vol %)
Page 14 of 182
NIT
AM
BH
Aromatics, vol %
CASE
0.8
CASE
2.13
CASE
2.1
(Benzene, vol%)
(0.76)
(2.13)
(2.1)
simulated
simulated
24.5
19.0
18.8
5 % vol
39.1
33.4
33.2
10 % vol
41.2
34.6
34.4
30 % vol
45.9
37.0
36.8
50 % vol
55.3
40.4
40.1
70 % vol
61.7
46.7
44.8
90 % vol
73.3
64.4
63.8
95 % vol
77.8
69.4
68.4
84.1
77.1
75.5
NIT
AM
BH
CASE
62468
CASE
63188
CASE
64350
78./8
79.6
83.8
793.2
793.5
767.9
MW, kg/kmol
115
114.5
116.4
Sulfur, wppm
10
200
290
RON (estimated)
75.3
88.1
92.8
MON (estimated)
74.3
78.4
81.7
RVP (kpa)
Paraffins, vol %
62.6
25.0
16.5
Olefins, vol %
1.0
15.3
28.7
(Diene Value)
(0.0)
(0.0)
(0.0)
Naphthenes, vol %
9.9
16.3
16.6
Aromatics, vol %
26.5
43.4
38.2
(0.43)
(0.47)
Characteristics
Distillation(ASTM
D86),C simulated
IBP
ssCCCCCCxxCCC868686)86),C
FBP
1.5.7
Rev. A
t/hr
St m3/hr
PONA (vol %)
(Benzene, vol%)
Page 15 of 182
NIT
AM
BH
Distillation(ASTM D86),C
CASE
simulated
CASE
simulated
CASE
simulated
IBP
106.0
75.2
104.7
5 % vol
112.0
111.8
110.8
10 % vol
114.9
115.0
113.6
30 % vol
125.6
125.7
124.2
50 % vol
137.2
137.3
136.2
70 % vol
149.8
149.5
148.8
90 % vol
170.7
167.2
166.9
95 % vol
178.6
173.6
173.4
182.9
178.2
178.0
Characteristics
FBP
1.5.8
Rev. A
BENZENE HEARTCUT
In order to meet the 0.9% vol benzene content in the gasoline pool in case of any
benzene upset in the feed (up to 1.9 vol %). This heart-cut is not used during normal
operation. The heart-cut properties are presented in the table hereafter.
NIT
AM
BH
CASE
NA
CASE
16000
CASE
15000
NA
23.1
22.4
NA
691.6
671.0
MW, kg/kmol
NA
85.4
85.4
Sulfur, wppm
NA
1116
64
Paraffins, vol %
NA
36.5
33.0
Olefins, vol %
NA
46.5
51.7
(0.0)
(0.0)
Characteristics
Max Available Rate,
t/hr
St m3/hr
PONA (vol %)
(Diene Value)
Naphthenes, vol %
NA
10.9
8.4
Aromatics, vol %
NA
6.2
6.93
(Benzene, vol%)
(5.8)
(6.85)
Distillation(ASTM D86),C
simulated
simulated
NA
45.7
45.2
5 % vol
NA
51.8
51.6
10 % vol
NA
54.3
54.3
30 % vol
NA
72.3
71.6
IBP
Characteristics
50 % vol
90 % vol
95 % vol
AM
BH
CASE
CASE
77.3
CASE
76.2
81.5
80.0
88.2
85.4
91.9
88.7
99.1
94.6
FBP
1.5.9
Page 16 of 182
NIT
NA
NA
NA
NA
70 % vol
Rev. A
Case
Splitter Purge
Rate, kg/h
NIT CASE
SOR
EOR
648
1039
AM CASE
SOR
EOR
537
866
BH CASE
SOR
EOR
562
905
H2, %mol
46.3
53.5
47.4
54.4
46.4
53.5
C1 to C4, %mol
35.3
27.1
36.9
28.7
38.4
30.3
C5+, %mol
18.4
19.4
15.7
16.9
15.2
16.2
Case
HP Purge
NIT CASE
SOR
EOR
AMCASE
SOR
EOR
BH CASE
SOR
EOR
Case
Rate, kg/h
NIT CASE
216
216
AMCASE
56
56
BH CASE
NA
NA
H2, %mol
88.4
88.4
91.1
91.1
NA
NA
6510
6510
32
32
NA
NA
C1 to C4, %mol
10.6
10.6
7.7
7.7
NA
NA
C5+, %mol
0.35
0.35
1.2
1.2
NA
NA
Case
Rich amine
Rate, kg/h
NIT CASE
SOR
EOR
NA
NA
AM CASE
SOR
EOR
10124
10124
BH CASE
SOR
EOR
NA
NA
DEA, % mol
NA
NA
5.38
5.38
NA
NA
Loading,
NA
NA
0.25
0.25
NA
NA
mol H2S
/ mol
DEA
Case
Stabilizer Purge
Rate, kg/h
NIT CASE
SOR
EOR
855
854
AM CASE
SOR
EOR
428
428
BH CASE
SOR
EOR
NA
NA
H2, % mol
23.3
23.2
30.4
30.4
NA
NA
H2S, % mol
11.2
11.2
12.4
12.4
NA
NA
C1 to C4, % mol
60.4
60.4
51.3
51.3
NA
NA
C5+, % mol
5.1
5.2
5.9
5.9
NA
NA
A partially desulfurized and sweet light FCC cut, routed to the MS pool
A desulfurized heavy FCC cut, routed to the MS pool
BATTERY LIMIT CONDITIONS OF PROCESS LINES
Streams
Pressure
Temperature C
kg/cmg
6.0
70
6.0
20.4
40
40
H2 Make-up
Normal operation
39.0 (*)
40
From CCR
22.0 (**)
40
20.0
45
7.0
40
7.0
40
40
47
Start-up
Product(s): Light FCC gasoline
FCC heart cut
Gas purges
Splitter purge
4.5
40
Streams
Pressure
Rev. A
Page 19 of 182
Temperature C
kg/cmg
Selective HDS HP purge
NIT Case
5.5
40
AM Case
4.5
40
5.0
40
Stabiliser purge
MATERIAL BALANCES
1.5.13 SHU SECTION OVERALL BALANCE
Case
AM CASE
BH CASE
MIX CASE
SOR
EOR
SOR
EOR
SOR
EOR
FCC gasoline
111 666
111 666
111 666
111 666
111 666
111 666
H2 make-up
277
323
244
284
245
286
TOTAL
111 943
111 989
111 910
111 950
111 911
111 952
Splitter purge
648
1039
537
866
562
905
Light gasoline
49 027
49 027
32 000
32 000
32 000
32 000
NA
16 000
16 000
15 000
15 000
Heavy gasoline
62 268
61 923
63 373
63 084
64 350
64 047
TOTAL
111 943
111 989
111 910
111 950
111 912
111 952
Feeds kg/hr
Products kg/hr
AM CASE
SOR
BH CASE
EOR
SOR
MIX CASE
EOR
SOR
EOR
Feeds kg/hr
Case
AM CASE
BH CASE
Rev. A
Page 20 of 182
MIX CASE
SOR
EOR
SOR
EOR
SOR
EOR
Heavy gasoline
62 268
61 923
63 373
63 084
NA
NA
H2 make-up
1271
1270
470
469
NA
NA
Lean Amine
10 000
10 000
NA
NA
TOTAL
63 539
63 193
73 843
73 553
NA
NA
Separator purge
216
216
56
56
NA
NA
Stabilizer off-gas
855
854
428
428
NA
NA
62 123
63 189
62 899
NA
NA
sour -
35
35
NA
NA
water
Stabilizer reflux drum -
11
11
NA
NA
sour water
Rich amine
10 124
10 124
NA
NA
TOTAL
63 539
63 193
73 843
73 553
NA
NA
Products kg/hr
Heavy
hydroteated 62 468
gasoline
Separator drum
Trade mark
HR
845,
manufactured
by
Refer (1)
Refer (1)
(1) Catalyst cycle length and estimated life time is different for each case:
NIT CASE : Estimated cycle life = 3 years, Estimated life time = 5 years
AM CASE : Estimated cycle life = 1.5 years, Estimated life time = 2.5 years
BH CASE : Estimated cycle life = 3 years, Estimated life time = 5 years
These cycle length and life duration are defined at iso-capacity (111 666 kg/hr)
(2) The 75-R-01 is designed to have some provision in the reactor for a future
loading. Additional catalyst amount will 49.7 m 3 allow to increase catalyst cycle life
and life time for AM CASE feed.
AM CASE : Estimated cycle life = 3 years, Estimated life time = 5 years
(3) Sock catalyst loading method
HR 806
Relevant to
Trade mark
HR
806,
manufactured
by
Refer (1)
Refer (1)
(1) Catalyst cycle length and estimated life time is different for each case:
NIT CASE : Estimated cycle life = 3 years, Estimated life time = 5 years
AM CASE : Estimated cycle life = 1.5 years, Estimated life time = 2.5 years
These cycle length and life duration were defined at iso-capacity (111 666 kg/hr)
(2) The 75-R-02 was designed to have some provision in the reactor for a future
loading. Additional catalyst amount will be 38.2 m 3 allowing to increase catalyst
cycle life and life time for AM CASE feed.
AM CASE : Estimated cycle life = 3 years, Estimated life time = 5 years
(3) Sock loading catalyst method
1.5.16 CATALYST BED PROTECTIONS
Details
Material
Supplier
Details
Shape
Outside Diameter
Loading density
Loaded Volume
Material
Supplier
Shape
Outside Diameter
Loading density
Loaded Volume
Material
Supplier
Shape
Outside Diameter
Loading density
Loaded Volume
Material
Supplier
Shape
Outside Diameter
Loading density
Loaded Volume
Presentation
Loading density
1350 kg/m3
4.72 m3
(1)
The volume specified for inert balls does not include inert balls volume
Relevant to
Presentation
Loading density
1400 kg/m3
29.7 m3 (1)
(1)
This amount of inert balls is defined for catalyst future loading provision.
1.5.18 CHEMICALS
1.5.18.1 Chemical during normal operation - Corrosion inhibitor agent
The corrosion inhibitor agent is injected and diluted at 10% Wt in desulfurized
heavy naphtha. Once injected in process unit, the corrosion inhibitor is at 10 ppm
wt of process stream.
Type
: CHIMEC 1044
Estimated consumption
: 832 kg/year
DMDS shall be injected during two 12-hours (max 18-hours) period. Reactor
sulfiding is done one by one.
Estimated consumption for initial catalyst loading:
o 75-R-01 : 4620 kg
o 75-R-02 : 1290 kg
Estimated consumption for future catalyst loading:
o 75-R-01 : 6012 kg
o 75-R-02 : 2061 kg
Stream
Very
Pressure Minimum
(for
Pressure
(kg/cm2g)
thermal 33
Temperature
(deg.C)
340
Medium pressure
design):
Normal
Maximum
Mechanical design:
Minimum
(for
thermal
35
38
40
9
360
380
400
Saturated.
Low pressure
design):
Normal:
Maximum:
Mechanical design:
Minimum
(for
thermal
10
11
12.5
2.5
250
280
300
saturated
3.0
4.0
5.5
5.5
10
150
170
190
100
185
5.3
7.6
3.5
33
65
44
design):
Normal:
Maximum:
Mechanical design:
Steam condensate (HP Normal:
Mechanical design:
and HP steam)
Cooling water Supply
Minimum:
Normal
Maximum:
Mechanical design:
Minimum pressure required
for return:
Maximum temperature for return:
Mechanical Design
Boiler
feed
water Minimum:
Normal:
(VHP/HP)
Maximum:
Mechanical Design:
Demineralised water
Minimum:
Normal:
Maximum:
Mechanical Design:
Plant air (oil-free and Minimum:
Normal:
water
for
catalyst
Maximum:
regeneration)
Mechanical Design:
Instrument air
Minimum:
Normal:
Maximum:
Mechanical Design:
Nitrogen
Minimum:
Template No. 5-0000-0001-T2 Rev A
7.6
47/17.5
50/20.5
71/29
3.0
9.0
3.0
4.0
5.0
9.0
4.0
5.0
6.0
9.0
5.0
65
120/120
120/120
155/155
Ambient
65
Ambient
65
Ambient
65
Stream
Fuel gas
Fuel oil
1.12
Pressure
Temperature
(kg/cm2g)
6.0
7.0
10.5
2.5
3.0
3.5
9.0
7.0
8.0
11
17
(deg.C)
Ambient
65
30
40-50
60
100
100
130
170
200
UTILITY SPECIFICATION:
1. NITROGEN QUALITY:
Nitrogen
Dew point at atm. pressure
CO
CO2
Oil content
Oxygen
Normal Flare
Acid Gas Flare
up
Back- Superimposed
Total
Back-
Pressure
(kg/cm2g)
0.1
0.1
BL (kg/cm2g)
1.5
1.5
outlet (kg/cm2g)
1.7
1.7
4. DM WATER
pH 6.7-7.3
Cation conductivity @ 25 0C (micromho/cm) 1-2
Hardness (CaCo3) (mg/l) Nil
Turbidity (NTU) Nil
Copper (mg/l) Nil
Total Fe (mg/l) <0.03
Total SiO2 (mg/l) - <0.05
KMnO4 Value @ 100 0C mg/l) - <5
5. BEARING COOLING WATER
pH 7.5-8.0
Hardness (CaCo3) (mg/l) 140-210
Turbidity (NTU) 20-30 (max 50)
Total dissolved solids (mg/l) 875-1300
M. Alkalinity (mg/l) 100-120
Chlorides as Cl (mg/l) 225-335
Sulphates as SO4 (mg/l) 205-466
Organophospahtes as PO4 (mg/l) 8-10
Total Fe (mg/l) 1 (max)
KMnO4 Value @ 100 0C mg/l) 30-40 (Max 50)
Oil content (mg/l) 10 (max)
Zinc Sulphate as Zn (mg/l) 1-2
START-UP REQUIREMENT
The estimated consumption is based on a normal start-up sequence. Intermittent
operation can be assumed to occur once every 3 years.
V1=100 m3 is the estimated volume of the SHU reaction section
V2=260 m3 is the estimated volume of the HDS reaction section
The overall volume V is considered for utility consumption is 360 m3.
a) Start-up instrument air
The instrument air is used for tightness test after catalyst loading:
Estimated consumption: 6 V (2160 Nm3)
b) Start-up nitrogen
Nitrogen gas is required for start-up and shutdown periods in order to free the
unit of any oxygen or hydrocarbons.
Unit pressurization:
8V
Catalyst drying:
15 V (max)
Unit purge:
3V
Total:
26 V (= 8280 Nm3)
5 ppm max
H2O
5 ppm max
Carbon compounds :
5ppm max
H2
20 ppm max
CO
20 ppm max
CO2
20 ppm max
Chlorine
1 ppm max
N2
c) Start-up hydrogen
Unit pressurization:
20 V
Unit purge:
10 V
Total:
30 V
Total in Nm3:
10 800 Nm3
95 % min.
C1
5% max.
C2+ :
0.5% max.
CO
20 ppm max.
CO2 :
O2
H2S :
1 ppm max
d) Start-up steam
LP Steam: LP Steam will also be used during start-up to inertise other equipments by
steam out.
1.7.2
Burning phase
Kg/hr
Polish
phase
Duration Kg/hr
burning Overall
consumption
75-R-01
358
2450
Duration kg
(hr)
82 190
9
75-R-02
960
5908
1.5
(days)
31 900
b) MP steam
MP steam is used for catalyst in-situ regeneration:
Stripping phase
Reactor No.
Kg/hr
Burning phase
Polish burning
Duration Kg/hr
Duration Kg/hr
Duration
(hr)
(days)
(hr)
75-R-01
7650
4473
2485
75-R-02
14730
11 983
5992
1.5
NIT CASE
5100
300
600
40
AM CASE
5100
300
320
40
BH CASE
NA
NA
NA
NA
NIT CASE
10
200
2260
40
AM CASE
11
200
2100
40
BH CASE
NA
NA
NA
NA
This stream exists during normal operation; it is sent to the sour purge for
treatment. This stream is sour (about 11.2 to12.4 % mol).
Continuous service for light ends and H2S removal: about 428 to 855 kg/hr, 40C
as operating temperature.
f) Regeneration gas purge to atmosphere
During PRIMEG+ reactors catalyst in situ regeneration operation, waste vapour
stream is routed to heater (75-F-01) stack at safe location under pressure control.
This waste vapour stream contains, during burning and polish burning phases:
CO2
SO2
SO3
H2O
Estimated
kg/hr
kg/hr
kg/hr
kg/hr
duration
75-R-01
83
599
15
4495
16 days
75-R-02
241
1206
31
12048
2.5 days
Reactor No.
The Splitter has 52 trays and the feed enters the column at tray 19
(numbering from bottom). The purpose of the Splitter is to fractionate the feed
and produce a Light Cracked Naphtha (LCN) and a Heavy Cracked Naphtha
(HCN). The LCN / Heart cut gasoline cut-point is adjusted to produce a low-sulfur
LCN while simultaneously recovering a large portion of olefins. This is possible
since the heavier boiling components contain a high disproportionate amount of
sulfur relative to low olefins content.
The Splitter overhead is almost totally condensed by air-cooling in the
Splitter Overhead Air Condenser 75-A-01. Vapour (excess hydrogen and light
ends) is separated from the reflux liquid in the Splitter Reflux Drum (75-V-02).
The Splitter Post Condenser (75-E-04) cools the vapour purge to battery limit
conditions in order to recover light ends from the purge. The splitter pressure is
controlled by the split range control of pressurizing hydrogen (normally no flow)
and venting to fuel gas header. The liquid is pumped by the Splitter Reflux Pumps
(75-P-03 A/B) and returned to the top of 75-C-01 as reflux, under flow control in
cascade with the reflux drum level control.
The LCN product is drawn from the accumulator tray number 48 of the
Splitter (numbering from bottom). It is cooled with the light gasoline Air cooler (75A-06) under flow control in cascade with the splitter tray 44 temperature control of
lighter sulfur compounds concentrated in the LCN.
The Splitter bottom is reboiled with 75-E-07 HP steam reboiler. The reboiling
steam rate is under flow control in cascade with the Splitter reflux flow. Heavy
naphtha from the splitter bottom (75-C-01) is sent to HDS section under flow
control in cascade with the splitter bottoms level control.
One benzene heart-cut is foreseen in order to reduce benzene content in the
gasoline pool in case of high concentration benzene in the PRIME G + feed. The
heart-cut benzene is drawn from the accumulator tray number 36. The heart-cut
stream is cooled by light gasoline air cooler 75-A-02 and pumped by 75-P-05 A/B
to storage after final cooling in 75-E-06 A/B under flow control reset by 31 st tray
temperature control.
As the selective hydrogenation reactor is operated mainly in liquid phase, a
sufficient liquid velocity shall be maintained at its inlet. Therefore, the
hydrocarbon flow rate to the reactor shall be at least of 75% of the normal flow
rate. In case of turndown (50% of feed), part of the splitter bottom shall be
recycled to the SHU feed surge drum under flow control.
The heavy naphtha from 75-C-01 Splitter is pumped by HDS Feed Pumps
(75-P-02 A/B) under flow control in cascade with the splitter level control. The
main part of HCN feed is mixed with the recycle hydrogen before entering the
First HDS Feed / Effluent Exchanger (75-E-08 A/B/C).
The HDS reactor is divided in 3 beds of HR806 catalyst. The overall temperature
rise in the reactor is controlled by two injection of recycle liquid quench from the
separator drum 75-V-03 between the three beds.
The HDS effluent is further heated in HDS heater, 75-F-01. The heater operates in
vapor phase and the feed HDS reactor inlet temperature is controlled via fuel gas
control. The effluent from the heater is then cooled by the HDS feed / effluent
exchangers 75-E-08 A/B/C and by exchanger with the SHU reactor feed/HDS
effluent exchanger 75-E-01. Final cooling is achieved in the HDS effluent air
cooler 75-A-03 and the reactor effluent trim coolers 75-E-09 A/B.
An intermittent washing water injection point upstream the HDS effluent air
condenser 75-E-03 enables to flush these equipment from salt deposit that may
have been formed at low temperature.
The hydrocarbon liquid is partially pumped back to the HDS section through 75-P06 A/B quench pumps. The remaining part of the liquid is routed to the stabilizer
section under flow control reset by 75-V-03 level control.
2.5 RECYCLE COMPRESSOR SECTION
Refer PFD No.: 04-2529-75-5FD-2 sheet 3/4 Rev 0
The vapour enters the amine KO drum (75-V-06) where it is freed from
condensed liquid hydrocarbon particles due to a wire mesh.
In the amine absorber (75-C-02) the recycle gas is contacted with a 25 % wt
lean DEA solution coming from battery limits. The lean DEA is pre-heated in the
lean amine pre-heater (75-E-10), thus maintaining a 10C temperature difference
between the gas and the amine.
The H2S enriched DEA, collected in the absorber bottoms, is then routed to
the DEA regeneration unit under amine absorber bottoms level control.
The sweetened gas is mixed with the H2 make up, then flows to the recycle
compressor K.O. drum (75-V-04) where it is freed from any liquid amine
entrainment that may have occurred.
Part of the gas is then purged to the fuel gas network under flow control to
prevent any light end concentration in the recycle loop. The remaining part of the
gas is compressed back to the 75-E-08 A/B/C inlet by the recycle compressor 75K-01 A/B.
2.6 STABILIZER SECTION
Refer PFD No.: 04-2529-75-5FD-2 sheet 4/4 Rev 0
The liquid from the separator is heated through the stabiliser feed/bottoms
heat exchangers (75-E-11 A/B) and enters the Stabiliser column (75-C-03). The
overhead of the stabilizer is condensed through the stabilizer overhead air
condenser (75-A-05) and additionally cooled in stabilizer overhead trim coolers
75-E-14A/B. The liquid phase, the water phase (if any) and the vapour phase
separate in the stabilizer reflux drum (75-V-05), the pressure of which is
controlled by the purge gas flow. The water collected in the boot is sent to the
sour water treatment under boot level control.
The liquid is routed back to the column as reflux by the stabilizer reflux
pumps (75-P-09 A/B) under flow control reset by reflux drum level control.
The stabilizer overhead is protected from corrosion by corrosion inhibitor injection
from the corrosion inhibitor package (drum + metering pump) into the stabilizer
overhead line.
The stabilizer bottom is reboiled by HP steam reboiler (75-E-13), the duty of
which is adjusted by HP steam flow rate reset by stabilizer sensitive tray control.
The bottoms of the stabilizer (treated heavy gasoline) is sent to storage under
flow control reset by stabilizer bottoms level control. The cooling down of the
stabilizer is ensured first by the stabilizer feed/bottoms heat exchanger (75-E-11
A/B) and by the heavy gasoline air cooler (75-A-07) heavy gasoline trim cooler
(75-E-12 A/B).
2.7 CATALYST IN-SITU REGENERATION OPERATION
The PrimeG+ unit is equipped with catalyst in-situ facilities that involve:
the HDS Reaction Section. The optimum amount of light gasoline depends on the
FCC feed sulfur content, feed thiophene content and on the product sulfur
specification. The exact amount of light FCC gasoline drawn should be precisely
controlled by monitoring the on-line light FCC gasoline sulfur analyzer.
The light FCC gasoline draw rate and the sulfur content is controlled indirectly by
a temperature controller located on the Splitter column a few trays below the light
FCC gasoline draw tray.
A lower light FCC gasoline withdrawal rate from the Splitter will produce an heavy
FCC gasoline with higher olefin concentrations and hence potentially higher
octane losses in the HDS Reaction Section. Alternatively, a higher light FCC
gasoline withdrawal rate from the Splitter will produce an heavy FCC gasoline
with lower olefin concentrations which is initially favorable for octane losses in the
HDS Reaction Section but with increased sulfur levels in the light FCC gasoline.
As the light FCC gasoline rate in the Splitter is increased, the severity of the HDS
Reaction Section has to be increased to offset the amount of sulfur that has left
with the light FCC gasoline.
3.5 FIRST HDS REACTOR (75-R-02)
The purpose of the HDS reactor is to achieve the bulk of the hydrodesulfurization
of the heavy FCC gasoline, while limiting olefins saturation.
The reaction is carried out between the vaporized gasoline and an hydrogen rich
gas over a desulfurization catalyst bed.
Sulfur in cracked gasoline is distributed as follows:
Aromatic sulfur (benzothiophene).
Acidic sulfur (mercaptan type).
Disulfide type.
Sulfide type.
Thiophene and alkyl thiophenes.
3.6 CHEMICAL REACTIONS AND CATALYST
3.6.1
OBJECTIVE
The objective is to help the operators to better understand the reasons of the
operating instructions and enable them to make wise decisions, should the
circumstances deviate from those covered in the Operating Instructions.
The different chapters of this section describe:
1. The various chemical reactions involved in the process as well as the effect of
the operating conditions.
2. The catalyst characteristics.
3. The catalysis mechanism.
4. The catalyst contaminants.
5. The process variables.
3.6.2
dependent upon the operating conditions but can also be widely modified through
the use of properly selected catalysts. One reaction (or a family of reactions) is
generally enhanced by a specific catalyst.
In other words thermodynamics dictates the ultimate equilibrium composition
assuming the time is infinite while kinetics enables the prediction of the
composition after a finite time. Since time is always limited, when reactions are
concurrent, kinetics is generally predominant.
A catalyst generally consists of a support (earth oxide, alumina, silica,
magnesia...) on which (a) finely dispersed metal(s) is (are) deposited.
The metal is responsible for the catalytic action, but very often the support has
also a catalytic action related to its chemical nature.
Template No. 5-0000-0001-T2 Rev A
A catalyst is not consumed, but can be deactivated either by impurities in the feed
or by some of the products of the chemical reactions involved, resulting in
polymers or coke deposits on the catalyst.
3.6.3
3.6.4
3.6.5
CHEMICAL REACTIONS
The FCC gasoline contains the following unsaturated components:
Olefins.
Aromatics.
Several chemical reactions can take place during the diolefin hydrogenation. The
most important ones are:
HYDROGENATION OF DIOLEFINS
Diolefins are hydrogenated into corresponding olefins and some of the olefins are
hydrogenated into corresponding paraffins.
A) Cyclodiolefins
+ H2
Cyclohexadiene
Cyclohexene
B) Normal or isodiolefins
Normal diolefins:
Their hydrogenation produce several isomers, for example:
CH3 - CH2 - CH2 - CH2 - CH2 - CH = CH2
CH3 CH = CH CH2 CH2 CH = CH2 + H2
1 5 Heptadiene
1 Heptene
CH3 - CH = CH - CH2 - CH2 - CH2 - CH3
2 Heptene (cis and trans)
Iso-diolefins
Isodiolefins hydrogenation produces also various isomers. Moreover double bond
migration can also occur within the newly generated isomer.
Diolefins are very unstable compounds, which polymerize easily into gums.
Therefore conversion of diolefins into olefins improves the product quality: these
reactions are highly exothermic. The difference between the diene value (DV) or
the maleic anhydride value (MAV) of the feed and the DV or MAV of product
measures the yield of these reactions and could be related to the hydrogen
consumption. Refer to chapter "Operation of the unit".
3.6.7
ISOMERIZATION OF OLEFINS
CH2 = CH - CH2 - CH2 - CH2 - CH3 CH3 - CH = CH - CH2 - CH2 - CH3
1 - Hexene
2 - Hexene
HYDROGENATION OF OLEFINS
These reactions are undesirable because they reduce the octane number.
The hydrogenation of diolefins is faster than the hydrogenation of olefins.
Nevertheless it is difficult to avoid totally hydrogenation of olefins, particularly if
the feed contains 1-olefins which are more reactive than 2,3-olefins.
This reaction is also exothermic.
The difference between the feed bromine number (BrN) and the product bromine
number measures the conversion rate of this reaction and could be related to the
hydrogen consumption. Refer to chapter "Operation of the unit".
3.6.9
26 Kcal/mole
Olefins to paraffins:
30 Kcal/mole
and
thiophenes.
Over
selective
hydrogenation
catalysts,
light
mercaptans and light sulfides are converted to heavier sulfur species. In addition,
H2S is also converted to heavier sulfur compounds. The combination of selective
hydrogenation and FCC naphtha fractionation allows the production of a light
naphtha stream with a very low sulfur content, provided that thiophene carry-over
in this stream is controlled. The sulfur shift reactions are faster reactions than the
diolefin hydrogenation reactions.
The heavy sulfur compounds produced over the selective hydrogenation
catalysts are essentially heavy sulfides and, to a lesser extent, heavy
mercaptans. The following mechanisms are believed to take place:
Conversion of light mercaptans to heavy sulfides
1. Conversion of light mercaptans to heavy mercaptans
2. Conversion of sulfides to heavier mercaptans
3. Conversion of H2S to mercaptans
Although some of these mechanisms involve the production of some H 2S, the
H2S addition reaction is a very fast reaction. Therefore, no H 2S exits the reactor.
Approximately 95-98% of the light mercaptans are converted in the Selective
Hydrogenation reactor. Carbonyl sulfide (COS) and carbon disulfide (CS 2) will
RS R'
H2
RH
+ H2S
Step 2
H2S
R'SH
H2
H2S
C2H5 S CH3
H2S +
R'SH
R'SH
3.7.1
Reactor temperature,
Reactor pressure,
REACTOR TEMPERATURE
Thermodynamics for conversion of light mercaptans and selective hydrogenation
of diolefins are very favorable. The reaction will go to completion over a wide
range of operating temperature. Diolefin hydrogenation to olefins is completed
even at relatively high temperature and low H 2 content.
For catalyst stability, the operation must take place at lower temperature to
prevent polymerization of gum precursor compounds. Thermal polymerization
deactivates the catalyst by coating of the active area and is accelerated at
temperatures above 200C.
3.7.3
REACTOR PRESSURE
An important criterion for liquid phase hydrogenation is the content of dissolved
hydrogen. The content of dissolved hydrogen depends on the total pressure, the
hydrogen make-up flow and the hydrogen make-up purity. Complete diolefin
hydrogenation requires only a small amount of hydrogen in excess of the
stoechiometric requirement.
Higher operating pressure:
Improves liquid distribution in the reactor and reduces pressure drop due to
vaporization.
The reactor operating pressure is fixed at the design stage, operator will maintain
this maximum operating pressure during all normal operation.
3.7.4
3.8.1
CHEMICAL REACTIONS
Sulfur removal is the major purpose of this reactor in order to prepare a
desulfurized stock of the gasoline pool. However, partial olefin saturation
reactions and partial denitrogenation (denitrification) of a small amount of
nitrogen compounds that are present in the feed occur simultaneously with
desulfurization.
The reaction taking place in the reactor can be grouped as follows:
HYDROREFINING
A) Desulfurization
The typical sulfur compounds in cracked gasoline are of the thiophenic and
benzothiophenic types.
The desulfurization occurs in several phases.
Thiophene
Thiophane
Mercaptans
H2S
The desulfurization reactions are exothermic, but owing to the limited amount of
reactant involved, they do not lead to a noticeable temperature increase.
The rate of desulfurization reactions follows first-order kinetics. In the reactor, the
desulfurization reactions take place. Benzothiophenes and thiophenes are
essentially converted and the residual sulfur is essentially in the form of
thiophanes (or tetra-hydro-thiophenes) and mercaptans.
B) Denitrification (or denitrogenation)
Nitrogen is removed in catalytic hydrotreating by the breaking of the C-N bond
producing a nitrogen free aliphatic and ammonia. The breakage of the C-N bond
is much more difficult to achieve than the C-S bond in desulfurization.
Consequently denitrification occurs to a much lesser extent than desulfurization.
Nitrogen compounds typically found in cracked gasolines are methylpyrrol and
pyridine types.
CH
+ 4H 2
CH
12
+ NH 3
C - CH 3
NH
Methylpyrrol
n-pentane
+5H
C 5H
12
+ NH
ammonia
n- pentane ammonia
N
pyridine
The heat released by the denitrification reactions is also negligible owing to the
small amount of nitrogen compound involved.
3.8.3
HYDROGENATION OF OLEFINS
Hydrogenation or olefin saturation is the addition of a hydrogen molecule to an
unsaturated hydrocarbon to produce a saturated product. Olefinic hydrocarbons
are found in high concentrations in cracked gasolines. The olefin saturation
reaction is highly exothermic and is controlled by the process. The comparative
reactivity of olefins is the following (from more reactive to less reactive):
n - olefins > n internal olefins > branched olefins > cyclic olefins > internal branched
olefins
-CH2 -CH3
1-heptene (n - olefins)
n-heptane
+ H2
CH3 - CH - CH = CH CH3
CH3
4 methyl 2 pentene
CH3
2 methyl pentane
Reactor temperature
Space velocity.
For each of these variables, we have to distinguish their influence on activity and
on selectivity.
3.9.2
TEMPERATURE
Thermodynamically, as the hydrodesulfurization and olefin hydrogenation
reactions are exothermic, these reactions are favored by low temperature.
In terms of selectivity, an increase of temperature enhances the selectivity
between hydrodesulfurization and olefin hydrogenation but the impact is very low.
Nevertheless, a control of temperature in reactors makes the process control
easier and avoids some phenomena like runaway.
term
of
activity,
higher
temperature
increases
the
activity
of
The effect of H2S partial pressure on the hydrogenation of olefins is very slight,
but H2S affects the hydrodesulfurization. Therefore, an increase of the hydrogen
sulfide partial pressure has a negative effect on the selectivity. An amine washing
of recycle gas is provided to decrease the H 2S content.
3.9.4
SPACE VELOCITY
As the reactor operates in the gaseous phase with a large amount of recycle
hydrogen, the residence time is only proportional (not equal) to the inverse of the
space velocity.
Space velocity is a parameter readily available to operators. Each time the feed
flow is changed, the space velocity changes in proportion to the flow. A decrease
of the space velocity (i.e. an increase of the residence time) enhances the activity
of reactions, yet without any enhancement of selectivity .
4.1 INTRODUCTION
The utility system consists of Nitrogen, Instrument Air (IA). Plant Air (AP), Sea
Cooling Water (WC), Service Water (SW), Boiler Feed Water (BFW), HP/MP/LP
Steam, LP Condensate, Bearing Cooling water (BCW) and Fuel Gas (FG).
Closed Blow down (CBD), Amine Blow down (ABD) Flare is also provided within
the unit.
Description related to various utility systems for Prime G+unit is given below.
4.1.1
4.1.2
4.1.3
The return water is collected in a 16 return header and sent to B/L. Individual return
line from cooler is provided with a Local temperature Indicator (TI) and Thermal
safety valve. The return header is provided with isolation valve and a spectacle
blind for positive isolation at the battery limit. The return header is also provided with
TI-4603, with TAH/TAL, PI-4603 with PAH/PAL and FI-4602 with FAL/FAH in DCS
and local PI & TI at B/L. A 6 Jump over between supply and return header is also
provided at B/L.
4.1.4
4.1.5
4.1.6
NITROGEN
A 8 header supplies N2 to Prime G+ Unit. N2 is used for various purposes
in equipment, line etc. for inertisation, blanketing, purging, in-situ regeneration
etc. The supply header is provided with DCS FI/FQ-4101 with FAH/FAL, PI-4102
with PAL/PAH along with local PI & TI at B/L.
4.1.7
LP STEAM SYSTEM
A 6 header supplies LP steam to Prime G+ Unit. FI/FQ-4401 with FAL/FAH,
PI-4402 and TI-4402 with Low and High alarm is provided in DCS to monitor LP
steam B/L condition. Also local PI & TI are provided. At B/L block valve along with
spectacle blind are provided for positive isolation.
Use of LP steam in the unit is mainly as follows:
4.1.8
MP STEAM SYSTEM
A 10 header supplies HP steam to Prime G+ Unit. FI/FQ-4403 with
FAL/FAH, PI-4402 and TI-4402 with Low and High alarm is provided in DCS to
monitor HP steam B/L condition. Also local PI & TI are provided. At B/L block
valve along with spectacle blind are provided for positive isolation.
Use of HP steam in the unit is mainly as follows:
4.1.9
40
AM CASE
BH
5100
300
320
NA
NA
NA
40
NA
NIT CASE
10
200
2260
AM CASE
11
200
2100
BH CASE
NA
NA
NA
ppm
Temperature, C
40
40
NA
Effluent
75-R-01
75-R-02
Effluent
75-R-01
75-R-02
Duration
days
7
1
H2O
Kg/hr
2485
5992
Duration
days
9
1.5
5.1 GENERAL
INSPECTION / CHECKING
Sections of the unit should be checked out as soon as the contractor
completes work in those areas. Immediately followed by inspection of those
areas, punch lists which indicate the deviations from the design specifications
should be written and distributed to the contractor. In this manner mistakes in
construction can be found and corrected early.
Inspection of the plant can be basically divided into the following areas:
Vessels
Piping
Heaters
Exchangers
Pumps
Instrumentation
5.2.2
INSPECTION OF EQUIPMENTS
Inspection of the interior of the vessels, columns, heaters and other
equipment normally accessible during operation should be made to ensure that
they are complete, clean and correctly installed. Tray assemblies in columns
should be checked with reference to the engineering drawings to detect any
defect in assembly or construction and to ensure cleanliness. Packing if any to be
done after internal inspection and flushing. The vessels are to be checked with
reference to engineering drawings. The demister is to be fitted after internal
cleaning and water washing.
In heaters, the burner assemblies should be checked for easy operation of
air registers, contour of the burner throat, debris material etc. The heater coils
supports to be checked for proper installation.
Checklist formats are attached as Annexure
5.2.3
5.2.4
INSTRUMENTS
All instrument tapings for pressure, level and flow should be clear and
Thermowells should not foul with the internals. These should be checked prior to
box up of the equipment.
Instruments will be checked, starting from the controller and proceeding
logically through the control loop. Cascade control system will be checked from
the impulse point of primary loop. Operating crew should check proper mounting
of control valves. Control valves responses should be checked for controller
outputs. The shutdown systems of the equipment and machinery will be checked
by simulating the various conditions in the control circuits.
5.2.5
RELIEF VALVES
Relief valves will be set in the shop and mounted before the system
pressure test. Block valves ahead and after relief valves will be checked for lock
open or lock close position as per P&ID. Relief valves will be checked against
specifications.
5.2.6
ROTARY EQUIPMENT
All rotary equipment such as pumps, fans etc. are to be checked for
bearings, internals and free movement. The auxiliaries, control systems on this
equipment should be thoroughly inspected.
5.2.7
DRAINAGE SYSTEM
Check the OWS and blow down system against drawings. Check for free
flow.
5.3 PREPARATION FOR PRE-COMMISSIONING
Check the unit for completion of mechanical work against P&ID.
Check list points are liquidated. Any pending point will not affect precommissioning operation.
Remove all construction debris lying around in the unit and clean up the area.
Install blinds as per master blind list.
Safety valves should be kept blinded during flushing and re-installed
afterwards.
These should be shop tested and set at the stipulated values.
Ensure that underground sewerage system is in working condition. Clear
plugging, if any. Check by flushing with water.
Check that communication between units, control room, offsite and utilities are
complete and in working condition.
Ensure that the required lube oil, grease and other consumable are available
in the unit.
5.4 PRE-COMMISSIONING
Prior to the commissioning of the plant there are several pre-commissioning
operations that must be conducted to prepare the plant for the actual start-up
these are:
1. Commissioning of utilities
2. Final inspection of vessels
COMMISSIONING OF UTILITIES
The various utility lines should be tested and placed into service as soon as
the construction schedule allows. Pressure tests should be carried out on all
steam condensate, air, fuel gas, flare, and nitrogen lines as are done on all
process lines.
a) Steam Network
Network is blown through completely from battery limit with a strong steam
flow in order to clean the lines. The following steps are recommended:
Check network, all equipment will be disconnected to avoid entry of flushed
material.
Drain all the low points. If necessary open steam trap inlet flanges.
Open slowly battery limit valve and let the temperature rise in the header,
slowly and steadily.
Check support of fixed points and expansion loops.
When line is hot, blow it through completely with a strong steam flow.
Close battery limit valves and prepare another network. When the blowing are
satisfactory, reconnect all equipment and remount steam traps. Recharge
header as above.
To gauge the effectiveness of the steam blowing (and the amount of scale left
in the lines), target plates should be installed at the blow-down points. The
lines should be repeatedly blown down until virtually unmarked target plates
are obtained.
All
equipment will be disconnected at the inlet and reconnected when lines are
cleaned. Control valves and orifice plates will be removed and re-installed, after
the lines become clean. When system has been flushed, charge the lines to the
operating pressure.
The following precautions to be taken:
To open vents at high points in order to expel air from equipment and piping
To open the battery limit valve, slowly and steadily.
c) Instrument Air and Plant Air:
Network shall be blown through completely from battery limit with strong flow
of air in order to clean and dry the lines. All joints and connections shall be
checked for tightness with soap solution. Header and branch lines will be blown
through with a high flow rate of air. During all tests, the instruments and control
valve shall be carefully isolated from the system.
d) Fuel Gas Networks:
Networks shall be blown through from battery limit with a strong airflow in
order to clean the lines. During the operations, orifice plates and control valves
shall be removed. Special care shall be taken to prevent water from entering the
furnace. The fuel oil and fuel gas headers will be commissioned before firing the
Heaters.
5.4.2
5.4.3
Screens should be placed in a flange between the suction valve and the pump
so that the screen may be removed without de-pressuring any vessels. The
flow through the screen should preferably be downward or horizontal.
Precautions should be taken to place the screen in a location where the dirt
particles will not drop into an inaccessible place in the line when the flow
through the pump stops. If this should happen, it would not be possible to
remove the dirt upon removal of the screen.
An air pressure test can be placed on the sections of the unit prior to a water
test so that any open lines or flanges may be discovered and taken care of
before liquid is admitted. It would be remembered that in pressure testing
vessels, the test gauge should be placed at the bottom of the vessel so that
the liquid head will be taken into account. Before draining any liquid from a
vessel, a vent must be opened on top of the vessel to prevent a vacuum from
pulling in the vessel sides.
In pressure testing equipment, particularly in cold weather, care should be
taken that the testing of the vessels is not carried out at temperature levels so low
that the metal becomes brittle. As metal temperatures decrease, the tending for
brittleness increases. Temperatures above 17C (60F) are considered
satisfactory for testing to eliminate the possibility of cold fracturing of equipment.
Such temperatures can be attained by warming the testing medium.
It will not be practical to test all of the equipment together. Thus, the unit will
be divided into sections as governed by the location of the various items of
equipment and the test pressures to which each item will be subjected. Suitable
blanks must be made up for insertion on nozzles and between flanges to isolate
the various sections of equipment as required.
receivers, etc., for the various towers will be tested together with the main
vessels. Test pressures will be determined from the pressure vessel summary for
the unit. During pressure testing, all safety valves must be blinded off since their
normal relieving pressure will be exceeded.
It may be convenient to test the heaters and reactors in one group. A field
hydrostatic test on the gas compressor after installation could result in damage to
the internals, so the compressors must be isolated from the reactor system. As
Template No. 5-0000-0001-T2 Rev A
the heaters are normally tested at a higher pressure than the reactors, it would be
simplest to blind off the heaters and test them first and then test the entire system
at the reactor test pressure. Blanks can be provided with connections for
introduction of water for testing and for venting of air as the system is filled with
water. It may be necessary to use Thermowells connections and pressure taps
for additional vents in the reactor system. At the completion of the hydrostatic
test, all water should be removed from the equipment. Where necessary, flanges
may be broken to drain low points and the equipment air blown to remove as
much water as possible before flanging up.
After hydrostatic pressure testing, a tightness test must be conducted to
check all flanges and fittings, especially the ones opened during hydro testing.
This final tightness test must be witnessed by Licenser representatives and is
normally done just prior to start-up.
5.4.4
carried out in the gas sections of the unit. Temporary water connections should be
provided at convenient locations in the system for carrying out water flushing. The
following points should be remembered during water flushing.
Low point drains and high point vents should be purged.
All instrument connection should be isolated, orifice plates removed, control
valves isolated and by-passed. In case there is no bypass, remove control
valve and flush the line. The valve will be installed after clean water starts
coming out and further flushing may be continued.
If there is any heat exchanger in the line, flushing should be done up to and
around the exchanger using by-pass line. It should be ensured that dirty water
from initial flushing does not get into the exchanger. Wherever bypasses are
not available, the flanged joints at the inlet of heat exchanger should be first
Template No. 5-0000-0001-T2 Rev A
opened and the line flushed till clear water starts coming out. Then reconnect
flange and flush through the exchanger.
At each opening of the flanged joints, a thin metallic sheet should be inserted
to prevent dirty water from entering the equipment or piping.
The flow of water should preferably be from top to bottom for flushing of heat
exchanger coolers. The bottom flange of the equipment should be opened to
permit proper flushing.
The flushing should be carried out with maximum possible flow of water till
clear water starts coming out.
Vertical lines, which are long and rather big (say over 100-mm dia) should
preferably be flushed from top to bottom. This will ensure better flushing.
Filling the lines and releasing from bottom is also helpful. The rundown lines
can also be flushed conveniently from the unit to the respective tanks.
It should be ensured in all flushing operation that design pressure of lines and
equipment is never exceeded. After flushing of lines and equipment, water
should be thoroughly drained from all low points. Lines and equipment
containing pockets of water should not be left idle for a long time; it is
preferable to dry these lines and equipment with air after water flushing.
Recommended air/water velocity during flushing or blowing to be
maintained for proper flushing
5.4.5
following outline: The pumps will be started and operated according to the
manufacturers instructions.
CAUTION: Many high head pumps are not designed to pump water. To do
so can result in damage to the pump internals.
It is extremely important that the proper type and viscosity oil and proper
grade of grease is used to lubricate the equipment. Refer to manufacturers
instructions and lubricating schedule for this information.
Motor should be checked and started to ensure that it has the correct direction
of rotation. The motor speed should be checked with tachometer to ensure
that RPM is correct. The manufacturer's lubrication schedule should be used
to ensure that all lubrication points have been serviced. After a short run each
bearing should be felt to ensure that it is free and not overheated.
See that the driver rotates the pump in the direction indicated by the arrow on
the pump casing. Rotate the pump by hand to see that it is clear before
starting.
Couple up and align the pumps, then check for cooling water availability and
start flow of cooling water to the pumps requiring external cooling, before they
are run in.
Open pump suction valve and close discharge valve (crack discharge valve
for high capacity, high head pumps). Make sure the pump is full of liquid.
Start the pump. As the pump is motor driven, the pump will come up to
speed.
If no pressure is
satisfactory, slowly open the discharge valve and give the desired flow rate.
Check the amperage of the motor. Do not run the pump with the discharge
block valve closed except for a very short time. Note any unusual vibration or
operation condition.
Check bearings of pumps and drivers for signs of heating. Recheck all oil
levels.
Run the pump for approximately one hour, then shut off to make any
adjustment necessary and check parts for tightness. Since it is not possible
to run the pump at operating temperature, a final check of alignment must be
made during normal operation by switching to the spare pump.
Start the pump and run it for at least four hours.
Shut the pump down and pull the strainer. Clean the strainer and replace it in
the suction line. Remove the temporary fine mesh liner from the strainer after
water flushing is complete.
On a new unit, the screens are sometimes left in service for the first run on all
locations where spare pumps have been provided.
When water is used for pressure testing and washing, it is sometimes better
to have packing in the pumps for a seal to prevent dirt from ruining the
mechanical seal.
After the lines and equipment are judged to be clean and all the pumps have
been run in, the water should be drained from the various systems.
Lines
containing low spots should be broken at the low spot if no drain is provided.
Underground lines, without drains, should be blown free of water. Before draining
any vessel, a vent must be opened on that vessel so that a vacuum will not be
created on draining. If the towers are to be left standing for a long period of time
before steam drying or before operation, an inert gas, such as nitrogen or sweet
fuel gas, must be introduced to the vessels to prevent rusting of the internals from
oxygen in the air.
Of course, no water circulation should be carried out through the gas
compressors.
micrometer.
A) Prior to unit start-up, all instruments must have been checked with regard to:
Template No. 5-0000-0001-T2 Rev A
Proper tagging,
Correctness of assembly,
Calibration,
B) The following guidelines may be adopted for checking and calibration of all
instruments.
a) Orifice Plates
Before each orifice plate is installed the orifice taps should be blown clear.
The plate should be callipered to check if the correct size orifice plate is installed.
The plate should then be installed after checking for the correct direction.
b) Differential pressure Transmitters and Receivers
Ordinarily these should be calibrated locally against a manometer. The
calibration should be checked at the receiver, which may be board or locally
mounted recorder or indicator.
c) Pressure Transmitters and Receivers
These should be checked in place. The calibration of the receiver should be
checked at the same time.
d) Alarms checking
All alarms, auto start and cut off systems should be checked by simulating the
conditions. Make sure that the field instruments actuate the corresponding light or
audible alarm in the control room or DCS printer.
e) Valves
The control valves are removed during washing operations. They should be
checked for cleanness of the seats and free movement of the plug or ball.
Check the valves motion and their response to the controller signal.
Template No. 5-0000-0001-T2 Rev A
When all the single instruments have been individually checked, when all
their addresses have been verified in the DCS, then the loop checking can take
place for each loop or group of control loops.
5.6 SAFETY DEVICES CHECK
All the safety devices, Interlock(s) and Emergency shutdown devices must
be checked. These devices are designed either to protect the catalyst against
mal-operation or to fulfil safety actions.
Safety sequences (Interlocks) are sequences of actions programmed into
the DCS/PLC and designed to ensure automatically a safe sequence of operation
when selected undesirable events occur.
5.7 HEATER REFRACTORY DRY-OUT AND REACTION SECTION DRYOUT
The furnace refractory must be thoroughly dried out so that it does not crack
when the Heater is brought into operation. The drying should be done by gradual
heating of the refractory so that no cracking takes place due to sudden
vaporisation of moisture from the refractory.
The refractory drying out of reactor feed heater can be done simultaneously with
the drying of the reaction section. Drying out can be done under air or nitrogen,
depending on the availability, using the recycle compressor.
Detail procedure is given in Annexure-I
5.8 PURGING AND GAS BLANKETING
It must be remembered that oil or flammable gas should never be charged
into process lines or vessels indiscriminately. The unit must be purged before
admitting hydrocarbons. There are many ways to purge the unit and ambient
conditions may dictate the procedure to be followed: nitrogen or inert gas
purging, displacement of air by liquid filling followed by gas blanketing, or
steaming followed by gas blanketing.
For the remainder of the unit other than the reactor section, steam purging
followed by fuel gas blanketing can be used to air free the unit. The following
steps will briefly outline this method.Potential problems or hazards could develop
during the steam purge are as follows:
Template No. 5-0000-0001-T2 Rev A
Collapse due to vacuum: some of the vessels are not designed for vacuum.
This equipment must not be allowed to stand blocked in with steam since the
condensation of the steam will develop a vacuum. Thus, the vessel must be
vented during steaming and immediately followed up with fuel gas purge at the
conclusion of the steam out.
Flange and gasket leaks: thermal expansion and stress during warm-up of
equipment along with dirty flange faces can cause small leaks at flanges and
gasket joints. These must be corrected at this time.
Water hammering care must be taken to prevent water hammering when
steam purging the unit.
The unit is isolated with blinds from adjacent sections containing hydrocarbons
(liquid or gaseous), and from utilities systems where pressure is lower than air
(or nitrogen) pressure.
The pressure rise must be checked on several pressure gauges and possibly
checked on a pressure recorder.
Circuits,
which do not have direct admission of steam, will be supplied through hoses.
The temperature of the whole installation is increased slowly and free expansion
of lines is checked. The condensed water is drained while the temperature of the
circuit rises.
When temperature is steady, vents are progressively closed in order to get the
desired pressure by keeping a vent slightly opened. A steam make-up is
maintained. All joints will be checked for leaks. If leaks are detected, system will
be depressurised, leaks attended and the system retested.
For the purpose of leak tests the unit will be divided into sections of
approximately the same design pressure.
This section will be isolated from the other sections by blinds and/or valves.
(tube side)
D) HDS section
The HDS section shall be isolated from other sections by blinds or valves.
E) Stabilization section
5.10
Rev. A
Page 80 of 182
6.1 INTRODUCTION
Start up and Operating Procedure are described in this section. Start up
and shutdown are the most critical periods in operation.
All vessels, piping, equipment are pressure tested, flushed and ready for service.
All rotating equipment such as pumps, compressors, motors etc. have
undergone functional test successfully.
All instruments have been checked, calibrated and ready for service. Control
should be on manual.
All safety valves are in position after setting and testing. Isolating valves will be
left in lock open position. Spare valves should be kept isolated.
Necessary utility headers (cooling water, steam, air, fuel gas, fuel oil, water etc)
are charged.
Flare, closed blow down and sewer systems are in operable condition.
All related units are informed of the start-up plan.
All other pre-commissioning activities such as flushing, cleaning, purging,
tightness testing etc are completed.
Fire and safety related equipment are checked.
All safety devices and emergency sequences have been tested.
General Service system such as lighting, PA, telephone etc is in working
condition.
The proper quantity and quality of nitrogen is available.
The unit is under a slight nitrogen pressure.
The reaction section has been dried out.
The feed, splitter and stabilizer sections have been thoroughly drained of free
water.
Catalysts have been loaded into the reactors.
b) The unit is isolated with blinds:
On the sewer lines and utilities except cooling water and nitrogen,
subsequent start-up of the same unit may or may not include all of the following
steps, depending upon the status of the unit after the shutdown. For instance,
catalyst sulfiding will not be required if the catalyst was not regenerated or
replaced.
6.3.1
6.3.2
PURGING OF AIR
a) General
The purpose of this step is to reduce the O 2 content in all the sections below
0.2% by volume prior to the introduction of hydrogen or hydrocarbons.
The air can be eliminated by two methods:
a) By repeated filling and pressuring the system with nitrogen and then releasing
the air enriched in nitrogen to atmosphere until the oxygen content reaches
the required minimum value. This method will be used in reaction section and
in compressor section where humidity has adverse effect on equipment or
catalyst. The vacuum ejector installed in this section is used for decreasing
the number of purging and nitrogen refilling cycles.
b) By steam out and subsequent refilling the equipment with fuel gas. This
method will be used for all equipment where humidity and steam can not
deteriorate the equipment or catalyst.
Note: During steam out operation, Reaction section and Compressor
section are isolated with blinds and filled with nitrogen. It is recommended
to start filling with nitrogen on reaction section, SHU preheating section
including.
b) Purging of air in Reaction Section
This section involves the following equipment:
1. 75-R-01
2. 75-R-02
3. 75-E-02
4. 75-E-03
5. 75-E-08 A/B/C
6. 75-F-01
7. 75-E-01
8. 75-A-03
9. 75-E-09
10. 75-V-03
Separator drum
11. 75-V-06
12. 75-E-10
13. 75-C-02
Amine Absorber
14. 75-V-04
The ejector (75-J-01) is connected to the vapor outlet line from the separator
drum. Isolate Reaction section with valves and blinds from remaining sections
of the Unit.
75-V-01
75-A-04
75-C-01
Splitter
75-A-01
75-E-07
Splitter reboiler
75-V-02
75-A-06
75-E-06
75-E-05
75-A-02
This section is isolated from the SHU and HDS reaction section by valves
and/or blinds. Isolate Pumps from the section by the valves at suction and
discharge and purged separately by nitrogen pressurizing/ depressurizing.
Stabilizer section
This section involves the following equipment and interconnecting piping:
75-C-03
Stabilizer
75-E-13
Stabilizer Reboiler
75-A-05
75-E-14
75-V-05
75-E-11 A/B
75-A-07
75-E-12
Isolated this section from the HDS reaction section by valves and/or blinds
Isolate Pumps from the section by the valves at their suction and discharge
and purged separately by nitrogen pressurizing/ depressurizing.
Eliminate air In the splitter and stabilizer sections by steam out and
subsequent filling with sweet fuel gas.
The start-up steam hoses for LP steam should be connected to the maximum
points, usually on suction-discharge of pumps, vessel bottoms. All vents on
columns reflux drums and other high points of lines should be opened. The air
coolers should be shut-down and cooling water circulation through coolers
and condensers stopped.
Introduced steam slowly to heat up slowly all parts of equipment/lines. Drain
the condensate at low points of piping and drums. The steam out operation
can be used for tightness test. This can be done by pressurizing the system
with steam and observing the flange connections to determine possible leaks.
UNIT STATUS
The feed and splitter sections are under nitrogen or fuel gas pressure but
still isolated from the reaction section by the block valves.
The reaction sections are isolated and kept under nitrogen pressure.
The stabilizer and splitter are under nitrogen pressure or fuel gas pressure,
isolated from reaction section.
All blinds have been removed including those located on the start-up lines,
utilities, sewers, PSV's, etc.
6.4.2
The feed control valve is closed and blocked by inlet and outlet valves.
Rev. A
Page 88 of 182
Note:
1. During the circulation it is good practice to switch to the standby's to
check out both pumps.
2. During the circulation minimum flow line of pumps must be kept in line.
Start-up
Naphtha
X-01
V-01
P-01A/B
V-02
P-03A/B
e
d
C-01
h
m
P-02A/B
V-05
E-11A/B
E-12A/B
P-07A/B
g)
h)
i)
j)
C-03
i
J
P-09A/B
6-P-75-2414-B9A
6-P-75-1807-B9A-IH
4-P-75-3105-A16A
3-P-75-3107-A16A
d)
e)
f)
6-P-75-1209-B9A-IS
8-P-75-1605-A9A
10-P-75-1506-A9A-IH
k)
l)
m)
n)
8-P-75-3002-A9A-IH
8-P-75-3004-B9A-IH
6-P-75-2912-A9A
6-P-75-1908-B9A
Rev. A
Page 90 of 182
Shutdown the splitter Reboiler heater while keeping circulation until the
temperature decreases in the splitter column bottom to 50C. Splitter should
be kept under pressure with nitrogen.
b) Stabilizer at total reflux
Put in service pressure control loop PIC-3101 on stabilizer reflux drum.
Commission the overhead air condenser 75-A-05 and overhead trim cooler
75-E-14 with set point as per the Process Flow Diagram. Pressurize with
nitrogen.
Start stabilizer Reboiler (75-E-13)
Do not increase the Reboiler outlet temperature too rapidly. Increase the
inventory temperature in the stabilizer very slowly so that trapped water, or
water that is emulsified in the start-up naphtha, has time to change state
(water to steam) in as controlled a manner as possible. It is recommended to
hold the Reboiler outlet temperature at 150C for some time.
Increase temperature on stabilizer bottom at a rate of 30C per hour up to
150C to 180C depending on distillation range of used inert naphtha and
actual operating pressure in the column.
As soon as the level is established in Stabilizer reflux drum (75-V-05), start
the Stabilizer reflux pumps (75-P-09 A/B) and commission level and flow
instruments on the reflux line (LIC-3102 and FIC-3001).
Keep constant the pressure in the stabilizer by admission of nitrogen.
Adjust a make up of inert naphtha coming from the splitter to fill the stabilizer
bottoms and the stabilizer reflux drum at 60 % of the design throughput.
The stabilizer (now isolated from the splitter) is left operating at total reflux for
several hours as necessary to commission all involved equipments and
instruments.
Shutdown the stabilizer heater while keeping circulation until the temperature
decreases in the stabilizer column bottom to 50C. Stabilizer should be kept
under pressure with nitrogen.
6.5 PRESSURIZATION
OF
THE
REACTION
SECTIONS
AND
6.5.1
UNIT STATUS
The reaction sections are still under nitrogen pressure. Selective
hydrogenation and HDS reaction sections have to be filled with hydrogen. The
selective hydrogenation reactor (75-R-01) is isolated from naphtha circuit by
block valves on the feed valve FV-1201 and on the reactor outlet PV-1501 and
PV 1401.
HDS feed/effluent heat exchangers (75-E-08 A~C),
First HDS reactor (75-R-02),
HDS Reactor feed Heater (75-F-01),
Air condenser (75-A-03 A/B),
Trim cooler (75-E-09 A/B),
Separator drum (75-V-03),
Amine absorber (75-C-02),
Amine Preheater (75-E-10),
Recycle compressors KO drum (75-V-04) and
Recycle compressors (75-K-01 A/B)
are isolated from naphtha circuit and stabilizer by the following block valves
-
and H2 make-up line to 75-V-04 Recycle compressor KO drum (on FV-2701 &
FV-2702).
6.5.2
6.5.3
Ensure there is adequate supply of DMDS for each catalyst, the facilities are
operational and the pump is calibrated. Remove the blind on the injection line
but keep blocked in.
Both recycle gas compressors 75-K-01 A/B (one for SHU reactor) need to be
operated in order to get sufficient flow through catalytic bed.
6.6.1
HDS
6.6.3
SULPHIDING PROCEDURE
The sulphiding procedure is the same for both catalysts HR 845, HR 806 is as
described below:
Ensure that 75-E-01 has not been filled by mal-operation with SR Naphtha
during cold circulation. Open the bypass of the exchanger and isolate it.
Isolate and bypass of the Amine Absorber.
Start recycle compressor to circulate hydrogen in the reaction section at
maximum flow rate.
Fire the HDS reactor heater 75-F-01 and increase the reactor inlet
temperature up to 180C at a rate of 30C/h.
Start the sulfiding agent injection at the inlet line of reactor (outlet of sulfiding
agent pump). Adjust the injection flow rate.
Increase the reactor inlet temperature up to 220C.
Keep these conditions. After 3 hours at 220C, check every hour at least the
H2S content of the recycle gas. Normally H 2S appears after 3 to 5 hours
from the beginning of sulfiding agent injection.
When the H2S breakthrough occurs (H2S > 0,2 % vol.) or after four hours at
220C, whichever is the later, continue the sulfiding agent injection and
increase the reactor inlet temperature up to 315C at a rate of 30C/h.
Hold this temperature for a minimum of 4 hours.
During sulfurization:
The reactor T must not exceed 30C.
UNIT STATUS
The sulfiding of the all the reactors is completed.
The H2 recycle are flowing through the HDS Reactor.
Recycle gas rate is set at 100% of design value.
The Diolefin (SHU) Reactor is under hydrogen gas pressure.
The Stabilizer is under N2 atmosphere.
The Splitter is under N2 atmosphere.
Filling up of the SHU reactor
Circulate through the reactor in once through mode (no recycling) until the
sample collected at splitter bottom is found clear (no more scales or catalyst
fines). The splitter bottom is sent to stabilizer (via pumps 75-P-02 A/B) from
where it is sent to slop/off spec.
Gradually increase the operating temperature in the reactor at a rate of 20C
per hour by increasing steam flow rate to SHU Reactor heater (75-E-03) to
reach the required SOR temperature.
Re-start splitter (75-C-01).
Put in operation the pressure controller in the splitter overhead system by the
pressure control loop PIC-1601. Ensure that Hydrogen make-up gas sent to
the reaction section should be sufficient to keep pressure in the splitter, if not,
N2 can be used.
Draw-off of light cut and heart cut is closed. When SHU effluent is found clear,
start routing splitter bottoms to the feed surge drum via the hydrogenated
naphtha recycle line through SHU recycle air condenser (75-A-04).
Since SHU feed is also preheated via 75-E-02 SHU feed/splitter bottom
exchanger, decrease 75-E-03 steam preheater duty as much as possible
while maintaining SHU inlet SOP temperature.
Wait until all temperature(s) indicators in the reactor give a steady indication
and maintain this circulation for 6 hours.
6.7.3
When the level in the separator drum (75-V-03) has reached 40%,
commission the level flow control instrument FIC-2402 and LIC-2404.
Start injecting wash water upstream of the reactor effluent air cooler. When a
water interface is appeared in the separator boot, commission the interface
level controller LIC-2401 and check it operates correctly.
At this step, check the proper functioning of instrumentation, control valves
and pumps.
The recycle compressor remains in operation and hydrogen gas is recycled
through the HDS feed/effluent exchangers (75-E-08 A/B/C shell side), First
HDS reactor (75-R-02), HDS reactor heater (75-F-01), HDS feed/effluent
exchangers (75-E-08 A/B/C tube side), SHU feed / HDS effluent exchanger
(75-E-01), HDS effluent air cooler (75-A-03), Reactor effluent trim cooler (75E-09), Separator drum (75-V-03) and the Recycle compressor KO drum (75V-04). Keep the Amine KO drum (75-V-06) and Amine Absorber (75-C-02) still
bypassed.
The pressure in HDS reaction section separator should be maintained at
approximately 15 Kg/cm2g by hydrogen gas make-up. Recycle compressor is
operating at full load.
Light burners of HDS reactor heater (75-F-01) and commission control loops
on reactor
Gradually increase the operating temperature of the HDS reactor at a rate of
30C per hour in order to reach 180 C.
6.7.4
Send inert naphtha back to the SHU feed surge drum (75-V-01) from the
bottom of stabiliser via recirculation line. Commission flow controller FIC2901.
Commission SHU feed pumps (75-P-01 A/B) for a continuous use in the
overall inert naphtha circulation around unit in order to reach 60% of the
design unit capacity.
Line up Amine Absorber with other equipment of the HDS reaction section,
which is currently filled with hydrogen.
Open the Lean and Rich amine block valves at B.L and start circulation of
solution through the HP Amine Absorber. Allow the HP Amine Absorber to fill
until a level is established at the bottom. Commission the level control loop,
LIC-2601, as well as flow control loops on the lean amine FIC-2501. The
recycle gas is gradually circulated through the absorber by cutting back on the
bypass gas stream.
6.7.5
Watch carefully the temperature gradient on the reactors. Decrease the inlet
temperature to the reactors if the temperature rise is too fast.
If there is no temperature rise in the reactors, increase the reactor inlet
temperature in steps of 2C maximum.
Monitor the temperature rise on each catalyst bed.
Adjust the operating conditions according to the analysis of the product
(MAV).
The Gasoline Splitter (75-C-01), light FCC gasoline draw-off, is put into
operation when the column top temperature reaches the design value and
reflux drum (75-V-02) liquid level is stabilized.
The FCC heart cut gasoline draw-off is put into operation if required (high
benzene content in FCC feed) when TIC-1502 reaches the operating value.
Gasoline should be sent to slop if it is not on-specification.
Once draw-off has started, start to add FCC gasoline to the SHU feed surge
drum (75-V-01).
The Stabilizer is operated with vapor distillate product only. The condensate is
returned to the column as reflux. The RVP of Hy. Gasoline and the H2S
stripping required to be monitored to define the proper operating pressure and
Reboiler temperature in the column.
Send off-spec Hydrotreated gasoline to slop until it is on-specification.
When the product is on-specification slowly increase unit feed flow rates in
steps of 5% up to 100%.
System is now ready for normal operation.
Description
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
Tag no.
TI-1101
PIC-1101
FI-1101
FIC-1102
TI-1103
Exchanger
Gasoline & H2 stream before & after 1ST SHU
Feed/HDS Effluent Exchanger
Gasoline & H2 at the inlet of SHU
FEED/EFFLUENT EXCHANGER
VHP condensate from SHU Preheater
Reactor Effluent (Gasoline & H2) after passing
through SHU FEED/EFFLUENT EXCHANGER
Gasoline & H2 stream before & after SHU
Feed/Effluent Exchanger
Gasoline & H2 stream before SHU Preheater
Reactor feed from SHU FEED/Effluent Exchanger
to SHU Preheater
Reactor feed from SHU Preheater to SHU
Reactor
VHP steam inlet to SHU Preheater
Kg/cm2g
M3/hr
M3/hr
o
70
3
163.5
163.5
M3/hr
FIC-1104
M3/hr
157.0
TI-1105
PDI-1106
TI-1201
FIC-1203
Value
FIC-1103
Effluent Exchanger
H2 to SHU section
H2 from Isomerisation Make-up Compressor
Exchanger
Gasoline & H2 stream from SHU FEED PUMPS to
Unit
40
FIC-1201
FIC-1202
Discharge
Gasoline & H2 stream from SHU FEED PUMPS
Rev. A
TI-1203
TI-2701
Kg/cm2g
o
40
0.3
40-70
M3/hr
M3/hr
163.5
163.5
66
Nm3/hr
1513
40
PI-1206
Kg/cm2g
36
FIC-1204
M3/hr
31.3
PI-1206
Kg/cm2g
33.4
PI-1207
Kg/cm2g
32.9
PDI-1208
Kg/cm2g
0.4
TI-1301
FIC-1301
TI-1302
65-162
M3/hr
15.4
162-189
PDI-1302
Kg/cm2g
0.4
PI-1303
Kg/cm2g
32.4
TI-1304
86-189
TI-1305
160-200
PI-1306
Kg/cm2g
31.9-37.6
Description
No.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
189
PI-1307
Kg/cm2g
32
PDI-1308
Kg/cm2g
0.4
5-74
TIC-1401
Reactor
Gasoline & H2 stream by pass to SHU Reactor
A Bypass line of reactor feed stream to SHU
160-200
PDIC-1401
reactor
Gasoline & H2 stream Inside SHU Reactor on the
first bed of catalyst
Gasoline & H2 stream before entering SHU
Reactor
Gasoline & H2 stream Inside SHU Reactor on the
160-200
TI-1403
160-219
PI-1403
TI-1404
PI-1405
0.8
PI-1404
Kg/cm2g
TIC-1402
48.
Value
44.
47.
Unit
TDIC-1306
46.
TI-1303
Preheater
Reactor feed stream before & after the Preheater
Reactor feed stream from SHU Preheater to SHU
43.
45.
Tag no.
Rev. A
TI-1405
Kg/cm2g
o
Kg/cm2g
o
30
160-219
30
160-219
29
PI-1407
Kg/cm2g
30
PDI-1408
Kg/cm2g
0.5
PI-1409
Kg/cm2g
28
PDI-1410
Kg/cm2g
0.5
PI-1411
Kg/cm2g
28
TI-1407
160-219
TI-1410
160-219
TI-1414
160-219
TI-1415
TI-1416
TI-1417
TIC-1501
PKIC-1501
FIC-1501
TIC-1502
PI-1502
LIC-1502
C
C
o
C
o
C
Kg/cm2g
M3/hr
o
C
Kg/cm2g
Mm
160-219
160-219
160-219
107-117
6.3
26.7
139-142
6.3
*
FI-1502A/B
M3/hr
Description
No.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
Tag no.
TI-1504
Rev. A
Page 105 of 182
Unit
o
Value
174-181
section
Splitter overhead i.e. Gasoline vapour
Inside the Splitter column above the heart cut
PI-1505
Kg/cm2g
PI-1507
Kg/cm2g
6.2
TI-1507
20th tray
Splitter outlet to Reboiler inlet
Inside the Splitter column below 1st tray
Gasoline & H2 stream on the 19th tray inside the
Splitter column
Splitter overhead & splitter underflow
Gasoline & H2 stream to the Splitter Feed
Light gasoline vapor in splitter reflux drum
Splitter overhead (vapor gasoline)
Splitter overhead to Splitter Reflux drum after
Splitter overhead air condenser
Fuel gas from Splitter Reflux Drum to Fuel gas
header
Fuel gas to FCC inlet
Splitter overhead to splitter reflux drum
Light FCC Gasoline to MS POOL
Light Gasoline from Accumulator tray no.48 of
Splitter
Light Gasoline after light gasoline cooler to light
gasoline MS POOL
FCC HEART CUT GASOLINE
FCC Heart cut gasoline from accumulator tray
no.36
FCC Heart cut gasoline after FCC Heart cut
cooler to storage
FCC Heart cut gasoline after FCC Heart cut
cooler to storage
Light Gasoline to storage after light gasoline
cooler
Gasoline & H2 at the inlet of First HDS Feed /
Effluent Exchanger
HDS feed & HDS recycle to HDS feed / effluent
86.
exchanger.
Vapor gasoline to HDS feed
Gasoline & H2 at the inlet of 1st HDS Feed/Effluent
87.
PI-1508
TI-1508
PI-1511
TI-1505
PDI-1506
TI-1504
PIC-1601
TI-1602
Kg/cm2g
o
C
Kg/cm2g
o
Kg/cm2g
o
C
Kg/cm2g
o
C
218-221
6.5
214-217
6.5
181-199
0.5
122-160
5.5
93-97
TI-1603
55
TI-1605
40
PI-1610
PI-1603
TI-1706
Kg/cm2g
Kg/cm2g
o
C
4.5
5.5
40
PI-1703
Kg/cm2g
7.6
PI-1704
Kg/cm2g
7.7
TI-1702
65
PI-1707
Kg/cm2g
7.6
PI-1714
Kg/cm2g
TI-1713
40
PI-1710
Kg/cm2g
PI-1901
Kg/cm2g
23.5-30
TI-1901
148-176
PI-1904
Kg/cm2g
22-28.5
PDI-1905
Kg/cm2g
1.2
Feed/Effluent Exchanger
HDS feed from First HDS Feed/Effluent
88.
TI-1902
210-240
Exchanger
Description
No.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
Tag no.
TI-1903
Rev. A
Page 106 of 182
Unit
o
Value
242-271
PI-1903
Kg/cm2g
22.5-29
PI-1904
Kg/cm2g
22-28.5
TI-1906
PI-1908
TIC-2001
PI-2001
TI-2002
PI-2002
TI-2003
PDI-2006
TI-2004
Kg/cm2g
o
Kg/cm2g
o
Kg/cm2g
o
Kg/cm2g
o
207-227
16.3-22.8
275-312
22.9
275-312
22.9
275-355
0.5
275-355
PDI-2004
Kg/cm2g
0.5
PI-2003
Kg/cm2g
28.4
PI-2007
Kg/cm2g
28.4
TI-2010
TI-2019
TI-2102A/B
PI-2102A/B
TI-2104A/B
PI-2103A/B
TI-2301
PI-2301
TI-2303
C
C
Kg/cm2g
o
C
Kg/cm2g
o
Kg/cm2g
o
275-355
275-355
301-355
19.8-26.3
336-373
17.8-24.3
144-157
16-22.5
65
PI-2303
Kg/cm2g
15.6-22.0
PI-2409
FIC-2402
PIC-2403
Kg/cm2g
M3/hr
Kg/cm2g
15-21.5
82.3
15
Description
No.
117. separator drum boot drain
Lean Ammine from ARU after being pre-heated in
118.
the lean amine pre-heater
119. Lean Ammine from ARU
OFF GAS from Amine K.O. Drum to Amine
120.
Absorber
121. LP Steam to Lean Amine Preheater
122. Off gas to Amine Absorber
123. Amine & Fuel gas in Amine Absorber
124. Fuel gas from Amine Absorber
125. Rich amine from amine absorber
126. Amine & Fuel gas inside Amine Absorber
127. Rich Amine from Amine Absorber
128. Make-up H2 to Recycle Compressor K.O. Drum
129. Make up H2 to Recycle Compressor K.O. Drum
130. make up H2 to Recycle Compressor K.O. Drum
Recycle gas from Recycle Compressor K.O. drum
131.
to Recycle compressor
132. H2 from Recycle Compressor to HDS Section
133. H2 to HDS section
Gasoline from Separator to Stabilizer
134.
Feed/Bottom Exchangers
135. Stabilizer Feed from Separator Drum
Heavy Gasoline from Heavy Gasoline Trim Cooler
136.
to MS POOL
Gasoline after Stabilizer Feed/Bottom Exchangers
137.
to stabilizer
Heavy Gasoline from Stabilizer Bottom to
138.
Stabilizer Feed/Bottom Exchangers
139. Heavy Gasoline after Heavy Gasoline Trim Cooler
Heavy Gasoline from Stabilizer Feed/Bottom
140.
Exchanger to Heavy Gasoline Trim Cooler
141. Heavy Gasoline to MS POOL via Storage
142. Heavy Gasoline from Stabilizer Bottom Pumps
Heavy Gasoline at the bottom of Stabilizer
143.
Column
144. Stabiliser reflux from, stabiliser Reflux Pumps
145. Stabilizer Feed
146. VHP Steam to Stabilizer Reboiler
147. Vap. Gasoline from Stabilizer overhead
From Stabilizer bottom to Stabilizer Feed/Bottom
148.
Exchangers
Stabilizer overhead to Stabilizer overhead
149.
Condenser
150. Vap. Gasoline below 1st tray in Stabilizer
151. VHP Condensate Pot for Stabilizer column
152. Top of Stabilizer column
153. Gasoline vapour at the top of Stabilizer column
154. Inside Stabilizer column below the feed plate
Rev. A
Page 107 of 182
Tag no.
Unit
Value
LIC-2401
M3/hr
TI-2501
50
TI-2504
40
TI-2502
40
TDIC-2503
PI-2601
PDI-2602
PI-2603
LIC-2601
PI-2608
PI-2609
TI-2701
PI-2701
FIC-2701
C
Kg/cm2g
Kg/cm2g
Kg/cm2g
M3/hr
Kg/cm2g
Kg/cm2g
o
C
Kg/cm2g
Nm3/hr
10
14.8
0.3
14.7-21.5
*
14.7
6
40
38.9
6944
PI-2705
Kg/cm2g
14.4-21.4
FI-2803
FI-2804
Nm3/hr
Nm3/hr
35145
35145
TI-2901
41
PI-2901
Kg/cm2g
FI-2901
M3/hr
PI-2903
Kg/cm2g
TI-2903
225-226
TI-2903
40
TI-2905
106-107
TI-2909
PI-2909
C
Kg/cm2g
40
9.5
LIC-3001
mm
FIC-3001
TI-3002
FIC-3002
PI-3003
M3/hr
o
C
M3/hr
Kg/cm2g
15
168-169
9.7
6.8
FIC-3003
M3/hr
106
TI-3004
PI-3004
LIC-3004
TI-3005
PI-3005
TI-3006
134-140
Kg/cm2g
MM
o
C
Kg/cm2g
o
C
7
*
160-200
6.9
203-217
Description
No.
155.
156.
157.
Tag no.
Rev. A
Page 108 of 182
Unit
Value
TI-3013
225-226
TI-3009
221
TI-3010
225
7.4 ALARMS:
S. No.
1.
Descriptions
Mixed stream of FCC Gasoline from
Tag no.
TAHH-1105
Unit
C
77
Value
DRUM
Gasoline & H2 at the inlet of SHU
TAL-1301
60
3.
FEED/EFFLUENT EXCHANGER
Reactor feed from SHU FEED/Effluent
TAL-1304
80
4.
SHU
TAH-1401
TAH-210
5.
SHU
TAL-1401
TAL-150
6.
TAH-1402
TAH-210
7.
SHU reactor
Gasoline & H2 stream Inside SHU
TAH-1403
TAH-225
8.
TAHH-1403
TAHH-230
9.
TAH-1404
TAH-225
10.
TAHH-1404
TAHH-230
11.
TAH-1405
TAH-225
12.
TAHH-1405
TAHH-230
13.
TAH-1407
TAH-225
14.
TAHH-1407
TAHH-230
15.
TAH-1408
TAH-225
16.
TAHH-1408
TAHH-230
17.
TAH-1409
TAH-225
18.
TAHH-1409
TAHH-230
Tag no.
Rev. A
Page 109 of 182
19.
Descriptions
Reactor on the second bed of catalyst
Gasoline & H2 stream Inside SHU
Unit
Value
TAH-1410
TAH-225
20.
TAHH-1410
TAHH-230
21.
TAH-1411
TAH-225
22.
TAHH-1411
TAHH-230
23.
TAH-1412
TAH-225
24.
TAH-1412
TAHH-230
25.
TAH-1413
TAH-225
26.
TAH-1413
TAHH-230
TAH-1414
TAH-225
28.
TAH-1414
TAHH-230
29.
TAHH-1415
TAH-225
30.
TAH-1501
TAHH-230
127
31.
TAH-1502
152
32.
TAH-1503
170
33.
TAH-1505
204
34.
TAH-1504
170
35.
TAH-1603
60
36.
TAH-1605
37.
TAH-2001
322
Reactor
On the First bed of catalyst inside first
TAH-2003
TAH-360
39.
HDS Reactor
On the First bed of catalyst inside first
TAHH-2003
TAHH-365
40.
HDS Reactor
On the First bed of catalyst inside first
TAH-2004
TAH-360
HDS Reactor
Template No. 5-0000-0001-T2 Rev A
Descriptions
On the First bed of catalyst inside first
Tag no.
TAHH-2004
42.
HDS Reactor
On the 2nd bed of catalyst inside first
TAH-2013
43.
HDS Reactor
On the 2nd bed of catalyst inside first
44.
Unit
C
Value
TAHH-365
TAH-360
TAHH-2013
TAHH-365
HDS Reactor
First HDS Reactor Effluent
TAH-2019
TAH-360
45.
TAHH-
TAHH-365
TAHH-385
46.
2103A/B
TDAL-2506
TDAL-5
47.
Stabilizer Feed
TAH-3002
TAH-179
48.
Stabilizer Feed
TAL-3002
TAL-163
49.
TAH-3006
227
50.
column
Above the 12th plate of Stabilizer
TAH-3007
227
51.
column
Feed Surge Drum pressure control
PAH-1101
Kg/cm2g
3.5
52.
PDAH-1106
Kg/cm2g
0.5
53.
PDAH-1208
Kg/cm2g
0.7
1ST
SHU
Feed/HDS
Effluent
54.
Exchanger
Gasoline & H2 stream before & after
PDAH-1302
Kg/cm2g
0.6
55.
PDAH-1308
Kg/cm2g
0.6
56.
SHU Preheater
Gasoline & H2 stream before entering
PAL-1403
Kg/cm2g
29.2
57.
SHU Reactor
Gasoline & H2 stream after passing
PAL-1407
Kg/cm2g
28
PDAH-1408
Kg/cm2g
1.75
Reactor
Gasoline & H2 stream before entering
SHU Reactor & after passing through
59.
PAL-1409
Kg/cm2g
27
60.
PDAH-1410
Kg/cm2g
1.75
PDAH-1506
Kg/cm2g
SHU reactor
Splitter overhead & splitter underflow
S. No.
62.
Descriptions
Light gasoline vapour in splitter reflux
Tag no.
PAH-1601
Unit
Kg/cm2g
Value
PAH-6.5
63.
drum
Light gasoline vapour in splitter reflux
PAL-1601
Kg/cm2g
PAL-5.2
64.
drum
Gasoline from splitter reflux pumps to
PALL-1604
Kg/cm2g
4.2
65.
PAL-1904
Kg/cm2g
21
66.
PDAH-1905
Kg/cm2g
1.5
PDAH-2004
Kg/cm2g
0.75
68.
PDAH-2006
Kg/cm2g
0.75
69.
PAH-2409
Kg/cm2g
PAH-22.5
70.
PAL-2409
Kg/cm2g
PAL-14.2
71.
PALL-2407
Kg/cm2g
22
72.
Reactor
Amine & Fuel gas in Amine Absorber
PDAH-2602
Kg/cm2g
0.5
73.
PAH-2705
Kg/cm2g
PAH-22
74.
PAL-2705
Kg/cm2g
PAL-13.6
75.
PAH-3003
Kg/cm2g
PAH-7.8
76.
PAL-3003
Kg/cm2g
PAL-6.5
77.
Vap.
in
PAH-3004
Kg/cm2g
7.8
78.
Stabiliser
FCC Gasoline Feed to SHU Feed
FAL-1102
M3/hr
117.6
79.
Surge Drum
Gasoline SHU Feed
FAL-1202
M3/hr
80.
FALL-1205
M3/hr
111.7
81.
H2 to SHU section
FAL-1203
Nm3/hr
1000
82.
FAH-1501
M3/hr
30.7
83.
FAH-2403
M3/hr
5.6
84.
FAL-2701
Nm3/hr
1284
Gasoline
below
1st
tray
K.O. Drum
Template No. 5-0000-0001-T2 Rev A
Rev. A
Page 112 of 182
S. No.
85.
Descriptions
H2 from Recycle Compressor to HDS
Tag no.
FALL-2802
Unit
Nm3/hr
Value
20832
86.
FEED/EFFLUENT Exchanger
H2 from Recycle Compressor to HDS
FAL-2803
Nm3/hr
20832
87.
Section
H2 to HDS section
FALL-2801
Nm3/hr
13020
88.
FAH-3002
M3/hr
10.7
89.
Heavy
Naphtha
at
the
bottom
of
LAH-1502
MM
LAH-3750
90.
Gasoline Splitter
Heavy Naphtha
at
the
bottom
of
LAL-1502
MM
LAL-700
91.
Gasoline Splitter
Heavy Gasoline at the bottom of
LAH-3001
MM
LAH-3190
92.
Stabilizer Column
Heavy Gasoline at the bottom of
LAL-3001
MM
LAL-1630
93.
Stabilizer Column
Heavy Gasoline at the bottom of
LALL-3002
MM
300
Stabilizer Column
7.5 OPEARATING
CONDITIONS
OF
DIFFERENT
CASES
OF
OPERATION
Refer to enclosed PFDs as attachment for operating conditions for different
cases.
7.6 EQUIPMENT LIST
7.6.1
PUMPS
Item No.
Item Description
Norma
Rated
Disc.
Diff.
NPSHA
l Cap.
Cap.
Press
Head
(m)
75-P-01
(m/hr)
167.1
(m/hr)
183.8
(Kg/cmg)
36.5
(m)
498
>8
A/B
75-P-02
112.3
123.5
34.8
472
A/B
75-P-03
SPLITTER
166.6
200
11.3
95.7
3.3
79.7
96
10.5
45.5
>8
A/B
75-P-04
A/B
REFLUX
PUMPS
LIGHT GASOLINE PUMPS
75-P-05
A/B
75-P-06
A/B
Item Description
Rated
Disc.
Diff.
NPSHA
l Cap.
Cap.
Press
Head
(m)
(m/hr)
(m/hr)
(Kg/cmg)
(m)
24.7
27.2
10.1
38.6
>8
QUENCH PUMPS
44.3
53.1
36.2
187.4
3.7
107.1
117.8
12.7
93.3
2.8
1.34
2.6
11.7
149.7
>8
15
18
12
86.7
2.*9
Internal
TL-TL
Oper.
Oper.
Dia.
(mm)
Temp
Press.
(mm)
3900
2400
2500
900
1100
900
11000
6800
8400
2800
3300
2500
C
70
55
40
40
40
40
Kg/cmg
3.0
5.5
21.5
21.4
6.3
21.5
600
1950
AMB
1.0
1600
5000
AMB
1.0
STABILIZER
A/B
PUMPS
75-P-08
CORROSION
A/B
PUMPS
75-P-09
STABILIZER
A/B
PUMP
BOTTOM
INHIBITOR
REFLUX
VESSELS:
Tag No.
75-V-01
75-V-02
75-V-03
75-V-04
75-V-05
75-V-06
75-V-09
75-V-10
7.6.3
Norma
75-P-07
7.6.2
Rev. A
Item Description
COLUMNS:
Rev. A
Page 114 of 182
Tag
Item
No.
Internal
TL-TL
Oper. Temp
Oper Press
No.
Description
of
Dia
(mm)
C
Top
Kg/cmg
Top
Bottom
tray
(mm)
75-C-
GASOLINE
52
3100
41550
116
01
75-C-
SPLITTER
AMINE
20
900
14150
50
02
75-T-
ABSORBER
STABILISER
30
2100
26750
177
1003
COLUMN
Bottom
199
6.03
6.47
14.8
203
7.85
8.08
(Btm);
1100
(top)
7.6.4
7.6.5
REACTORS:
Tag No.
Item Description
75-R-01
75-R-02
SHU REACTOR
HDS REACTOR
Internal
TL-TL
Oper. Temp
Oper Press
Dia (mm)
1800
2500
(mm)
Kg/cmg
23420
12950
200
355
30
28.4
Sr.
Tag
No.
No.
Service
Shell side
Tube side
fluid
fluid
Shell side
Tube side
temp (C)
temp (c)
75-E-01
SHU
HDS
HDS Effluent
SHU Feed
IN
211
75-E-02
Effluent exchanger
SHU Feed / Effluent
SHU Effluent
SHU Feed
219
188
155
188
3
4
5
6
7
8
75-E-03
75-E-04
75-E-05
75-E-06
75-E-07
75-E-08
exchanger
SHU preheater
Splitter post condensor
Light Gasoline cooler
FCC Heartcut cooler
Splitter reboiler
HDS Feed / Effluent
VHP Steam
HC+H2
Light Gasoline
Gasoline
VHP Steam
HDS Feed
SHU Feed
Cooling water
Cooling water
Cooling water
HC
HDS Effluent
238
55
65
65
238
174
238
40
40
40
238
312
128
33
33
33
216
370
200
40
40
40
221
207
A/B/C
75-E-09
Exchanger
Reactor effluent
HC
Cooling water
65
40
33
40
10
11
75-E-10
75-E-11
cooler
Lean Amine preheater
Stabilizer Feed/Bottom
Lean Amine
Stabilizer Feed
LP steam
Stabilizer
40
225
50
107
128
41
128
169
12
A/B
75-E-12
exchanger
Heavy gasoline
Heavy
Bottom
Cooling water
65
40
33
40
13
A/B
75-E-13
cooler
Stabilizer reboiler
gasoline
VHP steam
Stabilizer
238
238
221
225
Stabilizer
bottom
Cooling water
65
40
33
40
cooler
overhead
14
7.6.6
75-E-14
Feed
trim
trim
OUT
156
IN
66
OUT
155
AIR COOLERS
Sr. No.
1
2
3
4
5
6
7
Tag
75-A-01
75-A-02
75-A-03
75-A-04
75-A-05
75-A-06
75-A-07
Service
Splitter overhead air condenser
FCC heart cut air cooler
HDS Effluent air condenser
SHU recycle air condenser
Stabilizer overhead condenser
Light gasoline air cooler
Heavy gasoline air cooler
Temp. - in
97
142
158
218
135
116
107
Temp. - out
55
65
65
65
65
65
65
CONTROL VALVES:
Tag No.
Description
Action of CV
No
on Air failure
.
SHU FEED SURGE DRUM:
1. PV-1101A
Gases from FSD to Flare
2. PV-1101B
Nitrogen to FSD
3. LV-1101
FSD boot draining
4. FV-1103
Heavy Gasoline Recycle from SHU Recycle Air Condenser
5. FV-1104
Feed from storage
SHU FEED SECTION:
6. FV-1201
SHU feed to 75-E-01
FC
FC
FC
FC
FC
7.
8.
9.
A/B
FV-1202
FV-1203
FV-1204
A/B
SHU FEED PREHEATING SECTION:
10. FV-1301
VHP steam to SHU Preheater
A/B
SHU REACTOR:
11. PDV-1401
SHU Reactor first bed bypass
SHU SPLITTER SECTION:
12. PV-1404
Splitter feed
13. PV-1501
Depressurization line
14. FV-1501
VHP steam condensate from Splitter Reboiler
15. PV-1601
Splitter reflux drum pressure control
A/B
16. LV-1601
Reflux line
FC
FO
FC
FO
FC
FC
FC
FO
FC
FC
FO
S.
Tag No.
Description
Action of CV
No
on Air failure
.
17. FV-1701
Light gasoline to storage
18. FV-1702
FCC Heart cut gasoline to storage
19. FV-1703
Light gasoline pump min. fliow line
HDS FEED SECTION:
20. FV-1801
HDS feed pump min. flow line
21. FV-1901
HDS feed to HDS feed/Eff. Exchanger
22. FV-1902
HDS Feed / Eff Exchanger bypass
23. FV-1904
HDS recycle
HDS REACTION SECTION
24. FV-2001
Quench to reactor
25. FV-2002
Quench to reactor
26. FV-2003
Diluant line for start up
27. FV-2101
Plant air to HDS Reactor Feed Heater
HDS SEPARATOR SECTION
28. FV-2401
Quench pump min. flow line
29. FV-2402
Stabilizer feed line
30. LV-2401
Sour water boot
RECYCLE GAS KOD AND AMINE ABSORBER SECTION:
31. FV-2501
Lean amine to preheater
32. TV-2501
LP steam to preheater
33. LV-2501
HC liquid from Amine KOD
34. LV-2601
Rich amine to amine unit
35. FV-2601
Sweet purge gas to FG header
36. LV-2701
Amine from Recycle compressor K.O. drum to ARU
37. FV-2701
Make up H2 to Recycle Compressor K.O. Drum
38. FV-2702
Make up H2 to Recycle Compressor K.O. Drum
STABILISER COLUMN:
39. FV-3001
Reflux to Splitter
40. FV-3002
VHP condensate from stabilizer reboiler
41. FV-3003
Stabilizer bottom pump min. flow line
42. LV-3001
VHP Condensate from Condensate Pot
43. FV-2901
Heavy gasoline to stabilizer feed / bottom exchanger
44. PV-3101
Sour purge gas From stabilizer reflux drum
45. LV-3101
Sour water to sour water treater
7.7.2
SL
FC
FC
FO
FO
FC
FC
FC
FO
FO
FO
FC
FO
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FO
FC
FO
FC
FC
FC
FC
ON-OFF VALVES
TAG NO.
DESCRIPTION/LOCATION
NO.
SHU FEED SURGE DRUM:
1.
UV-1101
FCC Gasoline Feed to SHU Feed Surge Drum
ACTION
ON
AIR FAILURE
FC
SL
TAG NO.
DESCRIPTION/LOCATION
UV-1202
Effluent Exchanger
H2 from Recycle Compressors to SHU Feed/Effluent
Exchanger
SHU FEED PREHEATING SECTION:
7.
UV-1301
VHP steam to SHU Preheater
SHU SPLITTER SECTION:
8.
UV-1501
SHU emergency depressurisation to flare
9.
UV-1502
Heavy Gasoline from Splitter bottom
10. UV-1503
Splitter Reboiler steam inlet
11.
UV-1701
Light gasoline to storage
12. UV-1702
FCC Heart cut gasoline to storage
HDS FEED SECTION
13. UV-1901
HDS Feed to HDS Feed / Eff. Exchanger
HDS REACTION SECTION
14. UV-2101
Plant air to feed heater
15. UV-2301
BFW injection at HDS Eff. Air condenser
SEPARATOR DRUM:
16. UV-2401
Stabiliser Feed from Separator Drum
17. UV-2402
Separator Drum Boot Drain
18. UV-2403
Flare from Separator Drum for depressurisation
AMINE ABSORBER:
19. UV-2501
HC liquid from amine KOD
20. UV-2502
LP steam to Amine preheater
21
UV-2503
Lean amine to preheater
22
UV-2504
LP condensate To 75-V-19
23
UV-2505
LP condensate To OWS
24. UV-2601
Rich Amine from Amine Absorber
RECYCLE COMPRESSOR SECTION:
25. UV-2701
H2 from Recycle Compressor K.O. Drum
26. UV-2702
Make up H2 to Recycle Compressors K.O. Drum
27. UV-2703
Amine as Recycle Compressors K.O. Drum Drain
28. UV-2801
Recycle gas comp. discharge
STABILISER COLUMN:
29. UV-3001
Heavy Gasoline from Stabiliser bottom to Stabiliser Bottom
30.
7.7.3
UV-3002
ON
AIR FAILURE
FC
FC
FC
FC
FC
FC
FO
FC
FC
FC
FC
FC
FC
FC
FC
FC
FO
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
SAFETY VALVES:
S. No.
1.
2.
Pumps
Stabiliser Reboiler Steam Inlet
Rev. A
ACTION
NO.
2.
UV-1102
Heavy Gasoline Recycle from SHU Recycle Air Condenser
3.
UV-1103
SHU Feed Surge Drum Boot Drain
4
UV-1104
Feed from FSD to Charge pump
SHU FEED SECTION:
5.
UV-1201
Gasoline from SHU Feed pumps to SHU Feed/HDS
6.
Tag No.
PSV-1101 A/B
PSV-1102 A/B
Description/Location
Set
Pressure
(Kg/cm2g)
5.0
15
S. No.
Tag No.
Description/Location
Set
Pressure
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
PSV-1201 A/B
PSV-1202 A/B
PSV-1301
PSV-1401
PSV-1501A/B
PSV-1502
PSV-1601/1602
PSV-1701/02
PSV-1703/04
PSV-2001
PSV-2101
PSV-2201
PSV-2301/2301
PSV-2401A/B
/
(Kg/cm2g)
37
37
40
35.1
8
40
7.6
7.6
7.6
36.5
31
9.0
7.6
27.5
17.
18.
19.
20.
21.
2402
PSV-2601
PSV-2701A/B
PSV-2801A/B
PSV-2802A/B
PSV-2803
27.5
27.5
38.5
38.5
13
PSV-2804
(Regen. Case)
Recycle Compressor 75-K-01B Discharge 13
PSV-2901/2902
PSV-3001A/B
PSV-3002
PSV-3101/3102
PSV-3201/3202
PSV-3203/3204
PSV-3205
(Regen. Case)
Sea water return from 75-E-12 A/B
Flare from Stabiliser Column
Stabilizer reboiler condensate pot
Sea water return from 75-EE-14A/B
Corrosion inhibitor pump discharge
Sulfiding agent injection pump discharge
Corrosion inhibitor drum
22.
23.
24.
25.
26.
27.
28.
29.
7.6
9.0
40
7.6
13.7
32
10.5
CAUSE
ACTUATOR
DESCRIPTION
DEVICE
75-LAHH-1103 Very high level in 75-UV-
103
75-PALL-1604
EFFECT
ACTION
DESCRIPTION
Close
FCC gasoline feed
Close
Hydrogenated
stop
gasoline recycle
Pump 75-P-03 A/B
at
106
107
108
109
75-LALL-1701
75-P-03A/B operating
75-P-03
Start
discharge
spare
Low level
75-PStop
04A/B
chimney 75-P-05
75-LALL-1505
C-01
75-AT-2101
75-TAHH-
1403-1415
75-HS-
75-R-01
Case of fire
A/B
75-UV-
75-UV-
1102A(Board)
protection
Spare pump auto
start
Light
gasoline
Stop
pump stops
FCC
heart
close
pump stop
Air make up during
cut
regeneration
Close
1104
Close
SHU
feed
75-P75-HS-
Stops
Close
Close
01A/B
1102B(Local)
110
75-ZSC-1104
75-UV-1104
I-102
75-LALL-1106
CLOSE
Very low level in 75-UVSHU feed surge 1103
111
75-PAHH-1510
drum boot
Very
pressure
07 stop
splitter overhead
112
75-TAHH-2103
75-HS-
Stop
Heater shutdown
2102A(Board)
Rev. A
Page 120 of 182
heater O/L
75-HS-2102B
113
(Local)
75-HS-
HDS
2401A(Board)
section
2502
75-HS-
depressurization
75-UV-
2401B(Local)
reaction 75-UV-
Close
LP steam to lean
amine preheater
Close
Lean
2503
75-UV-
amine
to
Amine absorber
Open
HDS
2403
reaction
section
depressurization
75-UV-
Close
1901
75-UV-
reaction section
Close
H2 make up
Stop
2702
75-F-01
off
75-UV-
Close
HC to stabilizer
Close
Rich
2401
75-UV2601
75-UV-
amine
to
amine unit
Close
Close
3001
stabilizer
bottom
product
valve
75-UV-
Close
Recycle
2701
75-UV-
isolation
Close
Recycle
2801
75-P-
comp
comp
isolation
Stop
Stop 75-P-01A/B
Actuate
07A/B
I-117
interlock
I-122
Actuate
Amine
Low
absorber
Low
level
interlock
114
115
117
Rev. A
Page 121 of 182
75-LALL-2403
Close
HC to stabilizer
75-LAHH-2406
separator drum
2401
Very high level in 75-UV-
Close
BFW feed
Close
Rich
separator
116
drum 2301
75-LALL-2602
boot
Very low level in 75-UV-
75-LAHH-2704
Amine absorber
2601
Very high level in 75-K-
Stop
amine unit
Stop Recycle comp
comp KOD
Close
75-FALL-2801
01A/B
1901
amine
to
reaction section
Stop
75-F-01
Heater shutdown
I-113
118
75-TAHH-2807
75-LALL-3002
119
75-HS-
Case of fire
Close
Close
3001
stabilizer
bottom valve
75-P-
Stop
Stop 75-P-07A/B
01A/B
I-117
Actuate
Recycle
2801A(Board)
comp
shutdown
75-HS2801B(Local)
75-ZSC-2801
75-UV-
Close
2801
75-ZSC-2701
75-UV-
75-PALL-3107
121
75-HS-
75-P-09
Close
75-P-09
Case of fire
spare
75-UV-
Recycle
comp
isolation
Stop
A/B operating
discharge
comp
isolation
2701
120
Recycle
Pumps 75-P-09A/B
protection
Start
Close
start
Close
stabilizer
3002A(Board)
3001
75-P-
75-HS-
bottom valve
Stop
Stop 75-P-07A/B
Close
Hydrocarbon liquid
07A/B
3002B(Local)
122
75-ZSC-3001
75-UV-3001
75-LALL-2502
Close
Very low level in 75-UVamine KOD
I-113
2501
drain
HDS
depressurisation
123
75-LALL-2702
inter lock
Very low level in 75-UV-
124
75-FALL-1903
RGC KOD
2703
Very low flow at 75-UV-
Close
Hydrocarbon/Amine
Close
liquid drain
Stop feed to HDS
124
126
75-TALL-2003-
2019
75-AT-2101
75-TAHH-
2003-2019
75-LALL-2407
R-02
Very low level in 75-UVseparator
127
75-UV-
75-PALL-2407
75-F-01
75-UV-
reaction section
Close
OSBL
Stop
Stop
Close
Stop
LAL-3301
Pump
75-P-06
protection
operating
75-P-06
128
Heater shutdown
Air to heater during
regeneration
drum 2402
boot
Very low pressure 75-P-
H2 make up from
spare
Low level in CBD 75-P-11
Start
Stop
start
CBD pump
drum
129
LAH-3301
Start
CBD pump
LAL-3401
drum
Low level in Flare UV-3401
Close
KOD
LAH-3401
Open
Close
KOD
130
PAHH-
High-high
3012A/B/C
pressure
UV-3002
at
to 75-E-13
stabilizer O/H.
7.10
operating
parameters
are
the
variables
affecting
the
process
performance, which the operator can actually adjust in order to improve or restore
the unit performance.
The purpose of process:
To perform the desulfurization of the gasoline. Regarding product
specifications, refer to the process book.
To limit octane losses.
The operating parameters used to meet these specifications with an optimum
catalyst life are the following:
Reactors inlet temperature
Make-up hydrogen and recycle hydrogen flowrates leading to the hydrogen
partial pressure at outlet of the reactors, the hydrocarbon partial pressure, the
hydrogen sulfide partial pressure.
The space velocity (i. E. Feed rate).
Operator action on these parameter enables the unit to match different feed
and product qualities provided they are within the basis of design of the unit.
7.10.2 REACTOR TEMPERATURE
1. Selective Hydrogenation section:
A temperature increase favors di-olefin hydrogenation but also olefin
hydrogenation and coking, which reduces the cycle length. Moreover a high
separator drum 75-V-03 is recycled and mixed with the HDS feed for olefin
dilution.
In AM case; selective mode, the exotherm in the HDS rector is controlled at
200C by the liquid quench of the HDS reactor.
7.10.3 OTHER PARAMETER
1. Coke accumulation on the catalyst surface:
Coke can have 2 different origins.
Catalytic coke
During the catalyst cycle, coke may build-up on the catalyst surface within
the pores, reducing the reaction surface and consequently the activity. An
adjustment will be required on the Reactor inlet temperature to compensate for
this activity loss. This change is very gradual over the catalyst cycle and depends
upon the feed quality.
Coke formation due to coke precursors in the feed
This coke formation is due to a combined action of dissolved oxygen, rust
and temperature. Therefore, it is very important to be careful with the quality of
the feed especially to limit content of compounds containing the carbonyl bound
(C=O) and the rust content.
This formation of coke leads to a higher P in reactors and decreases the
catalyst cycle. The coke formation due to coke precursors in feed is more
important than catalytic coke.
2. Feed quality changes
a) Higher level of contaminants
If there is a higher level of contaminants in the feed, the operator must
increase
the
reactor
inlet
temperature
until
the
efficiency
of
the
If the sulfur content of the feed is higher, the operator must increase the
reactor inlet temperature to reach the same sulfur specification.
c) Higher olefin content
In order to avoid high exothermicity, the olefin content must be lower than
35% vol. The reactor inlet temperature needs not to be increased for a higher
olefin content. Quench and eventually top bed diluant shall be adjusted to control
the T through the catalytic beds.
3. Major changes in feed rate
As catalyst activity is higher with a lower space velocity, then the reactor inlet
temperature at 60% capacity should be different from the one at 100% capacity.
The operator can decrease the reactor inlet temperature at lower space velocity
and therefore preserve catalyst cycle length.
The end of a catalyst cycle is reached when the following takes place:
The catalyst deactivation is such that it is no longer possible to meet the product
specifications.
number of H 2 moles
number of total moles
has
no
real
impact
on
olefin
hydrogenation
but
affects
2. Di-olefin content
Di-olefin content higher than the design means an increased exothermicity for
the Di-olefin reactor. As there is no quench or diluent on them, an increase of
diolefin content in the feed induces a higher T across the catalyst bed. This
results in a shorter cycle length. If all the di-olefins are not hydrogenated in the
Diolefin reactor, they will reduce the second reactor cycle length.
3. Olefin content
Olefin content higher than the design in the heavy FCC gasoline fraction of
the feed means an increased exothermicity for the HDS reactor. This can be
compensated, in order to keep the same WABT, either by decreasing the inlet
temperature or by higher quench and diluent flow rates.
If these conditions are not sufficient, then the feed flow rate has to be
reduced, while maximizing the diluent rate and quench.
INTRODUCTION
Normal shutdown applies to a shutdown planned in advance for preventive
maintenance or to unexpected events which are not of an emergency nature.
Before initiating any planned shutdown, review all records to determine
what inspections and repair work must be accomplished during the shutdown.
Prepare a shutdown schedule, including plans for pre-arranging feed and product
inventories during turnaround time. Notify all services and other dependent
operating units of the schedule so that all activities can be properly coordinated.
Arrange for all required parts, tools and services in advance, in particular
adequate nitrogen for purging.
While shutting down the unit due to maintenance or emergency care must
be taken not to admit air into the system until all hydrocarbon vapours have been
removed. Operators should be thoroughly familiar with shutdown procedures and
understand the reasons for each work. Good judgement must be exercised as no
written procedure can completely cover all details or problems that can arise in
an emergency. Judgement is more likely to be exact if prior thought and planning
have been made
Precautions
During shutdowns, precautions must be taken to avoid the following, whether
planned or unplanned:
Exposing personnel to toxic or noxious conditions when equipment is drained
or depressurised.
Fire possibilities when the reactors are opened, due to explosive hydrogenoxygen mixtures, or exposure of pyrophoric material to air.
8.1.2
Prepare blind lists and blind list accounting procedures for required isolations.
Have test equipment onsite for:
Explosive Gas and Hydrogen Analyzers
Oxygen Analyzers (If Vessel Entry is Planned)
If inert atmosphere entry into the vessels is planned, have the necessary
personnel protective equipment on hand.
Have the necessary materials onsite to complete the shutdown.
Inform all interested parties of shutdown plans.
Have temporary piping spools, blinds, gaskets, etc., onsite.
Erect staging (scaffolding).
Ensure adequate storage space is available in the off plot storage system.
Plan for any unbalanced utilities.
8.1.3
GENERAL PROCEDURE
When shutting down, steps should be taken to prevent catalyst or
equipment damage from expansion, contraction, thermal shock or unusual
pressure surges. Purge with care all vessels, using inert gas and steam until all
equipment is free of hydrocarbon liquids and gases. Purge thoroughly and check
the atmosphere in the vessels before entering or starting repairs. Rigorously
observe all safety precautions.
The general procedure to be followed for a total shutdown is the following:
Lower the capacity and if necessary the severity.
Switch the product to off-spec. or raw storage.
Shutdown the Reaction section.
Drain all hydrocarbons.
Depressurize and purge.
Several shutdown cases are considered :
Short duration shutdowns (i.e. less than 24 hours).
Long duration shutdowns.
Shutdowns to be followed by catalyst regeneration or inspection of equipment.
8.1.4
The circulation of hydrogen through the HDS reaction section is continued for
a period of two hours to strip out hydrocarbons from the catalyst.
The unit is now considered to be on stand-by with gasoline feed stopped,
hydrogen circulating through the HDS catalyst beds at reduced temperature,
splitter and stabilizer at total reflux.
8.1.5
8.1.6
used to check the limit at which vessels can be opened for entry of atmospheric
air.
Care should be taken given the fact that catalyst pores retain some
hydrocarbons and some time is needed for their release. The period of time of
1-hour minimum is required to ensure that hydrocarbons are released and
tests show less than 0.5% vol of hydrocarbons.
When the catalyst remains in the reactors and only other parts of equipment
are subject of opening, close the reactor block valves and keep a positive
pressure of nitrogen in the reactors from 0.5 to 0.8 Kg/cm2g.
When catalyst is to be unloaded, the pressure is decreased to atmospheric by
opening the top flange and the catalyst is discharged by catalyst unloading
nozzles.
Before entering any vessel, the testing for explosiveness, H2S content and
oxygen content is mandatory.
c) Splitter and stabilizer sections
All vessels, exchangers and piping are free from hydrocarbons by pumping
and draining to sewer.
The content of splitter bottom sent to off spec tank via stabilizer. The
remaining hydrocarbons in the splitter, reflux drum and piping should be
drained to closed hydrocarbons collecting system.
The stabilizer bottom should be sent to off-spec storage. The remaining liquid
must be drained. Take care not to pass hydrogen.
When all the liquid is drained from the system, temporary steam hoses are
connected to pumps, columns, and drums and steam out operation started.
This operation is usual in refineries and familiar to operators.
After steam out, cooling down the equipment is ready for opening of
manways, dismounting of flange joints, etc. Before entering any vessel, the
testing for explosiveness and hydrogen sulfide presence is mandatory.
Important notes
1. Entry of personnel to vessels needs particular safety precautions. Vessels
operating in presence of H2S may contain sulfides adhered to the surface of
Template No. 5-0000-0001-T2 Rev A
metal. These sulfides are pyrophoric and may release H 2S. The forced
ventilation and permanent supervision is required on vessels subject to work
of personnel inside these vessels.
2. The nitrogen purge does not mean that vessel is ready for entering of
personnel. Nitrogen is suffocating gas leading to death. The vessels must be
fully vented and tested for oxygen content before admission of personnel
entry. The "dead" spaces in vessels such as down comers, separation weirs,
etc. must be considered.
8.2 UNIT RESTART
Any unit restart procedure derives from the first start-up procedure. The unit
status after the shutdown will dictate the point where the general start-up
procedure can be resumed.
For instance during a feed pump shutdown for a short duration, the unit
would be kept on standby with the make-up hydrogen flowing at full capacity, the
heater on and the reactor temperatures slightly lowered. The columns would
have no feed but the reboilers would be on and circulating at lower temperatures.
In this case, the restart procedure would begin at the steam-in step with levels
already in the vessels.
For a long duration shutdown, the unit has been cooled down, the SHU
reaction section filled with gasoline, the HDS reaction section left under pressure
of hydrogen and the columns under a nitrogen pressure.
The restart procedure will include the following steps:
Start the columns at total reflux by admission of steam to reboiler and inert
naphtha via start-up lines.
Re-pressurize the reaction section to the operating pressure.
Start the 75-P-01 A/B pumps and feed the selective hydrogenation section at
60% of normal flow with raw gasoline.
The 75-E-03 feed steam heater is started by admission of steam.
The gasoline from the SHU reactor is sent to the splitter 75-C-01, the light,
heart cut and heavy FCC gasoline products from the splitter are sent to the
off-spec storage.
The HDS reaction section is started with circulation of hydrogen gas through
the recycle compressor 75-K-01 A/B.
The heater 75-F-01 is put in service and temperature gradually increased up
to 180C.
The Amine absorber, filled with hydrogen, is lined up with other equipment of
the HDS reaction section, and the recycle gas circulated through the
absorber. Start circulation of amine solution.
When the products are on-spec, the splitter and the HDS section can be
connected. The heavy FCC gasoline product from the splitter is routed to the
HDS reacton section and stabilizer section.
When the product is on specification, slowly increase feed flowrate in steps of
5% up to 100%.
Catalyst sulfiding is not necessary if the catalyst has not been regenerated or
exposed to air during the long shutdown.
GENERAL
Emergencies must be recognised and acted upon immediately. The
operators and supervisory personnel should carefully study in advance, and
become thoroughly familiar with, the steps to be taken in such situations. While
some of the emergencies listed in this section may not only result in a unit
shutdown, they could cause serious trouble on the unit if not handled properly. In
addition, damage to the catalyst might occur. In general the objective of the
emergency procedures is to avoid damage to equipment and catalyst.
Hard and fast rules cannot be made to cover all situations, which might arise.
The following outline lists those situations, which might arise and suggested
means of handling the situation.
Emergency shut down by Operators
Loss of feed
Loss of cooling water
Lack of hydrogen make-up
Loss of Amine
Quench pump failure
Fuel gas failure
Steam failure
Instrument air failure
Power Failure
Automatic shut down
9.1.2
LOSS OF FEED
A loss of feed may be due to feed pump failure with an unexpected delay in
starting the spare pump or, more commonly, from leaks or other difficulties in the
feed line requiring an interruption of the feed. Loss of feed at the gasoline feed
pump is instantaneous and requires immediate action.
SHU section:
If feed is still available to do this operation:
Stop the heater 75-E-03.
Close the H2 make-up supply.
Reduce the unit capacity to 60% of the feed capacity.
Switch the products to off-spec storage.
Stop the unit feed when the reactor temperature is at least 10C below the
normal temperature.
Close the LCN line (from draw off tray) to storage and stop LCN pump 75-P04A/B.
Close the FCC heart cut line (from draw off tray) to storage and stop FCC
heart cut pump 75-P-05A/B.
Allow the splitter to operate on total reflux.
9.1.6
LOSS OF AMINE
Increase the reactor temperature to achieve the required HDS at a higher
octane loss. The stabilizer operation should be monitored to control the H 2S in the
heavy FCC gasoline product.
9.1.7
9.1.8
9.1.9
STEAM FAILURE
A lack of steam leads to SHU feed steam heater 75-E-03, splitter reboiler 75E-07 and stabilizer reboiler 75-E-13 failure.
Cut raw gasoline feed completely, as unstable gasoline product with H2S
cannot be sent to storage.
Follow the same procedure as per loss of feed.
9.1.10 INSTRUMENT AIR FAILURE
The valves take their safe positions according to the fail-open or fail-close
specification. The loss of instrument air pressure is generally slow and there is
time to proceed to a normal shutdown.
9.1.11 POWER FAILURE
It is assumed that all electrical equipment in the unit will shutdown including
air coolers, recycle compressor, and all pumps
The operator shall complete the shutdown procedure with the following actions:
Initiate the I-102 for stopping H2 make up and steam to steam heater 75-E03.
Stop heater 75-F-01. Watch the tube skin temperature in heater. If there is an
increasing trend, open the air damper and inject sufficient steam.
Isolation of the feed and make-up gases
Isolation of the product lines by closing control and block valves.
Closing of block valve downstream control valve FV-2901 on stabilizer bottom
outlet line.
Shut-off steam to the reboiler of stabilizer and splitter.
Maintain pressure in the reaction section. If necessary, inject nitrogen in the
stabilizer to maintain pressure.
There is a potential danger for increased hydrocracking in the reactors which
are idle with no flow of hydrogen to strip the hydrocarbons. If power outage is
suspected for a long duration, depressurize the reaction section to flare.
If the critical equipment is fed by an emergency power supply, the operators
must be familiar with the list of equipment that is able to be restarted
immediately.
In addition, the general philosophy is to restart the equipment in the following
order:
-
The compressor, in order to resume the hydrogen circulation and cool down
the reactors or to maintain the reactors inlet temperature after restarting the
heater.
The reflux pumps of the column, in order to bring under control the overhead
temperature and pressure.
The remaining electrical equipment is restarted as required by the start-up
procedure.
9.1.12 FIRE OR MAJOR LEAK
The following is only an overview of the steps to be taken during the discovery
of a leak resulting in a fire. This section will be defined in detail by the Unit Owner
and the Engineering Contractor according to the refinery safety philosophies and
will include any safety devices (hardware or software) which may be added
during detailed engineering. The following steps are described from a process
point of view, mainly aimed at avoiding runaway reactions and protecting the
equipment and catalyst.
Shut-off fuel to heater by activating the fuel gas emergency shutdown system
from the control room.
Shutdown the raw gasoline feed pump, close the splitter and stabilizer feed
and block-in.
Shut-off steam to the reboiler of the splitter and stabilizer, and to the SHU
feed steam 75-E-03.
Isolate the unit: Block the feed, product and hydrogen make-up gas lines.
Isolate the reaction section from the feed, splitter and stabilizer sections.
Depending on the severity of the leak and its location, shutdown the hydrogen
recycle compressor immediately, block-in and depressurize the HDS reaction
section to the flare.
Depressurize the splitter and stabilizer sections to the flare.
Drain all the vessels to the hydrocarbon blowdown.
As the depressurized hot vessels cool down, watch the pressure and inject N 2
as necessary to avoid a vacuum.
Nitrogen purging and steam out should be considered for the splitter and
stabilizer circuits.
If a fire has occurred, then all the steps above will be taken while the fire
fighting is taking place. Note, however, that the depressurizing step may be
needed sooner than described above depending upon the gravity of the situation.
If a small leak occurs in the heater, the hydrocarbons will ignite immediately in
this confined area. Open the snuffing steam and the damper (if possible) and
maximize the draft to keep the fire under control within the heater box.
In case of extreme emergency, the reaction section can be depressurized to
the flare, using the quick depressurization valve by actuating HS-2401
emergency shut down push button.
9.1.13 AUTOMATIC EMERGENCY SHUTDOWN
The actions undertaken in any emergency situation must aim at the following:
Protecting the operators.
Protecting the equipment and the catalyst.
Resulting in a safe situation compatible with an easy restart.
Process vessels, heater, compressors are fitted with switches which actuate
the corresponding devices to avoid damage of equipment in case that operating
variable exceeds the threshold limits. Hereafter are summarized the causes and
effects for the unit shutdown interlocks. Causes and effects for the equipment
safety interlocks are summarized in the Process Book. Other interlocks have to
be specified by Engineering Contractor or Manufacturer of equipment (heater,
compressor, etc).
In several cases, a number of actions are carried out by the emergency safety
sequences. But operators must always check the satisfactory completion of the
sequence and complement it as described. In addition they must be able to
perform the safety sequence in manual mode, if needed.
A few actions through hand-switches are left to operators judgement, who can
anticipate the automatic action such as reactors depressurization.
10.1
TROUBLE SHOOTING
This section offers some guidelines for trouble shooting various problems
that may be encountered over the course of normal operation of the unit and
effects on incoming / out going conditions. The information is given for the
following general subject areas of the unit:
10.1.1 HIGH DIFFERENTIAL PRESSURE (P) IN THE REACTOR
High pressure drop
This unit is designed for a given maximum reactor pressure drop. During
normal operation the pressure drop will be lower than indicated in the section
1.1.5 of the Process data Book. The reactor pressure drop indicator is transmitted
to the DCS and the trend data will allow the operator to predict when the unit
needs to be shutdown for catalyst skimming.
P is strongly dependent on the feed quality (precursors of coke in the
feed). That is why a special attention to the feed quality must be taken.
The pressure drop of the HDS reactor, is also dependent on the
performance of the selective hydrogenation reactor.
Leak of SHU feed in HDS effluent / HDS feed in HDS effluent / stabilizer
feed in stabilizer bottoms
Since, for these 3 equipments, the fluid with higher sulfur content is at
higher pressure, contamination of the hydrotreated gasoline is possible. When
sulfur shows up in the stabilizer bottoms and all the proper corrective actions
have been taken with no improvement, then it is highly likely that a leak exists in
either the SHU feed/HDS effluent or reactor feed effluent exchangers or stabilizer
feed bottoms exchangers. These leaks can be easily detected through sampling
upstream and downstream.
10.1.2 CHEMICAL H2 CONSUMPTION INCREASE
Hydrogen gas make up to Selective hydrogenation reactor 75-R-01
In normal operation, the H2 supply to the diolefin reactor is under flow ratio
to the feed. Increased H2 consumption may result from excessive olefin
saturation or higher diolefins content in the feed. Monitoring of the MAV at the
splitter bottom should be used to adjust the make-up H2 rate.
11.1
GENERAL
Control tests provide the information to the operating staff for making
necessary adjustments to get the maximum output and on-spec quality
products. The control tests are to be made at all steps to monitor the intermediate
and final products whether or not they are at the desired specification. Samples
are taken and analysed at regular intervals such that the operation of the plant
are monitored and any deviation (from specification will indicate some mal
operation / malfunction of the plant which can be spotted and rectified in time
without undue loss of time and product. Sometimes, samples are taken to find out
the effect of certain changes brought about in the operating conditions. The
samples are to be taken with great care so that the samples are representative
samples. The frequency of sampling, the type of analysis and points where
samples are to be taken are attached as annexure. During guarantee tests some
additional samples can be taken at higher frequencies that is also specified in the
technical procedures prior to test run. The following guidelines should be followed
while collecting samples.
11.2
SAMPLING PROCEDURE
1. Whenever hot samples are taken, check cooling water flow in the sample
cooler is circulating properly.
2. Sample points usually have two valves in series. One gate valve for isolation
(tight shutoff) and other globe valve for regulating the flow. Open gate valves
first and then slowly open the globe valve after properly placing the sample
containers. After the sampling is over, close the globe valve first and then the
gate. Then again open the globe valve and drain the hold up between the
gate and globe valve in case of congealing liquid.
3. Sample valve should be slowly opened, first slightly to check for plugging. If
the plugging is released suddenly, the liquid will escape at a dangerously
uncontrolled rate. Never tap the line to release the plugging. Call the
maintenance gang to properly unplug the line. In case of congealing type
samples, sample point should be equipped with copper coil type steam tracer.
It should be ensured that steam tracing line is functioning normally.
4. The operator taking the sample should be careful to stand in a position such
that the liquid does not splash on him and he has unobstructed way out from
the sample point in case of accident.
5. While taking dangerous toxic material for sampling, it will act as an observer
for safety. Proper gas mask is to be used. It is advisable to stand opposite to
wind direction in case of volatile toxic liquid.
6. Sample should be collected in clean, dry and stoppered bottle. In case of
congealing samples use clean dry ladle.
7. Rinsing of the bottle should be thorough before actual collection.
8. Before collecting, ensure that the line content has been drained and fresh
sample is coming.
9. Gradually warm up the sample bottle / metallic can by repeated rinsing before
collecting the sample.
10. Stopper the bottle immediately after collection of sample.
11. Attach a tag to the bottle indicating date, time, and name of the product and
tests to be carried out.
12. A few products suffer deterioration with time.
For example, the colour of the heavier distillates slowly deteriorates with time.
So these sampls should be sent to laboratory at the earliest after collection.
Template No. 5-0000-0001-T2 Rev A
1. The samples after collection should be kept away from any source of ignition
to minimise fire hazard.
2. Volatile samples (e.g. naphtha) should be collected in bottles and kept in ice
particularly for some critical test like RVP.
Stream
Feed
FCC1&2
Cold
feed
storage
Analyse
from Distillation
Method
ASTM D86
Frequency/day
1
Sp. Gravity
ASTM D-1298
Sulphur spec
IFP 9416
As required
Total sulphur
ASTM D-2622
ASTM D-3227
As required
from Mercaptans
Olefins
IFP
0104
/ 1
ASTM D1319
Bromine number
ASTM D-1159
Diene (MAV)
IFP 9407
2 per week
HDS feed
Diolefin content
IFP 0104
As required
Existing gum
ASTM D-381
As required
Total nitrogen
ASTM D4629
As required
RVP
NF M 07-007
As required
RON
ASTM 2699
MON
Gas
ASTM 2700
IFP 9603
1
1
SHU H2 make up
chromatography
HDS H2 make up Gas
IFP 9603
IFP 9603
As required
IFP
chromatography
Olefins
0104
/ As required
ASTM D1319
Light
FCC
ASTM D-1159
As required
Diene (MAV)
IFP 9407
2 per week
IFP 0104
ASTM D86
As required
As required
Sulphur spec
IFP 9416
As required
Sp gravity
ASTM D-1298
As required
Total sulphur
ASTM D-5453
ASTM D-3227
As required
Diolefin content
FCC Distillation
gasoline
Bromine number
heart
gasoline
cut Mercaptans
Olefins
IFP
0104
/ As required
ASTM D1319
10
Splitter
drum off gas
Bromine number
ASTM D-1159
Diene (MAV)
IFP 9407
As required
Diolefin content
IFP 0104
As required
RON
ASTM 2699
As required
MON
ASTM 2700
As required
NF M 07-007
IFP 9603
As required
As required
RVP
reflux Gas
chromatography
11
Stabilizer feed
Total sulphur
ASTM
Rev. A
Page 157 of 182
D-2622 As required
after
H2S
washing
Olefins
IFP
0104
/ As required
ASTM D1319
12
Bromine number
ASTM D-1159
As required
Diene (MAV)
Gas
IFP 9407
IFP 9603
As required
As required
Dragger tube
IFP 9603
As required
As required
Dragger tube
IFP 9603
As required
1
Dragger tube
ASTM D86
1
As required
Sulphur spec
IFP 9416
As required
Sp gravity
ASTM D-1298
As required
Total sulphur
ASTM D-5453
Mercaptans
ASTM D-3227
As required
Olefins
IFP
chromatography
13
Recycle
gas
amine
14
chromatography
H2S
Recycle gas from Gas
amine
15
H2S
to Gas
chromatography
H2S
FCC Distillation
Heavy
gasoline
0104
/ As required
ASTM D1319
16
Stabilizer
gas
17
HDS
Bromine number
ASTM D-1159
Diene (MAV)
IFP 9407
As required
Diolefin content
IFP 0104
As required
RON
ASTM 2699
As required
MON
ASTM 2700
As required
IFP 9603
As required
Dragger tube
ASTM D 1293
As required
As required
purge Gas
chromatography
H2S
separator PH
sour water
12.1
INTRODUCTION
Ignorance of the
details of the unit or the techniques of safe and efficient operation reduces the
margin of safety of personnel and subjects the equipment to more hazardous
conditions.
familiar with the equipment and materials being handled in the unit, and
recognise the hazards involved in handling them and the measures taken to
ensure safe operations.
Since the unit handles with one of the most potential source of fire and
explosion like LPG; therefore adherence of safety rules should be given uphill
importance.
12.2
12.2.1 GENERAL
Safety is the first consideration for all operations in the plant. Procedures,
practices, and rules have been established as guides to assure a safe working
environment. Safety also plays a major role in the efficient operation of the
refinery facilities.
This section is prepared to reemphasize the plant safety incorporated in the
unit and equipment design.
12.2.2 EMERGENCY SHUTDOWN
The emergency shutdown is already described
These different shutdowns are completed by different trips to protect the main
equipment and to prevent any misoperation. Alarms always precede these trips,
they allow operators to have corrective actions before the automatic shutdown.
12.2.3 OVERPRESSURE PROTECTION
Over pressure of equipment occurs in many ways. The basic reason of
overpressure is imbalance in heat and material flow in one or more equipment.
Pressure relief valves have been installed after careful evaluation of conceivable
of overpressure sources.
12.2.4 SAFETY SHOWER AND EYE WASH
Safety shower and eye wash stations are located in the chemical handling areas.
Physical properties
Physical state
gas
Color:
colorless
Boiling point
-79.2F (-61.8C)
Melting point
-117.2F (-82.9C)
Molecular weight
34.08
Specific gravity/air
1.189
b)
industry. Two types of hazards must be taken into account: explosive nature,
extreme toxicity when mixed with air or sulfur dioxide.
The maximum safe concentration of hydrogen sulfide is about 13 ppm.
Although at first this concentration can be readily recognized by its odor,
hydrogen sulfide may partially paralyze the olfactory nerves to the point at which
the presence of the gas is no longer sensed.
Therefore, though the odor of the gas is strongly unpleasant, it is neither a
reliable safeguard nor a warning against its poisonous effects. Hydrogen sulfide
in its toxic action, attacks nerve centers. Early symptoms of poisoning are slight
headache, burning of eyes and clouded vision. A concentration of 100 ppm of
hydrogen sulfide in air causes coughing, irritation and loss of smell after 2-15
minutes and drowsiness after 15-30 minutes.
A concentration of 1000 ppm of hydrogen sulfide in air can make person
suddenly unconscious with early cessation of respiration and death in a few
minutes.
Hydrogen sulfide is a combustible material and, when mixed with air or
sulfur dioxide, may be explosive. It is essential, therefore, to avoid such mixtures
in the processing of hydrogen sulfide. The explosive range of hydrogen sulfide in
air is from 4.5-45%. The ignition temperature of such mixtures is around 250C.
presence of hydrogen sulfide. Depending on the concentration the paper will turn
yellow or brown.
Adequate Dragger tubes can be used in the same way.
d)
Personal protection
Gas mask of appropriate type or positive air mask should be used.
e)
First aid
A person unconscious in an atmosphere which may be contaminated with
DMDS
The
material
safety
data
sheet
must
be
obtained
from
the
manufacturer/supplier.
Catalysts
The material safety data sheets for HR 845, HR 806, HR 841, ACT 065, ACT 077
and ceramic balls are attached in Attachment
12.3
SAFETY OF PERSONNEL
General safety rules, which shall be practised and enforces for all personnel
who enter the unit, are summarised below:
1. Safety helmets and boots shall be worn by all personnel at all times in the plant.
They may be removed when inside rooms or buildings that do not have
overhead or other hazards.
2. Smoking shall be permitted only in specified areas, which are clad as nonhazardous and are pressurized through a ventilation system. Failure of the
ventilation system automatically cancels the smoking privilege until the system
is repaired, inspected and authorised operation.
3. Each employees assigned to work in the unit shall know where the safety and
fire suppression equipment is located and how to operate this equipment.
4. Safety glasses, goggles or face shields shall be worn while performing work,
which could result in eye or face injury.
5. Operations personnel golden rule
Do not open or close any valve without first determining the effect.
12.4
The appropriate operations group must issue a work permit system before
commencing any maintenance work affecting the operation of the unit. The work
permit is issued for Hot and Cold work. The Hot work permit must include as
a minimum, a precise description and mode of execution of Hot works, the
equipment to be used, the expected time which Hot works is scheduled to start
and expected completion, an exact location of the Hot works and precautions
to be taken.
Unit areas are generally identified as hazardous areas as far as the threat of
fire is concerned. Therefore, in order to carryout works within these areas, a
written work permit is required. The work permit, when approved, indicates that a
specific work can be carried out in safe conditions provided that all safety
precautions are observed.
a) Permit for Hot work
Permits of hot works are required for any work involving the use of or
generation of heat sufficient to ignite flammable substances.
Typical sources of ignition are:
Electric and gas welding
Any machine capable of producing a spark
Not explosion-proof electrical equipment
Internal combustion engines
Ferrous tools, both hand operated and pneumatic or other type
b) Permit for Cold-Work
Permits for cold-work are required for any work not involving the use of a local
ignition source.
Typical examples of cold work are:
Disconnecting of lines for the insertion of blinds, etc
Opening of any equipment such as vessels, filters, etc.
c) Entry permits
Entry permits are required for entering enclosed spaces such as vessels,
sewer, pits, trenches, etc.
The use of any tool or machinery, which could provide a source of ignition, is
forbidden. Also, prior to entry it should be ensured that area is well ventilated and
the oxygen content in air is about 21% by volume. A fresh airflow to be ensured in
the enclosed space through out the duration of work. A gas test for H 2S and
flammable gases should also be performed before entry. A person should also be
on alert outside the enclosed space for rescue in case of emergency. Procedure
for carrying out work and rescue plan shall be formulated before commencement
of work.
d) Guidelines for release of permits
The equipment item, on which works have to be carried out, shall be clearly
indicated. During the shutdown of any system, permits covering the whole
section with above-mentioned item shall be issued, if possible. The type of
work permitted shall be clearly indicated.
The date and the period of validity of the permit shall also be indicated. If the
work does not get over within the period of validity of the permit, the permit
can be extended provided that, at each start of the works the safety conditions
are checked again and signed by the operator in-charge and by safety officer.
Beyond this extended period, a next permit will have to be issued. The
explosiveness test and the check of toxic gases shall be performed always at
the last moment before each start of the work and subsequently every time
the work is resumed or whenever doubts arise.
The validity of the permit can be cancelled at any moment by the operator or
by safety officer in case they deem that the conditions are not safe.
The conditions to be complied with shall include special precautions, such as
the use of protective clothing, breathing apparatus, safety equipment and the
tools to be used etc.
No one shall be allowed to enter the vessel or other enclosed spaces without
suitable protective clothing until the vessels or the enclosed spaces become
safe for entry by means of proper isolation, proper ventilation and suitable
check of the atmosphere inside and availability of rescue person outside the
enclosed equipment.
If welding or hot work is to be done ensure that
Fire fighting system is ready
Close the neighbouring surface drains with wet gunny bags
Keep water flowing in the neighbouring area to cool down any spark.
Responsible operation supervisor should be present at the place of hot work
till the first torch is lighted.
12.5
Provide tags on the various blinds to avoid mistakes. Maintain a register for
blinds.
Check for pyrophoric iron and if existing, keep this wet with water.
Keep the surrounding area cleaned up.
Get explosive meter test done in vessels, lines, equipment and surrounding
areas.
If welding or hot work is to be done, also:
Keep fire-fighting devices ready for use nearby.
Close the neighbouring surface drains with wet gunny bags.
Keep water flowing in the neighbouring area to cool down any spark bits etc.
Keep stem lancers ready for use.
After the above operations have been made, a safety permit should be
issued for carrying out the work. A responsible operating supervisor should be
personally present at the place of hot work till the first torch is lighted. Hot work
should be immediately suspended if instructed by the supervisor or on detecting
any unsafe condition.
When people have to enter a vessel for inspection or other work, one
person should stand outside near the manhole of the vessel for any help needed
by the persons working inside. The person entering the vessel should have tied
on his waist a rope to enable pulling him out in case of urgency. Detail procedure
for preparation for vessel entry is given in next sub-section.
12.6
Scaffolding is
preferred when the vessel is large enough to permit it to be sued. The scaffolding
base should rest firmly on the bottom of the vessel and be solidly encored. If the
scaffolding is tall, the scaffolding should be supported in several places to prevent
sway. The platform boards should be sturdy and capable of supporting several
people and equipment at the same time and also be firmly fastened down.
Rungs should be provided on the scaffolding spaced at a comfortable distance
for climbing on the structure.
Template No. 5-0000-0001-T2 Rev A
If scaffolding will not fit in the vessel a ladder can be used. A rigid ladder is
always preferred over a rope ladder and is essential to avoid fatigue during
lengthy periods of work inside a vessel. The bottom and top of the ladder should
be solidly anchored. If additional support is available, then the ladder should also
be anchored at intermediate locations. When possible, a solid support should
pass through the ladder under a rung, thereby providing support for the entire
weight should the bottom support fail. Only one person at a time should be
allowed on the ladder.
When a rope ladder is used, the ropes should be thoroughly inspected prior
to each new job. All rungs should be tested for strength, whether they are made
of metal or wood. Each rope must be individually secured to an immovable
support. If possible, a solid support should pass through the ladder so that a
rung can help support the weight and the bottom of the ladder should be fastened
to a support to prevent the ladder from swinging. As with the rigid ladder, only
one person should climb the ladder at a time.
Wearing of a Safety Harness
Any person entering a vessel should wear a safety harness with an
attached safety line.
manner that it can prevent a fall in the event the man slips and so that it can be
used to extricate the man from the vessel in the event he encounters difficulty. A
parachute type harness is preferred over a belt because it allows an unconscious
person to be lifted from the shoulders, making it easier to remove him from a tight
place such as an internal man way.
A minimum of one harness for each person entering the vessel and at least
one spare harness for the people watching the man way should be provided at
the vessel entry.
Providing a Man way Watch
Before a person enters a vessel, there should be a minimum of two people
available outside of the vessel, one of who should be specifically assigned
responsibility to observe the activity of the people inside of the vessel. The other
person must remain available in close proximity to the person watching the man
way so that he can assist or go for help, if necessary. He must also be alert for
events outside of the vessel, which might require the people inside to come out of
the vessel, for example, a nearby leak or fire. These people should not leave
their post until the people inside have safely evacuated the vessel.
A communication system should be provided for the man way watch so that
they can quickly call for help in the event that the personnel inside of the vessel
encounter difficulty. A radio, telephone, or public address system is necessary for
that purpose.
Providing Fresh Air
The vessel must be purged completely free of any noxious or poisonous
gases and inventoried with fresh air before permitting anyone to enter. The
responsible department, usually the safety department, must test the atmosphere
within the vessel for toxic gases, oxygen and explosive gases before entry. This
must be repeated every 4 hours while there are people inside the vessel. When
possible the Licenser technical advisor should personally witness the test
procedure. Each point of entry and any dead areas inside of the vessel, such as
receiver boots or areas behind internal baffles, where there is little air circulation
should be checked.
Fresh air can be circulated through the vessel suing an air mover, a fan, or,
for the cases where moisture is ca concern, the vessel can be purged using dry
certified instrument air from a hose or hard piped connection. When an air mover
is used, make certain that the gas driver uses plant air, not nitrogen, and direct
the exhaust of the driver out of the vessel to guarantee that this gas does not
enter the vessel. When instrument air is used, the Licenser technical adviser
must confirm the checking of the supply header to ensure that it is properly lined
up. It should be confirmed that there are no connections where nitrogen can enter
the system (Sometimes nitrogen improperly used as a backup for instrument air
by some refiners). The fresh air purge should be continued throughout the time
that people are inside of the vessel. The responsible control room should be
informed that instrument air is being used for breathing so that if a change to
nitrogen is required the people are removed from the affected vessel.
A minimum of one fresh air mask for each person entering the vessel and at
least one spare mask for the Manway watcher should be provided at the vessel
entry. These masks should completely cover the face, including the eyes, and
have a second seal around the mouth and nose. When use of the mask is
required, it must first be donned outside of the vessel where it is easy to render
assistance in order to confirm that the air supply is safe. Each mask must have a
backup air supply that is completely independent of the main supply. It must also
be independent of electrical power. This supply is typically a small, certified
cylinder fastened to the safety harness and connected to the main supply line via
a special regulator that activates when the air pressure to the mask drops below
normal. The auxiliary supply should have an alarm, which alerts the user that he
is on backup supply and it should be sufficiently large to give the user 5 minutes
to escape from danger.
12.6.2 PREPARATION OF VESSEL ENTRY PERMIT
Before entering the vessel a vessel entry permit must be obtained. A vessel
entry permit ensures that all responsible parties know that work is being
conducted inside of a vessel and establishes a safe preparation procedure to
follow in order to prevent mistakes, which could result in an accident. The permit
is typically issued by the safety engineer or by the shift supervisor. The permit
should be based on a safety checklist to be completed before it is issued. The
permit should also require the signatures of the safety engineer, the shift
supervisor, and the person that performed the oxygen toxic and explosive gas
check on the vessel atmosphere. Four copies of the permit should be provided.
One copy goes to the safety engineer, one to the shift supervisor, one to the
control room, and one copy should be posted prominently on the man way
through which the personnel will enter the vessel. The permit should be renewed
before each shift and all copies of the permit should be returned to the safety
engineer when the work is complete.
operations in other parts of the plant, which may be beyond the control of the
people entering the vessel. For these reasons vessel entry procedures must still
be rigorously followed during the checkout of a new unit.
The oxygen content of the atmosphere inside of the vessel should be
checked before every entry and the vessel should be blinded.
Independent
blinds at each vessel nozzle are preferred. However, in the event that many
vessels are to be entered in a new unit, which is separate from the rest of the
plant, the entire unit can be isolated by installing blinds at the battery limits rather
than by individually isolating every vessel nozzle.
12.6.4 INSPECTIONS DURING TURNAROUNDS
In turnaround inspections, the possibility that vessels will contain dangerous
gases is much higher. Equipment that has been in service must be thoroughly
purged before entry. The vessel should have been steamed out unless steam
presents a hazard o the internals and then fresh airs circulated through it until all
traces of hydrocarbons are gone.
persist afterwards, repeat the purging procedure until the vessel is clean. The
service history of the vessel must also be investigated before entry so that
appropriate precautions may be taken. The service may require a neutralisation
step or a special cleaning step to make the vessel safe. Internal scale can trap
poisonous gases such as hydrogen sulfide or hydrogen fluoride that may be
released when the scale is disturbed. If this sort of danger is present, fresh air
masks and protective clothing may be required to worn while working inside of
the equipment.
In a turnaround inspection, every vessel nozzle must be blinded at the
vessel with absolutely no exceptions. There will always be process material at
the low and high points in the lines connecting to the vessel because it is not
possible to purge them completely clean. The blinds must all be in place before
the vessel is purged.
Another factor to be cautious of, especially if entering a vessel immediately
after the unit has been shut down, is heat stress. The internals of the vessels
can still be very hot from the steam-out procedure or from operations prior to the
shutdown. If that is the case, the period of time spent working inside of the
Template No. 5-0000-0001-T2 Rev A
vessel should be limited and frequent breaks should be taken outside of the
vessel.
12.7
The operating personnel should be fully conversant with Fire fighting system
provided in the unit. All of them should have adequate fire fighting training and
will serve as an auxiliary Fire Squad in the event of a fire breakout. It will be the
primary responsibility of unit personnel to fight the fire at the very initial stage
and, at the least, localise it.
Major Fire fighting facilities provided in the unit comprising the following:
a) Fire Water System
Water is most important fire fighting medium. Water is used to extinguish the
fire, control, equipment cooling & exposure protection of equipment/personnel
from heat radiation.
An elaborate firewater distribution network is provided around unit. Firewater
Hydrants/Monitors are provided around unit, which give coverage to most of
equipment.
b) Foam System
For containing large Hydrocarbon fires, foam systems are useful. They
have inherent blanketing ability, heat resistance and security against burn back.
Low expansion foam is used for hydrocarbon oil fire.
Foam can be applied over burning oil pool with the help of foam tenders/foam
delivery system.
c) Portable Fire Extinguishers
Fire should be killed at the incipient stage. Portable fire extinguishers are
very useful in fighting small fires. All extinguishers in the unit must be located in
specified places only.
Template No. 5-0000-0001-T2 Rev A
location of the extinguishers. They also must know most suitable type, which,
when and how to use an extinguisher. For example, electrical fires should be put
out with CO2 or dry power extinguishers; water and foam should not be used.
The used extinguishers should be checked and restored by fire station personnel.
d) Fire Signal
Break Glasses have been provided at strategic locations of unit to see fire
alarm in fire station. If a fire is sighted, glass of window should be smashed,
causing fire alarm switch to actuate. This is an emergency call & should be
periodically tested for proper functioning.
e) Steam Smothering
LP Steam hose connections have been provided at every convenient point
inside unit. Steam lances of standard 15M length can be fitted with these hose
stations. Wherever hydrocarbon leakage is detected which is likely to catch fire,
Steam blanketing may be done. Apart from diluting combustible Hydrocarbons,
steam prevents atmospheric oxygen from taking part in combustion & thus help in
extinguishing fire. However, steam should never be applied on large pool of
hydrocarbon fire. Direct application of steam on burning oil may result in spillage
of burning hydrocarbon & spread of fire. Similarly use of firewater on hot oil
surfaces may cause sputtering & spread of fire.
12.7.1 USE OF LIFE SAVING DEVICE
Safety of the personnel should the prime concern. Life saving device is to
be used for personnel protection. Important life saving devices which are required
to be used are given below:
Head protection:
Safety helmets shall be worn by all personnel at all times in the plant for
protection of the head. They may be removed when inside rooms or buildings
that do not have overhead or other hazards.
Eye and face protection
Safety glasses, goggles or face shields shall be worn while performing work,
which could result in eye or face injury.
Hand Protection
Proper hand protective gloves should be worn.
Foot protection
Safety shoes are to be worn for foot protection.
Ear protection
Whenever persons are required to be work in noisy areas proper ear protection
device such as earplug etc, is to be used.
Breathing apparatus
Whenever persons are required to work or enter an area of high
toxic/aromatic/hydrocarbon vapour concentration, wear appropriate respiratory
protection, such as self-contained breathing apparatus or an air mask with an
external air supply.
13.1
GENERAL
This section covers the general procedure for operation and trouble
shooting of commonly used equipment like pumps, heat exchangers and furnace
etc. For specific information and more detail refer to vendor's manuals.
13.2
CENTRIFUGAL PUMPS
Start-up
Inspect and see if all the mechanical jobs are completed.
Establish cooling water flow where there is such provision. Also open steam
for seal quenching in pumps having such facilities.
Check oil level in the bearing housing, flushing may be necessary if oil is dirty
or contains some foreign material.
Rotate the shaft by hand to ensure that it is free and coupling is secure.
Coupling guard should be in position and secured properly.
Open suction valve. Ensure that the casing is full of liquid. Bleed, if necessary,
from the bleeder valve.
Energise the motor. Start the pump and check the direction of rotation. Rectify
the direction of rotation if it is not right.
Check the discharge pressure. Bleed if necessary to avoid vapour locking.
Open the discharge valve slowly. Keep watch on the current drawn by the
motor, if ammeter is provided. In other cases check at motor control centre.
In some pumps a by-pass has been provided across the check valve and
discharge valve to keep the idle pump hot. In such pumps, the by-pass valve
should be closed before starting the pump. It should be ensured that casing of
these pumps are heated up sufficiently prior to starting of the pump to guard
against damage of the equipment and associated piping due to thermal shock.
Shutdown
Close discharge valve fully.
Stop the pump
a) If pump is going to remain as standby and has provision for keeping the pump
hot, proceed as follows:
Open the valve in the by-pass line across the discharge valve and check
valve.
The circulation rate should not be so high to cause reverse rotation of idle
pump and also overloading of the running pump.
b) If pump is to be prepared for maintenance, proceed as follows:
Close suction and discharge valves.
Close valve on check valve by-pass line, if provided.
Close cooling water to bearing, if provided.
quenching, if provided.
Slowly open pump bleeder and drain liquid from pump if the liquid is very hot
allow sufficient time before draining is started.
13.3
HEAT EXCHANGERS
13.3.1 GENERAL
The unit has a number of heat exchangers, air coolers. Suitable valves for
bypassing and isolation were provided wherever necessary to offer the required
operational flexibility.
The exchangers have been provided with draining and flushing connections.
The coolers and condensers have been provided with TSV's on the cooling
waterside to guard against possible rise of pressure due to faulty operations with
the safety release to atmosphere. Temperature gauges or Thermowells have
been provided at the inlet and outlet of exchangers. Where water is the cooling
medium, no temperature measurement is provided for water inlet temperature,
which is the same as cooling water supply header temperature.
13.3.2 AIR COOLERS
Air coolers/condensers comprise of a fin tube assembly running parallel
between the inlet and outlet headers. These are of the forced draft type. The
forced draft fans provided have auto variable speed rotors in which the fan
speeds are adjusted during rotation. This allows variation in airflow as per the
cooling requirements. A high vibration switch is provided with alarm to indicate
any mechanical damage.
13.3.3 EXCHANGERS
Shell and Tube type heat exchangers can be broadly classified into following types:
Water Coolers/condensers
Exchangers
Start-up/shut down procedures for each unit shall vary slightly from case to case.
However, general start-up/shut-down procedures are discussed in the following
paragraphs.
START-UP
After the heat exchanger has been pressure tested and all blinds removed,
proceed as follows:
Open cooling medium vent valve to displace non-condensable (air, fuel gas,
inert gas etc.) from the system. Ensure the drain valves are capped. For highpressure system, drain valves should be flanged. This activity is not required if
gas is the medium.
Open cooling medium inlet valve. Close vent valve when liquid starts coming
out through it, then open cold medium outlet valve and fully open the inlet
valve also. Where cold medium is also hot, warming up of cold medium side
gradually is also essential.
Open hot medium side vent valve to displace non-condensable (air, fuel inert
gas etc.). Check that the drain is closed and capped. This activity is not
required if gas is the medium.
Crack open hot medium inlet valve. When liquid starts coming out from the
vent valve, close it. Open hot medium inlet valve and then open the outlet
valve fully. In case of steam heaters, initially the condensate shall be drained
to sewer till pressure in the system builds up to a level where it can be lined
up to the return condensate header.
In case by passes are provided across shells and tube side, gradually close
the bypass on the cold medium side and then the bypass across the hot
medium side.
Check for normal inlet and outlet temperatures. Check that TSVs are not
popping.
The operation of inlet and outlet valves should be done carefully ensuring that
the exchangers are not subjected to thermal shock.
In case of coolers/condensers, adjust the water flow to maintain the required
temperature at the outlet.
Shutdown
Shut down of an exchanger, coolers, condenser is considered when the equipment
is to be isolated for handling over to maintenance while the main plant is in
operation. The following is the suggested procedure for isolation of the piece of
equipment
Isolate the hot medium first. In case both hot and cold medium are from
process streams, exchanger shall remain in service till the hot stream has
cooled down enough.
In case of a cooler, adjust cooling water flow to the cooler, which is in line so that
product temperature is within allowable unit.
Drain out the shell and tube sides to OWS/Sewer/Closed blow down system as
applicable. In case flushing oil connection is given flush the exchanger to CBD.
Ensure that the CBD drum has sufficient usage to receive the flushing of the
exchanger
Blind inlet and outlet lines before handing over the equipment for maintenance.