Renovation Contracts
Second Edition
Canadian
Home Builders
Association
This publication has been developed by the Canadian Renovators Council of the Canadian
Home Builders Association for the benefit of professional renovators and their clients.
The content of the document is presented for information purposes only. Renovators
should consult with their legal advisor on the specific content and wording of their contract.
August 2010
Table of Contents
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
General Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Whats in a Contract? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Parties to the Contract . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Contract Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Scope of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Permits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
Project Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
Price . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Payment Terms and Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Changes to Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
Standards of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Utilities and Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
Workers Compensation and Other Laws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24
Insurance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25
Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26
Dispute Resolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27
Termination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28
Promotion and Privacy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
Miscellaneous . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30
Supplementary Clauses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Access via Neighbour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32
Appliances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32
Debris . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
Driveway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
Dust and Noise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Excavation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Final Payment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Intellectual Property . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
Landscaping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
Non-Competition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
Out of Level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Personal Effects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
Salvage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Underground Utilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Unknowns at the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Walls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Checklist of Possible Exclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40
Introduction
The most important tool for a renovator is a written contract.
Todays homeowners expect professional renovators to put it in writing. They know
that a written contract protects them and their investment in their home, and is a
strong indication that their renovator is legitimate and does business the right way.
By using a written contract, you set yourself apart from fly-by-night or
underground operators. The best way to push those guys out of the marketplace
is to show customers what it takes to do it right.
A good, solid contract is also the foundation for a positive renovation experience
for both you and your clients. It helps build their confidence and your relationship.
More importantly, it helps to prevent misunderstandings and false expectations
that can lead to a breakdown in your relationship and jeopardize the project.
Renovation covers a lot of different projects, done
by many different types of companies. Whether you
are a one-person operation doing small repair and
renovation jobs, or you run a large design-build
company focused on upscale whole-house
remodeling, you need a contract.
General Considerations
A renovation contract doesnt have to be complicated and difficult. As a legally
binding document, it must conform to certain legal standards and practices. As a
record of the agreement between you and your clients, it needs to communicate
the facts as clearly and simply as possible.
It has to be easy to understand and read. There is no need for legal bafflegab
or mouse print, which alienates customers and adds to your responsibility for
explaining the contract. In legal disputes, decisions tend to favour homeowners
if the language in a contract is so complex that people cannot reasonably be
expected to understand what they agreed to.
A legal expert can offer advice on the legal aspects and wording of the
contract. However, when it comes to capturing how your company does
business, you are the experttherefore you need to be the driving force in
developing the content of your contract.
Use the same contract form for all projects. If you do not need all the clauses
for some projects, simply write Not Applicable, or leave them blank. Create an
electronic file of the form so it is easy to fill in. That also makes the contract
more legible.
ALWAYS review the contract in detail with your clients before asking them to
sign. Dont rely on them to remember everything you have discussed earlier.
Go through the contract with them, clause by clause, point by point, and verify
that they understand and agree. Have them initial every page and attachment.
Whats in a Contract?
This booklet presents the kinds of information that can be expected in a
renovation contract.
It identifies a number of areas that should be included and outlines what can be
covered in each area, and why. Wording for specific clauses is offered as a starting
point only. Be certain to get legal advice when developing your own form.
It also offers suggestions for your review of the contract with your clientstheir
possible concerns and what to discuss with them.
Date
Parties to the Contract
Contract Documents
Scope of Work
Permits
Project Schedule
Price
Payment Terms and Schedule
Changes to Work
Standards of Work
For example, the main document can describe the Scope of Work in broad terms,
e.g., Build a single-storey, four-season sunroom addition, 20 by 16 on the back
of the existing home, with a reference, See attached Schedule ADrawings
and Schedule B, Scope of Work. Schedule B can list the steps involved in doing
the work, in as much detail as you deem appropriate, from demolishing an
existing deck and pathway to foundation work, construction and completion of the
new structure.
Schedules can also contain general information that doesnt change from one
project to another, such as:
Warranty information
Standards of work
Terms and conditions (a phrase used for a schedule that covers a range of
standard information in one document)
Except for very simple renovations, a contract can easily run many pages. The
advantage of using a main document with schedules is that it keeps the core
information simple and easy to understand: who, what, when, and how much.
All the details are added as schedules, clarifying how the project will be done and
under what circumstances.
Once a schedule, or attachment, has been referenced in the main contract document,
it becomes part of the contract, with the same legal weight as the main form. Any
change to a schedule is a change to the contract and must be dealt with as such.
Date
Whats Covered?
Date
Your Client
Your Company
Project Address
List the project address, whether the same or different from the
client address, as well as the legal description of the property
(check the property tax bill, purchase agreement or closing
papers or contact the land registry office in your area). The legal
description is important in case you have to place a claim on
the property.
Contract Documents
Whats Covered?
Schedules
Clarification
Scope of Work
Whats Covered?
Description of Work
Describe the work step by step, The Work entails the following:
. Be specific and detailed, for example:
Development of design and plans
Preparation (demolition, removal of old materials)
Salvage of items for reuse (fixtures, cabinets, doors, etc.).
If for disposal, who owns them?
Structural work (excavation, foundation, framing, insulation,
sheathing, subfloor, roofing, etc.)
Windows and doors (size and location)
Mechanical work (installation, ductwork, services, hook-ups)
Finishing work (e. g., trim, including profile, hardware,
plumbing fixtures, # of coats of paint and stain)
Disposal of waste (e.g., landfill)
Hazardous Materials
and Substances
Note any work you are not responsible for. For instance, the
owners may want to take on some tasks themselves, such as
demolition or painting, or they may want to hire some
contractors directly themselves. This needs to be stated in the
contract.
Discuss with Your Clients
Go through the stages of the work with your clientskey points
or in detailreferring to plans and drawings, as appropriate.
This helps to confirm that everyone sees it the same way.
Clients who know the work involved in their project also have
a better understanding of how it may affect their daily routines.
Further, it can give them a better appreciation of the price you
are charging.
It is important to clarify what can happen if the owners engage
other contractors to work on the project, or they plan to get
friends or family members to help out. They may believe that
they can save some money and may not understand the
implications, for example:
10
For larger projects, you may wish to list the products and
materials you will be using in a separate schedule. Be detailed.
Information may include the following:
Brand name/manufacturer
Model name or product number
Quantities and dimensions
Colour (name and/or number)
Performance characteristics
Certification/labeling
Warranty
11
Permits
Whats Covered?
Permits and
Inspections
The contract should spell out who is responsible for getting any
necessary permits, e.g., The following permits are required for
the work and will be provided by the Owner or Contractor as
set out in this Contract.
List the permits (demolition, building, electrical and so on) and
assign responsibility for each one. Note how the permits will be
paid for, e.g., The Contractor will include the cost of permits in
the contract price.
12
13
You can include a wish in the contract that the Contractor and
Owner reconsider and modify plans, as suggested above. This
can offer comfort to both parties and set the tone for solving a
potential problem, but it cannot guarantee the outcome. An
agreement to agree is not legally enforceable.
If the entire project is dependent on a zoning variance, the best
approach may be to make the contract conditional upon getting
the required approval. Then put everything on hold until that
happens.
Project Schedule
Whats Covered?
14
Substantial and
Full Completion
Time is of the
essence is a common
term in contracts,
which in effect says
that the specified time
and dates are vital and
mandatory, i.e., we
really mean it.
15
Delays (contd)
Price
Whats Covered?
Pricing Method
16
For a small job, you may be able to itemize the cost of the
project in the contract form itself. Otherwise, show the total
cost only (or the cost plus the percentage you will charge for
management) and refer to an attached Schedule of Cost for a
detailed breakdown.
Taxes
Time Limitation
POSSIBLE
ADDITIONAL COSTS
A number of situations can occur that can affect the price of the
project after the contract has been signed. It is wise to
anticipate them in the contract. (Also see Unknowns at the Site,
page 38).
Latent Defects
Escalation Clause
17
Escalation Clause
(contd)
Payment Schedule
18
Deposit
Fixed-Price Contracts
Cost-Plus Contracts
Payment Due
Specify Recipient
Security
19
20
Changes to Work
Whats Covered?
General Statement
Spell out how Change Orders are priced and paid for. For
example, Extras will be calculated in the following manner
(choose one):
21
Standards of Work
Whats Covered?
General Statement
www.tarion.com/HOME
and click link in menu.
Inconvenience
22
Homeowner
Responsibilities
Clean-up
Non-Smoking Policy
Access to Water,
Electricity and
Washroom Facilities
23
24
Whats Covered?
Workers
Compensation
Personal Disability
Insurance
Compliance with
Other Laws
For the benefit of your clients, you may want to note that, The
Contractor also agrees to comply with all laws, by-laws, rules,
regulations, codes and orders in force during the performance
of the Contract that relate to the preservation of public health
and construction safety.
Compliance with
Other Laws (contd)
Insurance
Whats Covered?
Your Insurance
Coverage
25
Your Insurance
Coverage (contd)
Tell your clients that they must contact their own insurance
company before work starts. While small renovation projects
usually have no effect on homeowner insurance, larger projects
may. For instance, a major renovation may increase the value of
the house significantly, and the homeowners should increase
their coverage accordingly, even before the project is
completed.
Warranty
Whats Covered?
Contractors Warranty
Set out the warranty you offer on the Work and any limitations
that may exist, such as, The Contractor warrants materials and
workmanship provided by the Contractor for the Work for a
period of ________ year(s)* from the date of substantial
completion. Any defects in the Work due to faulty materials
and/or workmanship will be corrected at the Contractors
expense during this warranty period.
*The warranty is usually offered for a one- or two-year period
(two years for RenoMark renovators).
26
Limitations
Product Warranties
Dispute Resolution
Whats Covered?
General Statement
Appointment of
Mediator
Binding Arbitration
27
Termination
Whats Covered?
28
Default by Owner
Default by Contractor
No-default Termination
Signs and
Photographs
29
Privacy
Miscellaneous
Whats Covered?
30
Supplementary Clauses
Renovation projects frequently include specific issues and considerations that
should be noted in the contract.
This section contains a series of pre-written clauses for addressing a range of
issues that are not uncommon in renovation projects. The clauses are suggestions
onlythey can be used as is or tailored to each particular project, and they can be
inserted in your standard contract form, included in a standard addendum, or used
as a separate addendum, depending on the issue. In all cases, a legal review is
recommended.
For some issues, more than one possible clause is offered. Choose one or more to
best suit the particular circumstances. Also, see the checklist at the back for other
possible topics that you might want to cover by a supplemental clause.
Access
In some cases, reasonable access to a clients home for the renovation work may
mean that the homeowner may have to vacate the premises. This can be noted in
the contract.
There may be two different scenarios for owner move-out: 1) the owner will not be
able to live in the home during renovations, or 2) the move-out is optional lets
see how it goes. A clause for each possible scenario is presented below.
The owner acknowledges that it will be necessary to move out of the house while
renovations are taking place. The Contractor will provide reasonable notification
(___ days) prior to start-up of the Work for the owner to vacate the home, as well as
for the Owners move-back into the home when the Work is sufficiently completed.
The Contractor will strive to conduct and complete the Work in an efficient and
timely fashion.
The Owner acknowledges that it may be necessary to move out of the house while
renovations are taking place. The Contractor will endeavour to minimize conditions that
would necessitate such a move, without jeopardizing the timely and efficient progress
of the Work. The Owner and the Contractor will strive to accommodate the needs of the
other party and, if required, will seek a mutually acceptable schedule for Owner move-out
and subsequent move-back into the house.
31
Appliances
Homeowners may assume that the work includes dealing with appliances, for
instance, part of completing a kitchen renovation. Add a clause to the contract to
clarify the contractors responsibilities regarding appliances.
The Contractor is not responsible for uncrating and installing appliances, unless
specified.
The Contractor is not responsible for the quality, performance or condition of Ownersupplied appliances.
32
Debris
As noted on page 23, homeowners are concerned about the disorder and mess
created by renovation. Depending on the scale of the project and the expected
impact on the home and the grounds, you may wish to develop specific and
detailed clauses, which will help the homeowners to have reasonable expectations
and keep their anxiety down. (Also see Dust and Noise page 34.)
The Contractor shall supply disposal bins as necessary for the removal of debris
resulting from the Contractors contracted work. Unless otherwise specified, offcontract work, performed by the Owner or others, must use separate disposal means
or containers.
During the Work, the Contractor will keep the site tidy and remove debris as necessary.
On completion, the Contractor will provide a final clean-up to include the removal of all
debris, surplus materials, tools and equipment, and the project will be left in a broomswept condition.
Driveway
Repair
When upgrading an existing driveway, it is a good idea to spell out the assumption
for the installation of a new driveway.
The condition of the base under the existing driveway surface is deemed to meet
approved industry standards. If found to be otherwise, the contractor will advise the
owner of any additional costs to prepare a proper base before installing a new
driveway.
Damage
If the project requires heavy use of the owners driveway, along with the potential
for damage, it may be wise to insert a clause to that effect in the contract.
Reasonable effort will be taken to protect the driveway. However, normal use of heavy
equipment, waste bins and/or trucks may cause damage to some driveways. All repairs
to the driveway, other than as the result of the Contractors negligence, will be the
responsibility of the Owner and will be charged as an extra to the contract.
33
Excavation
When the project includes excavation, an unknown factor is whats in the ground,
and how it might affect the work and the budget. Suggested supplementary
clauses include:
If soil conditions require additional excavation beyond standard practice or the depth
shown on the drawings, the additional costs incurred for excavation and foundations
will be charged as an extra to the contract.
During excavation, large rocks, tree trunks, roots or other natural or man-made
obstructions may be found; blasting or removal of these obstructions will result
in additional charges. Similarly, any other soil conditions that call for measures beyond
standard expectations and practices will be considered outside the agreed-upon scope
of the contract and will be charged as an extra to the contract.
It is assumed that unless otherwise noted, any slab to be removed in whole or in part
is not thicker than 4 inches. If the thickness exceeds 4 inches, the additional cost for
demolition and removal will be added to the contract as an extra.
Final Payment
Use this clause, or similar, to spell out the owners responsibility to pay
construction lien holdbacks as they become due, in situations where there is a
delay in completing the contract work. Owners should be aware that they cannot
delay payment of construction lien holdbacks related to previous invoices or
milestone payments on the ground that they are withholding a final payment to
cover further worki.e., the two are not linked.
Where further work is required to fulfill the contract, then unless otherwise specified,
the Owner may withhold payment in an amount reasonable to cover such further work,
but not to exceed $____________. Once that further work has been completed, that
amount is due and payable to the Contractor. Notwithstanding any withholding, the
Owner is responsible for paying the Contractor the full amount of the construction lien
holdback when due, in accordance with provincial lien legislation.
34
Intellectual Property
To protect your investment in your business tools as well as the information
developed in the pursuit of specific projects, you may wish to add a clause on the
use of your intellectual property.
Reproductions of any contents of this document (the contract form) or of any plans or
drawings for this Work, or use of same other than for this Work, is prohibited except
with the written permission of the Contractor.
Landscaping
Set out, in writing, who is responsible for dealing with landscaping that must be
disturbed during the renovation project, or for repairing or creating new
landscaping once construction is completed.
The Owner shall remove and preserve all landscaping items or materials (e.g. plants,
bushes, edgings, pavers and so on) to be saved or replanted, from the area designated
for excavation and storing of backfill material around same, prior to start-up.
The site will be rough-graded only; any landscaping or site finishing will be charged as
an extra to the contract, unless otherwise specified.
Non-Competition
In addition to asking your subcontractors and others to sign a non-competition
agreement (page 12) as a condition of working for your company, your contract
with the homeowners can also request that they respect this practice.
The Owner shall not contract any work directly with the subcontractors, suppliers or
subtrades. All business related to the renovation will be conducted through the
Contractor.
35
Out of Level
If you have reason to believe that the home is not level or plumb, and that this
could affect the contracted work, you may want to add a clause, such as:
It may be found that the existing structure is out of plumb and/or out of level. The
proposed work does not include leveling or straightening of the existing structure
unless it is specifically mentioned.
Leveling of the subfloor in preparation for installation of new hardwood flooring would
be an extra, to be ascertained, if necessary, after existing flooring is removed.
Personal Effects
The suggested clauses below elaborate on the homeowners responsibilities to
clear the work area (also see page 23).
The Owner shall remove furniture and all personal items from the work areas and any
areas required for access by the Contractor.
The Owner shall remove articles from the walls and other locations that are not secure
or may be dislodged or damaged, in all areas of the house affected by the Work and/or
access to the Work and/or services.
The Contractor holds no responsibility for items left by the Owner in any areas that are
affected by the renovation, including access points and traffic through the home.
36
Safety
Safety can be a concern for homeowners, particularly in homes with young
children. It is important to address the issue directly in conversation, and explain
the measures the contractor will take to protect everyone, including the people
who work onsite. At the same time, there are limits to the contractors ability to
ensure safety in off-hours; nor can the contractor be liable for existing conditions
in the home. It can be helpful to spell out in the Contract whats reasonable for the
homeowners to expect, as well as their own responsibilities, such as:
During the renovation the site will be kept work safe in accordance with provincial
regulations; however, the safety of the Owner, family members and guests is solely the
responsibility of the Owner. The Owner acknowledges that additional safety concerns
beyond work safe conditions may exist for young children, visitors to the home
during the renovation and others, and may at the Owners discretion and responsibility
decide to take additional safety measures, such as locking up the area under
construction or limiting entry to the Contractors crew only.
There may be features of the house that do not meet current code requirements. Where
such features are not included in the scope of work for the renovation, the Contractor is
not responsible
for them.
Salvage
What happens when demolition or other preparatory work results in unwanted
materials and items that are too good to be thrown away? The contract can set out
the framework for what to do with them and by whom.
Except as otherwise itemized, all materials to be removed from the premises shall be
disposed of by the Contractor, and if any such removed materials can be salvaged, reused or recycled, the benefit shall belong to the Contractor.
Services
If not part of the project budget, alert homeowners to the fact that possible work
and fees related to services, connections, meters and so on, inside or outside the
home, are additional costs, to be paid by them. For instance:
If it is required to move service meters, payment of any service connection fees or
service upgrade fees are the responsibility of the Owner.
Included in the contract is installation of simple surface-mounted light fixtures. If the
Owner chooses another fixture that requires more time to install, that time will be an
extra to the contract.
37
Storage
Use this clause to reinforce your discussion with the homeowners about how they
will get ready for renovations and live during the project.
The Owner acknowledges that space will be needed and provided at the site for the
storage of material and equipment. The space requirement will be established during
a meeting between the Owner and the Contractor, prior to the start of construction.
Underground Utilities
This clause, or similar, highlights the importance of due diligence in getting
information from the proper authorities before proceeding, and protects the
contractor in case of incomplete information.
The Contractor will contact the appropriate authorities and request information on the
location of all underground services in the areas of excavation, construction, grading
and paving, as well as access used by heavy equipment. The Contractor shall not be
held responsible for damage to or removal of underground services not identified
during the investigation, including cables, wires, telephone or hydro-electric
connections, pipes, sprinkler lines, water or sewage disposal systems or conduits or
similar items, and the Owner covenants and agrees to hold harmless and indemnify
the Contractor with respect thereto.
38
Walls
Use the following clause to help homeowners have realistic expectations of wall
repairs.
When repainting of existing surfaces is required by the Contract, the preparation will
consist of minor filling of small holes and cracks prior to the application of two coats
of paint. If the condition of the wall or wood surface is such that it requires further
remedial work, the Contractor will provide a quotation for the additional preparation
required.
39
40
Surveys
Permits
Engineering fees
Moving or storage of personal items or furniture
Any work not shown on the drawings or specifically mentioned in the Scope
of Work
Any work on the exterior of the house, except as noted
Painting of any surfaces not affected during construction
Supply or installation of video or sound equipment
Supply of security equipment
Supply or installation of telephone wiring
Final connection of telephone or cablevision outlets
Supply or installation of cablevision wiring
Supply or installation of computer cabling
Supply or installation of cabinets
Supply of appliances or hood fan
Supply or installation of flooring
Supply of plumbing fixtures
Supply of surface-mounted light fixtures
Interior or exterior painting
Landscaping, the site will be rough graded only
Payment of any service connection fees or service upgrade fees
Installation of Owner-supplied appliances
Environmental assessment
Removal or disposal of any hazardous materials or mould
Supply or installation of a make-up air unit
Hidden knob and tube wiring repairs, replacement or removal
Hidden galvanized water lines, replacement
Window coverings