Weekly Accomplishment Report Form

The document provides a weekly accomplishment report for a construction project as of an unspecified date in 2015. It includes sections on project data, work progress, and a description of work performed. The report details the project title and location, contractor, managers, contract amounts, start and completion dates, and work completed to date at 4% over the previous and current periods. It also notes any delays, problems, solutions or recommendations. The document is prepared by the project engineer and verified by construction division head of Clark Development Corporation.

Uploaded by

Jm Taaca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
9K views8 pages

Weekly Accomplishment Report Form

The document provides a weekly accomplishment report for a construction project as of an unspecified date in 2015. It includes sections on project data, work progress, and a description of work performed. The report details the project title and location, contractor, managers, contract amounts, start and completion dates, and work completed to date at 4% over the previous and current periods. It also notes any delays, problems, solutions or recommendations. The document is prepared by the project engineer and verified by construction division head of Clark Development Corporation.

Uploaded by

Jm Taaca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 8

CLARK DEVELOPMENT CORPORATION

Engineering, Construction and Maintenance Department

ACCOMPLISHMENT REPORT
as of ____________________________, 2015
A. PROJECT DATA

C. DESCRIPTION OF WORK PERFORMED

Project Title

Loction

Contractor
Project Manager
Original Contract Amount

:
:
: Php
: Php
:
:
:
:

Revised Contract Amount

Starting Date
Original Completion Date
Revised Completion Date
Remaining Time
B. WORK PROGRESS
% Completed
Previous
This Period
To Date

D.
Scheduled

Previous

Actual

Slippage

This Period

To Date

BRIEF ON THE DELAYS, MAJOR PROBLEM/SOLUTION/RECOMMENDATION

Material Cost
Labor Cost
Equipment Cost
Prepared by :

Project Engineer
MAGV/2K4/CONSTRUCTION
302121138.xls / project data (REA-EGBP)

Checked/Verified by :

EDGARDO GABRIEL B. PINLAC


Project Engineer

Noted by :

RENE E. ABAD
Construction Div. Head

CLARK DEVELOPMENT CORPORATION


Engineering, Construction and Maintenance Department

Contractor

MAGV/2K4/CONSTRUCTION
302121138.xls / project data (REA-EGBP)

CDC-ECMD

CDC-ECMD

CLARK DEVELOPMENT CORPORATION


Engineering, Construction and Maintenance Department

Project

Location

Date Started
Date of Completion
Report No.
Remaining Days

:
:
:
:

WEEKLY ACCOMPLISHMENT REPORT


FOR THE PERIOD OF _________________________, 2015

ITEM

ACTIVITIES/DESCRIPTION

TOTAL
APPROVED
QUANTITY

ACCOMPLISHMENT (%)
UNIT

UNIT
COST

TOTAL CONTRACT AMOUNT

Prepared by :

MAGV/2K4/CONSTRUCTION
302121138.xls / Physical Accomplishment (REA-E)

AMOUNT

% WT.

0.00

0.0%

Checked by :

Noted by :

EDGARDO GABRIEL B. PINLAC

RENE E. ABAD

PREVIOUS

THIS PERIOD

0.000%
0.000%
TOTAL TO DATE
Less Programmed
Slippage (+)

TOTAL TO DATE

0.000%

CLARK DEVELOPMENT CORPORATION


Engineering, Construction and Maintenance Department

Project

Location

Date Started
Date of Completion
Report No.
Remaining Days

:
:
:
:

WEEKLY ACCOMPLISHMENT REPORT


FOR THE PERIOD OF _________________________, 2015

ITEM

ACTIVITIES/DESCRIPTION

Project Engineer, Contractor

MAGV/2K4/CONSTRUCTION
302121138.xls / Physical Accomplishment (REA-E)

TOTAL
APPROVED
UNIT
UNIT
QUANTITY
COST
Project Engineer, CDC - ECMD

ACCOMPLISHMENT (%)
AMOUNT

% WT.

PREVIOUS

Construction Div. Head, CDC-ECMD

THIS PERIOD

TOTAL TO DATE

CLARK DEVELOPMENT CORPORATION


Engineering, Construction and Maintenance Department

ACCOMPLISHMENT REPORT
as of ____________________________, 2015
A. PROJECT DATA

C. DESCRIPTION OF WORK PERFORMED

Project Title

Loction

Contractor
Project Manager
Original Contract Amount

:
:
: Php
: Php
:
:
:
:

Revised Contract Amount

Starting Date
Original Completion Date
Revised Completion Date
Remaining Time
B. WORK PROGRESS
% Completed
Previous
This Period
To Date

D.
Scheduled

Previous

Actual

Slippage

This Period

To Date

BRIEF ON THE DELAYS, MAJOR PROBLEM/SOLUTION/RECOMMENDATION

Material Cost
Labor Cost
Equipment Cost
Prepared by :

Project Engineer
MAGV/2K4/CONSTRUCTION
302121138.xls / project data (REA) (MMP)

Checked/Verified by :

MELQUIADES M. PINEDA
Project Engineer

Noted by :

RENE E. ABAD
Construction Div. Head

CLARK DEVELOPMENT CORPORATION


Engineering, Construction and Maintenance Department

Contractor

MAGV/2K4/CONSTRUCTION
302121138.xls / project data (REA) (MMP)

CDC-ECMD

CDC-ECMD

CLARK DEVELOPMENT CORPORATION


Engineering, Construction and Maintenance Department

Project

Location

Date Started
Date of Completion
Report No.
Remaining Days

:
:
:
:

WEEKLY ACCOMPLISHMENT REPORT


FOR THE PERIOD OF _________________________, 2016

ITEM

ACTIVITIES/DESCRIPTION

TOTAL
APPROVED
QUANTITY

ACCOMPLISHMENT (%)
UNIT

UNIT
COST

AMOUNT

% WT.

PREVIOUS

THIS PERIOD

TOTAL TO DATE

4.00%
4.00%

TOTAL CONTRACT AMOUNT

Prepared by :

MAGV/2K4/CONSTRUCTION
302121138.xls / Physical Accomplishment (RE (MM

0.00

8.0%

Checked by :

Noted by :

MELQUIADES M. PINEDA

RENE E. ABAD

0.000%
Err:522
TOTAL TO DATE
Less Programmed
Slippage (+)

0.000%

CLARK DEVELOPMENT CORPORATION


Engineering, Construction and Maintenance Department

Project

Location

Date Started
Date of Completion
Report No.
Remaining Days

:
:
:
:

WEEKLY ACCOMPLISHMENT REPORT


FOR THE PERIOD OF _________________________, 2016

ITEM

ACTIVITIES/DESCRIPTION

Project Engineer, Contractor

MAGV/2K4/CONSTRUCTION
302121138.xls / Physical Accomplishment (RE (MM

TOTAL
APPROVED
UNIT
UNIT
QUANTITY
COST
Project Engineer, CDC - ECMD

ACCOMPLISHMENT (%)
AMOUNT

% WT.

PREVIOUS

Construction Div. Head, CDC-ECMD

THIS PERIOD

TOTAL TO DATE