Brochure DK 2015 New 1936

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

DK ENGINEERING

Head ofce: Dong Xuyen Industrial Zone, Rach Dua Ward, Vung Tau City, S.R. Vietnam
Branch ofce: No. 02 Pham Ngoc Thach Street, Ward 9, Vung Tau City, S.R. Vietnam
Tel:+
 84 64 3596 970
Fax:+
 84 64 3596 566
Website:h
 ttp://www.dkengineering.com.vn
E-mail:d
 k@dkengineering.com.vn
Tax Code:3
 500816144

DK ENGINEERING

Delivering solution, Expanding customer value

DK ENGINEERING J.S.C

ABOUT US

HUMAN RESOURCE
Company Prole
DK Engineering Joint Stock Company was established in the year 2007 in
Vietnam. We provide engineering design, procurement support, fabrication,
installation and operation support services to the oil and gas upstream and
midstream sectors. Operation head quarter is located in Vung Tau City of Vietnam,
we are recognized as one of well-known engineering and consulting service
provider in the regional oil and gas market.

With experienced Technical & Managing Staff


whom have being taken part into many onshore &
offshore projects in the eld of Oil and Gas which
include: Civil, Structure, Process, Mechanical and
E&I for over 10 years, We assure that we will bring
to you the best services with high quality, reliability,
effective cost-benet target, and best progress.

Our Vision
DK Engineering becomes a favored engineering and consulting company in
the oil and gas industry.

Our Mission

Our team:
- Fabrication section: 50
- Engineering section: 50
- Procurement, business development: 10
- R & D: 03
- Accountant, admin: 07
- QA/QC: 05

DK Engineering is engaged in providing engineering and consulting services of


innovative solutions, high quality, competitive prices and timely delivery for
the customers.

Statement Of Operation Policy


We are committed to deliver excellent services to the oil and gas industry.
By providing sound engineering solutions to our customer, we are making
outstanding effort to expand the customer value.
All DK Engineering employees are guaranteed to make uninterrupted improvement
on each task, product and service that ensure delivering high quality services
and secure a sustainable growth since our establishment.

ORGANIZATION CHART- GENERAL

Managing
Director

Deputy
Directors

HR Dept

Engineering
Section

Procurement
Dept

Business
Development Dept

R&D
Dept

Accountant
Dept

Fabrication
Section

Process Dept

Mechanical WS

Mechanic Dept

E&I WS

Structure Dept

HSE Dept

QA/QC
Dept

Piping Dept

E&I Dept

DK ENGINEERING

Delivering solution, Expanding customer value

DK ENGINEERING J.S.C

WORKSHOP, EQUIPMENT, MACHINES

COMPUTER SOFTWARE CAPABILITIES


We have specialized software to use for specic engineering disciplines as follows:
Process Engineering
HYSYS: Process simulation
Olga: Piping System
Aspen One Exchanger Design Desktop: Heat Exchanger, Air Cooler Calculation
NEC acostix: Exhaust silencing, Wall/Partition Design, Genset Acoustic Enclosure
Mechanical Engineering
CAESAR II: Piping stress analysis and design
PVElite: Pressure vessel and tank design analysis software
MATHCAD: Programming software
Microsoft Excel: In-house developed spreadsheets
Solidwork
Compress: Engineering for pressure vessel, ASME VIII-1 design capabilities
Electrical Engineering
CAPTOR: Electrical system design

It.
I
II
III
IV
V
VI
1
2
3
4

LIST OF TOOL AND EQUIPMENT


WELDING EQUIPMENT
LIFTING EQUIPMENT
CUTTING AND DRILLING
EQUIPMENT
QA/QC EQUIPMENT
HAND TOOL
OTHER EQUIPMENT
Water jet CNC machine
High pressure pump
Air compressor machine; 5HP
Water tanks

Specication

37kg/cm3
5 HP 10kg

Ea
Set

Q'ty
Bougth
Rend
15
27

Ea/Set

48

Ea
Ea/Set

11
105

Ea
Ea
Ea
Ea

1
1
1
1

Unit

Structural/Civil Design Analysis Software


Staad Pro. Version 8i,
Staad Offshore
SACS: Offshore structural analysis software
SAP 2000, Version 14: Structural analysis software
GRLWEAP: Pile driving simulation software
GEO SLOPE/W: Soil slope stability analysis software
Pipeline Analysis Software
OFFPIPE: Pipeline installation analysis software
SAGE Prole: Pipeline stability and stress analysis software
Auto pipe: Pipeline stability and stress analysis
Project Management
Microsoft Project
Primavera
Drafting
AutoCAD R 2006, 2D & 3D drafting software
PDMS: 3D computer aid design software
Cadworx 2013
Smart plan 3D

DK ENGINEERING

Delivering solution, Expanding customer value

DK ENGINEERING J.S.C

CORE SERVICES
Engineering consultant
We, specially, provide engineering design, project management, survey
services,report on technical evaluation & cost estimation such as:
Pressure Vessel & Tank
Process Equipment : Chemical injection skid, Fuel Gas Skid
Metering System: Ultrasonic, Orice, Turbine, coriolis, metering
Heat transmission equipment: Exchanger, Air Cooler, Heater.
Separation & Filtration System: 02 phases/03 phases, Degasser, lter,
oily water system
Processing plant, Compressor station, Generator Enclosure...
Offshore Production Platform
Onshore and offshore pipeline
Electrical, Instrumentation, Automation and Control System

CORE SERVICES
Fabrication Section
Pressure Vessel & Tank
Process Equipment : Chemical injection skid, Fuel Gas Skid
Construction of Processing plant, Compressor station, Generator Enclosure
Metering System: Ultrasonic, Orice, Turbine, Coriolis, metering
Heat transmission equipment: Exchanger, Air Cooler, Heater
Separation & Filtration System: 02 phases/03 phases, Degasser, lter, oily water
Pipeline System
Electrical, Instrumentation, Automation and Control System
Moreover, We can provide engineering solutions with modication & maintenance Services for Process System, Piping System

DK ENGINEERING

Delivering solution, Expanding customer value

DK ENGINEERING J.S.C

TYPICAL COMPLETED PROJECTS

Electrical,
Instrumentation,
Automation and
Control System

Engineering & assembly


HVAC system For FPSO - 2014

Installation Control cabinet GDC/PCS & GDC/SIS - Yokogawa - 2014

Engineering & Installation DCS Control System - Thai Binh - Ham Rong - BK15 - 2014

Engineering & assembly Heater Control Panel For TBHR Project-2014

Power Distribution Cabinet System Of PVC-MS - 2015

10

Engineering & assembly of the LV & HV Electrical System


for Meisheng Textiles Factory-2009

Engineering & Procurement & Construction Cathodic Protection system


For Ba Ria Phu My - PVGAS- 2014

Provision Of H4 EDG-MT Synchronizationn Cabinet


of Hoang Long JOC - 2015

11

DK ENGINEERING

Delivering solution, Expanding customer value

DK ENGINEERING J.S.C

CORE SERVICES

CORE SERVICES

CNC Water Jet Cutting

Procurement

SMART JET MODEL RANGE

Exactly, Quickly & competitive Price is our slogan. Let us to be your Partner for an optimized & renovated Products.
Familiar with Materials and Equipment in Oil and Gas Industries compliance with International standards:
ASME, ASTM, BS, API,
Qualied, experienced personnel in oil and gas projects.
Out source from all over the world as per Clients vendor list Inspection companies: ABS, DNV, LR, ASME
Provides internal part for process equipment : Separation, Filtration ....
(Herein known as distributor of Rhine Ruhr)

This is high pressure water jet cutting CNC machine.


Machine General Information
Dimensions Of Working Area: 8000 X 2000 mm
One Z-Support With An Elevation Of 100 Mm
High Quality Linear Motion
Hardened And Cut Racks And Pinions
Precise Compact Planetary Drives
All The Linear Axis Are Covered By Bellows
Stainless Steel Casing
Proportion Dose Of Abrasive
Optional Equipment:
Height Sensor
Remote Control
Linear Positional Accuracy +/- 0,08 Mm
Repeatability +/- 0,05 Mm
Maximum Working Speed 10 000 Mm/Min
Maximum Traverse Speed 20 000 Mm/Min
The Table Is Measured By Laser Interferometer
After Installation
Accuracy Values And Measuring Methods Are
Based On Iso 230-2 Standards.

Advantage:
Accuracy
No thermal deformation
Fastest
Protect environment

Contact information:
Phone: 0643.596.970 Fax: 0643.596.566
Mr. Ng - Director
Cell phone:0913863675 - Email: ngu-vv@dkengineering.com.vn

DK ENGINEERING

DK ENGINEERING J.S.C

Delivering solution, Expanding customer value

TYPICAL COMPLETED PROJECTS

Thai Binh - Ham Rong Gas Distribution And Gathering System Project, Block 102&106, PHASE 01 - 2015

12

Gas Distribution Pipeline And Metering Skid Project-phase 2 - Ton Phuong Nam - 2014

13

DK ENGINEERING

Delivering solution, Expanding customer value

DK ENGINEERING J.S.C

TYPICAL COMPLETED PROJECTS


Rang Dong Field Development - JVPC - 2015

Ba Ria GDS Project

Engineering, Procurement and Fabrication of


PVGAS GPMB - 2012

The feasibility study for slot extension of WHP-S1

Engineering New WHP-NE structural feasibility study

Engineering for Additional POB To NULQ Living Quarters Module

14

Engineering, Procurement and Fabrication of Pig System


PVGAS GPMB - 2012

Ca Mau Gas Processing Plant


PM3 Gas Booster Compressor Package - 2013

Engineering & Provide Equipment and Packages:


- Modied Cold Vent
- Closed Drain Vessel
- Fast stop Valve for gas turbine compressor

- Seal gas system for gas turbine compressor


- Nitrogen system
- Open Drain Tank

- Instrument Air Receiver Vessel


- Utility Air Receiver Vessel
- Control System

15

DK ENGINEERING

Delivering solution, Expanding customer value

DK ENGINEERING J.S.C

TYPICAL COMPLETED PROJECTS


TYPICAL COMPLETED PROJECTS
Open & Closed Drain Skid

TGT Project: Provision of engineering design for the Open & Close Drain Skids
Hoang Long Joint Operating Company - 2011

Engineering, fabrication for Hot Water Skid - VSP - 2015

Engineering for Separator And PW Degasser Skid


Cairn Enegy India Pty Ltd(CEIL) - 2012

16

Closed Drain Skid

Dragon Tortoise Gas Utilization Project


Provision of engineering design for Closed Drain Skid - PVSEG - 2010

Air Cooler

Engineering, procurement, assistant fabrication of Air Cooler - 2014

Provision of engineering design for Chemical Injection Skid - PCVL - 2010


Engineering, procurement, fabrication & installation of Heater Bundle (PVGas- 2014)

Engineering for Hypochlorite Injection Skid PK 5002 A/B


LPG Refrigerated Storage Thi Vai - PVGAS - 2011

Tan Phuoc Khanh Pipeline and Gas Metering Skid - 2010

Engineering, fabrication & installation of Heating Coil (PVGas- 2015)

Provide internal part for PVEP - 2014

Low Pressure Gas Distribution System For Pomina Steel Project - 2012

17

DK ENGINEERING

Delivering solution, Expanding customer value

DK ENGINEERING J.S.C

TYPICAL COMPLETED PROJECTS

OUR MAJOR CUSTOMERS

HST Full Field Development & HSD Early Production System Development
Client: Thang Long JOC - Year of Completion: 2012

Chemical Injection Skid

Open Drain Pump HST/HSD

Potable Water Tank HST/HSD

Rhine Ruhr - Australia

Potable Water Tank HST/HSD

Provision of engineering design for the Fuel gas conditioning


Te Giac Trang H01- H04 Field Development (Hoang Long J.O.C)-2011

18

Chemical Storage Tank HST/HSD

Provision of engineering design for the Fuel gas skid


Bien Dong Phase 1 Project (Bien Dong P.O.C)-2011

19

LIST OF MAIN PROJECTS


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

35

36
37
38
39
40
41
42
43
44

45

46
47

48

20

49
50

PROJECT/WORK DESCRIPTION
Engineering for modica on of DK I/2 & I/9 Pla orm
Chemical Injec on Skid CIS - Pearl Pla orm
Engineering for close drain vessel - Pearl Pla orm - PCVL
Supply cathodic materials/equipment for gas pipe line
Engineering for gas pipe line system
Engineering for oshore facili es - BP
Piping stress analysis
Engineering for u lity gas condi oning skid (UGS) Pearl Pla orm- PCVL
Engineering for oshore container - Schlumberger
Stress analysis piping - Ruby B
Calcula on of rolling coil
Engineering for pour point depressant (PPD) Tank - PCVL
EPC of gas pipeline and metering kid
Engineering for nitrogen skid - Pearl project
Calcula on of life ra
Engineering for gas lter, gas scrubber, are scrubber, test separator, HHP separator.
Engineering for chemical injec on skid Dai Hung 2 (COR & PPD)
Engineering for modica on of process equipment - Dinh Co GPP
Engineering for modica on of DK Pla orm
Calcula on & Engineering for chemical tank
Design & Installa on and commissioning of the LV & HV Electrical System
Engineering for pressure vessel - LPG
Engineering for chemical injec on skid - JVPC -7-09
Engineering for HT Company workshop
Engineering for Alpha ECC workshop
Engineering for chemical injec on skid - TOPAZ
Engineering and Installa on of 3000 kVA transformers for Meisheng Tex les factory
Installa on of electrical system 22kV for Meisheng Tex les factory
EPC of electrical distribu on system - Meisheng Tex les factory
Supply of 01 No. MSB & 04 Nos. of SSB
Pipe stress analysis
Engineering and installa on of gas pipeline
Detailed engineering for Alpha ECC workshop including electrical system.
Engineering of oshore pipeline Van Phong Project
Engineering for dragon tortoise gas u liza on project
1.Close drain drum
2.Open drain tank
3.Slug catcher
4.Flare scrubber
Engineering for chemical system ( pump skid)
Engineering for Te Giac Trang H01 project
1.Open & close drain package
2.Fuel gas condi oning skid
Engineering For Acquire
Survey, design, engineering, cost es mate for construc on of 8 nitrogen pipeline and 2
hydrogen pipeline
Engineering for open drain tank Dai Hung 2 Project
EPC of Tan Phuoc Khanh Gas pipeline and metering skid
Design, engineering, cost es mate for construc on of bypass pipe for heaters E -401A/B/C at
Phu My GDS
Design, engineering, cost es mate for modica on of isolated valves for PSVs - Phu My GDS
Engineering for Air Receiver PV Shipyard
Engineering For Su Tu Trang Project
1. Instrument Air Receiver -MBL-6470
2. Fuel Gas Scrubber-MBF-5730
3. Flare Scrubber -MBF-4324
4. Test Separator - MBD-2920
5. Hazardous Opened Drain Tank -Abj-6201
6. Methanol Storage Tank - MBJ-4810
7. Pipeline Pig Launcher -KAH-3010
8. Pipeline Pig Receiver -KAQ-2020
Design, engineering, cost es mate for modica on of instrument air system - Phu My GDC
Engineering for modica on of product input & output system
Engineering For Su Tu Trang Project - CIS
1, ZZZ-4200
2, ZZZ-4815
3, ZZZ-4215
Calcula on, engineering for BK3/BK10 process equipment
Calcula on engineering for sprinkler vessel RC1 -RC3 Produc on pla orm complex

Delivering solution, Expanding customer value


OWNER
Ministry of Defense of Vietnam
PCVL
PCVL
PVC PT
PVC PT
BP
JVPC
PCVL
Schlumberger
PCVL
KNOC
PCVL
My Xuan Ceramics Co., Ltd
PCVL
JVPC
PVEP
PVEP
PVGAS
Ministry of Defense of Vietnam
PVGAS
Meisheng Tex les Vietnam
Meisheng Tex les Vietnam
JVPC
Heat treatment company
ALPHA ECC
PCVL
Meisheng Tex les Vietnam
Meisheng Tex les Vietnam
Meisheng Tex les Vietnam
Meisheng Tex les Vietnam
JVPC
SSC
ALPHA-ECC
VAN PHONG

YEAR
2007
2007
2007
2007
2007
2007
2008
2008
2008
2008
2008
2008
2008

No.
51

52

53

JVPC

2010

PVGAS

2010

EPC of Dong Xuyen Port outdoor ligh ng system

Dong Xuyen Port J.S.C

2011

Bien Dong POC

2011

56

Calcula on and consultancy of DK14-15M installa on method statement

Vietsovpetro JV

2011

57

EPC of instrument air for PVGAS Service workshop

PVGAS Service

2011

2008
2008

58

Prepare investment project for construc on of Dong Xuyen Port

Dong Xuyen Port

2011

2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2009
2009
2009
2009
2009
2009
2009
2009

59

Installa on supervision consultancy of Rang Dong Bach Ho pipeline improvement to 4 mill cubic
meter of Gas/day

PVGAS

2011

60

Engineering for booster compressor suc on scrubber 230 -V-2501

KNOC

2011

61

Engineering for Rang Dong Field Development Project


1. Pump skid RDF-SK- 4900 & RDF- SK-4901
2. Biocide injec on RDF-Skid SK- 4915

JVPC

2011

62

Design, engineering, cost es mate for ma ress covering Bach Ho Long Hai pipeline

PVGAS

2011

Hoang Long JOC

2011

PCVL
PVGAS
PVGAS

2011
2011

Vietsovpetro JV

2010

Hoang Long JOC

2010

Vietsovpetro JV

2010

Air Liquide Vietnam

2010

PVEP
TPK Produc on and Commercial

2010
2010

PVGAS

2010

PVGAS
PV SHIPYARD

2010
2010

63

64
65
66
67
68
69
70
71
72
73

75

Engineering for liquid trap


Provision, installa on of 200A Ac ve harmonic lter Topaz pla orm
Structure Calcula on for Basket
Calcula on and engineering for oshore containers
Engineering for HST-HSD Project
1. Closed drain vessels
2. Pig launcher & pig receiver
3. Chemical storage tanks & open drain tanks
Engineering for Pressure Vessels - DANIELI

PCVL
KNOC
KNOC
JVPC
Bien Dong POC
PCVL
JVPC
Baker Hughes

2011
2011
2011
2011
2011
2011
2011
2011
2011

Thang Long JOC

2011

DANIELI VN
JVPC
Thang Long JOC

2011
2012
2012

79

Engineering for compact manifold of Thang Long Dong Do Project

Lam Son JOC

2012

80

Calcula on and engineering for compression & water injec on structure pla orm -JVPC

JVPC

2012

81

Installa on of E & I system, civil work - low pressure gas distribu on system for Pomina steel
project

PVGASD

2012

Ministry of Defense of Vietnam


JVPC
R&D Co.,
GE
JVPC
PVGAS

2012
2012
2012
2012
2012
2012

PVGAS

2012

Thang Long JOC

2012

Thang Long JOC

2012

PVGAS

2012

PVGAS

2012

Thang Long JOC

2012

Lam Son JOC

2012

82
83
84
85
86
87

91

Engineering for Modica on of DK I/14 & I/15 Pla orm


Calcula on and Engineering For Boat Landing - JVPC
Engineering for Jack - up
Engineering for mixed bed vessels
Engineering for C1 Temporary ladder
Engineering for maintenance of Phu My - HCM pipeline
Examining and verifying of engineering documents for GPP Ca Mau PM3 Gas Booster
Compression Package
Engineering For HST Full Field Development & HSD Early Produc on System Development:
Potable Water Tank, Flush Water Tank
Engineering for HST Full Field Development & HSD Early Produc on System Development:
1.HST - Diesel Loading Filter (01F -4410)
2.HSD - Diesel Loading Filter (02F -4410)
3.HST - Diesel Transfer Filter (01F -4420)
4.HSD - Diesel Transfer Filter (02F -4420)
Engineering for pig trap skid Ba Ria GDS

92

Engineering for gas lter separator skid Ba Ria GDS

89

90

2010

93
2010
2010

Engineering For U lity Gas Scrubber Ruby B


Engineering for Super gas heater - booster compressor Project
PMC of Super gas heater- booster compressor Project
Engineering for CLPP Flare Boom

Engineering for CLPP barge bumper Rang Dong eld development


Calcula on, engineering for sand je ng HST-HSD Project

2010

2010
2010

Engineering for Te Giac Trang - H04 Project


1, Open & closed drain package
2, Fuel gas condi oning skid
3, Diesel condi oning
Engineering for LP Test Separator
Engineering for Thi Vai LPG refrigerated storage
Engineering For Corrosion Inhibitor System

76
77
78

88

Vietsovpetro JV
Vietsovpetro JV

2010

Engineering for fuel gas skid - Bien Dong Phase 1 Project

2009

Cuu Long JOC

YEAR

55

PVGAS

PVGAS
PMPC

Examining and verifying of engineering documents for Rang Dong Bach Ho pipeline improvement
to 4 mill cubic meter of Gas/day

OWNER
PVD Training

54

74

Cuu Long JOC

PROJECT/WORK DESCRIPTION
Calcula on engineering for life ra pla orm
Pipe stress analysis for Rang Dong Field Development Project
1. Whp-S1,S1-8P produc on owline
2. WHP-N1, N1-5i Flowline & Extension Of N1w1 Manifold
3. Whp-N1, N1-6i Flowline & Line No. 6"-Wi-F-993
4. CPC-CLPP,CLPP closed drain discharge line
( ECR-270)

94

Engineering for HST Full Field Development & HSD Early Produc on System Development:
1.HST - close drain transfer pumps 01P -6010A/B
2.HSD - open drain transfer pumps 02P -6110A/B
3.HSD - close drain transfer pumps 02P -6010A/B
Engineering for Atmospheric Rectangular Tank

21

LIST OF MAIN PROJECTS


No.
95

OWNER

YEAR

Lam Son JOC

2012

PVPIPE J.S.C
PV Tran
Lam Son JOC
Lam Son JOC
Lam Son JOC
PVGAS

2012
2012
2012
2012
2012
2012

JVPC

2012

96
97
98
99
100
101

- 01 FWS Pig Launcher (Tag No. L-0921)


- 01 FWS Pig Launcher (Tag No. L-0901)
Prepare investment project for construc on of PVPIPE sample work shop
Survey and engineering HVAC system - EPSO - Block 12W Development Project
Engineering for Thang Long Dong Do open drain pump skid
Calcula on, engineering for CO2 Vent Snung system - Thang Long Dong Do Project
Calcula on, engineering for Nitrogen Bo le Rack Skid - Thang Long Dong Do Project
Calcula on, engineering for LPG Hai Phong storage widening

102

Calcula on, engineering for gangway on E1A

103

Pipe Stress Analysis - C1-8P

JVPC

2012

104

Calcula on, engineering for xing boxes

Baker Hughes

2012

105

Calcula on, engineering for sand je ng - Thang Long Dong Do Project

Lam Son JOC

2012

106

Calcula on, engineering for Degasser

107

Nui Phao Mining Project

108

Calcula on, engineering for Heat Exchanger

109

Injec on Water Filter Skid

110

Supply of Separator and PW Degasser Skid

111

Calcula on, engineering for Heat Exchanger

112

Modica on for H6, H7, H9 & H11 - Dinh Co - Thi Vai piping
Calcula on, engineering for Pipe stress analysis for Flowline & Gasli - WHP-E1A-16P

113

117

Diamond Project:
Calcula on, engineering for :
1. Chemical Injec on Skid
2. Fuel Gas Skid
3. Launcher
4. CO2 Vent Snung
5. LP-HP Separator Skid
6. Nitrogen
7. Open Drain Pump
8. Sample connec on packages
9. Tote tanks
PM3 Ca Mau Booster Compressor Project:
1.
Gas turbine Compressor sta on detail design included:
- Civil engineering
- Structural engineering
- Mechanical engineering
- Piping engineering
- Process engineering
- E & I engineering
- Gas turbine fuel gas system
- Fire & Gas and re gh ng engineering
2. Provide Equipment and Packages:
- Modied Cold Vent
- Closed Drain Vessel
- Fast stop Valve for gas turbine compressor
- Seal gas system for gas turbine compressor
- Nitrogen system
- Open Drain Tank
- Instrument Air Receiver Vessel
- U lity Air Receiver Vessel
- Control System
Engineering for gas pipeline 10 " Nghe An
Engineering for Injec on Compression Suc on Scrubber Package

118

Engineering for Anode - STN-N & STN-S Caisson Project

119

Engineering for Hydrate Inhibitor Injec on Package

120

Engineering for Oshore Store Containers

121

Engineering for U lity Gas Heater

122

Engineering for Nitrogen Rack package

123

Engineering for Subsea Valve skid

124

Engineering for Subsea Pipeline

125

Engineering for Su Tu Nau Field Development Project


A. Su Tu Nau South Pla orm
1.
Alloca on Separa on
2.
Produc on pipeline pig launcher
3.
Produc on pipeline pig receiver
4.
Fuel gas scubber
5.
Flare scrubber
6.
Instrument air receiver
7.
Hazardous open drain tank
8.
Diesel Loading Filter
9.
Diesel Transfer Filter Coalescer
10. Fuel Gas Filter
11. Chemical Injec on skid (ZZZ-4230)
A.
Su Tu Nau North Pla orm
1.
Produc on pipeline pig launcher
2.
Fuel gas scubber
3.
Flare scrubber
4.
Instrument air receiver
5.
Hazardous open drain tank
6.
Diesel Loading Filter
7.
Diesel Transfer Filter Coalescer
8.
Fuel Gas Filter
9.
Chemical Injec on skid (ZZZ-4240)

114

115

116

22

PROJECT/WORK DESCRIPTION
Engineering for Thang Long Dong Do pig receiver/launcher:

Delivering solution, Expanding customer value


No.

PROJECT/WORK DESCRIPTION

126

Engineering for U lity Gas Scrubber On RBDP-A Pla orm

127

Engineering for Pressure Vessel &Provision Of Internal part For Dai Hung 1

128

Noise survey and remedia on In armada TGT1 FPSO

129

Reanalysis for LPG Go Dau storage

130

WHP-S1 structure in-place reanalysis

131

Structure in-place reanalysis N1-LP-HEADER-CLPP

132

Engineering, Provision of Inlet Gas Metering System At Dinh Co Gas Processing Plant ( 16 class
900; 3 class 600)

133

Supply Of Spreader Bar 40T & Plate Clamp For PV PIPE

134

Engineering, Provision Gas Distribu on Pipeline and metering skid

135

Project: Underground Oil Storage Terminal In Quang Ngai Province, Vietnam


Item: Crude Oil Pipeline Underground Oil Storage Binh Son Renery

TNK

2012

NuiPhao

2012

Cuu Long JOC

2012

136

Re-analysis fa gue life P8-P10-JVPC

Petro 6 - India

2012

137

Engineering and fabrica on for 3 phase Separator Skid

Petro 6 - India

2012

PVGAS-PMC

2013

PVGAS SE

2013

JVPC

2013

138

Thai Binh - Ham Rong Gas Distribu on And Gathering System Project, Block 102&106 , Phase 01.
Engineering and fabrica on for:
1. TBHR-PAC01-Corrosion Inhibitor Skid
2. TBHRPAC10-LP Separator/ Filter Separator
3. TBHRPAC11-Condensate Preheater-Heater
4. TBHRPAC18 Cathodic Protec on System

PCVL

2013

PVGAS

2013

HDTDCTX Cua Lo

2013

JVPC

2013

Cuu Long JOC

2013

JVPC

2013

Vietsov Petro
PCVL

2013

Thang Long JOC

2013

PV Gas-JVPC

2013

JVPC

2013

Cuu Long JOC

2013

2013

OWNER

YEAR

Thang Long Joc

2014

PVEP -DAI HUNG

2014

VSP

2014

PVGAS -KVT

2014

JVPC

2014

JVPC

2014

PVGAS -DVK

2014

PV Pipe

2014

Ton Phuong Nam

2014

PV OS

2014

JVPC

2014

Rhine Ruhr - Australia

2014

PVGAS

2014

139

EPC of Diesel generator enclosure

Vietsovpetro

2014

140

Engineering and fabrica on for Metering Skid (Dai Hung GGP)

PVEP POC

2014

141

Engineering & assembly Control Panel For Yokogawa

Yokogawa

2014

142

Engineering & assembly Heater Control Panel For TB -HR Project

PVGAS

2014

143

BK14/BT7 - Engineering & assembly PCS & DCI system/Marshalling cabinet GA/IA

Vietsovpetro JV

2014

144

Engineering, Provision of S&T Heat Exchangers Thi Vai

PVGAS-DVK

2014

145

Provision Of Designing Materials, Onshore Fabrica on And Oshore Installa on O The VRC
Pneuma c Star ng System At RBDP -B Pla orm, Block 01&02, Oshore Vietnam

PCVL

2014

146

Engineering and fabrica on For Gas Pump Injec on Skid (Gas Pump Skid ZZZ-4278) STV-RD

PVGAS-DVK

2014

147

Engineering, Provision of Gas Chromatograph GC -1601-DVK

148

Engineering & Fabrica on Portable Water Filter - BK.TNG Wellhead Pla orm project

149

Engineering & installa on for HVAC-04 system

PVGAS-DVK

2014

Vietsovpetro JV

2014

PVGAS-DVK

2014

Rhine Ruhr - Australia


-SENEX

2015

PVGAS

2015

Vietsovpetro

2015

150

Engineering and fabrica on for 3 phase Separator Skid - No.02

151

Engineering for SSIV Skid, 16" pipeline Rang Dong-Bach Ho/Riser Block

152

Engineering & Fabrica on for BK.TNG Wellhead Pla orm Project:


1. Foam skid 2. Hot Water Skid 3. Chemical Injec on Skid (68AQ -01)

153

Rang Dong Field Development:


Engineering Living Quarters Extension In NULQ

JVPC

2015

154

Consul ng, report on technical evalua on & cost es ma on for external storage & gas pipeline
form Hon La port to Kham Muon

PTSC

2015

155

Engineering & Procurement & Construc on Module ER Probe

PVGAS-DVK

2015

156

Report on technical evalua on & cost es ma on for H1.H2.H4.H8.H13. L1 -H3-L4-H5-H12H14/2015

PVGAS-DVK

2015

157

Pipe stress analysis of E1 -22P ownline & gasli line in WHP-E1 & WHP-S1

JVPC

2015

158

Re Analysis, engineering for transporta on & replacement Interstage Cooler

Alpha -ECC

2015

159

Provision of Hea ng Coil Water Bath

PVGAS-DVK

2015

160

New WHP-NE Structural Feasibility Study - Rang Dong Field Development

JVPC

2015

161

The Feasibility Study For Slot Extension Of WHP -S1

JVPC

2015

162

Provision of Closed Drain Vesse l& HP Flake K.o Drum

Vietsovpetro JV

2015

163

Provision internal part for Thien Ung project

Vietsovpetro JV

2015

164

Provision, fabrica on, installa on for electrical cabinets for Hai Su Den Rig

Vietsovpetro JV

2015

165

Engineering Subsea check valve with spool in Rang Dong Field

PVGAS-DVK

2015

166

Provision, fabrica on, installa on for Hea ng-Coil

PVGAS -DVK

2015

167

Report on technical evalua on & cost es ma on for PM2.1& PM 4 Pipeline

PVGAS -VCKDNB

2015

168

Engineering, fabrica on, installa on Phu My - Ho Chi Minh Pipeline - Install Pig Sta on At Nhon
Trach GDS

PVGAS -DVK

2015

169

Engineering, fabrica on, installa on Heat Exchanger

PPS

2015

170

Site survey for S1 -8P and 2I-LTPT gaslif line and modify EOR owline

JVPC

2015

171

Modifyca on Of CPP-STV Chemical Injec on Package

PVGAS -DVK

2015

172

Provision, fabrica on, of Filter Separator - GDC Phu My

PVGAS -DVK

2015

23