Protocol
Has MOC been applied to the following
types of changes at the facility in the last
twelve months:
Process changes (hardware,
process control, process condition
changes)?
Procedural changes that affect AIPS critical content?
Temporary override of
safeguarding systems
Operations procedure temporary
variance
Asset abandonment and
restoration
Asset and (maintenance &
Inspection) activity registration and
deletion
Control of portable temporary
equipment
Other changes, e.g. critical
drawings and document
amendments, organisational
changes, etc.
Y / N / NA & Evidence
Possible approaches
Refer to PR-1001a
Refer to PR-1001c
Refer to PR-1001e
Refer to PR-1164 and PR-1419
Refer to PR-1344 and PR-1528
Refer to PR-1960
E.g. ask who is the asset focal point for
updates to critical drawings and
documents, etc.
SN
13.3
13.4
13.4
.1
13.4
.2
13.4
.3
13.4
.4
13.4
.5
13.4
.6
13.4
.7
Protocol
Y / N / NA & Evidence
Possible approaches
Ask the PSEC.
Refer to PR-1001a
Refer to PR-1001c
Temporary override of
safeguarding systems
Operations procedure temporary
variance
Asset abandonment and
restoration
Asset and (maintenance &
Inspection) activity registration and
deletion
Control of portable temporary
equipment
Other changes, e.g. critical
drawings and document
amendments, organisational
changes, etc.
Refer to PR-1001e
Refer to PR-1164 and PR-1419
Refer to PR-1344 and PR-1528
Refer to PR-1960
E.g. ask to see a register of the critical
drawings and documents currently being
updated.
Facility _________________________________________________________________
Change Description__________________________________
SN
Question
Date____________
Change Ref.__________________________
Yes
No
Remarks
SN
13.1
13.2
13.3
13.4
13.5
13.6
13.7
Question
Yes
No
Remarks
SN
13.8
13.9
13.1
0
Question
Yes
No
Remarks