This document outlines safety lockout-tagout procedures for working on energized or de-energized equipment. It states that before any electrical unit is de-energized, it must be verified that all associated loads are disconnected and the unit is de-energized. No work can be done on a de-energized unit unless its energy isolating device has been properly locked out and tagged out. Only authorized and experienced personnel are allowed to perform lockout-tagout work. Proper coordination between project and site authorities is required before equipment is de-energized or work commences.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
188 views1 page
Safety Lockout Tag Out Procedure
This document outlines safety lockout-tagout procedures for working on energized or de-energized equipment. It states that before any electrical unit is de-energized, it must be verified that all associated loads are disconnected and the unit is de-energized. No work can be done on a de-energized unit unless its energy isolating device has been properly locked out and tagged out. Only authorized and experienced personnel are allowed to perform lockout-tagout work. Proper coordination between project and site authorities is required before equipment is de-energized or work commences.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
SAFETY LOCKOUTTAG-OUT PROCEDURE
For all activities on or near energized or de-energized equipment on which, affected
employee(s) could be exposed to potential start-up or release of a stored energy of such equipment, machine or part thereof while being worked on, the minimum requirement for this shall be observed on all applicable procedures and all relevant requirements of SADARA site procedures. Before any existing electrical unit is de-energized, it must be physically verified by the responsible foreman/supervisor in conjunction with the authorized plant personnel that all loads associated with that unit are under the circumstances shall, a de-energized unit verified to have been de-energized Under no circumstances shall, a de-energized unit or part thereof shall be worked on unless the energy isolating device of that unit has been properly lockout-tag out in an off position by the responsible originator or authorized representative. Specific unit or part thereof to be worked on must be legibly identified prior to starting work. Proper coordination between all responsible project and site authorities must be made prior to equipment de-energization or commencing any work on a DE energized unit or part thereof including restoration of the same. Only competent experienced personnel shall be allowed to perform the job including attendants required. The responsible crew supervisor / foreman or the authorized personnel originator shall ensure affixing his own lockout / tag-out device to all equipments DE energized isolating device i.e. Main power source and substation and local control switches(s) i addition to clients or the plant operations installed lockout-tag-out device before commencing any activity. The lockout-tag out device affixed by client. Plant operation or maintenance to the equipment shall not relieve Sharqawi crew from installing its own lockout- tag-out device. A safety checklist for equipment Lockout / Tag-out and restoring equipment to service shall be properly filled in by the authorized person to ensure safe work execution blank checklist forms shall be kept available at all times at the Sharqawi safety office. Sharqawi OSHA conforming Danger Do Not Operate laminated red tag shall be used as tag out device this device provides the following information: Identification of equipment out of service Reason for being out of service Approximate period out of service Name, badge and telephone no of originator Date and time of affixing number of originator Signature of the originator Lay down yard Materials /equipment arrangement