Pre-Bid Agreement for School Project

The document outlines a pre-bid agreement for the proposed two-storey Jaime Hilario Integrated School in La Salle, Bataan between the architect and potential bidders. It specifies that plans and documents are the property of the owner and must be returned within 2 days of contract award. Any discrepancies in drawings, specifications or site conditions must be reported immediately to the architect. Bidders are required to attend a pre-bid conference for clarification and to understand the plans fully. Sealed bids are due on July 12th, 2013 at 5:00 PM at La Salle Greenhills, with non-conforming bids subject to rejection. The architect and bidders agree to follow the

Uploaded by

Ponz Madiano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
220 views2 pages

Pre-Bid Agreement for School Project

The document outlines a pre-bid agreement for the proposed two-storey Jaime Hilario Integrated School in La Salle, Bataan between the architect and potential bidders. It specifies that plans and documents are the property of the owner and must be returned within 2 days of contract award. Any discrepancies in drawings, specifications or site conditions must be reported immediately to the architect. Bidders are required to attend a pre-bid conference for clarification and to understand the plans fully. Sealed bids are due on July 12th, 2013 at 5:00 PM at La Salle Greenhills, with non-conforming bids subject to rejection. The architect and bidders agree to follow the

Uploaded by

Ponz Madiano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROPOSED TWO-STOREY JAIME HILARIO INTEGRATED SCHOOL - LA SALLE

PRE-BID AGREEMENT

Date
Project

:
:

Location
Owner
Architect
Bidder

:
:
:
:

28th of June 2013


PROPOSED TWO- STOREY JAIME HILARIO INTEGRATED
SCHOOL - LA SALLE
Banawang, Bagac, Bataan
DE LA SALLE PHILIPPINES
Vicente R. Benito, Jr.
_____________________________________________

The Architect and the Bidder Agree as follows:


P.A. 100

Ownership of Documents
Plans, Specifications and other related Contract Documents are
the properties of the Owner and therefore they shall be returned
complete and in proper order, upon submittal of Bids but not
later than 2 days after the award of the contract. Failure to do
so shall mean forfeiture of Bid Deposits.

P.A. 100

Clarification of MEANING and/or DISCREPANCIES of


Drawings, Specifications and Site Conditions.
Any discrepancies found between the Drawings & Specifications
and Site conditions or any error, changes, or omissions in the
Drawings or Specification shall be immediately reported to the
Architect who shall promptly correct such discrepancies, errors
or omissions after his recovery.

VRB Architectural Services, SHALL NOT BE RESPONSIBLE FOR NON-CONFORMITY OF


BID DUE TO THE MISINTERPRETATION OF DRAWINGS, SPECIFICATIONS & SITE
CONDITIONS. Any work involving such discrepancies shall be done at the Contractors
risk.
P.A. 300

Conference prior to date of Bidding


Bidders are enjoined to confer with the Architect prior to bidding
date thru the Pre-Bid Conference or queries addressed thru fax.
All questions and discrepancies shall be clarified and explained
by the Architect on such conference or thru fax. Should there be
no questions asked, the Architect assumes that the bidder
understand the plans. Inform the Architect for clarification of
discrepancies. His discussion shall be final.

P.A. 400

Date of Bidding
Sealed proposal in duplicate using the sample bid form, retyped on the Contractors letterhead legal size paper kept inside
4 x 9 envelop shall be received on:

Date: 12th of July 2013

PRE-BID AGREEMENT
Page 1 of 2

PROPOSED TWO-STOREY JAIME HILARIO INTEGRATED SCHOOL - LA SALLE

Time: 5:00 PM
Place: La Salle Greenhills,
343 Ortigas Avenue,
Mandaluyong City
Failure to do so shall mean rejection of bid proposal & forfeiture
of bid deposits.
P.A. 500

Conformity to Bid-procedures
Right to reserved to Arch. Vicente R. Benito, Jr. to reject any or
all bids without explanations on the basis of non-conformity of
bid documents to procedures of bidding.
The Architect and the Bidders to this Agreement hereby agree
to full performance of the covenants contained herein.

______________________
VICENTE R. BENITO, JR.
Architect

PRE-BID AGREEMENT
Page 2 of 2

UAP

_________________________
Bidder

You might also like