NCR
NCR
Excavated area is to be smoothly grinded, welded and PT has to be done in front of client.
[13] Recommended Preventive Action (Required Yes
Preventive Action will be implemented.
Date:
(Print name)
(Sign name)
[16] Engineering Disposition Required Yes No
[17] Response Approved by:
Date:
(Print name)
[18] Verified by:
(Sign name)
(Print name)
DOC. NO.: QSR04-3
PAGE 1 OF 1
(Sign name)
Closed Date:
REV.: 02
NONCONFORMANCE REPORT
Report No.:
PEC/UNIT-3/NCR/001
Date of Issue:
03.04.2007
Form Contractors Inspector Name: R.SENTHIL KUMAR
General Information:
Material Description or item number: Plate & Angle As per attachment.
Purchase Order
Requisition
No.:QCSD9DO125
No.:QCS/50/00/ME
/RQ/Na/120-A
1. Nonconforming Conditions Detected:
As attached
We are aware of clients restricted origins of supply countries. In spite of our best efforts, we could not locate
certain materials (refer attached list) as allowed origins of supply countries. Keeping in view of clients delivery
schedule we had to resort purchase of materials from out side the allowable supply states.
To: CONTRACTOR:
Procurement Manager,
Quality Control Manager
From: Vendors Representative Name : V.J.ROY
Position:
Sr.Purchas
e officer
2. Vendors Recommended Disposition Plans:
Repair,
Re-work / Replace,
As attached.
Use-as-is,
These materials purchased with Mill T.C. & Heat marks. We are sure that the materials meet the Quality Control
requirements and we fabricated out of these materials.
3. Technical Justification:
As attached ____________________________
NONCONFORMANCE REPORT
As proposed by Vendor,
Position:
Date
Position:
Date
Signature:
Date:
As Proposed by Vendor,
As proposed by Contractor
Rejected,
With Comments as attached
Reviewed by Name:
Approved by Name:
8. Completion of Disposition Order:
Position:
Position:
with quality record,
with witness,
Date:
Date:
without quality record,
N/A
Position:
with review of quality record,
N/A
Position:
[2] NCR No.: GSCC/SHOP/ NCR # - 012