MT Procedure For MAG50
MT Procedure For MAG50
MT Procedure For MAG50
1.
PURPOSE
1.1
2.
SCOPE
2.1 The scope of this procedure
nondestructive testing personnel.
3.
is
for
all
NDT
Shop/Shop/Lab
REFERENCES
The following documents form a part of this procedure to the extent
specified herein:
3.1
BSS7040
3.2
ASTM E 1444-05
3.3
SNT-TC-1A
3.4
3.5
4.
5.
ISO 17025
AMS-2641
Base
3.6
AMS 3044
3.7
ASTM D 445
DEFINITIONS
4.1
4.2
4.3
4.4
4.5
PROCEDURE
5.1
This procedure meets the requirements of ASME and BSS 7040 and
must be accepted by the Responsible Level III.
5.2
Unless approved by the Responsible Level III, all parts will require
100% inspection. If partial inspection is performed, an illustration,
either a drawing or photo of the tested area, shall accompany the
NDT results.
5.3
Record Retention
5.3.1 Unless otherwise specified, all inspection documents, process
control log books, equipment performance, calibration records
and other documents required to produce or record inspection
Personnel Qualification
5.4.1 Personnel conducting Magnetic particle inspection shall be
qualified and certified in accordance with Qualification and
Certification Procedure for Motabaqah NDT Nondestructive
Testing Personnel, which is established from the American
Society of Nondestructive Testing Recommended Practice SNTTC-1A and NAS-410, latest revisions. Personnel holding Level
III certification in Magnetic particle inspection shall be
responsible for qualifying and certifying MOTABAQAH NDT
personnel as Level I and Level II in Magnetic Particle Testing. It
is the responsibility of Level I, and II Magnetic Particle
personnel to perform the examinations evaluate and record
the results according to this procedure.
5.5
Compliance
5.5.1 When customer purchase orders, manufacturers drawings or
manuals, or technical orders detail the requirements for
performance of the magnetic particle inspection, such as type
and rate of current, they shall be followed in lieu of the
requirements to this procedure. A copy of NDT requirements
from governing documentation shall accompany each work
order or each part when the governing documentation has
specific requirements for each part. Deviation from this
procedure requires approval from responsible Level III. For
components processed in-house, an initial review of the part
must be accomplished and Magnetic Particle Inspection
Technique Sheet be completed and approved by the
Responsible Level III.
5.5.1.1 Signed techniques are located in the MT
Shop/Shop/Lab and are filed in ring binders folder by
order of department in which the part is typically
worked; top assembly number and specific part
number. The index of technique sheet folder by
listing each part number filed and may be used by
the technician as a guide to locate the specific
technique in the binders.
5.6
Examination Sequence
5.6.1 Perform magnetic particle examination after all operations,
which might cause or reveal discontinuities. Such operations
include, but are not limited to, forging, heat treatment,
Preparation of Parts
5.7.1 The surface of the part to be examined shall be essentially
smooth, clean, dry, and free from oil, scale, machining marks,
or other contaminants or conditions that might interfere with
the efficiency of the examination. If prior operations have
produced a residual magnetic field that may interfere with the
examination, the part shall be demagnetized.
5.8
Traceability
5.8.1 Components submitted to MT Shop/Shop/Lab shall be
identified by Identification Tag, which must list part number,
serial number (if applicable), part description, work order
number and technician. Tag must be affixed to the part or,
when not practical, placed inside a plastic bag with the part to
prevent mixing of components. Prior to returning the
components to the Shop, identification tags must be
reattached.
5.8.1.1 When parts are submitted to the MT Shop/Shop/Lab
are for inspection, the NDT Work Order Sign In Sheet,
must be reviewed and parts processed on a first
in/first out system unless specifically annotated as
urgent.
5.9
Record of Examination
Reference
Section
Maximum Interval
FL1, FL2, FL3
5.14.1
5.14.1
5.15.1
Viscosity
5.16.1
5.17.1
Ammeter Accuracy
5.17.1 &
5.18.1
6 Months FL 4
6 Months FL 4
6 Months FL 4
5.19.1
6 Months FL 4
5.20.1
6 Months
5.21.1
Yearly/weekly
5.22.1
6 Months
5.23.1
5.16 Viscosity
Amperage
FWDC or HWDC
Minimum Number
of Holes Indicated
500
1000
1500
2500
3500
5.16.1
Liquid vehicle purchased with certification of conformity to AMS 2641
does not require verification of viscosity for makeup of new
suspension bath. Verification of viscosity is required whenever
additional liquid is added to an existing bath. The suspension
viscosity shall not exceed 5 centistokes, as measured in
accordance with ASTM D 445.
5.17 Equipment Calibration
5.17.1
Magnetic particle equipment shall be checked for
performance and accuracy at the time of purchase and at 6month intervals thereafter, when malfunction is suspected, or
when electrical maintenance that may affect equipment
accuracy is performed. Equipment checks shall be made at
frequencies specified in Table-I and record maintained in
accordance with Para 5.3.1. The calibration of equipment shall
be traceable to the National Institute of Standards and
Technology (NIST) or other recognized standards, where
applicable. Calibration of all current and voltage measuring
devices, ammeter shunts, and gauss meter used in verification
shall be calibrated in accordance with ISO17025. Equipment
calibration is monitored through calibration schedule and is
documented on Calibration Record Folder and Calibration Result
Sheet, when applicable.
5.18 Ammeter Calibration
5.18.1
To check the equipment ammeter, a calibrated ammeter
shall be connected in series with the output circuit.
Comparative readings shall be taken at least three output
levels encompassing the usable range of the equipment. The
equipment meter shall not deviate by more than 10% or 50
amperes; whichever is greater from the current values shown
by the calibrated ammeter. This check shall be accomplished
at interval specified in Table-I and in accordance with ISO
17025.
5.19 Timer control check
5.19.1
On equipment using a timer to control the current
duration, the timer should be calibrated to within 0.1
Second using a suitable electronic timer at interval specified
in Table-I
5.20 Magnetic Field Quick Break Check
5.20.1
On equipment that using a, Quick Break feature, Proper
functioning of this circuit shall be verified at interval specified
in Table-I. The test may be performed using a suitable
or other
equipment
5.35.1
Non-relevant indications are those that result from
surface conditions, machining marks, incomplete bond
between base metal and cladding etc. Also particles will
adhere to certain areas created by such design factors as
keyways, drilled holes or abrupt changes of section.
Indications thought to be non-relevant shall be considered to
be relevant until further evaluation is made. This may include
surface conditioning and re-examination. Non-relevant
indications that could mask relevant indications are not
acceptable. Such area shall be thoroughly cleaned and reexamined. NDT technicians shall be acquainted with these
and other irrelevant indications and shall be able to recognize
them.
5.36 Relevant Indication
5.36.1
Relevant indications are those that result from mechanical
discontinuities. All relevant indications shall be evaluated in
accordance with the applicable acceptance criteria. Linear
indications are indications in which the length is more than 3
times the width. Rounded indications are indications that are
circular or elliptical; with the length less than 3 time the width.
5.37 Acceptance Criteria
5.37.1
Acceptance criteria shall be as specified by the
customer purchase order, manufacturers drawings or
manuals, or technical orders. Parts that contain surface
discontinuities in excess of acceptance limits are
unacceptable. If acceptance criteria are not specified, it shall
be the absence of any relevant indications during component
examination, as observed and interpreted by the operator
following the procedures in this document.
5.38 Demagnetization
5.38.1
When using DC demagnetization, the initial field shall be
higher than in nearly the same direction as the field reached
during examination. The field shall then be reversed,
decreased in magnitude, and the process repeated until an
acceptable low value of residual field is reached. Whenever
possible parts that have been magnetized circularly shall be
magnetized in the longitudinal direction before being
demagnetization. After demagnetization, a magnetic field
probe or magnetic field indicator shall not detect fields with
an absolute value above 3 gauss anywhere on the part.
5.39 Post Examination Cleaning
5.39.1
All parts shall be cleaned after examination. Cleaning
shall be done with a suitable solvent or by other means. Parts
shall be inspected to ensure that the cleaning procedure has
removed magnetic particle residues from holes, crevices,
passageways, etc. such residue could have an adverse effect
on the intended use of the part. Parts shall be protected from
corrosion or damage when required.
5.40 Serviceable Components
5.40.1
Components that have met the Magnetic Particle
examination requirements and are found to be acceptable
shall be marked and the marking shall be affixed to the record
accompanying the component.
5.41 Unserviceable Components
5.41.1
Components that have been found to be defective
during the Magnetic Particle examination shall be segregated,
so as to prevent their inadvertent use or mixing with
acceptable parts. They shall be identified with a red
Reject/Unserviceable Tag.
5.42 Other Markings
5.42.1
Other means of identification, such as tagging, may be
used for parts that have a configuration or function precluding
the use of stamping, or etching.
5.43 Magnetic Particle System Preventative Maintenance
5.43.1
On an annual basis or if contamination occurs, magnetic
particle materials should be discarded and replaced with new
materials. This should be done by draining the magnetic
particle fluid tank and discarding the materials in accordance
with Environmental, Health and Safety Standards. When
changing batch numbers for the carrier or particle, new carrier
should be added when tank appears to be completely empty
to flush out remainder of carrier and particle that may be held
in the pump. New carrier should continually be added until it
runs clear out of the hose, ensuring no, in use carrier is
trapped anywhere in the system. In no case should batch
numbers be mixed. Turn machine off. The tank and rack
should be wiped as clean as possible. Ensure and verify that
the valve of the tank have been closed prior to adding new
carrier. Add new carrier and turn machine back ON. Slowly
add particles to the carrier according to manufacturer
instructions and allow them to agitate prior to taking an initial
sample in accordance with para 5.14.1. Add carrier or
particles as necessary to obtain the optimum results.