International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.

6, November 2015

A DECISION SUPPORT SYSTEM FOR ESTIMATING


COST OF SOFTWARE PROJECTS USING A HYBRID OF
MULTI-LAYER ARTIFICIAL NEURAL NETWORK AND
DECISION TREE
Javad Pashaei Barbin1 and Hassan Rashidi2
1

Department of Computer Engineering, Naghadeh Branch, Islamic Azad University,


Naghadeh, Iran
2
Department of Mathematics and Computer Science, Allameh Tabataba'i University,
Tehran, Iran

ABSTRACT
One of the major challenges for software, nowadays, is software cost estimation. It refers to estimating the
cost of all activities including software development, design, supervision, maintenance and so on. Accurate
cost-estimation of software projects optimizes the internal and external processes, staff works, efforts and
the overheads to be coordinated with one another. In the management software projects, estimation must
be taken into account so that reduces costs, timing and possible risks to avoid project failure. In this paper,
a decision- support system using a combination of multi-layer artificial neural network and decision tree is
proposed to estimate the cost of software projects. In the model included into the proposed system,
normalizing factors, which is vital in evaluating efforts and costs estimation, is carried out using C4.5
decision tree. Moreover, testing and training factors are done by multi-layer artificial neural network and
the most optimal values are allocated to them. The experimental results and evaluations on Dataset
NASA60 show that the proposed system has less amount of the total average relative error compared with
COCOMO model.

KEYWORDS
Estimation the Cost of SoftwareProjects, Multi-layerArtificial Neural Network, Decision Tree, COCOMO.

1. INTRODUCTION
Making sure of meeting the demands of users in software projects, reconciling the production
steps of software projects with the designs and plans already made from an engineering point of
view, doing a project in specific circumstances and elimination of barriers in the administration of
projects are of great importance [1]. The duties of the administrator of the software projects
becomes evident in the necessity of supervising the developing projects with regard to the fact
that the process of completion and development of projects is not tangible and assessable from a
physical point of view and renewing technique operations to remove the defections of the system
in the end require high quantitative and qualitative cost. In attention to the administrating points
in software projects will not only result in the supposed advantages but also in the failure of the
project. Meanwhile, detecting software risks and identifying the relationships among them play
crucial roles in administration decision-makings.
DOI:10.5121/ijfcst.2015.5603

23

International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.6, November 2015

The project manager is supposed to monitor the fulfillment of the duties of development team
based on the administrating designs of the project; it is assumed that needs have been properly
identified. The project manager is not responsible for improper identification of needs; however,
while facing every kind of problem, in addition to informing the development team of the issue,
he tries to offer a solution for it. The management of software projects while analyzing the
estimated costs of previous projects can ensure better accuracy of estimation for the new projects
[2].If estimation is accurate enough in the initial stages of project; it will result in success in
human resources and cost. With knowledge of the cost of previous projects, management team
can control the development of software projects using efficient methods.
Estimating the cost of software projects is identifying a set of methods, techniques, analytical and
system-design tools in a framework of modeling design based on a conceptual paradigm for
organizing the development process of software projects adopted in an effective way. In the
software production and development model, accurate analysis of cost estimation and that of each
stage based on the chosen methodology is vital in administrating morphology project. Production
and development processes in each software project vary according to the methodology and
process model chosen. In order to analyze, design and implement the presumed system, low-cost
methods should be used. Estimation is a systematic way for allocating the activities, and
responsibilities in a software development team. Its purpose is to produce high-quality software
which meets the demands of ultimate users with a program and anticipatable budget. As software
projects grew and software engineering developed, organized methods were devised for
developing software, each of which is applicable based on the type of a project and its limitations.
Producing great projects without any software-engineering methods is impossible. In order to
produce complex software systems we need such methods and techniques, which if we want to
proceed according to the normal process of usual software, we will not succeed. Therefore, we
should have accurate estimation in great and complex projects.
Various algorithmic models such as COCOMO I [3], COCOMO II [4], and FP [5] are used to
estimate the cost and effort software projects.SCE aims to increase the likelihood of success of
projects by identifying and assessing systemic effort and cost. Accurate estimation at initial stages
is of vital importance for project managers and software development companies in order to make
the projects successful and the costs more reasonable. Algorithmic models such as COCOMO
depend on a number of factors, which are used for calculating impractical features. These models
try to formulize the relationship between features of efforts and the size of the projects. These
models operate based on such criteria as number of lines of code or the degree of factors effective
for estimation. The magnitude of projects is measured by these units; afterwards, the amount of
effort required and costs is calculated.
We've organized the overall structure of this paper as follows: in the Section 2, we will review the
literature related to cost estimation of software projects. We will discuss proposed model in the
Section 3. In Section 4, we will explain the results and evaluation of the proposed model. Finally
in Section 5, we will come to the conclusions and future work.

2. REVIEW OF LITERATURE
Using artificial intelligence techniques, many researches have been carried out in recent years on
cost estimation of software projects. But, we cannot claim with absolute certainty that artificial
intelligence methods can accurately estimate the cost 100%.However, based on the investigations

24

International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.6, November 2015

made, we daresay that artificial intelligence methods are more accurate and effective in
comparison with Algorithmic models.
Using a combination of Ant Colony Optimization (ACO) and Genetic Algorithm (GA)
Algorithms, a new model is proposed for SCE [6]. Evaluation was conducted on NASA60
dataset. ACO algorithm is used for training data and GA algorithm is used to test data. MMRE
standard is the fitness function of the proposed model. Test results have shown that as the number
of generations increases the degree of MMRE decreases in the proposed model. The results of 10
of software projects on NASA60 dataset showed that the MRE of the proposed model is less than
COCOMO models. PSO algorithm is proposed for estimating the software effort [7]. Evaluation
was conducted on the dataset KEMERER. In order to test and train PSO algorithm is used
COCOMO model. Experimental results show that the proposed model is more accurate in
comparison with COCOMO model. The degree of MMRE is 56.57 in the proposed model and
245.39 in the COCOMO model respectively.
PSO-FCM and PSO-LA hybrid models have been proposed for the SCE [8]. Evaluation was
conducted on NASA60 dataset. InPSO-FCM hybrid model, the minimum of distance between the
clusters, the total of inter-cluster distance and the number of clusters have been used as fitness
parameters and for improving PSO algorithm. Use the FCM (Fuzzy C-Means) makes the particles
gather in the best cluster and fitness function to have a great deal of local optimum points. LA
(Learning Automata) is used to adjust the behavior of the particles so that the efficiency of PSO
algorithm will be improved. In PSO-LA hybrid model, all particles simultaneously search for a
place in the search space. In PSO-LA LA hybrid model, LA model strategy allows the particles to
achieve a local optimum given the award criterion for PSO algorithm. Their results show that
PSO-FCM hybrid model has less degree of MRE error rate PSO-LA hybrid model. The degree of
MMRE error in PSO-FCM model is 25.36, 24.56, 24.22 and 23.86 and 26.32 in PSO-LA model.
The degree of PRED accuracy (25) in the COCOMO model is 40 and 61.6, 58.3, 65 and 68.3 in
PSO-FCM. Also in the PSO-LA, it is equal to 63.3.
A case comparison has been presented for SCE using data-mining techniques [9]. Evaluation has
been carried on ISBSG, COCOMO81, Desharnais and Maxwell datasets. The results show that
the degree of MdMRE error in Regression Trees (CART), M5, MLP, Radial Basis Function
Networks (RBFN) models on ISBSG dataset is respectively, 61.6, 115, 55.7, and 70.4. And on
COCOMO81 dataset, it is respectively 89.2, 105, 107, and 76.4. And on Desharnais dataset, it is
respectively, 100, 36.1, 32.4, and 33.4. And on Maxwell dataset, it is respectively 100, 65.5, 57.1,
and 48.4. The degree of PRED accuracy (25) on ISBSG dataset, it is respectively 16.3, 13.9, 26.1,
and 22.7. And on COCOMO81 dataset, it is respectively 9.52, 15.9, 12.7, and 11.1. And on
Desharnais dataset, it is respectively 2.47, 35.8, 38.3, and 34.6. And on Maxwell dataset, it is
respectively 14.5, 19.4, 14.5, and 30.6. The assessments show that M5 and CART models
perform better than other models.

3. PROPOSED MODEL
Using the test, repetition method and a comparison of the results and the results obtained, the
number of layers used in this network indicates that three-layer network has better accuracy. In
this paper, in order to enhance the performance of decision-helping system, we have considered
hidden layers of neural network to be 15, which equals the parameters of software projects; then,
we calculated the performance of network for the existent topology with different number of
25

International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.6, November 2015

neurons in the hidden layer. Finally, we chose the structure with higher-performance topology.
Another parameter used by the user to get utmost performance is transfer functions in order to
apply a threshold for each neural network layer. In this paper, tensing transfer function has been
used for the neurons of hidden and output layers to improve the efficiency of the neural network
[10]. Artificial Neural Networks, which are regarded to be one of the important methods for datamining, is more efficient in estimating software cost in comparison with other methods. Neural
networks are able to be taught without combining extracted knowledge with the rules, process
them and extract their core knowledge. Hence, the use of neural networks is more efficient and
useful than conventional methods for cost estimation. They also provide better and powerful tools
to help managers to analyze, model and find relationships between resources, of doing which
COCOMO and statistical methods are not capable.
There are several algorithms in neural network learning field; post-transmission algorithm is one
of the most popular ones, which has various functions. Neural network utilizes the concept of
learning to solve problems; gradient descending methods are widely used to train networks. By
gradient descending method we mean the altercations of weight according to network error
derivatives in a way that network error is minimized. This algorithm has two phases, the first of
which is called feedback. In this phase, through neurons data are applied first from hidden layers
into outer layer. The processed data is conveyed from previous layers into next hidden and outer
layers by application on transfer functions. The second phase of post-transmission algorithm is
the reduction of errors. In the first phase, once the application is due and calculation over, the
actual output is obtained. Then, we will find the difference between actual and target output
values of test. This value is called error. In the second phase, the error is run backward so that the
communications which are the same as weights can be updated. In this paper, considering the top
speed of post-transmission algorithm gradient combination is measured, and the supporting
decision system is designed by this algorithm. Some of the advantages of this algorithm
compared with other algorithms of search and minimization are its high accuracy, reduction of
repetitions in learning process, hence reduction of learning time. This algorithm is fully automatic
and independent of the parameters definition user. It prevents any waste of time in computational
and learning processes. From an optimal point of view, learning in artificial neural network is
equivalent to minimizing an error function, which is a multivariate function and is dependent on
the weights of network.
Some of the most important decision tree algorithms can be C4.5 algorithm [11]. The algorithm
uses an entropy-based criterion. It also uses pruning technique for removing extra branches. The
process of training and testing is usually continued till all the groups are purified; namely, all the
samples are placed in a category when the tree stops growing. The algorithm chooses a quality for
each given item with regard to irregularities of each of them. After choosing the best quality, the
qualities lacking value are allocated with values on the part of those that provide the data and the
algorithm is continued. The choice of which quality should be in the stem depends on the GAIN
of every feature. For calculating GAIN formula (1) is used:

Gain ( S , A) = Entropy ( s )

vvalues ( A )

Sv
S

Entropy ( S v )

(1)
Where Values (A) is a collection of all the features of A and SVis subset of S for which A has V.
Entropy defines the purity (disorder or lack of purity) of a set of examples. If the S set consists of
26

International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.6, November 2015

a set of positive and negative examples of the target concept of entropy, S is defined to the
category of Boolean as formula (2):

Entropy ( S ) = P log 2 P P log 2 P


(2)
In formula (2), isthe proportion of positive examples to all of the examples and is the
proportion of negative examples to all of the examples. log0 = 0 is assumed to be zero. C4.5
algorithm is able to use disintegrated, noisy and valueless features; also it is able to sue features
with high vales because of the use of Gain factor. Even if there is no error in the training data,
pruning is done which makes the tree more perfect and less dependent on the training set. The
deduction of tree begins with the node of the tree, which offers all the given data and classifies
the data into smaller collections retrospectively. This is done by testing the degree of each of the
groups. Sub-trees indicate the classifications of original data sets that complete the tests specified
ratios measurement. This process usually continues till purification of sets is due; it means that all
samples are put in one category and at this very moment the tree stops growing.
Input: an attribute-valued dataset D
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

Tree={}
If D is "pure" OR other stopping criteria met then
Terminate
End if
For all attribute a D do
Compute information-theoretic criteria if we split on a
End for
abest = Best attribute according to above computed criteria
Tree = Create a decision node that tests abest in the root
Ds = Induced sub-datasets from D based on abest
For all Dsdo
Treec = C4.5(Dv)
Attach Treec to the corresponding branch of tree
End for
Return Tree

Figure 1.Shows the pseudo code of decision tree

Figure (2) shows the model of decision supporting system for estimating the cost of software
projects using a combination of multi-layered artificial neural network and C4.5 decision tree. In
the proposed model,we have 15 effort estimation factors for network; testing and training data are
done by C4.5 decision tree. C4.5 decision tree chooses the most optimal ones from among the
factors and test the projects based on those values. This cycle goes on until MMRE function is
more than COCOMO. We have chosen 80 percent of data for network training and 20% for data
testing.

27

International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.6, November 2015

Figure 2. The proposed model

In the proposed model, MMRE is considered as error function for comparing with COCOMO
model. The purpose of error function is to minimize the degree of error in the proposed model in
comparison with COCOMO model; the proposed model is repeated until the degree of MMRE
decreases. Fitness function is defined for the proposed model as equation (4) [12].

MREi =

a(i) e(i)
a(i)

100
(3)

MMRE =

1
MREi , i = 1,2,..., n
n i =1

(4)
Using equation (4),we can obtain total error by the proposed and COCOMO models. PRED is
also an important criterion in the accuracy of estimation. The most common methods for
prediction accuracy are PRED and MMRE. PRED (x) is defined according to equation (5) [12].

PRED( x) =

1 n 1, ifMRE x

n i =1 0 , otherwise

(5)
PRED (x) criterion, which is defined on the basis of MRE, is the most widely used in the
accuracy of estimations and is a good measure of how well the models operate.

4. EVALUATION AND RESULTS


In this section, we have investigated the proposed model on NASA60 dataset. The proposed
model is also compared with COCOMO model. Simulation of models has been conducted in
VC#.NET 2013 programming. The results of the implementation of the proposed model while
training and testing the data are shown in Table (1). The test results on the data sets of NASA60
[13] dataset show that the proposed model has less MRE error than COCOMO model.
28

International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.6, November 2015

Table 1: Comparison MRE of models


No.

KSLOC

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

2.2
3.5
5.5
6
9.7
7.7
11.3
8.2
6.5
8
20
10
15
10.4
13
14
19.7
32.5
31.5
12.8
15.4
20
7.5
16.3
15
11.4
21
16
25.9
24.6
29.5
19.3
32.6
35.5
38
48.5
47.5
70
66.6
66.6
50
79
90
78
100
150
100
100
190

Actual
Effort
8.4
10.8
18
24
25.2
31.2
36
36
42
42
48
48
48
50
60
60
60
60
60
62
70
72
72
82
90
98.8
107
114
117.6
117.6
120
155
170
192
210
239
252
278
300
352.8
370
400
450
571.4
215
324
360
360
420

MRE
COCOMO
24.15
3.95
7.36
58.88
20.05
23.91
30.83
29.55
28.22
22.22
27.21
41.66
46.19
34.90
9.36
25.88
6.10
93.91
3.81
27.96
22.51
60.76
41.75
29.79
39.54
42.04
36.75
34.48
27.85
31.65
18.94
35.78
29.88
32.10
28.46
24.31
37.81
21.28
23.76
35.17
36.90
45.74
38.29
24.50
120.66
49.50
44.97
15.85
1.89

MRE
Proposed
21.36
2.65
6.98
35.26
15.14
21.65
15.98
32.54
11.24
9.87
19.65
32.85
14.98
25.64
1.23
16.98
7.85
52.65
6.54
20.98
13.24
45.65
32.10
21.98
16.84
32.65
12.98
25.74
20.35
15.32
16.54
13.62
14.98
12.65
32.62
16.57
12.95
16.52
17.54
20.38
16.54
32.51
19.84
20.36
95.84
30.26
29.54
12.32
6.95

29

International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.6, November 2015
50
51
52
53
54
55
56
57
58
59
60

115.8
101
161.1
284.7
227
177.9
282.1
219
423
302
370

480
750
815
973
1181
1228
1368
2120
2300
2400
3240

11.37
19.87
4.76
38.36
3.93
3.64
17.21
29.00
25.78
0.46
25.21

8.97
20.65
3.02
21.54
6.54
1.98
11.49
8.74
59.30
1.06
8.41

Figure (3) shows the comparative charts of MRE of the proposed and COCOMO model. As you
consider, the degree of MRE in the proposed model is less in the majority of the projects; this is
indicative of the efficiency of the proposed model and the accurate assessment of effort factors in
software projects. The degree of MMRE in the COCOMO model is 29.64 and 19.98 in the
proposed model. The results show that the proposed model has lower amount of MMRE in
comparison to COCOMO model, and has reduced 1.45 times of that.

Figure 3. Comparison of the values of MRE

The results of evaluations have shown that enforcement of and running the proposed model in the
face of the uncertainty factor values has better cost performance. Because the exact amount of
cost factors affect the total amount of effort and cost estimates. The results of the implementation
of the proposed model on NASA60 dataset showed that the proposed model is of a high caliber of
estimates in comparison with COCOMO model. Figure (3) indicates the MRE diagram of the
proposed model compared with COCOMO model on the basis of the number of iterations. As
observed, MRE value reduces as the number of repetitions increases; this is the result of training
and testing most of the data.

5. CONCLUSION
Some of the most challenging items projects in the development of software projects, and
defining projects have always been accurate estimations of projects and their due completion. As
complexity of projects increases, the cost of software development projects continues to grow.
30

International Journal in Foundations of Computer Science & Technology (IJFCST) Vol.5, No.6, November 2015

Therefore, accurate estimation of costs in the initial stages of development seems to be very
important. One of the most important decisions on software projects is a detailed estimate of the
cost and reduction of risks. Proper evaluation of the project cost estimates traditionally with the
help of experts has such limitations as high costs and time-consuming process of validation. In
most cases, estimating the costsoftware depends on the number of line codes of software projects.
The most important algorithmic model for estimating the cost of software projects is the
COCOMO model. Today, with the development of artificial intelligence models, hybrid models
have become widely spreading; in this article, based on a combination of artificial neural
networks and decision tree model we have offered a supporting system to estimate the cost and
effort of software projects. C4.5 decision tree is used to optimize multi-layer artificial neural
network. It follows that this could help managers of projects in deciding the financial allocation
for various projects. The results showed that the proposed model has less degree of MMRE error
compared with COCOMO.

REFERENCES
1.
2.

3.
4.
5.

6.

7.
8.

9.

10.

11.
12.

13.

P.C. Pendharkar, Probabilistic Estimation of Software Size and Effort, Expert Systems with
Applications, Vol. 37, Issue 6, pp. 4435-4440, 2010.
Maleki. I, Ebrahimi. L, Jodati. S, Ramesh. I, Analysis of Software Cost Estimation Using Fuzzy
Logic, International Journal in Foundations of Computer Science & Technology (IJFCST), 4(3) 2741, 2014.
B.W. Boehm, Software Engineering Economics, Prentice-Hall, Englewood Cliffs, New Jersy, 1981.
B.W. Boehm, Software Cost Estimation with COCOMO II, Prentice Hall PTR, Englewood Cliffs,
New Jersy, 2000.
A.J. Albrecht, J. Gaffney, Software Function, Source Lines of Code, and Development Effort
Prediction: a software science validation, IEEE Transactions on Software Engineering SE, 9(6), pp.
639-648, 1983.
I. Maleki , A. Ghaffari, M. Masdari, A New Approach for Software Cost Estimation with Hybrid
Genetic Algorithm and Ant Colony Optimization, International Journal of Innovation and Applied
Studies, 5(1), 72-81, 2014.
F.S. Gharehchopogh, I. Maleki, S.R. Khaze, A Novel Particle Swarm Optimization Approach for
Software Effort Estimation, International Journal of Academic Research, Part A, 6(2), 69-76, 2014.
F.S. Gharehchopogh, L. Ebrahimi, I. Maleki, S.J. Gourabi, A Novel PSO based Approach with
Hybrid of Fuzzy CMeans and Learning Automata in Software Cost Estimation, Indian Journal of
Science and Technology, 7(6), 795-803, 2014.
Z.A. Khalifelu, F.S. Gharehchopogh, Comparison and Evaluation Data Mining Techniques with
Algorithmic Models in Software Cost Estimation, Elsevier, Procedia-Technology Journal, ISSN:
2212-0173, Vol. 1, pp. 65-71, 2012.
A.B. Nassif, D. Ho, L.F. Capretz, Towards an Early Software Estimation using log-linear Regression
and a Multilayer Perceptron Model, Journal of Systems and Software, Vol. 86, Issue 1, pp.144-160,
2013.
Quinlan J.R. (1993). C4.5: Programs for Machine Learning, Morgan Kaufmann Publishers, San
Mateo.
MacDonell. S.G, Gray. A.R, A Comparison of Modeling Techniques for Software Development
Effort Prediction, in Proceedings of International Conference on Neural Information Processing and
Intelligent Information Systems, pp. 869-872. 1997.
Menzies. T, Port. D, Chen. Zh, Hihn. J, Validation Methods for Calibrating Software Effort Models,
ICSE ACM, USA, 2005.
31