Local Area Planning in Ahmedabad

Download as pdf or txt
Download as pdf or txt
You are on page 1of 86

Transforming Ahmedabads City Center

Using Planning and Infrastructure Development to Refurbish Our Cities

Ahmedabad Urban Development Authority - AUDA


Ahmedabad Municipal Corporation AMC

Bimal Patel, HCP Ahmedabad, 25th June 2015

Ahmedabad

Ahmedabad 5 million people


300 sq. km.

20 km

Modern Ahmedabad's City Center

Modern Ahmedabads City Center

Ellis Bridge
Nehru Bridge
Ashram Road

Gandhi Bridge

Ashram Road

Sardar Patel Stadium

Low FSI limits have restricted the size of buildings

Many old buildings are small and rundown

Many new buildings are small and lackluster

The street network is sparse; many streets are narrow

Area under public domain (streets) = 22%

Streets are not pedestrian friendly

The area has inadequate infrastructure

Ahmedabad does not have a city center to be


proud of

To promote the development of its city center


Ahmedabad has been strengthening its public
transport network

Metro and BRTS Networks, Ahmedabad


Average time to access
CBD by BRTS
= 30 min. (approx)
Average time to access
CBD by Private Vehicle
= 35 min. (approx)

To promote the development of its city center


Ahmedabad has also increased FSI in the area

Ahmedabads City Center - Development Plan 2012

Mixed use zone


FSI (plot): 5.4
(increased)
More detailed plan
(LAP)
Byelaws further
simplified

The challenge is to ensure that increasing FSI


does not lead to stressed infrastructure, more
congestion and lower productivity

How do AUDA and AMC plan to manage this


transformation?

Establishing a blank slate

building a new grid of streets

and then build a gleaming new CBD?

The plan should:


1.
2.
3.
4.
5.

Respect property rights


Widely be considered to be fair and desirable
Be financially viable for developers
Be financially viable for development authority
Be legally implementable

AUDA and AMCs plan for transforming


Ahmedabads city center

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

Existing street network

No of existing blocks 31
Area under public domain (streets) = 22%
Average Perimeter = 743m

Existing street network

No of existing blocks 31
Area under public domain (streets) = 22%
Average Perimeter = 743m

Existing Development

New street and street widening proposals


New Streets to be appropriated
when plot is redeveloped

Proposed Block

Future plot configuration

Wide setback along central spine (Ashram Road)


Carefully considered setback along Ashram Road

Narrower setback along other streets


Carefully considered setback along other streets

All roadside setbacks to be appropriated to expand public realm


6m Setback Along other streets

9m Setback Along Ashram Road

All roadside setbacks to be appropriated to expand public realm


Setback to be appropriated when plot is redeveloped

The effect of adding streets and appropriating setbacks


No. of proposed blocks - 76

No of existing blocks 31
Area under public domain (streets) = 22%
Average Perimeter = 743m

No. of proposed blocks - 76


Area under public domain (streets) = 40%
Average Perimeter = 361m

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

Setbacks between plots


6m setbacks between plots

Setbacks between plots not to be appropriated


6m setbacks between plots

Entire remaining area can be built upon


Full Coverage

Maximum permissible height 86m (as per airport authority)


defines the development envelope

Possible building development envelope is larger than permitted


size of building

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

A mandatory build-to line along Ashram Road

A mandatory arcade along Ashram Road

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

Current FSI 1.8 available as a matter of right

Additional FSI up to 5.4 available for a fee

Transfer of development rights within CBD


Existing Building to be retained

Existing Building retained

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

Building Smart Infrastructure

Communication

Electricals

Storm water drainage

Sewerage

Water supply

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

Building Smart Infrastructure

Increasing Green Cover in Public Domain

Existing green coverage for Ahmedabad CBD West 20%

Proposed green coverage for Ahmedabad CBD West Additional 6.14% (on SRFD) + 24% (on-street) = 30%

The final outcome

Ahmedabads City Center Today

Existing
FSI (Plot)

1.8

FSI (Gross)

1.00

Total Built Floor Space (sq.m)

12,75,000

Population

85,000

Public Domain (Streets)

22%

Number of Blocks

31

Average Block Perimeter

743m

Green Cover in Public Domain

6%

Ahmedabads City Centre After A Couple of Decades

Existing

Future

FSI (Plot)

1.8

5.4

FSI (Gross)

1.00

5.00

Total Built Floor Space (sq.m)

12,75,000

54,00,000

Population

85,000

2,00,000

Public Domain (Streets)

22%

40%

Number of Blocks

31

76

Average Block Perimeter

743m

416m

Green Cover in Public Domain

6%

30%

CBD From Air Night View

CBD at Street Level - Arriving at the CBD

Arcade

Sabarmati River from the CBD

CBD on Kite Flying Day

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

Detailed Plan
A. Key Map showing Part Plan Areas and Number

1. Detailed Physical Survey

3. ROW Types Notified ROW & Future ROW

5. Permissible Building Footprint & Margins

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

1. Improving the street network and walkability


2. Increasing land area in the public domain
3. Simplifying byelaws and regulating development
4. Ensuring harmonious development
5. Raising resources for building infrastructure
6. Building smart infrastructure
7. Building pedestrian friendly streets
8. Increasing green cover in the public domain
9. Preparing a detailed statutory plan/regulations
10.Visualizing incremental changes
11.Involving the public

Thank you

HCP Design Planning and Management Pvt. Ltd.


Paritosh, Usmanpura, Ahmedabad 380013
www.hcp.co.in

You might also like