Annual Report 2013-14 English
Annual Report 2013-14 English
Annual Report 2013-14 English
2013-14
Ministry of Power
Government of India
www.powermin.nic.in
Inauguration of SAMPARK, SAMANVAY EVAM SAMVAD by Shri Piyush Goyal, Honble MOS(I/C) Power
nd
on 2 June 2014. Conference was attended by officials of Ministry of Power,
Ministry of Coal and Ministry of New & Renewable energy.
PERFORMANCE HIGHLIGHTS
NATIONAL ELECTRICITY POLICY
In compliance of section 3 of the Electricity Act, 2003. the
Government of India has notified the National Electricity Policy
on 12.2.2005.
The Policy aims at achieving the following objectives :
a) Access to Electricity - Available for all households in the
next five years
b) Availability of Power - Demand to be fully met by 2012.
Energy and peaking shortages to be overcome and
adequate spinning reserve to be available.
c) Supply of reliable and quality power of specified standards
in an efficient manner and at reasonable rates.
d) Per capita availability of electricity to be increased to over
1000 units by 2012.
e) Minimum lifeline consumption of 1 unit/houlsehold/day as
a merit good by year 2012.
f) Financial Turnaround and Commercial Viability of
Electricity Sector.
g) Protection of consumers interests.
TARIFF POLICY
In compliance of section 3 of the Electricity Act, 2003, the
Government of India has notified the Tariff Policy on
6th January 2006.
The objectives of the Tariff Policy are to :
a) Ensure availability of electricity to consumers at reasonable
and competitive rates;
b) Ensure financial viability of the sector and attract
investment.
c) Promote transparency, consistency and predictability in
regulatory approaches across jurisdictions and minimize
perceptions of regulatory risks;
d) Promote competition, efficiency in operations and
improvement in quality of supply.
Tariff Policy has been amended vide resolution dated
31.3.2008, 20.1.2011 and 8.7.2011.
IMPROVED POWER SUPPLY POSITION:
Power Supply position in the country has improved
substantially during the current year. The energy shortages in
the country have reduced to 4.3% during the period April, 2013
to January, 2014 as compared to 8.8% during the same period in
previous year. Similarly, the peak shortage have reduced to
4.2% from 9.0%.
NOTIFICATION OF REGULATIONS:
During the year 2013-14 CEA notified Central Electricity
Authority (Technical Standards for connectivity of the
Distributed Generation Resources) Regulations, 2013. These
regulations specify technical rules for connecting small
generation resources like Roof Top Solar, Biomass, small hydro
etc. to the main grid at voltage level below 33 kV. CEA also
for coastal location and another site at Narla & Kasinga sub
division of Kalahandi District for inland location have been
identified for setting up of additional UMPPs in Odisha.
?
A site at Kakwara in Banka Distt. has been identified for
Million Tonne
224.7
20.7
Captive Mines
14.6
E-auction
4.3
Import (Blending)
24.5
28.1
IMPORT OF COAL
To meet its balance FSA obligations, CIL may import coal and
supply the same to the willing TPPs on cost plus basis.
TPPs may also import coal themselves if they so opt. Higher cost
of imported coal is to be considered for pass through as per
modalities suggested by CERC.
In order to maximize coal based generation, Power Utilities
were advised to import 82 Million Tonne (MT) coal for the year
2013-14. Coal based power plants of the country have achieved
around 8% growth in electricity generation since last year.
INDEPENDENT COAL REGULATORY BILL
MoP has stressed the need for setting up an independent coal
regulator with the authority to fix prices of coal and powers to
resolve disputes.
Independent Coal Regulatory Bill has been approved by the
Cabinet on 27.06.2013. Ministry of Coal introduced the Bill in
the Parliament in December, 2013
ALLOCATION OF NEW COAL BLOCKS TO NTPC
Inter-Ministerial Committee in MoC finalized allocation of 4
coal blocks in August, 2013 (Banai, Bhalumuda, Chandrabila,
KudanaliLaburi) for NTPC power projects of 8460 MW.
COAL LINKAGE FOR 13TH PLAN POWER POJECTS
Request for Coal linkage of 33 GW for 13th plan power projects
has been taken up with Ministry of Coal through Group
constituted in Planning Commission.
THIRD PARTY SAMPLING AND QUALITY CONTROL
MECHANISM
With the concerted efforts of MOP, Ministry of Coal/Coal India
Limited had agreed for Third Party Sampling at loading points to
address the issue of coal quality since October, 2013. CIL
appointed agency for third party sampling and is operational
w.e.f. 1.10.2013.
Member
(Power Systems)
(Major Singh)
(Additional Charge)
Member (Plg)
(Major Singh)
Member (Hydro)
(Krishna Narain Garg)
Member
(Thermal)
(Krishna Narain Garg) (A/C)
Chairperson
(Smt. Neerja Mathur)
CEA
tion, Energy
efficiency*
International
Cooperation*
Energy Conserva-
Technology*
Information-
RTI
Parliament and
Official Language
Public Grievances
Administration
Satish Kumar
JS (A)
Matters
including CPRI
& NPTI
Coordination
Monitoring
Panel
Power Projects
Planning
Policy &
Raj Pal
Economic Adviser
Finance &
Budgetary
Control
Internal
Pradeep Kumar
JS & FA
Electricity
Fund
National
Side
Management
Demand
REC
RGGVY
RE
PFC
APDRP
B.N. Sharma
Jt. Secretary
Fuel Supply
IPP
DVC
NTPC
Thermal
Power Projects
Ultra Mega
G. Sai Prasad
Jt. Secretary
&
Monitoring**
Operating
PGCIL**
Transmission**
for Open
Access in Trans
& Distribution
including
Franchising
Nodal Officer
SBR)
R&R (Including
*
Joint Secretary (SK) will route the IT, EC, EE & IC files through Additional Secretary (RNC)
** Joint Secretary (JA) will route the O&M, PGCIL, Trans Files through Additional Secretary (DC)
*** JS (Hydro/CVO) will route all files except vigilance cases through AS (DC); vigilance cases will be submitted directly
to Secretary.
V&S***
BBMB
Management
for Hydro
Projects.
Environment
including CPSU.
namely NHPC,
SJVNL,
NEEPCO,
THDC;
Hydro matters
Mukesh Jain
Jt. Secretary
SECRETARY (POWER)
ORGANISATION STRUCTURE
As on 27.05.2014
Rural Electrification;
j.
v)
10
2.
3.
State
Private
Total
Share
Hydro
Source
8654
3482
3491
15627
19.9
Thermal
24840
23301
11552
59693
75.8
Nuclear
3380
3380
4.3
Total
36874
26783
15043
78700
100
6.
Central
2008-09
750
2009-10
Private
Total
1821.2
882.5
3453.7
2180
3118
4287
9585
2010-11
4280
2759
5121.5
12160.5
2011-12
4770
3761.2
11970.5
20501.7
2012-13
5397.3
3968
11257.5
20622.8
Central
State
Share (%)
4.
5.
46.9
34
19.1
100
Private
Total
Target
Central
State
Private
All India
24840
23301
11552
59693
Thermal
MTA
Targ.
14920
18501
17336
50757
Ach.
Tar.
12790
14030
21720
48540
8654
3482
3491
15627
Hydro.
MTA
Targ.
2922
2854
2461
8237
Hydro
Nuclear
Target
Ach.
Target
Ach.
Target
4023.3
5023.3
645
374
3951
3911
87
57
Total
Ach.
Target
Ach.
2000
6668.3
5397.3
4038
3968
7180
11187.5
70
70
7250 11257.5
15154.3
20121.8
802
501
2000
17956.3 20622.8
Sector
State
Hydro
Nuclear
Ach.
Target
Ach.
Target
3123.3
1160
914
258
4451
1971
85
45
7660
5150
199
99
15234.3
8281
1198
402.0
Ach.
Targ.
1550
2702
1292
5544
3380
0
0
3380
Nuclear
MTA
Targ.
3380
0
0
3380
Total
Ach.
Target
Ach.
2000
6037.3
1418
4536
2016
7859
5294
2000
18432.3
8683
Ach.
Targ.
880
0
0
880
36874
26783
15043
78700
Total
MTA
Targ.
21222
21355
19797
62374
Ach.
15220
16732
23012
54964
11
Sector
Central
Thermal
Hydro.
Target
XII Plan
Target
(2012-14)
Ach till.
31.12.2013
Target
XII Plan
14878
7146.6
6183.3
6004
Nuclear
Target
Ach. till Target
(2012-14) 31.12.2013 XII Plan
1559
632
5300
Total
Target
Ach. till Target
(2012-14) 31.12.2013 XII Plan
4000
26182
Target
Ach. till
(2012-14) 31.12.2013
12705.6
6815.3
State
13922
8402
5882
1608
172
102
15530
8574
5984
Private
43540
14840
16337.5
3285
269
169
46825
15109
16506.5
All India
72340
30388.6
28402.8
10897
2000
903
5300
4000
88537
36388.6
29305.8
REGION
SECTOR
STATE
FUEL TYPE
COMMISSIONING
DATE
CAPACITY
(MW)
SR
P.S.
AP
COAL
02.07.2012
150
THAMMINAPATNAM TPP I U 1
SR
P.S.
AP
COAL
09.09.2012
150
WR
C.S.
CHAT
COAL
02.06.2012
660
WR
P.S.
CHAT
COAL
21.06.2012
135
WR
P.S.
CHAT
COAL
04.02.2013
50
KORBA WEST
WR
S.S
CHAT
COAL
22.03.2013
500
WR
P.S.
JHAR
COAL
29.03.2013
270
NR
S.S.
DEL
GAS
27.06.2012
250
SALAYA TPS U 2
WR
p.s.
GUJ
COAL
13.06.2012
600
UMPP-MUNDRA UNIT2
WR
P.S.
GUJ
COAL
17.07.2012
800
UMPP-MUNDRA U 3
WR
P.S.
GUJ
COAL
16.10.2012
800
WR
P.S.
GUJ
GAS
20.01.2013
382.5
UMPP-MUNDRA U 4
WR
P.S.
GUJ
COAL
16.01.2013
800
WR
S.S.
GUJ
COAL
05.03.2013
500
UMPP-MUNDRA U 5
WR
P.S.
GUJ
COAL
18.03.2013
800
PIPAVA CCPP
WR
S.S
GUJ
GAS
22.03.2013
351
NR
P.S.
HAR
COAL
11.04.2012
660
NR
C.S.
HAR
COAL
07.11.2012
500
ER
P.S.
JHAR
COAL
19.11.2012
270
ER
C.S.
JHAR
COAL
15.02.2013
500
WR
C.S.
MAHA
COAL
19.04.2012
500
WR
P.S.
MAHA
COAL
28.04.2012
60
WR
P.S.
MAHA
COAL
17.08.2012
300
GEPL TPP U1
WR
P.S.
MAHA
COAL
08.09.2012
60
WR
P.S.
MAHA
COAL
11.09.2012
660
WR
P.S.
MAHA
COAL
07.02.2013
300
BELA TPP-1U-1
WR
P.S.
MAHA
COAL
20.03.2013
270
WR
P.S.
MAHA
COAL
25.03.2013
660
AMARAVATI
WR
P.S.
MAHA
COAL
25.03.2013
270
MOUDA TPP
WR
C.S.
MAHA
COAL
29.03.2013
500
WR
C.S.
MP
COAL
14.06.2012
500
WR
P.S.
MP
COAL
12.08.2012
250
WR
P.S.
MP
COAL
24.02.2013
600
WR
S.S
MP
COAL
22.03.2013
250
THERMAL PROJECTS
13
PROJECT NAME
REGION
SECTOR
STATE
FUEL TYPE
COMMISSIONING
DATE
WR
C.S.
MP
COAL
25.03.2013
500
BINA TPP
WR
P.S.
MP
COAL
31.03.2013
250
ER
P.S.
ODISHA
COAL
25.04.2012
600
ER
P.S.
ORI
COAL
29.03.2013
350
JALIPA KAPURDI U5
NR
P.S.
RAJ
LIG
5.02.2013
135
JALIPA KAPURDI U8
NR
P.S.
RAJ
LIG
28.02.2013
135
JALIPA KAPURDI U6
NR
P.S.
RAJ
LIG
03.03.2013
135
JALIPA KAPURDI U7
NR
P.S.
RAJ
LIG
16.03.2013
135
RAMGARH GT
NR
S.S.
RAJ
GAS
20.03.2013
110
SR
S.S.
TN
COAL
11.10.2012
600
SR
C.S.
TN
COAL
28.02.2013
500
SR
S.S.
TN
COAL
09.03.2013
600
SR
P.S.
TN
COAL
11.03.2013
150
TRIPURA CCGT
NER
C.S.
TRI
GAS
03.01.2013
363.3
NR
C.S.
UP
COAL
25.05.2012
500
NR
S.S.
UP
COAL
24.05.2012
250
NR
S.S.
UP
COAL
25.05.2012
250
NR
S.S
UP
COAL
11.03.2013
250
TOTAL (THERMAL)
CAPACITY
(MW)
20121.8
HYDRO PROJECTS
Budhil Unit-1
NR
P.S.
HP
HYDRO
30.5.2012
35
Budhil Unit-2
NR
P.S.
HP
HYDRO
26.5.2012
35
NR
C.S.
HP
HYDRO
07.06.2012
77
NR
C.S.
HP
HYDRO
12.06.2012
77
NR
C.S.
HP
HYDRO
28.062012
77
NR
C.S.
J&K
HYDRO
08.11.2012
11
NR
C.S.
J&K
HYDRO
11.11.2012
11
NR
C.S.
J&K
HYDRO
22.11.2012
11
SR
S.S
TN
HYDRO
08.12.2012
15
ER
C.S.
WB
HYDRO
20.01.2013
33
NR
C.S.
J&K
HYDRO
28.01.2013
11
ER
C.S.
WB
HYDRO
30.01.2013
33
ER
C.S.
WB
HYDRO
24.02.2013
33
NER
S.S
MEGH
HYDRO
06.03.2013
42
MYNTDU U3
TOTAL (HYDRO)
TOTAL (2012-13)
501
20622.8
REGION
SECTOR
NR
Barh-II U-4
ER
STATE
FUEL TYPE
COMMISSIONING
DATE
CAPACITY
(MW)
UP
Coal
07.10.2013
500
Bihar
Coal
30.11.2013
660
WR
MP
Coal
25.12.2013
250
WR
MP
Coal
18.11.2013
600
NR
Rajasthan
Coal
14.09.2013
250
SR
TN
Coal
13.09.2013
600
NR
Delhi
Gas
07.05.2013
250
Rokhia GT-9
NER
Tripura
Gas
31.08.2013
21
SR
AP
Coal
17.04.2013
150
WR
Chhattisgarh
Coal
13.08.2013
600
WR
MP
Coal
30.05.2013
660
WR
MP
Coal
18.12.2013
660
WR
Maharashtra
Coal
03.11.2013
300
WR
Maharashtra
Coal
27.08.2013
300
WR
Maharashtra
Coal
10.06.2013
660
Kamalanga TPP U2
ER
Odisha
Coal
28.09.2013
350
Kawai, U-I
NR
Rajasthan
Coal
28.02.2013
660
Kawai, U-2
NR
Rajasthan
Coal
28.05.2013
660
SR
Tamil Nadu
Coal
30.12.2013
150
WR
MP
Coal
10.12.2013
45
TOTAL
8326
THERMAL PROJECTS
HYDRO PROJECTS
Teesta LD -III U-4
ER
WB
HYDRO
01.04.2013
33
NR
J&K
HYDRO
30.10.2013
15
NR
J&K
HYDRO
31.10.2013
15
NR
J&K
HYDRO
02.11.2013
15
Uri-II, U-1
NR
J&K
HYDRO
25.09.2013
60
Uri-II, U-3
NR
J&K
HYDRO
27.09.2013
60
Uri-II, U-2
NR
J&K
HYDRO
16.11.2013
60
SR
TN
HYDRO
27.08.2013
15
SR
TN
HYDRO
06.09.2013
15
SR
TN
HYDRO
25.09.2013
15
ER
SIKKIM
HYDRO
20.04.2013
49.5
ER
SIKKIM
HYDRO
21.04.2013
49.5
TOTAL
402
8728
15
Generation (BU)
1997-98
420.6
1998-99
448.4
1999-2000
480.7
2000-01
499.5
2001-02
515.2
2002-03
531.6
2003-04
558.3
2004-05
587.4
2005-06
Central
(%)
State
(%)
Private
Utilities
(%)
Overall
(%)
1997-98
64.7
70.4
60.9
71.2
1998-99
64.6
64.6
60.7
68
1999-00
67.3
67.3
63.7
68.9
2000-01
74.3
65.6
73.1
69.0
2001-02
74.3
67.0
74.7
69.9
2002-03
77.1
68.7
78.9
72.1
2003-04
78.7
68.4
80.5
72.7
2004-05
81.7
69.6
85.1
74.8
2005-06
82.1
67.1
85.4
73.6
2006-07
84.8
70.6
86.3
76.8
2007-08
86.7
71.9
90.8
78.6
2008-09
84.3
71.2
91.0
77.2
617.5
2006-07
662.4
2007-08
704.5
2008-09
723.8
2009-10
771.6
2009-10
85.5
70.9
82.4
77.5
2010-11
811.1
2010-11
85.1
66.7
76.7
75.1
2011-12
876.9
2011-12
82.1
68.0
76.2
73.3
2012-13
912.0
2012-13
79.2
65.6
64.1
69.9
2012-13*
607.227
2012-13 *
77.96
64.64
63.06
68.90
2013-14*
639.163
2013-14*
73.33
57.41
62.17
64.04
*April to November
* April to November
17
The power supply position since beginning of 9th Plan was as under :
Year
1997-98
424505
390330
34175
8.1
1998-99
446584
420235
26349
5.9
1999-00
480430
450594
29836
6.2
2000-01
507216
467400
39816
7.8
2001-02
522537
483350
39187
7.5
2002-03
545983
497890
48093
8.8
2003-04
559264
519398
39866
7.1
2004-05
591373
548115
43258
7.3
2005-06
631554
578819
52735
8.4
2006-07
690587
624495
66092
9.6
2007-08
737052
664660
72392
9.8
2008-09
777039
691038
86001
11.1
2009-10
830594
746644
83950
10.1
2010-11
861591
788355
73236
8.5
2011-12
937199
857886
79313
8.5
2012-13
998114
911209
86905
8.7
2012-13*
663928
606613
57315
8.6
2013-14*
671229
640834
30395
*upto November
4.5
MU=Million Unit
Peak Demand:
Year
1997-98
65435
58042
7393
11.3
1998-99
67905
58445
9460
13.9
1999-00
72669
63691
8978
12.4
2000-01
78037
67880
10157
13.0
2001-02
78441
69189
9252
11.8
2002-03
81492
71547
9945
12.2
2003-04
84574
75066
9508
11.2
2004-05
87906
77652
10254
11.7
2005-06
93255
81792
11463
12.3
2006-07
100715
86818
13897
13.8
2007-08
108866
90793
18073
16.6
2008-09
109809
96785
13024
11.9
2009-10
119166
104009
15157
12.7
2010-11
122287
110256
12031
9.8
2011-12
130006
116191
13815
10.6
2012-13
135453
123294
12159
9.0
2012-13*
135453
123294
12159
9.0
2013-14*
135561
129815
5746
4.2
*upto November
Generation (BU)
1000.0
912.0
900.0
876.9
811.1
800.0
771.6
700.0
639.2
662.4
587.4
600.0
531.6
480.7
500.0
607.2
617.5
558.3
515.2
499.5
448.4
420.6
400.0
300.0
200.0
100.0
0.0
1997-98 1998-99 1999- 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2012-13 2013-14
2000
(Upto (Upto
Nov-12) Nov-13)
73.33
57.4
62.2
64.0
77.96
64.6
63.1
68.9
79.2
65.6
64.1
69.9
68.0
76.2
73.3
82.1
85.1
76.7
75.1
66.7
77.5
85.5
82.4
70.9
91.0
84.3
71.2
77.2
78.6
86.7
90.8
71.9
76.8
84.8
86.3
70.6
85.4
73.6
82.1
67.1
74.8
81.7
85.1
69.6
68.4
77.1
78.9
72.1
68.7
74.3
67.0
74.3
73.1
69.0
65.6
67.3
67.3
63.7
68.9
71.2
72.0
66.0
64.6
64.6
60.7
68.0
78.0
64.7
70.4
84.0
74.7
69.9
96.0
90.0
78.7
80.5
72.7
60.9
723.8
704.5
60.0
54.0
48.0
42.0
36.0
30.0
24.0
18.0
12.0
6.0
0.0
2012-13 2013-14
(Upto
1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 (Upto
Nov-12) Nov-13)
15.0
Central
State
Private
Overall
19
13.8
13.0
12.4
11.8
11.3
12.2
11.2
11.7
12.3
11.9
14.0
12.7
9.8
12.0
10.6
9.0
180000
9.0
60000
135453
123294
135453
123294
130006
116191
122287
110256
119166
104009
109809
96785
108866
90793
93255
81792
87906
77652
84574
75066
81492
71547
78037
67880
72669
63691
67905
58445
80000
65435
58042
100000
78441
69189
120000
100715
86818
140000
10.0
8.0
135561
129815
160000
6.0
4.2
4.0
2.0
0.0
-2.0
-4.0
1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Peak Demand
Peak Met
5746
12159
12159
13815
-6.0
12031
15157
13024
18073
13897
11463
10254
9508
9945
9252
10157
8978
20000
9460
40000
7393
16.0
13.9
220000
200000
18.0
16.6
240000
-8.0
-10.0
Percent Shortage
Peak Shortage
11.1
9.6
8.8
6.2
830594
746644
777039
691038
690587
624495
631554
578819
591373
548115
559264
519398
545983
497890
522537
483350
480430
450594
446584
420235
424505
390330
400000
507216
467400
800000
737052
664660
1000000
600000
8.7
8.6
9.0
8.0
937199
857886
5.9
7.1
8.5
7.3
861591
788355
1200000
7.5
10.0
8.5
8.4
7.0
4.5
671229
640834
7.8
9.8
663928
606613
8.1
11.0
10.1
995557
908652
1400000
6.0
5.0
4.0
3.0
2.0
1.0
0.0
-1.0
-2.0
Energy Availability
Energy Shortage
-4.0
30395
57315
86905
79313
73236
83950
86001
72392
52735
43258
39866
48093
39187
39816
29836
26349
1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Energy Requirement
20
66092
-3.0
200000
34175
1600000
Percent Shortage
-5.0
-6.0
3
4
Owner
Name of Project
PM
Total Capacity
Rajasthan
NTPC
Anta CCPP
GT-Gas
88.71
Rajasthan
NTPC
Anta CCPP
GT-Gas
88.71
Rajasthan
NTPC
Anta CCPP
GT-Gas
88.71
Rajasthan
NTPC
Anta CCPP
GT-Gas
153.20
Uttar Pardesh
NTPC
Auriaya CCPP
GT-Gas
109.30
Uttar Pardesh
NTPC
Auriaya CCPP
GT-Gas
109.30
Uttar Pardesh
NTPC
Auriaya CCPP
GT-Gas
111.19
Uttar Pardesh
NTPC
Auriaya CCPP
GT-Gas
111.19
Uttar Pardesh
NTPC
Auriaya CCPP
GT-Gas
111.19
Uttar Pardesh
NTPC
Auriaya CCPP
GT-Gas
111.19
Rajasthan
NLC
Steam
125.00
Rajasthan
NLC
Steam
125.00
Haryana
NTPC
Steam
500.00
Haryana
NTPC
Steam
500.00
Haryana
NTPC
Steam
500.00
Delhi
NTPC
Steam
95.00
Delhi
NTPC
Steam
95.00
Delhi
NTPC
Steam
95.00
Delhi
NTPC
Steam
210.00
Delhi
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Dadri CCPP
GT-Gas
130.19
Uttar Pardesh
NTPC
Dadri CCPP
GT-Gas
130.19
Uttar Pardesh
NTPC
Dadri CCPP
GT-Gas
130.19
Uttar Pardesh
NTPC
Dadri CCPP
GT-Gas
130.19
Uttar Pardesh
NTPC
Dadri CCPP
GT-Gas
154.51
Uttar Pardesh
NTPC
Dadri CCPP
GT-Gas
154.51
Haryana
NTPC
Faridabad CCGT
GT-Gas
137.76
Haryana
NTPC
Faridabad CCGT
GT-Gas
137.76
Haryana
NTPC
Faridabad CCGT
GT-Gas
156.07
Uttar Pardesh
NTPC
Steam
490.00
Uttar Pardesh
NTPC
Steam
490.00
Uttar Pardesh
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Steam
500.00
Uttar Pardesh
NTPC
Steam
500.00
Uttar Pardesh
NTPC
Steam
500.00
Uttar Pardesh
NTPC
Steam
500.00
Uttar Pardesh
NTPC
Steam
500.00
Uttar Pardesh
NTPC
Steam
500.00
21
10
11
12
13
14
15
16
17
18
19
20
21
Uttar Pardesh
NTPC
Steam
200.00
Uttar Pardesh
NTPC
Steam
200.00
Uttar Pardesh
NTPC
Steam
200.00
Uttar Pardesh
NTPC
Steam
200.00
Uttar Pardesh
NTPC
Steam
200.00
Uttar Pardesh
NTPC
Steam
500.00
Uttar Pardesh
NTPC
Steam
500.00
Uttar Pardesh
NTPC
Steam
110.00
Uttar Pardesh
NTPC
Steam
110.00
Uttar Pardesh
NTPC
Steam
110.00
Uttar Pardesh
NTPC
Steam
110.00
Uttar Pardesh
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Steam
210.00
Uttar Pardesh
NTPC
Steam
210.00
Himachal Pradesh
NHPC
Hydro
66.00
Himachal Pradesh
NHPC
Hydro
66.00
Himachal Pradesh
NHPC
Hydro
66.00
Himachal Pradesh
NHPC
Hydro
180.00
Himachal Pradesh
NHPC
Hydro
180.00
Himachal Pradesh
NHPC
Hydro
180.00
Himachal Pradesh
NHPC
Hydro
100.00
Himachal Pradesh
NHPC
Hydro
100.00
Himachal Pradesh
NHPC
Hydro
100.00
Himachal Pradesh
NHPC
Hydro
77.00
Himachal Pradesh
NHPC
Hydro
77.00
Himachal Pradesh
NHPC
Hydro
77.00
Uttarakhand
NHPC
Hydro
70.00
Uttarakhand
NHPC
Hydro
70.00
Uttarakhand
NHPC
Hydro
70.00
Uttarakhand
NHPC
Hydro
70.00
NHPC
Hydro
130.00
NHPC
Hydro
130.00
NHPC
Hydro
130.00
NHPC
Hydro
115.00
NHPC
Hydro
115.00
NHPC
Hydro
115.00
NHPC
Hydro
115.00
NHPC
Hydro
115.00
NHPC
Hydro
115.00
NHPC
Hydro
11.00
NHPC
Hydro
11.00
22
23
24
25
26
27
28
29
NHPC
Hydro
11.00
NHPC
Hydro
11.00
Uttarakhand
NHPC
Hydro
31.40
Uttarakhand
NHPC
Hydro
31.40
Uttarakhand
NHPC
Hydro
31.40
Uttarakhand
THDC
Hydro
250.00
Uttarakhand
THDC
Hydro
250.00
Uttarakhand
THDC
Hydro
250.00
Uttarakhand
THDC
Hydro
250.00
Uttarakhand
THDC
Hydro
100.00
Uttarakhand
THDC
Hydro
100.00
Uttarakhand
THDC
Hydro
100.00
Uttarakhand
THDC
Hydro
100.00
NHPC
Hydro
120.00
NHPC
Hydro
120.00
NHPC
Hydro
120.00
NHPC
Hydro
120.00
NHPC
Hydro
60.00
NHPC
Hydro
60.00
NHPC
Hydro
60.00
NHPC
Sewa II H E P
Hydro
40.00
NHPC
Sewa II H E P
Hydro
40.00
NHPC
Sewa II H E P
Hydro
40.00
NHPC
Nimoo Bazoo
Hydro
15.00
NHPC
Nimoo Bazoo
Hydro
15.00
NHPC
Nimoo Bazoo
Hydro
15.00
Himachal Pradesh
SJVNL
Hydro
250.00
Himachal Pradesh
SJVNL
Hydro
250.00
Himachal Pradesh
SJVNL
Hydro
250.00
Himachal Pradesh
SJVNL
Hydro
250.00
Himachal Pradesh
SJVNL
Hydro
250.00
Hydro
250.00
Himachal Pradesh
SJVNL
Rajasthan
NPCIL
Rjasthan A P S
Nuclear
100
Rajasthan
NPCIL
Rjasthan A P S
Nuclear
200
Rajasthan
NPCIL
Rjasthan A P S
Nuclear
220
Rajasthan
NPCIL
Rjasthan A P S
Nuclear
220
Rajasthan
NPCIL
Rjasthan A P S
Nuclear
220
Rajasthan
NPCIL
Rjasthan A P S
Nuclear
220
Uttar Pradesh
NPCIL
Narora A P S
Nuclear
220
Uttar Pradesh
NPCIL
Narora A P S
Nuclear
220
Total NR
30
21221.26
Gujrat
NTPC
Gandhar CCPP
GT-Gas
144.30
Gujrat
NTPC
Gandhar CCPP
GT-Gas
144.30
23
31
32
33
34
35
36
37
24
Gujrat
NTPC
Gandhar CCPP
GT-Gas
144.30
Gujrat
NTPC
Gandhar CCPP
GT-Gas
224.49
Gujrat
NTPC
GT-Gas
106.00
Gujrat
NTPC
GT-Gas
106.00
Gujrat
NTPC
GT-Gas
106.00
Gujrat
NTPC
GT-Gas
106.00
Gujrat
NTPC
GT-Gas
116.10
Gujrat
NTPC
GT-Gas
116.10
Chhattiagarh
NTPC
Steam
200.00
Chhattiagarh
NTPC
Steam
200.00
Chhattiagarh
NTPC
Steam
200.00
Chhattiagarh
NTPC
Steam
500.00
Chhattiagarh
NTPC
Steam
500.00
Chhattiagarh
NTPC
Steam
500.00
Chhattiagarh
NTPC
Steam
500.00
Chhattiagarh
Steam
250.00
Chhattiagarh
Steam
250.00
Maharashtra
GT-Gas
240.00
Maharashtra
GT-Gas
240.00
Maharashtra
GT-Gas
260.00
Maharashtra
GT-Gas
240.00
Maharashtra
GT-Gas
240.00
Maharashtra
GT-Gas
260.00
Maharashtra
GT-Gas
240.00
Maharashtra
GT-Gas
240.00
Maharashtra
GT-Gas
260.00
Maharashtra
NTPC
Steam
500.00
Maharashtra
NTPC
Steam
500.00
Chhattiagarh
NTPC
Steam
500.00
Chhattiagarh
NTPC
Steam
500.00
Chhattiagarh
NTPC
Steam
660.00
Chhattiagarh
NTPC
Steam
660.00
Chhattiagarh
NTPC
Steam
660.00
Madhya Pradesh
NTPC
Steam
210.00
Madhya Pradesh
NTPC
Steam
210.00
Madhya Pradesh
NTPC
Steam
210.00
Madhya Pradesh
NTPC
Steam
210.00
Madhya Pradesh
NTPC
Steam
210.00
Madhya Pradesh
NTPC
Steam
210.00
Madhya Pradesh
NTPC
Steam
500.00
Madhya Pradesh
NTPC
Steam
500.00
Madhya Pradesh
NTPC
Steam
500.00
38
39
40
41
Madhya Pradesh
NTPC
Steam
500.00
Madhya Pradesh
NTPC
Steam
500.00
Madhya Pradesh
NTPC
Steam
500.00
Madhya Pradesh
NHDC
Hydro
65.00
Madhya Pradesh
NHDC
Hydro
65.00
Madhya Pradesh
NHDC
Hydro
65.00
Madhya Pradesh
NHDC
Hydro
65.00
Madhya Pradesh
NHDC
Hydro
65.00
Madhya Pradesh
NHDC
Hydro
65.00
Madhya Pradesh
NHDC
Hydro
65.00
Madhya Pradesh
NHDC
Hydro
65.00
Madhya Pradesh
NHDC
Hydro
125.00
Madhya Pradesh
NHDC
Hydro
125.00
Madhya Pradesh
NHDC
Hydro
125.00
Madhya Pradesh
NHDC
Hydro
125.00
Madhya Pradesh
NHDC
Hydro
125.00
Madhya Pradesh
NHDC
Hydro
125.00
Madhya Pradesh
NHDC
Hydro
125.00
Madhya Pradesh
NHDC
Hydro
125.00
Gujarat
NPCIL
Kakarapara A P S
Nuclear
220
Gujarat
NPCIL
Kakarapara A P S
Nuclear
220
Maharashtra
NPCIL
Tarapur A P S
Nuclear
160
Maharashtra
NPCIL
Tarapur A P S
Nuclear
160
Maharashtra
NPCIL
Tarapur A P S
Nuclear
540
Maharashtra
NPCIL
Tarapur A P S
Nuclear
540
Total WR
42
Tamil Nadu
18233.59
NEYVELI LIGNITE
Steam
210.00
Tamil Nadu
NEYVELI LIGNITE
Steam
210.00
Tamil Nadu
NEYVELI LIGNITE
Steam
50.00
Tamil Nadu
NEYVELI LIGNITE
Steam
50.00
Tamil Nadu
NEYVELI LIGNITE
Steam
50.00
Tamil Nadu
NEYVELI LIGNITE
Steam
50.00
Tamil Nadu
NEYVELI LIGNITE
Steam
50.00
Tamil Nadu
NEYVELI LIGNITE
Steam
50.00
Tamil Nadu
NEYVELI LIGNITE
Steam
100.00
Tamil Nadu
NEYVELI LIGNITE
Steam
100.00
Tamil Nadu
NEYVELI LIGNITE
Steam
100.00
Tamil Nadu
NEYVELI LIGNITE
Steam
210.00
Tamil Nadu
NEYVELI LIGNITE
Steam
210.00
Tamil Nadu
NEYVELI LIGNITE
Steam
210.00
Tamil Nadu
NEYVELI LIGNITE
Steam
210.00
Tamil Nadu
NEYVELI LIGNITE
Steam
210.00
Tamil Nadu
NEYVELI LIGNITE
Steam
210.00
25
43
44
45
46
47
48
Tamil Nadu
NEYVELI LIGNITE
Steam
210.00
Tamil Nadu
NEYVELI LIGNITE
Steam
250.00
Kerala
NTPC
GT-Gas
115.20
Kerala
NTPC
GT-Gas
115.20
Kerala
NTPC
GT-Gas
129.18
Andhra Pradesh
NTPC
Steam
200.00
Andhra Pradesh
NTPC
Steam
200.00
Andhra Pradesh
NTPC
Steam
200.00
Andhra Pradesh
NTPC
Steam
500.00
Andhra Pradesh
NTPC
Steam
500.00
Andhra Pradesh
NTPC
Steam
500.00
Andhra Pradesh
NTPC
Steam
500.00
Tamil Nadu
Steam
500.00
Tamil Nadu
Steam
500.00
Andhra Pradesh
NTPC
Steam
500.00
Andhra Pradesh
NTPC
Steam
500.00
Andhra Pradesh
NTPC
Steam
500.00
Andhra Pradesh
NTPC
Steam
500.00
Karnataka
NPCIL
Kaiga A P S
Nuclear
220
Karnataka
NPCIL
Kaiga A P S
Nuclear
220
Karnataka
NPCIL
Kaiga A P S
Nuclear
220
Karnataka
NPCIL
Kaiga A P S
Nuclear
220
Tamil Nadu
NPCIL
Madras A P S
Nuclear
220
Tamil Nadu
NPCIL
Madras A P S
Nuclear
220
Total SR
49
50
51
52
53
54
26
10019.58
Bihar
Steam
110.00
Bihar
Steam
110.00
Bihar
NTPC
BARH STPP ST II
Steam
660.00
Jharkhand
D.V.C
Steam
210.00
Jharkhand
D.V.C
Steam
210.00
Jharkhand
D.V.C
Steam
210.00
Jharkhand
D.V.C
Steam
130.00
Jharkhand
D.V.C
Steam
130.00
Jharkhand
D.V.C
Steam
130.00
Jharkhand
D.V.C
Steam
250.00
Jharkhand
D.V.C
Steam
250.00
West Bengal
D.V.C
Steam
130.00
West Bengal
D.V.C
Steam
210.00
West Bengal
D.V.C
Steam
500.00
West Bengal
D.V.C
Steam
500.00
Jharkhand
D.V.C
GT-Gas
30.00
Jharkhand
D.V.C
GT-Gas
30.00
Jharkhand
D.V.C
GT-Gas
30.00
57
58
59
60
61
62
63
West Bengal
D.V.C
Steam
500.00
West Bengal
D.V.C
Steam
500.00
West Bengal
D.V.C
Steam
210.00
West Bengal
D.V.C
Steam
210.00
West Bengal
D.V.C
Steam
210.00
West Bengal
D.V.C
Steam
210.00
West Bengal
D.V.C
Steam
250.00
West Bengal
D.V.C
Steam
250.00
West Bengal
D.V.C
Steam
500.00
West Bengal
D.V.C
Steam
500.00
West Bengal
NTPC
Steam
200.00
West Bengal
NTPC
Steam
200.00
West Bengal
NTPC
Steam
200.00
West Bengal
NTPC
Steam
500.00
West Bengal
NTPC
Steam
500.00
West Bengal
NTPC
Steam
500.00
Bihar
NTPC
Steam
210.00
Bihar
NTPC
Steam
210.00
Bihar
NTPC
Steam
210.00
Bihar
NTPC
Steam
210.00
Bihar
NTPC
Steam
500.00
Bihar
NTPC
Steam
500.00
Bihar
NTPC
Steam
500.00
Odisha
NTPC
Steam
500.00
Odisha
NTPC
Steam
500.00
Odisha
NTPC
Steam
500.00
Odisha
NTPC
Steam
500.00
Odisha
NTPC
Steam
500.00
Odisha
NTPC
Steam
500.00
Odisha
NTPC
Steam
62.50
Odisha
NTPC
Steam
62.50
Odisha
NTPC
Steam
62.50
Odisha
NTPC
Steam
62.50
Odisha
NTPC
Steam
110.00
Odisha
NTPC
Steam
110.00
Bihar
D.V.C
Hydro
20.00
Bihar
D.V.C
Hydro
20.00
Bihar
D.V.C
Hydro
23.20
Bihar
D.V.C
Hydro
40.00
Bihar
D.V.C
Hydro
40.00
Sikkim
NHPC
Hydro
20.00
Sikkim
NHPC
Hydro
20.00
27
64
65
Sikkim
NHPC
Hydro
20.00
Sikkim
NHPC
Hydro
170.00
Sikkim
NHPC
Hydro
170.00
Sikkim
NHPC
Hydro
170.00
West Bengal
NHPC
Hydro
33.00
West Bengal
NHPC
Hydro
33.00
West Bengal
NHPC
Hydro
33.00
West Bengal
NHPC
Hydro
33.00
Total ER
66
15925.20
TRIPURA
NEEPCO
GT-Gas
21.00
TRIPURA
NEEPCO
GT-Gas
21.00
TRIPURA
NEEPCO
GT-Gas
21.00
TRIPURA
NEEPCO
GT-Gas
21.00
67
TRIPURA
ONGC J/V
Tripura CCGT
GT-Gas
363.30
68
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
30.00
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
30.00
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
30.00
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
33.50
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
33.50
28
69
70
71
72
73
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
33.50
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
33.50
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
33.50
ASSAM
NEEPCO
Kathalguri CCPP
GT-Gas
33.50
Nagaland
NEEPCO
Hydro
25.00
Nagaland
NEEPCO
Hydro
25.00
Nagaland
NEEPCO
Hydro
25.00
Meghalaya
NEEPCO
Hydro
25.00
Meghalaya
NEEPCO
Hydro
25.00
Meghalaya
NEEPCO
Hydro
25.00
Assam
NEEPCO
Hydro
50.00
Assam
NEEPCO
Hydro
50.00
Assam
NEEPCO
Hydro
50.00
Assam
NEEPCO
Hydro
50.00
Arunachal Pradesh
NEEPCO
Hydro
135.00
Arunachal Pradesh
NEEPCO
Hydro
135.00
Arunachal Pradesh
NEEPCO
Hydro
135.00
Manipur
NHPC
Hydro
35.00
Manipur
NHPC
Hydro
35.00
Manipur
NHPC
Hydro
35.00
Total NER
Total ALL INDIA:
1598.30
66997.93
29
Type
Date of
Transfer
Levellised Successful
Tariff (in developer
` Per
kWh)
Mundra,
Gujarat
Coastal
23.04.2007
2.264
Tata
Power Ltd.
Sasan,
Madhya
Pradesh
Pithead
07.08.2007
1.196
Reliance
Power Ltd.
Krishnapat- Coastal
nam, Andhra Pradesh
29.01.2008
2.333
Reliance
Power Ltd.
Tilaiya,
Jharkhand
07.08.2009 1.77
Pithead
Reliance
Power Ltd.
The sites in Tamil Nadu & Gujarat for their second UMPPs
are being examined by CEA/PFC.
31
TRANSMISSION
POWRGRID
Transmission projects continue to be accorded a high priority in
the context of the need to evacuate power from generating
stations to load centres, system strengthening and
augmentation of National Grid. Construction targets of
POWERGRID's transmission projects for the year 2013-14 and
the achievements up to November 30, 2013 are summarized
below:
Parameter
MOU
Target
(Excellent)
Achievement
upto
November
30, 2013
% of
Achievement
Commissioned
Ckt. Kms. ready
for
Commissioning
(GW-Ckms)
7500
3829
51
Transformation
Capacity Addition
Ready for
Commissioning
(MVA)
20000
17310
87
10.
Ckt-I of LILO of 2x S/C 400KV Parbati-II Koldam/ Nalagarh Line at Parbati Pooling
Point (Q) - 2 GW-Ckm
400kV
11.
400kV
12.
400kV
13.
400kV
14.
Re-conductring of Siliguri-Purnea
D/C line - Ckt-II - 87 GW-Ckm
400kV
15.
400kV
16.
Baharampur(India)-Bheramara (Bangladesh)
400kV D/C line - 72 GW-Ckm
400kV
17.
400kV
18.
LILO of both ckt of 400KV Kishenpur Wagoora at Wanpoo Sub station - 5 GW-Ckm
400kV
II
New Sub-Stations
1.
765/400kV
2.
765/400kV
3.
765/400kV
4.
400/220kV
5.
400kV
6.
400kV
III
Extension of Sub-Stations
1.
765/400kV
2.
765/400kV
3.
400/220kV
4.
400/220kV
SI.
No.
Transmission lines
1.
765kV
2.
765kV
3.
765kV
5.
400/220kV
4.
765kV
6.
400/220kV
5.
765kV
7.
400/220kV
6.
765kV
8.
Imphal - 50 MVA
132/33kV
7.
400kV
8.
400kV
9.
400kV
33
34
Existing
(Nov.'13)
130
500
2000
1600
1600
1600
2100
2100
2100
500
14230
390
1400
1200
1400
4390
500
260
260
2100
2100
1000
6220
1000
130
2000
500
3630
WEST- SOUTH
Chandrapur HVDC back-to-back
Kolhapur-Belgaum 220kV D/c
Barsur - L. Sileru 220kV HVDC Monopole *
Ponda - Nagajhari 220kV D/c
Sub-total
EAST- NORTH EAST
Malda - Bongaigaon 400 kV D/c
Birpara-Salakati 220kV D/c
Sub-total
Various 132kV inter-regional links
Total
* 200 MW HVDC Monopole is currently not in operation
1000
260
200*
260
1520
1000
260
1260
600
31,850
Transmission System
Awarded to :
1.
2.
Reliance Power
Transmission Ltd.
Reliance Power
Transmission Ltd.
3.
4.
Raichur - Sholapur
Transmission System
5.
Consortium of Patel
Engg with Simplex
Infrastructure & BS
Transcom
Sterlite Technologies Ltd.
Transmission System
Awarded to :
--
--
35
Entry Route
Revised Position
FDI Cap
No Change
Entry Route
Automatic.
37
Shri B.N. Sharma, JS (D), MoP, Shri P.K. Sinha, Secretary (Power), MoP, Shri Raj Pal, EA, MoP
38
iii) Kutir Jyoti SchemeThis programme was launched in 1988-89 to provide single
point light connections to households of rural families below
the poverty line including harijans and adivasi families. The
allocation amongst the States was based on the size of rural
population below the poverty line and level of village
electrification in the State, with higher weightage given to
States having larger population of rural poor and low
electrification levels. This scheme has been now merged with
RGGVY.
(iv) Accelerated Rural Electrification Programme(AREP)The scheme was introduced in the year 2003-04 under which
interest subsidy of 4% was to be provided on loans availed by
State Governments/Power Utilities from Financial Institutions
for carrying out rural electrification programme. The assistance
was limited to electrification of un-electrified villages,
electrification of hamlets/dalit bastis/tribal villages and
electrification of households in villages through both
conventional and non-conventional sources of energy.
(v) Accelerated Electrification of One lakh villages and One
crore householdsGovernment of India in 2004-05 introduced a scheme
Accelerated Electrification of One lakh villages and One crore
households by merging the interest subsidy Scheme- AREP
(Accelerated Rural Electrification Programme) and Kutir Jyoti
Programme. Under this scheme there was a provision for
providing 40% capital subsidy for rural electrification projects
and the balance as loan Assistance on soft terms from REC. The
scheme has now been merged with the new scheme RGGVY.
(vi) Rajiv Gandhi Grameen Vidyutikaran Yojana(RGGVY)This Scheme of Rural Electricity Infrastructure and Household
Electrification has been introduced in April, 2005 for achieving
the National Common Minimum Programme objective of
providing access to electricity to all Rural Households over a
period of four years. Rural Electrification Corporation (REC) is
the nodal agency for the programme. An amount of
` 5000 crore was provided for remaining years of X Plan period.
Under this scheme 90% Capital Subsidy will be provided for
rural electrification infrastructure through: -
39
Benefitting education of girls through electricity under Rajiv Gandhi Gramin Vidyutikaran Yojna
Annexure-I
Year Wise Village Electrification
Sl.
YEARS
1
2
3
4
5
6
7
1990-91
1991-92
1992-93
1993-94
1994-95
1995-96
1996-97
8th Plan Total
1997-98
1998-99
1999-00
2000-01
2001-02
9th Plan Total
2002-03
2003-04
2004-05
2005-06
2006-07
10th Plan Total
2007-08
2008-09
2009-10
2010-11
2011-12
11th Plan Total
2012-13
2013-14
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Nos. of Villages
Electrified
10286
6046
3669
3352
3554
4086
3843
34836
3207
2780
2093
1218
4118
13416
2626
3352
3884
9819
28706
48387
9301
12056
18374
18306
7934
65971
2587
1016 (Up to 31.01.2013)
REMARKS
RGGVY
RGGVY
RGGVY
RGGVY
RGGVY
RGGVY
RGGVY
RGGVY
RGGVY
RGGVY
41
Secretary (P), MoP visited DT at Ahmed Nagar and inspected Meter, MODEM etc.
Initially 100% funds for Part A and 25% (90% for special
category states) funds for Part B projects shall be provided
through loan from the Govt. of India. The balance funds for
Part B projects shall be raised from financial institutions.
43
State
No of Projects Sanctioned
Andhra Pradesh
113
388.81
Bihar
71
194.60
Chandigarh
01
33.34
Chhattisgarh
20
122.45
Goa
04
110.74
Gujarat
84
230.72
Haryana
36
165.63
Jharkhand
30
160.61
Karnataka
98
391.14
10
Kerala
43
214.40
11
Madhya Pradesh
83
275.63
12
Maharashtra
128
315.43
13
Puducherry
04
27.53
14
Punjab
47
272.85
15
Rajasthan
87
315.93
16
Tamil Nadu
110
417.00
17
Uttar Pradesh
168
650.68
18
West Bengal
61
163.77
1188
4451.26
Sub-Total
Special category States
19
Arunachal Pradesh
10
37.68
20
Assam
67
173.78
21
Himachal Pradesh
14
96.41
22
J&K
30
151.99
23
Manipur
13
31.55
24
Meghalaya
33.99
25
Mizoram
35.12
26
Nagaland
34.58
27
Sikkim
26.30
28
Tripura
16
35.18
29
Uttrakhand
31
125.82
Sub-Total
210
782.39
TOTAL
1398
5233.65
45
State
No of Projects Sanctioned
Andhra Pradesh
126.56
Assam
21.82
Bihar
22.02
Chattisgarh
41.06
Gujarat
138.51
Jammu &Kashmir
52.89
Jharkhand
70.23
Haryana
24.29
Kerala
83.15
10
Madhya Pradesh
102.94
11
Maharashtra
161.62
12
Punjab
52.36
13
Puducherry
13.89
14
Rajasthan
150.90
15
Tamilnadu
182.17
16
Uttar Pradesh
12
280.81
17
Uttrakhand
16.55
18
West Bengal
32.94
Total
70
1574.71
46
State
Projects Sanctioned
1
2
Andhra Pradesh
79
1365.72
Assam
67
644.05
3
4
Bihar
64
1155.21
Chhattisgarh
19
710.24
Gujarat
58
954.02
Jharkhand
30
1181.45
Haryana
33
1321.12
Karnataka
81
786.59
Himachal Pradesh
14
338.97
10
J &K
30
1665.27
11
Kerala
43
1078.30
12
Madhya Pradesh
81
2034.60
13
Maharashtra
122
3408.24
14
Manipur
13
398.87
15
Meghalaya
159.73
16
Mizoram
240.41
17
Puducherry
84.78
18
Punjab
46
1632.70
19
Rajasthan
81
1536.07
20
Sikkim
68.46
21
Tamil Nadu
74
2281.69
22
Tripura
16
165.09
23
Uttar Pradesh
167
5777.01
24
Uttrakhand
31
584.09
25
West Bengal
59
808.78
1229
30381.46
Total
Annexure III
STATE
Andhra Pradesh
NO. OF TOWNS
113
54
Assam
67
01
Chhattisgarh
20
08
Gujarat
84
71
Himachal
14
11
Karnataka
98
46
Maharashtra
128
67
Madhya Pradesh
83
64
Rajasthan
87
03
10
Sikkim
02
02
11
Tripura
16
01
12
Uttar Pradesh
168
34
13
Uttrakhand
31
08
14
West Bengal
61
61
TOTAL
431
47
2.
3.
4.
5.
6.
7.
?
The Balance 50% Short Term Liabilities will be rescheduled
48
ENERGY CONSERVATION
800
700
600
500
400
300
200
100
0
1971 1973 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011
Coal/peat
Oil
Natural gas
Nuclear
Hydro
Geothermal/solar/wind
49
50
900
829
773
800
700
644
558
600
592
500
400
343
388 384
368
297
300
200
123 120
191
157 174
100
0
1999 2000 20012002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Year
800
711
616
700
504
600
500
400
308
359 357
252 245
300
155
200
100 90
100
325
122
103
45
0
1999 2000 20012002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Year
51
5000000
4507668
4500000
4000000
3500000
3090610
3000000
2500000
2072285
2000000
1563426
1500000
911553
1000000
500000
696150
343526
399722
2005
2006
525708
Year
2007
2008
2009
2010
2011
2012
2013
59
37
126
Andhra Pradesh
Delhi
Karnataka
Kerala
Punjab
Haryana
Chhatisgarh
Himachal Pradesh
Maharashtra
53
54
State Sector
Central Sector
Total (State
Sector +
Central Sector)
1. LE
38 (6820)
32 (5246)
70 (12066)
2. R&M
20 (4150)
45 (13151)
65 (17301)
Total
58 (10970)
77 (18397)
135 (29367)
2.
3.
1.
2.
3.
3.
1. 2
1.
2.
ii)
55
ii)
56
S. Consultancy Services
No.
Status
1.
Implementation Support
Consultancy (ISC)
2.
Study on Review of
institutional capacity
and Strengthening of
Institutional capacity
CEA
3.
Study on Reduction of
Barriers to R&M
intervention in
Thermal Power
Plant in India
4.
Study on Developing
Markets for
implementation of
R&M schemes in TPS
in India
5.
Study on Review of
Experience from
Pilot R&M projects
interventions in
TPS in India
ii)
57
A panoramic view of Hirakud Hyro-electric Project of Odisha Hydro Power Corporation Ltd. (OHPC)
59
INTERNATIONAL COOPERATION
INTERNATIONAL COOPERATION
IC Division works for enhancing Cooperation with various
countries in the Power Sector. During 2013, Minister level visits
were undertaken to Germany, Sweden, USA, Canada and UK.
Further, active interest has been taken in enhancement of
Bilateral Cooperation with Bangladesh, Bhutan, Canada, China,
Nepal, Sri Lanka, Germany, Japan, United States of America,
European Union etc. Multilateral engagement under the
umbrellas of SAARC, Clean Energy Ministerial and International
Energy Agency was also undertaken.
Representatives of many countries regularly visit Ministry of
Power, which demonstrates their confidence in the policies of
our sector.
BILATERAL COOPERATION:
Bangladesh
A Memorandum of Understanding on energy cooperation was
signed between Govt. of India and Govt. of Bangladesh in
January, 2010. Pursuant to that NTPC signed an MOU for
cooperation in power sector with Bangladesh Power
Development Board (BPDB) on 30th Aug 2010. The MOU, interalia, included setting up a 1320 MW coal based power project
through 50:50 Joint Venture with BPDB in Bangladesh, subject
to techno-commercial feasibility and necessary approvals. A
Joint Venture Agreement (JVA) was signed between NTPC and
BPDB on 29.01 .2012 for incorporating a Joint Venture Company
(JVC) with equal equity participation (50:50) for developing
power project(s) in Bangladesh. JV Company by the name of
'Bangladesh- India Friendship Power Company (Pvt) Limited'
(BIFPCL) has been incorporated on 31st Oct 2012, as per the laws
of Bangladesh, for developing coal based power project(s) in
'Bangladesh. NTPC is providing consultancy services to
Bangladesh Power Development Board (BPDB) for feasibility
studies for proposed coal based power projects at Khulna and at
Chittagong. Feasibility Report for the 1320 MW coal based
power project at Khulna has been finalized and accepted by
NTPC and BPDB. Power Purchase Agreement (PPA) and
lmplementation Agreement (lA) for the project have been
signed by BIFPCL with BPDB and Govt. of Bangladesh
respectively on 20.04.2013. Land filling work at site is under
progress. Work on construction of temporary site office and
transit camp has started. For Chittagong power project, NTPC
would take up preparation of Feasibility Report as soon as
location is identified by BPDB.
A PPA has been signed between BPDB & NTPC Vidyut Vyapar
Nigam Limited (NWN) on 28.02.2012 for supply of 250 MW of
power to Bangladesh from unallocated quota of Government of
India in Central generating stations.
NTPC is providing O&M consultancy for Siddhirganj Peaking
Power Plant. The Scope of work covers management of
Commissioning, PG test, Operation & Maintenance, Finance &
61
Power Sale Agreement (PSA) between NEA and PTC has been
signed for import of 150MW for 25years. For initial 5-7years, it is
estimated that Nepal will have a power deficit to the tune of
200- 300 MW and this shortfall is likely to be met by import from
Indian Electricity market through the 400kV MuzaffarpurDhalkebar D/C line to be initially operated at 220 kV. In the next
7-10 years, hydro power projects in Nepal such as Upper
Marsyangdi (600MW) Upper Karnali (900 MW), Arun-III
(900MW), Tamakoshi (800 MW) etc., are likely to be
materialized. NEA would have huge surplus for export to India
after meeting their internal load demand. In order to evacuate
and transfer of power to India, additional high power density
400kV AC (Quad) cross border links in Upper Karnali- Berilly,
Upper Marsyangdi Gorakhpur, Arun-III- Muzaffarpur, ButwalGorakhpur corridors are being planned to be developed,
matching with the commissioning of the above hydro projects
in Nepal.
Sri Lanka
Pursuant to the Memorandum of Agreement signed between
NTPC, Govt. of Sri Lanka (GOSL) and Ceylon Electricity Board
(CEB), NTPC and CEB signed a Joint Venture Agreement on 6th
September 2011 in Colombo to develop a 2x250 MW coal based
power project in Trincomalee Sri Lanka with equal (50:50)
equity participation. JV Company by the name "Trincomalee
Power Company Limited" (TPCL) has been incorporated in
Colombo on 26th September 2011.
Progress made on project Agreements:
On 7th October 2013, in the presence of Hon'ble Foreign
Minister, GoI and Ministers of Sri Lanka, following agreements
were signed by TPCL with the respective counterparties in
Sri Lanka.
i.
ii.
Electrical Grid
62
2.
3.
4.
63
64
II.
(i)
3.
a.
Generation Projects:
a.
b.
c.
d.
e.
2.
a.
b.
65
Final Dividend Payment for 2012-13 - North Eastern Electric Power Corporation Ltd.
67
68
69
ii)
70
State
Installed
Commissioning
Capacity
(MW)
schedule
1.
600
March 2017
2.
Mizoram
60
December 2015
3.
Arunachal Pradesh
110
September 2015
4.
Tripura
101
November 2014
5.
Agartala Gas
Turbine PlantCombined Cycle
Extension Project
Tripura
51
March 2015
6.
Grid Interactive
Solar Power Plant
at TGBPP Site
Tripura
October 2014
T O TA L
927
FUTURE PROJECTS :
Sl. Name of
No. the Project
State
Installed
Capacity
(MW)
1.
Arunachal Pradesh
2.
Meghalaya
85
3.
Lungreng HE Project
Mizoram
815
4.
Chhimtuipui HE Project
Mizoram
635
5.
Mat HE Project
Mizoram
76
6.
Assam/Meghalaya
240
7.
Manipur
1500
Hydro Total
7101
Meghalaya
500
3750
THERMAL PROJECTS
1.
1.
2.
3.
Gujarat
100
TOTAL
7708
107
71
Inauguration of DVC Pavilion in IITF-2013 by Union Power Secretary, Shri P K Sinha IAS
72
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
I)
73
74
b)
c)
d)
e)
f)
g)
3)
75
(ii)
2.
a)
b)
b.
c.
d.
77
c)
d)
e)
3.
4.
6.
7.
8.
(c)
(i)
(ii)
79
(1)
(b)
(c)
(d)
(e)
(f)
These are:-
The staff shall examine the reports of the MemberSecretary, NRPC and NRLDC and shall submit to the
Commission within one month of the receipt of the
reports of NRPC and NRLDC.
(ii)
3.
Joint Electricity Regulatory Commission (For the State of Goa & Union Territories)
Introduction
In exercise of the powers conferred by Section 83 of the
Electricity Act, 2003, the Central Government constituted a two
member (including Chairperson) Joint Electricity Regulatory
Commission for all Union Territories except Delhi to be known
as 'Joint Electricity Regulatory Commission for Union
Territories' with Headquarter at Delhi as notified vide
Notification No. S.O. 643(E) dated 2nd May, 2005. Later with the
joining of the State of Goa, the Commission came to be known
as 'Joint Electricity Regulatory Commission for the State of Goa
and Union Territories' as notified vide Notification No. 1271(E)
dated 30th May, 2008. The Joint Electricity Regulatory
Commission for the State of Goa and Union Territories started
functioning with effect from August 2008. Office of the
Commission is presently located in a rented building in the
district town of Gurgaon, Haryana.
g)
Functions of JERC
1. As per the Electricity Act, 2003, the Commission is vested
with the responsibility of discharging the following
functions:
j)
k)
a)
l)
2.
a)
b)
c)
81
d)
e)
f)
3.
82
22.03.2013
25.03.2013
28.03.2013
31.03.2013
31.03.2013
10.04.2013
15.04.2013
22.05.2013
3.
2.
3.
4.
5,
6.
7.
8.
83
NTPC LIMITED
1.0
2.0
MW) & Kanti Stg-I U#1 (110 MW). While Barh & Rihand
are new units, Kanti Stg-I U#1 has undergone R&M for
revival after take over from BSEB.
85
COMMERCIAL PERFORMANCE
Billing and Realisation: NTPC has been able to
consistently maintain 100% realization of bills for 11 years
in succession. During the current financial year 2013-14,
the amount billed up to Nov.'13 is ` 45,851 crore.
86
GROWTH
Under Long Term Planning, NTPC prepares Corporate
Plans which are co-terminus with the national five year
plans. In view of the changes in the business
environment, NTPC has prepared its Corporate Plan
2010-32 which lays the broad roadmap for NTPC's
growth for the period 2010-32.
NTPC envisages to have an installed capacity of 128,000
MW by the year 2032 with a well diversified fuel mix
comprising 56% coal, 16% gas, 11% nuclear energy, 9%
renewable energy and 8% hydro power based capacity.
NTPC has formed various Joint Venture companies and
Subsidiaries for pursuing growth. Details of these
companies are enclosed at Annexure-I.
4.1
3.2
4.0
4.3
87
JV Company
NTPC has formed a joint venture company under the
name 'Pan-Asian Renewables Private Ltd' with Asian
Development Bank (ADB) and Kyuden International
Corporation, a wholly owned subsidiary of Kyushu
Electric Power Company Inc. (Kyushu), Japan as
partners. The company has been incorporated to
develop renewable energy projects and initially
establish over a period of three years a portfolio of
about 500 MW of renewable power generation
resources in India.
Forward Integration
NTPC has formed following Subsidiaries/ Joint Ventures
for related power business
(i) NTPC Electric Supply Company Limited (NESCL)
(ii) NTPC Vidyut Vyapar Nigam Limited (NVVN)
(iii) National Power Exchange Limited (NPEX)
Details enclosed at Annexure-I(C).
4.6
Backward Integration
4.6.1. Development of Captive Coal Mines : Coal mining is
integral to NTPC's fuel security strategies. NTPC realizes
that greater self reliance on coal will go a long way in
ensuring the sustained growth of generation.
NTPC has been allotted six coal blocks namely PakriBarwadih, Chatti-Bariatu, Kerandari, Dulanga, Talaipalli
and Chatti-Bariatu (South). These coal blocks are being
developed with a targeted coal production of 3 MTPA by
2014, which shall be raised to 33 MTPA by 2017-18.
Subsequently, these coal blocks shall achieve their full
production potential of 53 MTPA, which will cater to
88
89
Heat recovery from waste flue gas for air conditioning of ESP
control room at NTPC Ramagundam has been
commissioned.
90
91
92
93
94
95
NTPC limited has been given Jury Award for 'Lasting Impact
on Indian Economy' at the PSU Awards- 2013.
NTPC Limited was awarded the Pride of India award for its
leadership and contribution to the power sector.
Equity Holding as
on 30.11.2013
Area(s) of Operation/Status
96
NTPC-50%
SAIL-50%
3.
4.
NTPC-74%
Indian Railways-26%
5.
NTPC-65%
BSEB-35%
6.
NTPC-50%
BSEB-50%
7.
NTPC-50%
UPRVUNL-50%
NTPC-50%
IPGCL-25%
HPGCL-25%
9.
NTPC-50%
CEB-50%
10.
NTPC-50%
BPDB-50%
(B)
1.
NTPC-100%
2.
Anushakti Vidhyut
Nigam Limited
NTPC-49%
NPCI -51%
(27.01.2011)
NTPC, GAIL-32.86%
each
IFIs-16.87%
MSEB Holding Co.17.41%
Company has taken over gas based Dabhol Power Project along with
LNG terminal. Entire 1940 MW Power Blocks of the gas power project
are under commercial operation and GoI has allocated full quantum of
gas required for Power Blocks.
5 MTPA LNG terminal of RGPPL has been commissioned and being
commercially utilised since April 2013.
97
Pan-Asian Renewables
Private Limited
(14.10.2011)
(C)
1.
NTPC-100%
2.
NTPC-100%
3.
NTPC-16.67%
NHPC-16.67%
PFC-16.66%
TCS-19.04%
BSE-16.66%
IFCI-5.72%
Meenakshi
Energy-4.77%
DPSC-3.81%
(D)
1.
98
NTPC-50%
ADB-25%
Kyushu-25%
NTPC-14.28%
SAIL,
CIL-28.58% each
The JVC shall endeavor to Develop Projects and establish over a period
of three (3) years a portfolio of about 500 MW of Renewable Power
Generation resources in India. In the long term, the JVC shall endeavor
to Develop Projects up to an aggregate capacity of 2,500 MW or more.
In the future, the JVC may Develop Projects outside India, provided always
that the JVC shall only Develop Projects in Developing Member Countries.
The First Business Plan of the Company is under preparation.
NTPC-50%
Singareni Collieries
Co. Ltd.-50%
3.
NTPC-50%
CIL-50%
(E)
1.
NTPC-50%
BHEL-50%
The company seeks to explore, secure and execute EPC contracts for
power plants and other infrastructure projects in the AGREED MARKET
in India and abroad including plant engineering, project management,
quality assurance, quality control, procurement, logistics, site
management, erection and commissioning services. The company is
also to engage in manufacturing and supply of equipment for power
plants and other infrastructure projects in India and Abroad.
Company has prepared its Business Plan in two Phases. Under Phase-I,
company shall take up EPC contracts and manufacturing of BOPs. In
Phase-II, company shall create manufacturing facility for Boilers,
Turbines and Generators. The Company is to set up its manufacturing
facility at Mannavaram in Andhra Pradesh and the construction work is
in progress. The Company is also exploring EPC Contracts from BHEL on
nomination basis.
2.
NTPC-49%
Bharat Forge
Ltd.-51%
3.
NTPC-44.60%
Govt. of
Kerala-54.56%
Others-0.84%
NTPC took over 44.6% stake in TELK for entry into manufacturing and
repair of high voltage power transformers and associated equipment
For expansion and up gradation of the facility, technology tie up is
being pursued.
(F)
1.
NTPC-50%
Reliance
Infrastructure
Ltd.-50%
2.
NTPC-50%,
Alstom Power
Gen. AG-50%
3.
NTPC-20%
NHPC-20%
PGCIL-20%
DVC-20%
CPRI-20%
To establish research and test facility for power sector such as "Online
High Power Test Laboratory" for short circuit testing and other facilities
as may be required for the same in the country. The Lab is being set up at
Bina, MP.
4.
NTPC-25%,
PFC-25%,
PGCIL-25%
REC-25%
99
State
Capacity (MW)
End X
Plan
XI
Plan
XII
Plan
Total
Installed
I.
1.
UP
2000
2000
2.
Chhattisgarh
2100
500
2600
3.
AP
2600
2600
4.
WB
1600
500
2100
5.
MP
3260
1000
4260
6.
Rihand-I & II
UP
2000
1000
3000
1340
1000
2340
840
980
1820
7.
Kahalgaon-I & II
Bihar
8.
UP
9.
Odisha
3000
3000
10.
Talcher TPS
Odisha
460
460
11.
UP
1050
1050
12.
Simhadri-I & II
AP
1000
1000
2000
13.
Tanda TPS
UP
440
440
14.
Badarpur
Delhi
705
705
15.
Sipat-I & II
Chattisgarh
2320
660
2980
16.
Mouda-I
Maharashtra
1000
1000
Barh-II
Bihar
17.
Total (Coal)
660
660
22395
6300
4320
33015
II.
1.
652
652
2.
Anta-I
413
413
Rajasthan
3.
Kawas-I
Gujarat
645
645
4.
Dadri
UP
817
817
5.
Jhanor-Gandhar-I
Gujarat
648
648
6.
RGCCPP Kayamkulam-I
Kerala
350
350
Faridabad
Haryana
7.
Total (Gas)
III.
1.
2.
RENEWABLE PROJECTS
Andaman Solar PV
A&N
Dadri Solar PV
UP
Total (Renewable)
430
430
3955
3955
10
10
IV.
1.
120
120
2.
Durgapur (NSPCL)
120
120
West Bengal
3.
Bhilai (NSPCL)
Chhattisgarh
74
500
574
4.
Ratnagiri (RGPPL)
Maharashtra
740
1200
1940
5.
Muzaffarpur (KBUNL)
Bihar
110
110
220
6.
Jhajjar (APCPL)
Haryana
1000
500
1500
7.
Vallur (NTECL)
Tamil Nadu
500
500
1000
100
1054
3310
1110
5474
27404
9610
5440
42454
Capacity (MW)
Ongoing projects
750
1320
500
2640
800
520
2400
1320
1600
10
1600
11
500
12
13
10
14
15
Unchahar Solar PV / UP
10
16
10
17
50
18
Singrauli Solar PV / UP
15
19
171
20
500
21
1000
22
1980
23
390
24
1320
Sub Total - A
19419
B.
Projects for which Main Plant bids have been received/ invited
1320
1600
1980
120
40
40
Sub Total - B
5100
101
1320
500
1320
1600
2640
1320
2640
1320
1050
10
1050
11
2100
12
1300
13
1300
14
460
15
100
16
20
17
1320
18
500
102
Sub Total - C
21860
46379
NHPC LIMITED
NHPC Limited (earlier known as National Hydroelectric Power
Corporation Ltd.) is a Schedule A Mini-Ratna Enterprise of the
Government of India with an authorized share capital of
` 15,000 Crore and an investment base of more than ` 40,471
crores. NHPC was set up in 1975 and has now become the
largest organization for hydro power development in India,
with capabilities to undertake all the activities from
conceptualization to commissioning of Hydro Projects. The
main objects of NHPC include, to plan, promote and organize an
integrated and efficient development of power in all its aspects
through Conventional and Non Conventional Sources in India
and Abroad and transmission, distribution, trading and sale of
power generated at stations. The Company is also listed with
the Bombay Stock Exchange and National Stock Exchange.
NHPC at present has power stations aggregate to 5747 MW
(including JVs) of installed capacity in operating and has six
projects under construction with total installed capacity of 4050
MW. Amongst this under construction projects, three Units of
60 MW each of Uri-II Project have been commissioned.
Remaining one unit (60MW) is likely to be commissioned in
Dec'13. One more project (Parbati-III of 520MW) is scheduled
to be commissioned by the end of financial year.
Projects under Operation
NHPC has so far commissioned 18 hydroelectric projects with
an aggregate installed capacity of 5747 MW which includes 2
projects with total installed capacity of 1520 MW in Joint
Venture with Govt. of Madhya Pradesh as per details below.
S. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Name of Project
Bairasiul
Loktak
Salal
Tanakpur
Chamera-I
Uri-I
Rangit
Chamera-II
Dhauliganga-I
Dulhasti
Teesta-V
Sewa-II
Chamera-III
Chutak
TLDP-III
Nimoo Bazgo
Indirasagar (JV)
Omkareshwar (JV)
State
Himachal Pradesh
Manipur
Jammu & Kashmir
Uttarakhand
Himachal Pradesh
Jammu & Kashmir
Sikkim
Himachal Pradesh
Uttarakhand
Jammu & Kashmir
Sikkim
J&K
Himachal Pradesh
J&K
WB
J&K
Madhya Pradesh
Madhya Pradesh
Total
Installed
Capacity
(MW)
180
105
690
120
540
480
60
300
280
390
510
120
231
44
132
45
1000
520
5747
Installed
CAPACITY
ACTUAL
LIKELY TO BE
TOTAL
GENERAGENERATED EXPECTED
TION UPTO
IN BALANCE
GEN30.11.2013
PERIOD i.e. ERATION
(Including
DEC/13 to
DURING
Auxilliary
MAR'14
2013-14
Consumption
and Transformation loss)
BAIRA SIUL
180
502
114
616
LOKTAK
105
480
121
601
SALAL
690
2712
338
3050
TANAKPUR
94.2
354
34
388
CHAMERA -I
540
1976
278
2254
URI
480
1953
550
2503
RANGIT
60
294
54
348
CHAMERA-II
300
1218
197
1415
DHAULIGANGA
280
282
287
DULHASTI
390
1821
268
2089
TEESTA-V
510
2155
168
2323
SEWA-II
120
356
109
465
CHAMERA-III
231
857
103
960
Chutak
44
20
16
36
TLDP-III
132
180
33
213
NIMMO BAZGO
45
33
37
71
URI-II
180
119
331
450
PARBATI-III
520
46
46
TOTAL
4901
15314
2802
18115
NOTE
Anticipated generation from Dec'13 to Mar'14 has been
considered keeping in view present trend of generation in
Nov'13.
103
PLANTAVAILABILITY FACTOR
UPTO NOV'13
LIKELY PLANT
AVAILABILITY
FACTOR IN BALANCE PERIOD i.e.
DEC'13 TO MAR'14
(ANTICIPATED)
TOTAL
EXPECTED
PAF DURING
2012-13
BAIRA SIUL
99.5
68.7
89.3
LOKTAK
90.5
83.1
88.0
SALAL
81.9
33.1
65.7
TANAKPUR
73.4
15.8
54.3
CHAMERA -I
99.8
86.1
95.2
URI
78.4
49.3
68.8
RANGIT
99.8
80.6
93.4
101.7
86.1
96.5
31.5
8.5
23.9
CHAMERA-II
DHAULIGANGA
DULHASTI
100.0
86.1
95.4
TEESTA-V
97.2
48.5
81.1
SEWA-II
101.4
76.0
93.0
CHAMERA-III
93.5
72.0
86.4
Chutak
62.5
22.8
49.3
TLDP-III
NIMMO BAZGO
39.1
29.5
35.9
100.0
29.8
76.7
98.1
56.2
64.2
0.0
5.0
1.7
86.3
56.8
68.1
URI-II
PARBATI-III
TOTAL
Project
State
Uri-II
J&K
Capacity (MW)
Parbati-II
H. P.
Subansiri Lower
Parbati-III
H. P.
520
W. B.
160
Kishanganga
J&K
330
Total
4050
240*
800
2000
104
105
106
107
109
GRID MANAGEMENT
The grid management function in the country is continued to be
looked after by Power System Operation Corporation Limited
(POSOCO), a fully owned subsidiary of POWERGRID, with its
state-of-the-art Unified Load Despatch & Communication
facilities. These facilities are being updated continuously to
further improve quality and economy in operation of power
systems besides improving data availability, visibility and
transparency.
TECHNOLOGY DEVELOPMENT
For efficient utilisation of precious RoW, the Company is
deploying state-of-the-art technologies such as high
temperature low sag Conductors, series compensation
including Thyristor Control, Multi Circuits, Compact & Tall
Towers, High Surge Impedance Loading Lines, etc.. The
Company gives priority to research activities with potential for
societal, environmental & national benefits by application of
advance technologies and finding solutions to gear up for future
challenges.
110
111
112
113
114
2011-12
2012-13
Sanctions
75,197
64,752
75,147
Disbursements
34,122
41,418
45,151
Profit Before
Tax
3,544
4,242
5,967
2,620
3,032
4,420
599
792
924
Dividend
iii.
iv.
v.
RESOURCE MOBILISATION
Domestic
PFC mobilized funds amounting to ` 24,767 Crore from the
domestic market during FY 2013-14 till 30.11.2013. Out of
the above, ` 20,534 Crore was raised through issue of
unsecured/secured taxable/Tax Free bonds in the nature
of debentures, ` 2,299 Crore by way of long/medium term
loans from Banks/FIs, and ` 1934 Crore by way of issue of
Commercial Paper and Short Term Loans.
6.2 External
During the FY 2013-14 (up to Nov, 2013), PFC could not
raise foreign currency loan in the absence of availability of
funds at competitive rates resulting from volatility in the
foreign currency markets and higher forward rates due to
Rupee depreciation. During the FY 2012-13, the Company
had raised ECB of USD 500 Million through Syndicated
loans.
7.0 NEW BUSINESS INITIATIVES
7.1 Establishment of Post Sanction Coordination Unit
The Post Sanction Coordination (PSC) Unit is primarily
responsible for administering loans for private sector
power projects where PFC is the Lead FI. It is dedicated to
the needs of those private sector borrowers who have
reposed faith in the services of the Corporation.
Despite the challenges being faced by the sector, the Unit
has achieved disbursements of ` 3265 crore during the
Financial Year 2012-13 and ` 3253 crore during the first
two quarters of Financial Year 2013-14. The major
projects to which disbursements were made during the
period include RKM Powergen Pvt. Ltd., Indiabulls
Realtech Ltd., GVK Ratle Hydro Electric Project Pvt. Ltd.,
Indiabulls Power Ltd., KSK Mahanadi Power Company Ltd.,
Ind Bharat Energy (Utkal) Ltd., Jal Power Corporation Ltd.,
Bhubaneshwar Power Pvt. Ltd., Lanco Amarkantak Power
Ltd., Udupi Power Corporation Ltd., Parbati Koldam
Transmission Company Ltd., East Coast Energy Pvt. Ltd.,
DANS Energy Pvt. Ltd. and others.
With an aim to give impetus to consortium lending
operations, PSC is working towards harnessing the huge
business potential offered by the power sector.
115
116
117
118
119
PFC has revisited the CSR Policy and formulated a new CSR
& SD Policy in FY 2013-14 as per revised DPE guidelines
which clubbed together CSR and SD Policy.
120
No.
21
7
6
4
3
1
42
22.7 Assignments
79 assignments worth around ` 211 Crore (apart from
UMPPs and ITPs) out of which 60 assignments have
121
Type
Date of
Transfer
Levellised Successful
Tariff (in ` Developer
Per kWh)
Tata Power
Ltd.
Reliance
Power Ltd.
Reliance
Power Ltd.
Reliance
Power Ltd.
122
Date of
Transfer
Levelised Successful
Tariff (in Developer
` million
p.a.)
1. East North
Interconnection
Company Limited
2. Jabalpur
Transmission
Company Limited
3. Bhopal Dhule
31.03.2010
1187.95
31.03.2011
1421.28
31.03.2011
1995.30
4. NagapattinamMadhugiri
Transmission
Company Limited
5. Patran
Transmission
Company Limited
6. Prurlia &
Kharagpur
Transmission
Company Limited
7. DarbhangaMotihari
Transmission
Company Limited
29.03.2012
987.02
13.11.2013
274.00
09.12.2013
589.00
10.12.2013
1173.69
Sterlite
Technologies
Limited
Sterlite
Transmission
Project Pvt. Ltd.
Sterlite
Transmission
Project Pvt. Ltd.
Power Grid
Corporation
of India Limited
Techno Electric
& Engineering
Company Limited
Sterlite Gird
Limited
Essel Infraprojects
Limited
For RTCL, Letter of Intent (LOI) has been issued to the successful
bidder and the SPV will be transferred shortly. For DTCL, TTCL
and BGTCL the bidding process are under progress.
2012-13
(` in Crore)
1.
79,470.49
40,183.06
2.
3.
26,728.86
4.
Resource Mobilization
30,759.16
5,163.95
3,817.62
17,454.38
Dividend
814.65
103.26
5.
6.
Transmission &
Distribution
Generation
Renewable
Energy
Loan under
RGGVY scheme
DDG (excluding
RGGVY Subsidy)
Short Term Loan
Total
Targets
as per
MoU
for the
year
2013-14
Target
achieved
till
30.11.2013
Anticipated
achievement
during the
remaining period
of the year i.e.
upto 31.03.2014
17058
13000
25448.09
134
3941
500
271.82
2100
12.89
1.40
1675
44599.8
2700
22242.4
66000
123
Sl. Particulars
No.
1.
2.
3.
4.
5.
6.
Targets
as per
MoU
for the
year
2013-14
Transmission &
Distribution
{including projects
under international
Cooperation and
Development (IC & DI)}
Generation
Renewable Energy
Loan under RGGVY
scheme
Loan under DDG Scheme
Short Term Loan
Total
Target
achieved
till
30.11.2013
Anticipated
achievement
during the
remaining period
of the year i.e.
upto 31.03.2014
12013.94
7300
7779.93
112.57
174.78
2260
250
175
1.68
1432.00
21514.90
3.87
2957
12945.87
PBDT/Total
5.07
Employee
(` in crore per
Employee)
10.14
5.60
181%
5.
Interest
1.69
Coverage Ratio
(Time)
1.69
1.45
116%
(2)
31500
Particulars
Achievement till
30.09.2013
Achievement
Annualized
for the
year
Targets
as per
MoU for
the year
2013-14
1.
Total Income
(` in crore)
8226
16451
13500
122%
2.
Gross Margin
(` in crore)
7877
15755
12700
124%
3.
23.91
15.70
152%
124
4.
%
Achievement on
Annualized
basis
(ii)
(ii)
125
2.
(c)
(d)
Sl.
1.
Particulars
Targets
achieved
till
30.11.2013
Anticipated
tragets to
be achieved
till 31.03.2014
RGGVY
Electrification works in Un-electrified villages (Nos.)
(a) North East States
283
400
(b) Other than NE States
416
1100
Total
699
1500
126
Plan
xth Plan
XIth Plan
XI Plan
Phase-II
Total
Number Number of
of
un-electriProjects filed villages
covered
(Revised)
Number Number
of elecof BPL
trified
Housevillages
hold
(Revised) (Revised)
Sanctioned
Cost
(`in crore)
(Revised)
235
341
72
63925
46385
1909
101498
228370
53505
8046892
15005887
4559141
13330.61
21267.10
9175.28
648
112219
383373
27611920
43772.97
9.
9.1
127
128
No. of
Programs
No. of
Participants
1.
Regular-National
Programmes
15
175
2.
International Programmes
05
86
3.
Programmes in
collaboration with IPE
02
30
4.
R-APDRP Programmes
sponsored by MoP/PFC
24
439
5.
Sponsored programmes
02
35
6.
In-house programmes
04
59
7.
Others
02
68
Total
54
892
Type of Programmes
No.
No. of
Programs
1.
Regular-National Programmes
10
2.
International Programmes,
sponsored by MEA, GOI (8/4 weeks
duration)
04
3.
03
4.
11
5.
10
6.
Sponsored Programmes
08
7.
06
Total
52
129
130
SJVN LIMITED
(In ` Crores)
Year
GoI
GoHP
Public
Total
2004-05
107.37
35.79
143.16
2005-06
119.57
39.86
159.43
2006-07
176.25
58.75
235.00
2007-08
183.00
61.00
244.00
2008-09
240.00
80.00
320.00
2009-10
220.00
83.30
24.90
328.20
2010-11
213.33
84.40
33.20
330.93
2011-12
250.66
99.17
39.01
388.84
2012-13
255.99
101.28
39.84
397.12
1766.17
643.55
136.95
2546.68
Cumulative Total
.
Sh. R.P. Singh, CMD and Sh. N.L. Sharma, Director (Personnel)
receiving achievement award for Social Development & Impact from Dr. Pranav Sen, Chairman ,NSO
135
Actual Achievement
up to November
2013-14
Total Target
for the FY
2013-14
Gross Energy
Generation in MUs
6314.63
6930.00
Capacity Addition
NIL
NIL
S. Description
No.
2012-13 2011-12
2010-11 2009-10
1682.10 1927.50
1829.74
1769.74
INCOME DETAILS
Sales
II
Other income
234.52
209.29
149.42
138.99
III
Claim from
Insurance Co.
IV
Total income
1916.62 2136.79
1979.16
1908.73
Profit before
Depreciation,
Interest &
Finance Charges,
and Taxation.
1685.31 1888.27
1739.57
1730.63
VI
1184.58 1345.89
1156.19
VII
1052.34 1068.68
912.13
972.74
330.93
328.20
VIII Dividend
IX
Tax on Dividend
136
1017.47
397.12
388.84
67.49
63.08
53.69
54.82
4273.38 3685.65
3068.89
2528.25
Power House
Capacity
Energy Generation
137
138
Education
B.
Health care
C.
Community facilities
D.
Infrastructural facilities
E.
A view of KTPS Stage -VI (500 MW) Project of APGENCO, funded by PFC.
139
141
Khurja Super Thermal Power Plant (1320 MW) were signed with
the beneficiaries in the Northern Region.
142
Tariff for Tehri HPP (1000MW) for the period 2006-09 has been
approved by Hon'ble CERC vide their Order dated 16.04.2013.
Accordingly, the bills were raised/regularized for the period
2006-09. The tariff petition for Tehri HPP(1000MW) for the
period 2009-14 was filed before the Hon'ble CERC on
04.11.2011. Based on the Tariff Order dated 16.4.2013 for Tehri
HPP for the period 2006-09, revised Tariff Forms for the period
2009-14 have also been submitted before Hon'ble Commission
on 23.07.2013. Presently, for Tehri HPP provisional billing is
being done based on the AFC for the Year 2008-09 (as per the
CERC Tariff Regulations, 2009) pending finalisation of tariff for
the period 2009-14.
The tariff petition for Koteshwar HEP (400MW) for the period
2011-14 had also been filed before the Hon'ble CERC on
30.03.2012.Hearings on tariff petition of Koteshwar HEP were
held on 16.07.2013 and 27.08.2013 before the Hon'ble
Commission. The Tariff Order of Koteshwar HEP (400MW) may
be issued by Hon'ble CERC shortly. Presently,for Koteshwar
HEP,provisional billing is being done on the tariff as agreed
between THDCIL and the beneficiaries in the 18th Technical
Coordination Committee (TCC) and 20th Northern Regional
Power Committee (NRPC) meetings held on 28th Feb.' 2011 and
1st March 2011 respectively.
For the financial year 2012-13, approx. 98% revenue has been
realized from the beneficiaries against the energy billing of
` 1636.85 Cr. towards sale of energy based on provisional tariff.
During the Year, the company has also earned net revenue of
` 16.84 Cr. on account of Unscheduled Interchange (UI) charges
under the prevailing UI mechanism and ` 1.73 Cr. on account of
interest due to late payment of UI charges. During the financial
year 2013-14 (upto 30.11.2013), based on the provisional tariff,
` 971.34 Cr. revenue has been realized from the beneficiaries
against the billing of ` 1554.79 Cr. towards energy bills raised
between 01.04.2013 to 30.11.2013. In addition, the company
has also earned net revenue of ` 8.63 Cr. for the period
01.04.2013 to 30.11.2013 on account of Unscheduled
Interchange (UI) charges under the prevailing UI mechanism.
PROJECTS AT A GLANCE:
THDCIL has successfully commissioned Tehri HPP (4x 250 MW)
and Koteshwar HEP (4x100 MW) during Xth and XIth Plans
respectively. THDCIL plans to add 1024 MW during the XIIth plan.
The projects in hand with a total proposed installed capacity of
about 8795 MW are in various stages of Development as briefed
below:
PROGRESS OF ONGOING PROJECTS
Tehri Pump Storage Plant (PSP) 1000 MW
The Tehri PSP is part of the 2400 MW Tehri Hydro Power
143
144
FY
2012-13
FY
2013-14
(till
Nov., 13)
Expected
Gen
(Dec.13
Mar.14)
Remark
14462
9350
4038
60.92
58.92
51.30
203
181
47
Low
generation
during Dec. 13
to Mar. 14 is
due to low
system demand
FY
2012-13
FY
2013-14
(till
Nov'13
Expected
Gen.
(Dec'13
Mar/14)
Remark
Low generation
Projection during
Dec'13 to Mar'14
is due to low
system demand
Thermal Gen.
(MU) of
New Units
10995
9311
6441
Thermal PLF %
70.16
57.22
63.37
(` Crore)
Particulars
18077
9110
27187
7926
3943
11869
7837
3874
11711
B. Misc. Income
89
69
158
791
3943
4734
Interest
1124
936
2060
(333)
3007
2674
(173)
(173)
Operation (3-4)
Past Year's Adjustment
(Debit)/Credit
Profit/(Loss) on Irrigation
& Flood Control
111
11
122
Surplus/(Deficit) [5+6+7]
(222)
2845
2623
Income Tax
Net Surplus/(Deficit) [8-9]
(222)
2012-13
(Actual)
Total
(Anticipated)
A. Sale of Power
2845
2013-14
(Actual)
(prov. upto
Nov' 13)
Target (Prov.)
(Dec'13Mar'14)
(MU)
(MU)
(MU)
(i) Thermal
25457
18661
10479
203
181
47
Total
(ii) Hydel
25660
18842
10526
23307
17112
9560
*PURCHASE OF POWER
(at DVC BUS) (MU)
2578
1718
1416
TOTAL STOCK
(at DVC BUS) (MU)
25885
18830
10976
25250
18270
10515
2623
Note: The above anticipated Profit /(Loss) for the financial year
2013-14 is subject to
(i) Revision of tariff up on grant of any additional allowance on
account of ARR and ACS gap by State Regulators based on the
petition to be filed by DVC, not considered above.
ANTICIPATED CAPITAL EXPENDITURE FOR 2013-14
CRORES. (RE 2013-14 - ` 3516 Crores)
`2980
145
Project
No
Capacity
Anticipated Target
(MW)
1.
1000
EPC Contractor :
Main plant Pkg. : BHEL
CHP Pkg.: L&T
PWS Pkg.: KBL
Rly. Infra: RITES
2
Raghunathpur TPS
Unit-1&2 (2x600 MW)
Unit-1:
COD achieved on 18.07.13
Unit-2:
1. TG put on Barring Gear on 23.01.13.
2. Steam Blowing completion on 09.02.13.
3. Oil & Coal Synchronization done on 11.02.13
4. Full Load achieved on 15.02.13
1000
EPC contractor:
Main plant Pkg.: BHEL
CHP Pkg.: ThyssenKrup
PWS Pkg.: VA Tech
Rly. Infra: RITES
3
upto 31.03.14
Unit-1:
COD achieved on 15.05.12.
Unit-2:
COD achieved on 05.03.13.
1200
Unit-1:
1. TG Oil flushing done on 19.07.13.
2. TG put on Barring Gear on 27.09.13
3. Non-drainable Hydro test of Boiler
done on 06.11.13
EPC Contractor :
Main plant Pkg. :
R. Infra
CHP Pkg. : TRF
PWS Pkg. : MBL
Rly. Infra : RITES
4
Unit-2:
COD by Jan'14.
Unit-1:
1. Steam Blowing
Completion by Feb'14.
2. Safety V/v setting by Feb'14.
3. Oil Synchronization by Feb'14
4. Coal Firing & full load
by Feb'14.
Unit - 2 :
Readiness of TG Box-up
by Feb' 14.
500
TG Box-up by
March'14
EPC contractor :
Main plant Pkg. : BHEL
CHP Pkg. :
a) Main Pkg.- Tecpro
b) Stacker Reclaimer
Pkg. TRF
PWS Pkg.:
a) DM Plant-VATECh
b) PT Plant-Mcnalley
Bharat Engg. Co.
Rly. Infra : RITES
Location
Capacity
(MW)
Package
Awarded
Progress made
upto 31.12.2013
Anticipated Target
upto31.03.2014
Unit-1
1) COD achieved
on 1.09.2011.
Unit-2
1) COD achieved
on 24.07.2012.
--
146
Dist:
Dhanbad
State:
Jharkhand
1050
Schemes
No.
Progress up
Remarks
to 30.11.2013
Anticipated Target
up to 31.03.2014
1.
85%
2.
100%
Commissioned
on 10.07.13
3.
Supply-Erection
100%-100%
100%-85%
100%-100%
100%-100%
Work in progress
Completion by
i) Completed
ii) 03/2014
iii) Completed
iv) Completed
4.
Commissioned
Ph-I: 30.06.2011
5.
100%
Commissioned
on 29.03.13
6.
81%
Work in progress
7.
100%
Commissioned
on 16.07.13
8.
100%
Commissioned on
23.06.12
9.
90%
Work in progress
10.
Supply-100%
Erection-100%
Commissioned
on 06/2013
11.
100%
Commissioned on
29.09.12. Finally 1
No. 160 MVA
Tr. commissioned
on 25.09.13
12.
21%
work in progress by
resolving severe ROW
PDC-03/2014.
13.
99%
Work in progress
14.
24%
PDC-03/2014
PDC- 06/2014.
Depends upon obtaining final Forest
Clearance. Proposal is pending with
MOEF, New Delhi.
PDC-03/2014.
147
ENERGY CONSERVATION
DVC has been making continuous efforts to induct efficient and
modern practices in Energy Management System to increase
the availability of power with lower coal, oil, water and Auxiliary
Power Consumption vis--vis improvement in Unit Heat Rate.
Scope as
per survey
(Provisional)
Achievement
in 2013-14
(up to 30.11.13)
Cumulative
achievement
Target
for remaining
period up to
March'14.
1.
5,234
25
5,018
216
2.
2,232
11
2,157
75
3.
4,88,050
4,16,732
71,318
4.
42
34
Note:
i)
DDG Projects:
i) Sanction accorded for 30 nos. villages under DDG projects
on 26.08.13. Award for execution to be made within 201314 for execution of the projects.
ii) DPR for balance 48 nos. villages under DDG projects
submitted to JSEB for onward transmission to RECL for
project sanction.
RGGVY Projects - XII Plan:
DPR for all the nine districts namely Dhanbad, Koderma,
Bokaro, Gumla, Simdega, Giridih, Hazaribag, Ramgarh and
Chatra districts have been submitted for project sanction.
148
149
Status
1.
2.
Construction of Balpahari
Dam over the Barakar River
in DV Area.
Preparation of Guide
Curves for unified control
of Reservoirs in
Damodar Barakar Basin
including Tenughat Dam.
3.
Installation of 39 nos.
ARG in and around DV
Area for modernization and
expansion of rain gauge
network.
4.
5.
Rehabilitation program
of Konar Dam.
150
Achievement up
to 30th
November, 2013
Anticipated
Achievement up to
31st March, 2014
01
Renovation of Old
100 nos of structures
300 nos
Water Bodies /
are under various stages structures
Check Dams / Water of construction.
Harvesting Structures
/Ponds created by
DVC.
02
Experimentation on
Ground Water
Recharge in UV & LV
03
Maintenance
04
Soil Conservation
Training
Programmes
1) One no of Summer
Training Programme
completed for B.Tech
/M.Tech students.
Total Strength 39 students
2) Three nos of farmers
training completed on
the subject separately
on - i) Sustainable
Production of crop
ii) beneficial use of
inorganic and organic
fertilizer for seasonal
crop. iii) Use of soil
testing of farmer's
field for sustainable
crop production.
i) Participatory
Watershed
Management
Fisheries
ii) Watershed
Planning &
Project
Formulation
iii) WHS
iv) NRM
Govt. of India
confirms the
Budgetary
allocation for
Centrally
Sponsored
Training
Programme.
05
Advisory Services
through Soil
Laboratory
Total Annual
Target is likely
to be achieved
i.e., 1800 nos.
Target Achieved
a) Data collection in
respect of Rainfall,
Run-off and Silt
discharge completed
for 2013.
b) Total no. of Silt
Monitoring
Stations = 16
07
Eco Development
works in the power
projects as per
Guidelines of
Ministry of
Environment &
Forest, GOI.
Continuation of
maintenance work of
7 lakhs square meter
of greenery area at
lower valley & upper
valley are in progress.
As stated
Afforestation in
the Valley Area
Target Achieved
08
2.
3.
4.
5.
6.
151
7.
8.
9.
12. All tenders over ` 2 lacs are done through e-tender system.
152
Installed Capacity
Mega Watt
5x157
785
2x126+3x108
576
Ganguwal
1x27.99+2x24.20
76.39
Kotla
1x28.94+2x24.20
77.34
Dehar
6x165
990
Pong
6x66
396
153
154
155
157
9.
1.
2.
3.
4.
5.
6.
Accreditation of ESCOs
8.
158
Energy Audit
Protection Audit
IMPORTANT EVENTS
15th Standing Committee on R&D
The 15th Standing Committee on R&D was convened on 29th July
2013 in CEA, New Delhi, to take stock of the technical and
financial progress of ongoing Research Projects under the
National Perspective Plan, to review the actions taken on the
decisions of the 14th SCRD and to seek approval of SCRD for
proposals received from Task Force Conveners regarding
various issues of ongoing research projects. The meeting was
chaired by Shri A.S. Bakshi, Chairperson CEA and attended by
Members and invitees of the Standing Committee on R&D.
Inauguration of LED Illumination Laboratory
International conference on Power Cables CABLETECH2013 : Diagnostics Cables & Capacitors Division, CPRI,
Bangalore organized an International conference on Power
Cables CABLETECH-2013, at CPRI, Bangalore, India on 7th
& 8th February, 2013.
159
Overseas assignments:
160
M/s
161
Mr. Tank Aik Kwong, Mr. Sze Ming and Mr. Liu Mun On of
M/s VNS Manufacturing, Singapore, visited STDS-CPRI,
Bhopal, on 12th July, 2013 to discuss on ASTA Evaluation of
switchgear panels.
A delegation from CESI, Italy led by Mr. Francecso FraisopiDirector Business Development, Mr. Fabio MenicantiDirector Business Development, Mr. Domenico-Director
(Testing Division) and their Indian Representatives
Mr. Y.R. Anand and Mr. T.S. Muralidhar from Unimark,
162
163
Northern Region
1. NPTI Corporate Office, Faridabad
2. NPTI (Northern Region), Badarpur, New Delhi
3. NPTI (Hydro Power Training Centre), Nangal
B.
Southern Region
4. NPTI (Power System Training Institute), Bengaluru
5. NPTI (Hot Line Training Centre), Bengaluru
6. NPTI (Southern Region), Neyveli
C.
D.
Western Region
9. NPTI (Western Region), Nagpur
One Year Post Graduate Diploma Course in SubTransmission & Distribution Systems
165
166
Shri T.K.Barai,
Chief Engineer (FS&A) & Director
(Grievances)
Central Electricity Authority,
6th Floor, Sewa Bhawan,
R.K. Puram, New Delhi-110066
Telefax: 26105746,
E-mail - [email protected]
Transferred
cases
received
Total
Applications
received
RTI
Applications
transferred
Total
Request/
Appeal
accepted
Request
117
107
218
Appeal
10
10
PFC
PFC has a Grievance Redressal System for dealing with
grievances of the employees and the public at large. The
systems are duly notified and the Nodal Officers ensure quick
redressal of grievances within the permissible time frame. PFC
has also notified Citizen's Charter to ensure transparency in its
work activities. The Charter is available on the website of PFC to
facilitate easy access.
DVC
In DVC, a well-defined Public Grievance Redressal Mechanism
has been set up under the Grievance Redressal Cell to redress
the grievance. The public grievances in DVC are generally
received either directly from the grievance petitioners or
grievances forwarded by the MOP, Dept. of Administrative
Reforms & Public Grievance, Ministry of Personnel, Public
Grievances & Pensions etc. After receipt of the grievance
petitions the type of grievance is identified and analyzed.
At this stage, Public Grievance Officer, DVC go through the
representations and come to a prima facie view regarding the
gravity of the matter involved and decide to send it to the
concerned section. The same is sent to the concerned Dept for
its reply / redressal in time-bound manner. The reply so
received in regard to the grievance petition is considered and
placed before the appropriate authority for final disposal. All
out efforts are taken to redress the public grievance at the
earliest.
REC
With a view to setting Fair Lending Practices in a transparent
manner, REC has framed its Fair Practice Codes (FPC) which are
in consonance with draft FPC suggested by RBI, from time to
time. Under these codes, Grievance Redressal Mechanism has
been defined and any aggrieved customer may contact the
Grievance Redressal Officer (GRO) of the Company for redressal
of grievances in an amicable manner, in shortest possible time
and at lowest appropriate level.
If the complaint/dispute is not redressed within a period of one
month, the customer may appeal to the Officer-in-Charge,
DNBS, Regional Office of RBI.
THDC
THDCIL has a well established system of Public Grievance
Redressal. Director Public Grievance and Public Grievance
Redressal Officer of the rank of General Manager for each
Project/Unit of THDCIL have been designated and their contact
details of (address, contact no., email ID, etc.) are available on
THDCIL website. The Quarterly status of Public Grievances
received and disposed off after duly addressing the issues are
regularly updated and available on the THDCIL's web site.
167
Details of
Aggrieved
Person with
Address
Details of
Grievance in
brief
Status of Grievance
1.
DOPPW/P/2009/
14879 dated 21.3.12
Non-settlement
of pension case.
Matter
disposed off.
2.
MPOWR/E/2013
/00259
Dated 01.08.13
Non-settlement
of pension case.
Matter
disposed off.
.3.
PRSEC/E/2013
/ 12362
Dated 23.08.13
Himanshu Nagpal,
R/o Flat No. 145,
Akash Kunj, Sector-9,
Rohini, Delhi-110085.
Requested to
concerned section
of MHRD/MOP to
clarify regarding
the validity /
recognition of
B.Tech degree
granted by IGNOU
for consideration
of his promotion.
Matter does
not pertain
to NHPC
4.
PRSEC/E/2013
/ 13008
Dated 23.08.13
Ved Vrat,
R/o H.No. 199/18,
Amrit Bazar,
Kapurthala-144601.
Reimbursement
of pending
medical bills
Matter
disposed off.
5.
MPOWER/E/2013
/0344
dated 28.09.2013
A.K.Sachdeva,
SF-440, Tower
Apartments,
Pitampura, Delhi
Disposed off
6.
MPOWER/E/2013
/0347
dated 02.10.2013
A.K.Sachdeva,
SF-440, Tower
Apartments,
Pitampura,
Delhi-110034
Disposed off
7.
MPOWR/E/2012/
00215
dated 02.07.12
Sh.Raushan Kumar
R/o Distt.Madhubani,
Bihar
Disposed off
8.
Received from
MOP vide F.No.
11/5/2013-NHPC
(Desk) dated
30.10.2013
Displaced families
of Chamera-III HEP
For providing
permanent
employment in
NHPC to one
member of
each family
Disposed off
Remarks
169
Anant Ram,
R/o Sainj, Distt. Kullu,
Himachal Pradesh
--
Matter is under
examination and outcome
of the same shall be
intimated in due course.
10.
MPOWR/E/2013
/00336
dated 20.11.2013
Permanand Pathak,
R/o Choraut,
Sitamarhi, Bihar
Disposed off
11.
DARPG/P/2013
/03575
dated 01.07.2013
G.V.Raste,
R/o Saptalingee Nagar,
at SAT(D) Valee
Tal-Devrukh
Distt-Ratnagiri,
Maharashtra
Taking up of BAV
Project (55MW)
on the river BAV
in Ratnagiri
District,
Maharashtra
on built, operate
and transfer basis.
Disposed off
170
Under
process
166
162
14
14
04
SJVNL
SJVN limited has already complied with the various statutory
guidelines of the Right To Information Act-2005.The various
details as required under the Act are available on our web site
www.sjvn.nic.in. In addition to these various other documents
such as The Annual Reports, Delegation of Powers & Code of
Conduct etc. are also available on the web site.
To make the RTI application disposal system more efficient in
addition to designated Public Information Officer at Corporate
171
172
was passed by Parliament on 15th June 2005 and came fully into
force on 12th October 2005.
In compliance of provisions of the RTI Act 2005, DVC has taken
necessary steps to implement the Act. In order to strengthen
the system of RTI implementation in DVC, a RTI Cell has already
been set up in Secretariat Department, DVC, HQ, Kolkata. The
RTI Cell acts as a nodal point for all RTI implementation issues
within DVC, HQ as well as in the field formations of DVC. The Cell
is created in the Secretariat Department, DVC, HQ, Kolkata and
headed by a Senior Manager & CPIO under the guidance of
Additional Secretary, DVC. There are one Transparency Officer
and nine Public Information Officers (PIOs) in DVC for its HQ and
for major projects. Senior Manager & CPIO, DVC, Kolkata takes
care for compliance of the provisions of the RTI Act 2005 and
overall monitoring. During the period all RTI applications
received were dealt with due importance by the respective PIOs
in co-ordination with the concerned departments. All out
efforts were made to reply all RTI applications received within
the specified timeframe.
Apart from above, regular monitoring is done from the HQ on
functioning of the PIOs posted at different projects of DVC. Any
doubt clarification/explanation to all field formations of DVC is
done by Senior Manager & CPIO, DVC, HQ. In case the applicant
does not receive a reply/ decision within the specified time or is
aggrieved by a decision of the PIO, he/she may within thirty (30)
days from the receipt of such a decision prefer an appeal to the
Appellate Authority, DVC under the RTI Act 2005. Shri A. Mallik,
Director (HRD), DVC, DVC Towers, VIP Road, Kolkata-700054 is
the Appellate Authority, DVC.
For more details regarding the application format, address and
contact details of the Appellate Authority, CPIO/PIOs, anyone
can access to DVC's website at www.dvc.gov.in.
BBMB
Right to Information Act, 2005 is in place and fully operational
w.e.f 12th October, 2005. The Act provides for setting out the
practical regime of right to information in order to promote
openness, transparency and accountability in public offices.
BBMB has adopted and implemented the Act in letter and spirit.
The necessary infrastructure has been provided for
operationalization of the Act. BBMB has designated nine Asstt.
Public Information Officers (APIOs) and eight Public
Information Officers (PIOs) at different locations. In line with
requirements of the Act, eight Appellate Authorities have also
been designated. The official Website of BBMB
(www.bbmb.gov.in) depicts official designations, addresses
and phone nos. of these officers. Comprehensive details
regarding the procedure in respect of applying for information
have been given on the website. The information regarding 17
no. manuals which have been prepared as per provisions of
Section 4(2) of the RTI Act, is also available on the website. The
information is regularly updated from time to time as per
provisions of the RTI Act.
No of
request
received
No. of
decisions
Sec. 8 (1)
A B
1.
679
679
NIL
C D
a)
c)
Amount
of Charges
collected
(`)
Other Section
F G H I
J 9 11
NIL
CPRI
Number of
cases where
disciplinary
action was
taken against
any officer in
respect of administration
of this Act.
NIL
d)
24 Others
NIL
11,374/-
: 24 Nos.
: 17 Nos.
BEE
: 7 Nos.
: 21 Nos.
: 3 Nos.
Applications received by
Appellate Authority
: 3 Nos.
173
The President, Shri Pranab Mukherjee presented the National Painting Competition Prizes,
at the National Energy Conservation Awards function, in New Delhi on December 16, 2013. The Secretary,
Ministry of Power, Shri Pradeep Kumar Sinha is also seen
175
NTPC
Several steps were taken for the propagation and
implementation of Official Language Hindi in the Corporation.
The progress of the usage of Hindi in our Projects and Regional
HQ were inspected and proper suggestions were given to the
Heads of the offices in this regard. Quarterly meetings of Official
Language Implementation Committee were held in June and
September, 2013 in which the implementation of Hindi in the
organization was reviewed thoroughly.
NHPC
The provisions of the official language Act and Rules were
complied with during the year, in the Corporation. The
Company has made sincere efforts to increase the progressive
use of official language in accordance with the policy of
Government of India.
NHPC has been conferred with first prize under the Indira
Gandhi Rajbhasha Shield Yojna, the highest award of this field,
by the Govt. of India for the year 2011-12. Our Director
(Personnel) received this Prize from Hon'ble President of India
Sh. Pranab Mukharjee during the Award Ceremony held at
Vigyan Bhawan, New Delhi on 14.09.2013.
176
Jammu Office:
Certificates.
2.
Ministry of
177
PFC
Power Finance Corporation Limited (PFC) believes in creating
possibilities of better tomorrow. Following the same principal
and to ensure the effective implementation of Official Language
Policy in the Corporation, so far, meetings of the Committee
were organised for each quarter to review and find out
solutions for better implementation of Official Language Policy
either under the chairmanship of CMD, PFC or Deputy
Chairman of the Committee i.e. Director (Commercial) with all
the directors, executive directors and Heads of Units being the
members of the Committee.
178
c.
d.
e.
g.
h.
i.
j.
Achievement
upto
30.11.2013
Targets likely to
be achieved
upto
31.03.2014
1.
12
2.
10
3.
4.
Hindi Workshop
5.
Hindi Website
100%
100%
SJVNL
In order to ensure the implementation of the Official Language
Policy of the Govt. of India, all possible efforts have been made
by the company to achieve the targets as specified by the
Department of Official Language. Company has received
awards in recognition for these efforts. Under section 3.3(i) of
Official Language Act cent percent documents were issued
bilingually. All the letters received in Hindi were replied to in
Hindi. Company's website is already in bilingual form and it is
updated from time to time.
To encourage executives and non-executives to do their entire
work in Hindi a number of incentive schemes are under
implementation namely 1) Payment of amount equivalent to
one increment every month for doing whole office work in
Hindi, 2) Honorarium for writing technical papers in Hindi, 3)
Cash prize on passing Hindi typing examination and 4) Cash
prize for Best write-up published in in-house Hindi journal
Himshakti. Under these schemes 367 executives and nonexecutives have received prizes amounting to `4,43,460/approximately.
179
181
182
3.
4.
5.
CEA
The Vigilance Division, CEA is headed by Chief Vigilance Officer
(CVO) and is nodal point in Vigilance set up of Authority and its
Subordinate Offices. The Division deals with various facets of
Vigilance mechanism and functions for carrying out
investigations into complaints, suggesting corrective measures
for improving the control system, compliance of laid down
procedures and also for carrying out preventive vigilance
exercises.
As part of preventive vigilance, the Vigilance Division facilitates
in ensuring job rotation in sensitive posts. The Vigilance Division
has also taken steps to ensure that website of CEA plays an
important role in increasing transparency in its functions.
Vigilance Awareness Week 2013 was observed in Central
Electricity Authority and its Subordinate offices from 28th
October to 2nd November, 2013. The Vigilance Awareness Week
was celebrated to highlight the theme Promoting Good
Governance Positive Contribution of Vigilance.
Complaints other than anonymous/ pseudonymous were taken
up for investigation promptly and after completion of
investigations, reports submitted to the prescribed authority.
As on 01.01.2013 one case of disciplinary action was pending
under CEA's disciplinary jurisdiction. One case was added
during the period. Thus at present (as on 31.12.2013) two cases
are pending finalization. Prescribed periodical Returns were
sent to the Ministry of Power in time.
PAO
No Vigilance or disciplinary case is pending or contemplated
against any officer or Staff Member in this office as on date.
NTPC
Vigilance Department of NTPC Limited consists of four Units,
namely, Corporate Vigilance Cell, Departmental Proceeding Cell
(DPC), MIS Cell, Technical Cell (TC) reporting to Chief Vigilance
Officer. The Units deal with various facets of Vigilance
Mechanism and function independently and exclusively to
ensure transparency, objectivity and quality in vigilance
functioning.
183
2.
3.
4.
5.
6.
7.
8.
184
9.
185
186
Disciplinary Cases
As on date, no disciplinary case/proceedings are pending in
REC.
Anticipated targets to be achieved during the remaining
period of the year i.e. upto 31.3.2014
(i) Efforts will be made to take new initiatives/to streamline
systems/procedures as under:
Preparation of comprehensive HR manual consisting of
recruitment policy, service rules, CDA rules, promotion
policy etc.
E - Banking :
All payments above the threshold value of Rs. 1.00 Lac are now
being made through RTGS system / Electronic mode.
All the important CVC circulars and OMs issued during this
period have also been circulated to all concerned with a view to
improve overall system in the Corporation.
187
3.
System Improvement
On the basis of continuous monitoring and
recommendation of Vigilance Dept., Kolkata the DVC
management has taken the following actions for system
improvement:
Disciplinary Cases
During the period one Major Penalty of Dismissal was imposed.
10 Nos. of warning were issued to the executives.
DVC
2.
Disposal of Complaints
All the complaints received by the Vigilance Department
during the period under review were disposed after
scrutiny and needful action within the prescribed time
frame. Some of them were taken up for detailed
investigation and some were referred back to HODs for
taking suitable administrative actions. Up to 30-11-13,
about 80 complaints were received and processed as per
its merit.
Inspections
Greater stress was laid on periodic inspections during the
period as a part of preventive vigilance. The Vigilance
Department conducted 132 periodic inspections and 66
surprise inspections in different field formations. Four
intensive examinations on CTE's pattern were also carried
out. The actionable points observed during the inspections
were brought to the notice of the concerned HOD and
other officials for suitable corrective and administrative
measures. In the course of inspection the need for
effecting suitable changes in the procedure/manual
Other Activities
As a part of preventive vigilance, altogether 1951 Vigilance
clearances in respect of DVC employees were given for
different purposes. Around 220 Annual Property Returns
of DVC employees were scrutinized during the period. As
per CVC guidelines, Annual Work Plan for the year 2013-14
has been prepared. Annual action plan for training courses
to be conducted in vigilance awareness has also been
implemented. The prescribed periodic returns to CVC, CTE
and MOP on anti corruption have submitted to concerned
authorities in time.
In accordance with CVC guidelines, Vigilance Awareness
Week was observed between 28.10.13 to 02.11.13 in all
field formations as well as DVC Head Qtrs. The theme of
VAW -2013 was Promoting good governance Positive
contribution of Vigilance."
The Review Meeting of Vigilance activities of DVC followed
by training programme for newly inducted Project
ii)
189
Photo
Total Employees
as on 31.12.2013
59
Number of
women
employees
Percentage of
overall staff
strength
10
16.9
125
29
23.2
62
09
14.5
C(MTS)
54
01
1.8
Total
300
49
16.3
Total
Employees
on 30.11.2013
Number
of Women
employees
Percentage
of overall
staff
strength (%)
294
31
10.54%
175
80
45.71%
109
38
34.86%
MT S-C
161
16
9.94%
Total
739
165
22.33%
PAO
Representation of women may be indicated in the format
given below:Group
Total Employees
as on 31.10.2013
Number of
women
employees
Percentage of
overall staff
strength
44
16
36%
24
13%
Total
70
19
27%
NTPC
Group
Total
Employees
on 30.11.2013
Number
of Women
employees
Percentage
of overall
staff
strength (%)
14,186
909
6.41
5,844
359
6.14
4,184
261
6.24
1,152
24
2.08
D(S)
Total
25,366
1,553
6.12
NHPC
NHPC provides conducive working environment to all its female
employees and strives to ensure gender equality at all levels.
NHPC provides the best working conditions prevalent in the
industry to female employees in respect of work, leisure health
and hygiene. Further, our organization ensures that there is no
hostile environment towards women at work place and no
women employee has any grounds to believe that she is in a
disadvantageous position regarding her employment.
The various benefits and facilities provided to Women
employees in NHPC Ltd are briefed as below:
I.
Maternity Leave
Maternity Leave is granted to female employees for a
period up to 180 days to take care of the new born.
II
191
PFC
Representation of women may be indicated in the format given
below:-
Total Employees
as on 30.11.2013
Number of Percentage of
women
overall staff
employees
strength
3077
248
8.1%
1327
123
9.3%
3895
247
6.3%
D (Excluding
Sweepers
1679
294
17.5%
Sweepers
112
41
10090
953
Total
Total Employees
as on 30.11.2013
Number of
women
employees
Percentage of
overall staff
strength
445
88
19.77%
445
88
19.77%
Total Employees
as on 30.11.2013
Number of Percentage of
women
overall staff
employees
strength
378
60
15.8
36.6%
134
30
22.3
9.4%
45
6.6
87
10.3
Total
644
102
15.8
Number of Percentage of
women
overall staff
employees
strength
4031
272
6.75%
2533
192
7.58%
2606
105
4.03%
155
17
10.97%
Total
9325
586
6.28%
192
Total
Total Employees
as on 30.11.2013
POWERGRID
As on November 30, 2013 there are 586 Women Employees
working at different levels in the corporation. Details are given
below:
Group
Group
SJVNL
Activities relating to Women Employees
Group
Total Employees
as on 30.11.2013
Total
1472
Number of Percentage of
women
overall staff
employees
strength
141
9.58
Employment of Women:
Since the inception in 1989, 123 females have been recruited at
various executive/non-executing levels in the Corporation. At
present, the strength of the women employee is 141 which
comprise of 51 Executives and 90 Non-Executives. Their present
strength accounts for about 9.58 % of the total work force on
the rolls of the Corporation. It is ensured that women
employees get adequate representation in various
activities/programs in the corporation, a Women Cell has been
set up in the year 1997 in the Corporation with the objectives of
promoting awareness among women employees about their
Total Employees
as on 30.11.2013
Number of Percentage of
women
overall staff
employees
strength
737
56
986
140
993
149
62
34
2778
379
Total
13.64%
2.
3.
4.
5.
Total Employees
as on 30.11.2013
Number of
women
employees
Percentage of
overall staff
strength
Total
2091
120
5.73%
Total Employees
as on
30.11.2013
Number of Percentage of
women
overall staff
employees
strength
2660
119
4.47
4864
299
6.14
C&D
2839
257
9.05
Total
10363
675
6.51
BBMB
Representation of women in BBMB is indicated below:Group
Total Employees
as on
30.11.2013
Number of Percentage of
women
overall staff
employees
strength
221
16
7.23
315
29
9.20
5436
527
9.69
4150
393
9.46
Total
10122
965
9.53
193
194
Number of women
Percentage of
overall staff
strength
77
13.60
566
BEE
Group
Total employee
as on
31.12.2013
09
Number of
Women
employee
01
Percentage of
overall staff
strength
11.11%
02
07
03
42.85%
18
04
22.22%
Total employee
as on
31.12.2013
07
Number of
Women
employee
01
Percentage of
overall staff
strength
14.28%
01
01
01
100%
N.A.
09
02
22.22%
Total
NMEEE
Group
Total
NTPC
Total
Employees
as on
31.12.2013
Physically
Challenged
employees
VH
HH
Percentage of
Physically
Challenged
employees
59
0.0
125
1.6
62
0.0
C(MTS)
54
1.8
Total
300
1.33
CEA
Representation of physically Challenged Employees in CEA is
given below:Total
Employees
as on
30.11.2013
Physically
Challenged
employees
VH
HH
Percentage of
Physically
Challenged
employees
OH Total
294
175
3.42%
109
0.92%
MTS-C
161
Total
739
0.95%
PAO
Representation of Physically Challenged Employees may be
indicated in the format given below:Group
Total
Employees
as on
31/10/2013
Physically
Challenged
employees
Percentage of
Physically
Challenged
employees
VH
HH
OH Total
-
44
2%
24
Total
70
1%
Total Employees
as on
31.11.2013
Physically
Challenged
employees
Percentage of
Physically
Challenged
employees
VH
HH
OH Total
14186
06
07
98
111
0.78
5844
03
01
27
31
0.53
4184
63
65
105
233
5.57
8.42
1152
25
31
41
97
D(S)
Total
25366
94
102
255
451
1.86
NHPC
Group
OH Total
Group
Group
Total Employees
as on
30.11.2013
Physically
Challenged
employees
Percentage of
Physically
Challenged
employees
VH
HH
3077
26
31
1.0
1327
23
25
1.9
3895
16
19
0.5
D (Excl.
Swprs)
1679
0.5
(Sweepers)
112
0.0
10090
72
83
0.8
Total
OH Total
195
Total Employees
as on
31/11/2013
Physically
Challenged
employees
VH
HH
Percentage of
Physically
Challenged
employees
NEEPCO
Representation of Physically Challenged Employees may be
indicated in the format given below:
Group
OH Total
4031
47
59
1.46%
2533
22
22
0.87%
2606
56
66
2.53%
155
2.58%
Total
9325
10
14
127
151
1.62%
Total Employees
as on
31/11/2013
Physically
Challenged
employees
VH
Total
HH
Percentage of
Physically
Challenged
employees
OH Total
445
11
2.47
445
11
2.47
Total Employees
as on
31/11/2013
Physically
Challenged
employees
Percentage of
Physically
Challenged
employees
378
1.85
134
0.74
45
2.2
87
1.14
Total
644
10
1.55
196
Total Employees
as on
30/11/2013
Physically
Challenged
employees
Percentage of
Physically
Challenged
employees
VH
HH
737
986
16
993
12
62
2778
13
10
31
Total
OH Total
1.11%
SJVN
Group
Total Employees
as on
31/11/2013
Total
1472
Physically
Challenged
employees
Percentage of
Physically
Challenged
employees
VH
HH
OH Total
02
01
10
13
0.88
Total
Total Employees
as on
30/11/2013
2091
Physically
Challenged
employees
Percentage of
Physically
Challenged
employees
VH
HH
OH Total
02
06
19
27
1.3%
Total Employees
as on
30.11.2013
Physically
Challenged
employees
VH
HH
Percentage of
Physically
Challenged
employees
OH Total
2660
26
26
0.98
4864
22
30
0.62
C&D
2839
15
25
0.88
Total
10363
11
63
81
0.78
BBMB
Representation of Physically Challenged Employees in BBMB is
shown below:
Group
Total Employees
as on
30.11.2013
Physically
Challenged
employees
VH
HH
Percentage of
Physically
Challenged
employees
566
Physically
Challenged
employees
Percentage of
Physically
Challenged
employees
VH
HH
OH
Total
02
02
09
13
2.29
OH Total
Percentage
of physically
challenged
employees
1.40
221
315
0.31
Group A
5436
33
41
0.75
Group B
150
04
04
2.66
203
02
02
02
06
2.95
4150
29
42
1.01
Group C
Total
10122
16
63
84
0.82
Group D
is as
Total
566
02
02
09
13
2.29
BEE
Representation of Physically Challenged Employees may be
indicated in the format given below:Group
Total No. of
Employees
as on
31.12.2013
09
02
07
01
14.28%
18
01
5.55%
D
Total
NMEEE
Group
Total No. of
Employees
as on
31.12.2013
07
01
01
09
Total
197
RECREATION ACTIVITIES
MINISTRY OF POWER
Shri Randhir Singh Toor, continue to excel in Inter-Ministerial & other state sports
tournaments. His contribution as a captain of Ministry of Powers (MoP) Kabbaddi &
volley ball team will be remembered for a long time. As a true sportsman he always
represented MoP Inter-Ministerial sports events & achieved distinction.
List of events in which he participated and achieved distinction :
Sr. Tournament Name
rd
Place
New Delhi
New Delhi
New Delhi
Date
Event Name
Position
29 Dec., 2013
200m
Second
1500m
Third
55 kg.
Wrestl.
Third
th
th
29 Dec., 2013
rd
th
23 -24
Dec., 2013
MOP Carom Team lifted runners-up trophy fo team event in Inter-CPSU Carom Tournament
Organized by NHPC in 2013-14.
199
WELFARE OF SC/ST/OBC/MINORITIES
MINISTRY OF POWER
Welfare of Scheduled Castes, Scheduled Tribes and Other
Backward Classes
An SC/ST Cell has been functioning in the Ministry since the
early nineties under the direct control of the Deputy Secretary
(Administration) who is also the Liaison Officer for Scheduled
Castes and Scheduled Tribes. SC/ST Cell also assists the Liaison
Officer for OBCs. The Cell monitors the implementation of
reservation policies of the Government of India in respect of
Scheduled Castes, Scheduled Tribes, Other Backward Classes,
Physically Handicapped and Ex-Servicemen in the Ministry as
well as Autonomous Bodies/CPSUs under the administrative
control of the Ministry of Power.
PAO
Representation of SC/ST/OBC may be indicated in proforma
given below:-
NTPC
DETAILS OF SC/ST/OBC EMPLOYEES IN NTPC (AS ON 30TH
NOV.'12)
Group
Total
Group
Total
Representation
Employees
(as on
31.10.2013)
SCs
SC%
STs
ST%
44
16%
2%
7%
24
17%
13%
21%
Total
70
11
16%
6%
11%
Group
Representation
Total
OBC OBC%
Representation
Employees
(as on
30.11.2012
SCs
SC%
STs
ST%
OBC OBC%
Employees
(as on
31.12.2013)
SCs
SC%
STs
ST%
14186
1715
12.09
599 4.22
2253 15.88
59
05
8.4
06
10.1
00
00
5844
936
16.02
409 7.00
369
6.31
125
21
16.8
03
2.5
15
12.0
4184
763
18.24
299
7.15
591
14.13
62
16
25.8
02
3.2
08
12.9
1152
214
18.58
129 11.20
172
14.93
C
(MTS)
54
31
57.4
02
3.7
00
00
D(S)
0.00
0.00
Total
300
73
24.3
13
4.3
23
7.6
Total
25366
3628
14.30
OBC OBC%
WELFARE OF MINORITIES
The schemes, as recommended by the Government for the
welfare of the Minorities from time to time, are implemented.
CEA
Group
Total
SCs
294
50
17
13
4.4
13
4.4
175
17
9.7
3.4
1.1
109
18
16.5
5.5
10
9.2
MTS-C
161
27
16.8
1.9
1.2
Total
739
112
15.2
28
3.8
27
3.7
ST%
1436 5.66
3385 13.34
POWERGRID
STATEMENT SHOWING THE NUMBER OF EMPLOYEES AND THE
NUMBER OF SC, ST & OBC IN POWERGRID AS ON NOVEMBER
30, 2013.
Group
Employees
(as on
30/11/2013)
STs
0.00
Representation
SC%
OBC OBC%
Total
Representation
Employees
(as on
30/11/2013)
SCs
SC%
4031
533
13.2%
204 5.1%
756
18.8%
2533
315
12.4%
112 4.4%
335
13.2%
2606
396
15.2%
25.4%
155
27
17.4%
18
20.6%
Total
9325
1271 13.6%
STs
ST%
11.6
OBC OBC%
32
201
NEEPCO
Representation of SC/ST/OBC may be indicated in Performa
given below:
Group
Total
Total
SCs
SC%
STs
737
78
10.58
123 16.68
99
13.43
986
36
3.65
260 26.36
142
14.40
993
66
6.64
391 39.37
153
15.40
62
11.29
50 80.64
1.61
Total
2778
187
6.73
824 29.66
395
14.21
Employees
(as on
30/11/2013)
SCs
SC%
STs
ST%
445
75
16.85
25
5.62
OBC OBC%
70
15.13
Total
Representation
Employees
(as on
30.11.2013)
SCs
SC%
STs
ST%
378
36
9.52
12
3.17
44
11.64
134
20
14.92
1.49
0.74
45
15.55
4.44
87
27
31.03
1.14
3.44
Total
644
90
13.97
15
2.32
50
7.76
OBC OBC%
Group
OBC OBC%
Total
Representation
Employees
(as on
30/11/2013)
SCs
SC%
STs
ST%
OBC OBC%
1472
321
21.86
92
6.25
141
9.58
Human Resources
The total manpower on the rolls of SJVN is 1472 as on
November 30, 2013. The strength of HPSEB/HP Govt. on
deputation on the above date is 304. The strength of SC, ST and
OBC employees as on the above date was 321, 92 and 141
respectively
Human Resources Development
SJVN believe that employees are its most valuable assets and
has evolved growth oriented human resource development
strategy.
Empowerment of manpower skills through training, receives
utmost importance all the time. The Company has well
established strategy for imparting training to the employees
and involved other professional people to motivate the
employees for good working. The training imparted is twodimensional i.e. by giving in-house training and through
external professional institutions as well. We also facilitate the
professional candidates of various institutions for undergoing
vocational training in this organization.
THDC
Representation of SC/ST/OBC may be indicated in proforma
given below :Group
202
ST%
SJVNL
Total
Representation
Representation
Employees
(as on
30/11/2013)
PFC
Representation of SC/ST/OBC may be indicated in the proforma
given below:Group
Total
Total
Total
Representation
Employees
(as on
30.11.2013)
SCs
SC%
STs
ST%
OBC OBC%
2091
288
13.77
28
1.33
154
7.36
Total
Representation
Employees
(as on
SCs
30.11.2013)
SC%
STs
ST%
OBC OBC%
3077
431
14.0
195
6.3
459
14.9
1327
189
14.2
81
6.1
232
17.5
3895
392
10.1
150
3.9
169
4.3
D
(Excl.
Swprs)
1679
220
13.4
127
7.6
90
5.4
(Sweepers)
112
Total
10090
82.1
1324 13.1
0.9
0.0
554
5.5
950
9.4
Group
Total
Representation
Employees
(as on
30/11/2013)
SCs
SC%
STs
ST%
OBC OBC%
2660
443
16.65
157
5.9
527
19.8
4864
905
18.6
276 5.67
707
14.53
C&D
2839
279
9.82
166 5.84
78
2.74
Total
10363
1627
15.7
599 5.78
1312 12.66
92
DVC
BBMB
Representation of SC/ST/OBC is indicated below:Group
Total
Representation
Employees
(as on
30/11/2013)
SCs
SC%
STs
ST%
221
25
11.31
1.35
315
29
9.20
2.54
5436
1033
19.00
0.05
489
8.99
4150
1352
32.57
0.14
377
9.08
Total
10122
2439
24.09
0.08
877
8.66
OBC OBC%
203
25%
20%
Group
Bus facilities for Shobha Yatra at token charges of Re.1 per km.
ii)
Representation
Employees
(as on
15.12.2013)
566
Group
SCs
SC%
140 24.73%
Total
STs
ST%
OBC OBC%
64 11.30% 53
9.36%
Representation
Employees
(as on
15.12.2013)
SCs
SC%
STs
ST%
213
38
17.84
15
7.04
24
11.21
150
32
21.33
16 10.66
17
11.33
C
(Excluding
Safaiwalas)
Safaiwalas
187
58
31.0
31 16.57
12
6.41
16
12
75.0
02
TOTAL
566
140
24.73
64 11.30
53
9.36
204
12.5
BEE
Representation of SC/ST/OBC may be indicated in proforma
given below:-
OBC OBC%
Total
Representation
Employees
(as on
31.12.2013)
SCs
SC%
STs
ST%
09
02
07
TOTAL
18
OBC OBC%
NMEEE
Group
Total
Representation
Employees
(as on
31.12.2013)
SCs
SC%
STs
ST%
07
01
14%
01
14%
01
01
N.A.
TOTAL
09
01
11%
01
11%
OBC OBC%
E - GOVERNANCE / IT - INITIATIVES
MINISTRY OF POWER
IT Cell of the Ministry is responsible for implementing and
executing various ICT (Information & Communication
Technology) Projects/ activities like Design, Development &
Implementation of e-Governance Projects and related training,
Design, Development & Hosting of Web Site, Maintenance and
Implementation of Web Portals and Web Based Applications,
Maintenance of Local Area Network (LAN), Internet Services
and Video Conferencing in coordination with National
Informatics Centre (NIC) Cell of the Ministry.
Major Projects/ Activities during the year 2013 :
(1) Design, Development & Implementation of e-Governance
Projects and related training. The following projects were
implemented : (i)
(ii)
(v)
(i)
(ii)
205
DVC
IT initiatives in DVC during the year 2013-14 are enumerated
below:
1.
2.
3.
4.
5.
6.
7.
8.
9.
207
Ownership
Modewise breakup
Sector
Delhi
Haryana
State
Thermal
Gas
Hydro
(Renewable)
RES**
(MNRE)
Grand Total
Diesel
Total
Thermal
Nuclear
Coal
135.00
1800.40
0.00
1935.40
0.00
0.00
0.00
1935.40
Private
0.00
108.00
0.00
108.00
0.00
0.00
16.00
124.00
Central
4421.37
207.61
0.00
4628.98
122.08
690.33
0.00
5441.39
Sub-Total
4556.37
2116.01
0.00
6672.38
122.08
690.33
16.00
7500.79
State
3160.00
25.00
3.92
3188.92
0.00
884.51
70.10
4143.53
Private
1720.00
0.00
0.00
1720.00
0.00
0.00
53.10
1773.10
Central
1202.03
535.29
0.00
1737.32
109.16
488.7
0.00
2335.18
Sub-Total
6082.03
560.29
3.92
6646.24
109.16
1373.21
123.20
8251.81
1019.64
Himachal
State
0.00
0.00
0.13
0.13
0.00
393.60
625.91
Pradesh
Private
0.00
0.00
0.00
0.00
0.00
1748.00
0.00
1748.00
Central
152.02
61.88
0.00
213.90
34.08
809.34
0.00
1057.32
Sub-Total
152.02
61.88
0.13
214.03
34.08
2950.94
625.91
3824.96
0.00
175.00
8.94
183.94
0.00
780.00
147.53
1111.47
Jammu
State
&
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Kashmir
Central
329.32
129.14
0.00
458.46
77.00
878.03
0.00
1413.49
Sub-Total
329.32
304.14
8.94
642.40
77.00
1658.03
147.53
2524.96
2630.00
25.00
0.00
2655.00
0.00
2230.23
154.50
5039.73
500.00
0.00
0.00
500.00
0.00
0.00
143.08
643.08
Punjab
State
Private
Central
Rajasthan
Uttar Pradesh
660.88
263.92
0.00
924.80
208.04
799.30
0.00
1932.14
Sub-Total
3790.88
288.92
0.00
4079.80
208.04
3029.53
297.58
7614.95
State
3865.00
553.80
0.00
4418.80
0.00
987.96
23.85
5430.61
Private
2140.00
0.00
0.00
2140.00
0.00
0.00
3459.20
5599.20
Central
1014.72
221.23
0.00
1235.95
573.00
560.36
0.00
2369.31
Sub-Total
7019.72
775.03
0.00
7794.75
573.00
1548.32
3483.05
13399.12
State
4923.00
0.00
0.00
4923.00
0.00
524.10
25.10
5472.20
Private
2850.00
0.00
0.00
2850.00
0.00
0.00
821.38
3671.38
Central
2909.95
549.97
0.00
3459.92
335.72
1335.35
0.00
5130.99
10682.95
549.97
0.00
11232.92
335.72
1859.45
846.48
14274.57
Sub-Total
Uttrakhnad
Chandigarh
State
0.00
0.00
0.00
0.00
0.00
1252.15
174.82
1426.97
Private
0.00
0.00
0.00
0.00
0.00
400.00
15.05
415.05
Central
300.50
69.35
0.00
369.85
22.28
353.86
0.00
745.99
Sub-Total
300.50
69.35
0.00
369.85
22.28
2006.01
189.87
2588.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
State
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
32.54
15.32
0.00
47.86
8.84
52.88
0.00
109.58
Sub-Total
Central Unallocated
Total
State
32.54
15.32
0.00
47.86
8.84
52.88
0.00
109.58
977.19
290.35
0.00
1267.54
129.80
524.05
0.00
1921.39
14713.00
2579.20
12.99
17305.19
0.00
7052.55
1221.81
25579.55
Northern
Private
7210.00
108.00
0.00
7318.00
0.00
2148.00
4507.81
13973.81
Region
Central
12000.50
2344.06
0.00
14344.56
1620.00
6492.20
0.00
22456.76
Grand Total
33923.50
5031.26
12.99
38967.75
1620.00
15692.75
5729.62
62010.12
209
As on 30.11.2013
State
Ownership
Modewise breakup
Sector
Goa
Gujarat
State
Thermal
Gas
Hydro
(Renewable)
RES**
(MNRE)
Grand Total
Diesel
Total
Thermal
Nuclear
Coal
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.05
Private
0.00
48.00
0.00
48.00
0.00
0.00
0.00
48.00
Central
326.17
0.00
0.00
326.17
25.80
0.00
0.00
351.97
Sub-Total
326.17
48.00
0.00
374.17
25.80
0.00
0.05
400.02
State
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
36.71
4.20
0.00
40.91
7.38
0.00
0.00
48.29
Sub-Total
36.71
4.20
0.00
40.91
7.38
0.00
0.00
48.29
4470.00
1594.72
17.28
6082.00
0.00
772.00
15.60
6869.60
Private
8620.00
2960.00
0.20
11580.20
0.00
0.00
4187.46
15767.66
Central
2648.27
424.27
0.00
3072.54
559.32
0.00
0.00
3631.86
State *
15738.27
4978.99
17.48
20734.74
559.32
772.00
4203.06
26269.12
Madhya
State
Sub-Total
3532.50
0.00
0.00
3532.50
0.00
1703.66
86.16
5322.32
Pradesh
Private
1760.00
0.00
0.00
1760.00
0.00
0.00
558.22
2318.22
Chhatisgarh
Maharastra
Central
2256.39
257.18
0.00
2513.57
273.24
1520.00
0.00
4306.81
Sub-Total
7548.89
257.18
0.00
7806.07
273.24
3223.66
644.38
11947.35
State
2280.00
0.00
0.00
2280.00
0.00
120.00
52.00
2452.00
Private
2618.00
0.00
0.00
2618.00
0.00
0.00
256.90
2874.90
Central
1490.49
0.00
0.00
1490.49
47.52
0.00
0.00
1538.01
Sub-Total
6388.49
0.00
0.00
6388.49
47.52
120.00
308.90
6864.91
State
8400.00
672.00
0.00
9072.00
0.00
2884.84
307.93
12264.77
Private
8526.00
180.00
0.00
8706.00
0.00
447.00
4460.87
13613.87
Central
3313.27
2623.93
0.00
5937.20
690.14
0.00
0.00
6627.34
32505.98
20239.27
3475.93
0.00
23715.20
690.14
3331.84
4768.80
State
Sub-Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Haveli
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
44.37
27.10
0.00
71.47
8.46
0.00
0.00
79.93
Sub-Total
44.37
27.10
0.00
71.47
8.46
0.00
0.00
79.93
1622.35
196.91
0.00
1819.26
228.14
0.00
0.00
2047.40
Central Unallocated
Total
State
18682.50
2266.72
17.28
20966.50
0.00
5480.50
461.74
26908.74
western
Private
21524.00
3188.00
0.20
24712.20
0.00
447.00
9463.45
34622.65
Region
Central
11738.01
3533.59
0.00
15271.60
1840.00
1520.00
0.00
18631.60
Grand Total
51944.51
8988.31
17.48
60950.30
1840.00
7447.50
9925.19
80162.99
210
As on 30.11.2013
State
Ownership
Modewise breakup
Sector
Thermal
Gas
Hydro
(Renewable)
RES**
(MNRE)
Grand Total
Diesel
Total
Thermal
Nuclear
Coal
5092.50
0.00
0.00
5092.50
0.00
3734.53
219.03
9046.06
Andhra
State
Pradesh
Private
600.00
3370.40
36.80
4007.20
0.00
0.00
1075.46
5082.66
Central
2880.98
0.00
0.00
2880.98
275.78
0.00
0.00
3156.76
Sub-Total
8573.48
3370.40
36.80
11980.68
275.78
3734.53
1294.49
17285.48
State
2720.00
0.00
127.92
2847.92
0.00
3599.80
995.26
7442.98
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Private
2060.00
0.00
106.50
2166.50
0.00
0.00
2697.93
4864.43
Central
1378.39
0.00
0.00
1378.39
254.86
0.00
0.00
1633.25
Sub-Total
6158.39
0.00
234.42
6392.81
254.86
3599.80
3693.19
13940.66
State
0.00
0.00
234.60
234.60
0.00
1881.50
158.42
2274.52
Private
0.00
174.00
21.84
195.84
0.00
0.00
35.10
230.94
Central
914.56
359.58
0.00
1274.14
95.60
0.00
0.00
1369.74
Sub-Total
914.56
533.58
256.44
1704.58
95.60
1881.50
193.52
3875.20
4770.00
523.20
0.00
5293.20
0.00
2182.20
123.05
7598.45
State
Private
400.00
503.10
411.66
1314.76
0.00
0.00
7823.08
9137.84
Central
3306.23
0.00
0.00
3306.23
524.00
0.00
0.00
3830.23
Sub-Total
8476.23
1026.30
411.66
9914.19
524.00
2182.20
7946.13
20566.52
State
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
100.17
0.00
0.00
100.17
0.00
0.00
0.00
100.17
Sub-Total
100.17
0.00
0.00
100.17
0.00
0.00
0.00
100.17
0.00
32.50
0.00
32.50
0.00
0.00
0.00
32.50
State
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
230.09
0.00
0.00
230.09
19.28
0.00
0.00
249.37
Sub-Total
230.09
32.50
0.00
262.59
19.28
0.00
0.00
281.87
1329.58
0.00
0.00
1329.58
150.48
0.00
0.00
1480.06
12582.50
555.70
362.52
13500.72
0.00
11398.03
1495.76
26394.51
Central Unallocated
Total
State
Southern
Private
3060.00
4047.50
576.80
7684.30
0.00
Region
Central
10140.00
359.58
0.00
10499.58
1320.00
Grand Total
25782.50
4962.78
939.32
31684.60
1320.00
0.00 11631.57
19315.87
0.00
0.00
11819.58
11398.03 13127.33
57529.96
211
As on 30.11.2013
State
Ownership
Modewise breakup
Sector
Bihar
Jharkhand
West Bengal
State
Odisha
Total
Thermal
Hydro
(Renewable)
RES**
(MNRE)
Grand Total
Diesel
210.00
0.00
0.00
210.00
0.00
0.00
70.70
280.70
Private
0.00
0.00
0.00
0.00
0.00
0.00
43.30
43.30
Central
1744.70
0.00
0.00
1744.70
0.00
129.43
0.00
1874.13
Sub-Total
1954.70
0.00
0.00
1954.70
0.00
129.43
114.00
2198.13
State
1190.00
0.00
0.00
1190.00
0.00
130.00
4.05
1324.05
Private
900.00
0.00
0.00
900.00
0.00
0.00
16.00
916.00
Central
268.88
0.00
0.00
268.88
0.00
70.93
0.00
339.81
Sub-Total
2358.88
0.00
0.00
2358.88
0.00
200.93
20.05
2579.86
State
4970.00
100.00
12.06
5082.06
0.00
977.00
98.40
6157.46
Private
1341.38
0.00
0.14
1341.52
0.00
0.00
33.05
1374.57
Central
905.49
0.00
0.00
905.49
0.00
271.30
0.00
1176.79
7216.87
100.00
12.20
7329.07
0.00
1248.30
131.45
8708.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Private
1050.00
0.00
0.00
1050.00
0.00
0.00
0.00
1050.00
Central
5505.60
90.00
0.00
5595.60
0.00
193.26
0.00
5788.86
Sub-Total
6555.60
90.00
0.00
6645.60
0.00
193.26
0.00
6838.86
Sub-Total
DVC
Thermal
Gas
Nuclear
Coal
State
420.00
0.00
0.00
420.00
0.00
2061.92
64.30
2546.22
Private
3100.00
0.00
0.00
3100.00
0.00
0.00
35.50
3135.50
Central
1595.06
0.00
0.00
1595.06
0.00
105.01
0.00
1700.07
Sub-Total
5115.06
0.00
0.00
5115.06
0.00
2166.93
99.80
7381.79
State
0.00
0.00
5.00
5.00
0.00
0.00
52.11
57.11
Private
0.00
0.00
0.00
0.00
0.00
99.00
0.00
99.00
Central
82.61
0.00
0.00
82.61
0.00
75.27
0.00
157.88
Sub-Total
82.61
0.00
5.00
87.61
0.00
174.27
52.11
313.99
Central Unallocated
1454.16
0.00
0.00
1454.16
0.00
0.00
0.00
1454.16
Total
State
6790.00
100.00
17.06
6907.06
0.00
3168.92
289.56
10365.54
Eastern
Private
6391.38
0.00
0.14
6391.52
0.00
99.00
127.85
6618.37
Region
Central
11556.50
90.00
0.00
11646.50
0.00
845.20
0.00
12491.70
Grand Total
24737.88
190.00
17.20
24945.08
0.00
4113.12
417.41
29475.61
Sikkim
212
State
As on 30.11.2013
State
Ownership
Modewise breakup
Sector
Assam
State
Thermal
Gas
Hydro
(Renewable)
RES**
(MNRE)
Grand Total
Diesel
Total
Thermal
Nuclear
Coal
60.00
276.20
20.69
356.89
0.00
100.00
31.11
488.00
Private
0.00
24.50
0.00
24.50
0.00
0.00
0.00
24.50
Central
0.00
297.82
0.00
297.82
0.00
329.72
0.00
627.54
60.00
598.52
20.69
679.21
0.00
429.72
31.11
1140.04
Sub-Total
Arunachal
State
0.00
0.00
15.88
15.88
0.00
0.00
103.91
119.79
Pradesh
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
0.00
32.05
0.00
32.05
0.00
97.57
0.00
129.62
Sub-Total
0.00
32.05
15.88
47.93
0.00
97.57
103.91
249.41
State
0.00
0.00
2.05
2.05
0.00
282.00
31.03
315.08
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Total
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
0.00
65.61
0.00
65.61
0.00
74.58
0.00
140.19
Sub-Total
0.00
65.61
2.05
67.66
0.00
356.58
31.03
455.27
State
0.00
169.50
4.85
174.35
0.00
0.00
16.01
190.36
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
0.00
180.34
0.00
180.34
0.00
62.37
0.00
242.71
Sub-Total
0.00
349.84
4.85
354.69
0.00
62.37
16.01
433.07
State
0.00
0.00
45.41
45.41
0.00
0.00
5.45
50.86
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
0.00
46.96
0.00
46.96
0.00
80.98
0.00
127.94
Sub-Total
0.00
46.96
45.41
92.37
0.00
80.98
5.45
178.80
State
0.00
0.00
2.00
2.00
0.00
0.00
28.67
30.67
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
0.00
32.84
0.00
32.84
0.00
53.32
0.00
86.16
Sub-Total
0.00
32.84
2.00
34.84
0.00
53.32
28.67
116.83
State
0.00
0.00
51.86
51.86
0.00
0.00
36.47
88.33
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
0.00
27.28
0.00
27.28
0.00
34.31
0.00
61.59
Sub-Total
0.00
27.28
51.86
79.14
0.00
34.31
36.47
149.92
Central Unallocated
0.00
55.40
0.00
55.40
0.00
127.15
0.00
182.55
60.00
445.70
142.74
648.44
0.00
382.00
252.65
1283.09
State
North- Eastern
Private
0.00
24.50
0.00
24.50
0.00
0.00
0.00
24.50
Region
Central
0.00
738.30
0.00
738.30
0.00
860.00
0.00
1598.30
60.00
1208.50
142.74
1411.24
0.00
1242.00
252.65
2905.89
Grand Total
213
Ownership
Modewise breakup
Sector
Andaman &
Nicobar
lakshadweep
Total
Islands
State
Thermal
Gas
Hydro
(Renewable)
RES**
(MNRE)
Grand Total
Diesel
Total
Thermal
Nuclear
Coal
0.00
0.00
40.05
40.05
0.00
0.00
5.25
45.30
Private
0.00
0.00
20.00
20.00
0.00
0.00
5.10
25.10
Central
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub-Total
0.00
0.00
60.05
60.05
0.00
0.00
10.35
70.40
State
0.00
0.00
9.97
9.97
0.00
0.00
0.00
9.97
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub-Total
0.00
0.00
9.97
9.97
0.00
0.00
0.00
9.97
State
0.00
0.00
50.02
50.02
0.00
0.00
5.25
55.27
Private
0.00
0.00
20.00
20.00
0.00
0.00
5.10
25.10
Central
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Grand Total
0.00
0.00
70.02
70.02
0.00
0.00
10.35
80.37
214
Ownership
Modewise breakup
Sector
Thermal
Gas
Hydro
(Renewable)
RES**
(MNRE)
Grand Total
Diesel
Total
Thermal
Nuclear
Coal
14713.00
2579.20
12.99
17305.19
0.00
7052.55
1221.81
25579.55
Northern
State
Region
Private
7210.00
108.00
0.00
7318.00
0.00
2148.00
4507.81
13973.81
Central
12000.50
2344.06
0.00
14344.56
1620.00
6492.20
0.00
22456.76
Sub Total
33923.50
5031.26
12.99
38967.75
1620.00
15692.75
5729.62
62010.12
Western
State
18682.50
2266.72
17.28
20966.50
0.00
5480.50
461.74
26908.74
Region
Private
21524.00
3188.00
0.20
24712.20
0.00
447.00
9463.45
34622.65
Central
11738.01
3533.59
0.00
15271.60
1840.00
1520.00
0.00
18631.60
Sub Total
51944.51
8988.31
17.48
60950.30
1840.00
7447.50
9925.19
80162.99
Southern
State
12582.50
555.70
362.52
13500.72
0.00
11398.03
1495.76
26394.51
Region
Private
3060.00
4047.50
576.80
7684.30
0.00
0.00 11631.57
19315.87
Central
10140.00
359.58
0.00
10499.58
1320.00
0.00
0.00
11819.58
Sub Total
25782.50
4962.78
939.32
31684.60
1320.00
11398.03 13127.33
57529.96
Eastern
State
6790.00
100.00
17.06
6907.06
0.00
3168.92
289.56
10365.54
Region
Private
6391.38
0.00
0.14
6391.52
0.00
99.00
127.85
6618.37
Central
11556.50
90.00
0.00
11646.50
0.00
845.20
0.00
12491.70
Sub Total
24737.88
190.00
17.20
24945.08
0.00
4113.12
417.41
29475.61
60.00
445.70
142.74
648.44
0.00
382.00
252.65
1283.09
North Eastern
State
Region
Private
0.00
24.50
0.00
24.50
0.00
0.00
0.00
24.50
Central
0.00
738.30
0.00
738.30
0.00
860.00
0.00
1598.30
60.00
1208.50
142.74
1411.24
0.00
1242.00
252.65
2905.89
0.00
0.00
50.02
50.02
0.00
0.00
5.25
55.27
Sub Total
Islands
ALL INDIA
State
Private
0.00
0.00
20.00
20.00
0.00
0.00
5.10
25.10
Central
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total
0.00
0.00
70.02
70.02
0.00
0.00
10.35
80.37
State
52828.00
5947.32
602.61
59377.93
0.00
27482.00
3726.77
90586.70
Private
38185.38
7368.00
597.14
46150.52
0.00
2694.00 25735.78
74580.30
Central
45435.01
7065.53
0.00
52500.54
4780.00
9717.40
0.00
66997.94
136448.39 20380.85
1199.75
158028.99
4780.00
39893.40 29462.55
232164.94
Total
Figures at second place of decimal may not tally due to rounding off
Abbreviation:
** Renewable Energy Sources (REC) include SHP, BP, U&I, Solar and Wind Energy
SHP=Smal Hydro Project (<25MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power,
RES=Renewable Energy Sources
Installed capacity in respect of RES as on 30.09.2013
215
State
Assam
150
Year of Commissioning
HYDRO
1
Assam
100
July 1997
Assam
25
July 2004
Nagaland
75
July 2000
Arunachal Pradesh
405
March 2002
Hydro Total
755
Assam
291
THERMAL
6
GTG: 1995/96
STG: 1998
216
Tripura
84
Thermal Total
375
TOTAL
1130
June 1998
Units due/
inspected
(up-to
30.11.2013
37 / 27
No. of Paras
No. of Paras
No. of Paras
raised (up-to
30.11.2013
settled
outstanding up-to
30.11.2013
38
19
452
AUDIT OBSERVATIONS
The Organization-wise Break-up of outstanding Audit
Observations & Inspection Reports issued up-to 30.11.2013 is
as under:-
Sl.
No.
Name of Organization/
Office
No. of
Inspection
Reports
issued upto
30.11.2013 in
2013-2014
No. of Paras
outstanding as on
30.11.2013
(including
old Paras)
01.
Ministry of Power
--
56
02.
03
186
03.
01
26
04
BBMB, Nangal
--
05
JERC, Gurgaon
--
12
06
NPTI, Faridabad
--
17
07
CPRI Benguluru
01
13
08
01
07
09
Special Audit
(i)
REC (AG&SP)
--
(ii)
REC (RGGVY)
--
(iii)
PFC (AG&SP)
--
(iv)
BEE (BLY)
--
(v)
BEE (NMEEE)
--
10
(vi)
BBMB (Chandigarh)
--
10
10
RGGVY Scheme
02
10
11
R-APDRP Scheme
03
13
12.
BEE
--
34
13.
Controller of Accounts
(i)
--
12
(ii)
01
15
(iii)
01
08
(iv)
--
Total
13
452
Pending ATNs of MOP/PSUs etc:The position of pending Action Taken Notes as on 30.11.2013 is
as under:Pending
Paras
MOP
Audit
Total
(i) Commercial
16
(ii) Civil
Total
17
COMPUTERISATION
The Office is generating Computerized Accounts through two
packages namely COMPACT (PAO-2000) for accounts of Pay &
217
218
219
220
33,000 crore for Xth Plan and first two years of XIth Plan by CCEA,
allocation of funds during 2004-12 as per Budget Estimates and
Revised Estimates was Rs. 31,338 crore and Rs. 27,488.56
crore respectively. MOP did not fully utilize the funds allocated
under the scheme and released only Rs. 26,150.76 crore to REC
up to March 2012 and the latter in turn released Rs.25,652 crore
to PIAs up to March 2012. PIAs had intimated utilization of Rs.
22,510.14 crore (20 May 2012). Balances remaining unutilized
with PIAs ranged from Rs. 1.47 crore to Rs.375.07 crore in 19
States while PIAs reported excess utilization ranging from Rs.
3.64 crore to Rs. 115.13 crore in eight States. As substantial
unutilized fund remained with PIAs, an amount of Rs. 337 crore
towards interest earned by PIAs on unutilized funds remained
to be remitted to the Government account as of August 2013
and thus, did not further the cause of RGGVY.
REC did not link the terms of release of funds with achievement
of physical targets set under approved RGGVY projects. In some
cases, this resulted in release of 67 per cent to 90 per cent of the
project cost to PIAs/contractors whereas the physical
achievement against the released funds was less. During Xth and
XIth Plan, 576 projects were sanctioned originally for Rs.
26,427.47 crore and awarded for Rs. 31,268.12 crore.
Sanctioned cost estimates for all projects were revised to Rs.
34,070.87 crore as of December 2012.
Against the targeted coverage of 1,23,601 un-electrified villages
and 4,12,88,438 rural households including 2,30,10,265 BPL
households, only 1,04,496 un-electrified villages (84.54 per
cent) and 2,15,04,430 rural households (52.08 per cent)
including 1,90,80,115 BPL households (82.92 per cent) had
been covered by 31st March 2012. However, actual achievement
would need to be viewed against the fact that the scheme was
beset with the problems as discussed in the report.
RGGVY also envisioned that Rural Electricity Distribution
Backbone (REDB), Village Electrification Infrastructure (VEI) and
Decentralized Distributed Generation (DDG) would indirectly
facilitate power requirement of agriculture and other activities
including irrigation pump sets, small and medium industries,
khadi and village industries, cold chains, healthcare, education
and IT etc.. It was felt that this would facilitate overall rural
development, employment generation and poverty alleviation.
However, in actual practice, the projects sanctioned were based
on a minimalist approach of providing oneunit electricity per
day per household.
The formulation of the scheme, from inception, was flawed as
identification of villages and estimation of beneficiaries was
based on unreliable data. Implementation of the scheme was
characterized by several instances of non-adherence to the
scheme guidelines, including important inputs like
authenticated BPL lists and RE plans not being in place. RGGVY
projects were planned without adequate survey work as DPRs
221
VISION
Reliable, adequate and quality power for all at reasonable
prices.
FUNCTIONS :
The main work items dealt by the Ministry of Power include
following :
MISSION
Ministry of Power seeks to achieve its vision by providing
necessary support and enabling policy framework for
integrated development of power infrastructure in the country
to meet the requirements of the growing economy and to meet
the requirements and aspirations of the people for quality
power particularly of poor households in rural areas.
OBJECTIVES:
(I) Improving the Power availability through
i. Fresh Capacity addition
ii. Improved Generation
iii. Capacity requirement saved through Energy
Conservation measures
(II) Expanding the Transmission Network in the country
through :
i. Transmission lines addition
ii. Transformation capacity addition
(III) Universal power access through implementation of
RGGVY scheme aiming at :
i. Village electrification
ii. BPL Households electrification
(IV) Reducing AT&C losses through implementation of RAPDRP scheme, by :
i. Setting up a verifiable system of measuring AT&C
losses in project areas.
ii. Distribution infrastructure strengthening which aim at
reducing AT&C losses.
iii. Setting up of SCADA Centres in Project Areas.
(v)
223
Objectives
Weight
age (out
of 100)
Improving
Power
availability
34
Actions
Success
Indicators
Unit
Weight
age (out
of 100)
Excellent
100%
Very
good
Good
80%
Fair
70%
Poor
(60%)
15956*
MW
11
15956
14361
12765
11169
9574
Thermal
15154
MW
15154
13639
12123
10608
9093
Hydro
802
MW
802
722
642
561
481
Public Sector
8706
MW
8706
7836
6965
6094
5224
Generation performance
920
BU
920
828
736
644
552
4.85
MU/MW
4.85
4.37
3.88
3.40
2.91
950
MW
950
855
760
665
570
NO.
15.03.2013
Date
15.03.13
20.03.13
25.03.13
31.03.13
31.03.13
Expanding the
Transmission
Network
10
No.
24
No.
24
22
19
17
14
No.
No.
No. of
meetings
7333
ckm
7333
6600
5866
5133
4400
8695
ckm
8695
7826
6956
6087
5217
1398
ckm
1398
1258
1118
979
839
Transformation capacity
addition/ready for
commissioning (Central)
11210
MVA
11210
10089
8968
7847
6726
Transformation capacity
addition/ready for
commissioning (State)
20459
MVA
20459
18413
16367
14321
12275
4100
MW
4100
3690
3280
2870
2460
26.03.2013
Date
4800
No.
4800
4320
3840
3360
2880
34
Lakh
34
30.6
27.2
23.8
20.4
No.
15.03.2013
Date
Field testing of
1200 KV system
3
Access to
electricity to all
224
30.03.2013
31.03.2013
10
Reducing AT&C
losses through
implementation
of R-APDRP
scheme
20
Enhancing the
availability of
trained and
skilled manpower for the
power sector
International
Co-operation
with Bhutan,
and Signing
of JV
Agreements
Efficient
functioning
of the RFD
System
Administrative
Improving
internal
Efficiency/
responsiveness/
service delivery
of Ministry/
Department
Ensuring
compliance to
the Financial
Accountability
Framework
400
No.
400
360
320
280
240
25
NO.
25
23
20
18
15
51
No.
51
46
41
36
31
400
No.
400
360
320
280
240
400
No.
400
360
320
280
240
400
No of
towns
400
360
320
280
240
16225
No.
16225
14603
12980
11358
9735
132000
No.
132000
118800
105600
92400
79200
Bhutan : Preparation/
Updation of DPR
No.
Signing of JV Agreements
No.
On-time
submission
Date
Mar.5
2012
Mar. 6
2012
Mar. 7
2012
Mar. 8
2012
Mar. 9
2012
On-time
submission
Date
May, 1
2012
May, 3
2012
May, 4
2012
May, 5
2012
May, 6
2012
% of
implementation
100
95
90
85
80
Area of
operations
covered
100
95
90
85
80
Implementation of
identified
innovations
Date
Mar. 5
2013
Mar. 6
2013
Mar. 7
2013
Mar. 8
2013
Mar. 9
2013
Implementation of Sevottam
Independent
Audit of
Implentation
of Citizen's
Charter
100
95
90
85
80
Independent
Audit of
implementation of
public
grievance
redressal
system
100
95
90
85
80
Percentage
of ATNs
submitted
within due
date (4
months)
from date of
presentation
of Report to
Parliament
by CAG
during the
year.
0.5
100
90
80
70
60
225
Objectives
Improving
Power
availability
Actions
Projected
Unit
FY
2008-09
FY
2009-10
FY
2010-11
FY
2011-12
15956
MW
3,454
9585
12160.5
20502
Thermal
15154
MW
Hydro
802
MW
Public Sector
8706
MW
Generation performance
920
BU
723.8
771.5
811.104
876.44$
4.85
MU/MW
950
MW
1,504
2868
2670
2998
No.
15.03.2013
Date
FY
2013-14
FY
2014-15
No.
24
No.
No.
No.
No. of
meetings
7333
ckm
5,556
5,515
4986
9774$
8695
ckm
4,576
4,917
8847
7421$
1398
ckm
1,358
1534
3239$
Transformation capacity
addition/ready for
commissioning (Central)
11210
MVA
6,580
10,290
5310
30675$
Transformation capacity
addition/ready for
commissioning (State)
20459
MVA
12,100
12,585
25717
23485$
MVA
1440
630
127$
4100
MW
26.03.2013
Date
4800
No.
12,056
18,374
18306
7934$
34
(no. in
Lakh)
30.9
47.18
58.83
34.44
No.
15.03.2013
Date
Actual
Year
2012-13
Finalization of Fuel
Efficiency norms by BEE
Success
Indicators
Access to
Providing infrastructure for
electricity to all Electrification
226
Reducing
AT&C
losses
through
implementation
of R-APDRP
scheme
400
No.
25
NO.
51
No.
400
No.
400
No of
towns
16225
No.
14225
14869
15825
17012$
132000
No.
113302
115132
127207
135168$
Bhutan : Preparation/
Updation of DPR
No.
Signing of JV Agreements
No.
Enhancing the
availability of
trained and
skilled
manpower for
the power
sector
International
Co-operation
with Bhutan,
and Signing
of JV
Agreements
SECTION 4
Description and Definition of Success Indicators and
Proposed Measurement Methodology
?
Transformation capacity in term of rating of transformers
?
AT&C Aggregate Technical and Commercial
?
BPL Below Poverty Line
?
Project area for SCADA under R-APDRP : Towns with
?
Energy Conservation measures are related to energy saved
?
One Trainee week one person trained for a week
?
Generation is in kilo watt hours (kWh), called units (1
?
UMPP Ultra Mega Power Project
kilometers)
?
RFS Request for selection
?
RFP Request for Proposal
?
RFQ Request for Qualification
?
R&M Renovation and Modernisation
?
QPR Quarterly Performance Review
SECTION 5
Specific Performance Requirements from other Departments
1.
227
7.
3.
8.
9.
4.
5.
6.
Section 6
Outcome/Impact of Activities of Department / Ministry
SI.
Outcome/Impact
of Department/
Ministry
1.
Improving
access to power
especially in
rural areas
MNRE, States
Improving
availability of
power
MNRE, Dept. of
Atomic Energy,
Ministry of coal,
Ministry of
Environment &
Forest,
Department of
Heavy Industries
2.
228
Jointly with
Success
Indication (s)
2009-10
2010-11
(Provisional)
2011-12
i. Number of
unelectrified
18,374
18,306
7934*
47.18
lakhs
58.83
lakhs
34.44*
lakhs
i. Fresh Capacity
added
9585 MW
12160.5
20502 MW*
ii. Power
Generation
771.5 BU
811.104
BU
876.44
BU*
2868 MW
2670 MW
2998 MW@
2012-13
2013-14
3.
Improving quality
of power
Discoms, States.
Regulators
Developers
i. Minimizing grid
Disturbance
ii. Transmission
lines addition/
ready for
commissioning
(ckm)
15367
20434*
iii. Transformation
capacity addition/
ready for
commissioning
(MVA)
31657
54287*
4.
Improved
(NR/WR/ER/NER)
88.07
89.71
SR
86.37
92.87
i. No .of articies
published in
leading
magazines and
journals.
40
40
12
12
iii. No of new
patents
5.
Better project
implementation
Number of
delayed
6.
Reducing AT&C
losses
Measurement of
agriculture
consumption that
is used by the
regulators in tariff
filing (%age of
such tariff filling)
229