Lab Manual - Level 3 - Mini Project
Lab Manual - Level 3 - Mini Project
Lab Manual - Level 3 - Mini Project
KEJURUTERAAN
AWAM
UNIVERSITI
TEKNOLOGI
MARA
PASIR
GUDANG
LABORATORY
MANUAL
COURSE
COURSE CODE
ECW351
LEVEL OF OPENNESS
CATEGORY
FULLY OPEN
100
PERIOD OF ACTIVITY
5 WEEKS
TITLE
MINI PROJECT
1.1
Introduction
The need for an open-ended laboratory activity is emphasized in enhancing
independent learning activities and inculcating creativity and innovation of
students.
This open-ended laboratory activities is created to provide a platform for
students (as a group) to determine the objectives and scopes of the
laboratory assignment, identify the necessary apparatus and prepare step
by step methodology to carry out the task to address the given problem.
The group will be required to analyse all the technical data obtained and
present them in a technical format.
1.2
Objective
PREAMBLE
May 2015
2. The Problem
A new water treatment plant will be built in a new residential area. As an
civil engineer, you are responsible on the water quality assessment of the
project. Suggest the relevant water tests that need to be undertaken and
discuss the possible cause and mitigations measure should it exceed
allowable limit.
PROBLEM STATEMENT
Apparatus
The group must identify the availability of the chosen apparatus in the
laboratory before the right procedures can be identified.
3.2
Procedures
The group is required to search for the relevant procedure to carry out
the test based on the available apparatus in your laboratory. The
document must be made ready for verification by the instructor before
the laboratory activity commences.
3.3
Data Acquisition
All data collected and observed during the test must be tabulate in
proper format for easy verification and presentation of the technical
report
RESULTS
The group is required to submit the technical report of the laboratory results
highlighting the apparatus used, the procedures undertaken for the test,
data acquisition process, analysis carried out and the relevancy of the setout output to address the given problem. The results also should discuss
the suitability of the water sample as water supply with strong supporting
points and evidences. The format of the technical report is left to the
creativity discretion of the group.
The report must be submitted 7 days after the completion of the test.
May 2015