Simptww V 306
Simptww V 306
Scheduling Info:
Updated (Rev#):
_______________
Julaini
Frequency Months
Date
Resource(s)
NOTES
(# )
hrs
(Date Comp.
22.12.10 )
hrs
hrs
N/A
Steam Tracer
(Remove / Install)
(Remove / Install)
/
/
N/A
N/A
LO/TO
(Install / Remove)
/ hrs
hrs
/
ICC Aproval
JSA / Risk
Prediction
(Date Comp. )
Job Walkthrough
Scaffolding -
External
Insulation
Internal
UBF (in-house)
Atmajaya
, Mech
Operation
CSE Crew FPG
Mech
hrs
Crane /
Blower /
Vacuum Truck /
Lighting /
Empty Vessel
Wash
Forklift /
Drums /
Skylift
Gen. Set
Method :
FORM-PM-SIMPTWW
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
Develop: 15/10/2010
Cont.
Operation
Operation
Rev. # 01
SIMPTWW FORM
Task Name Pressure vessel internal inspection
Equip. Name: Glycerine Evaporator
P&ID /
Equip Tag # : V-306
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:
Major Turnaround
Updated (Rev#):
_______________
System Owner
(s):
Julaini
Frequency Months
Additional Information Required - Pls. add drawings, sketches, photo etc. to show the location and scope of work.
Comments :
Shutdown Procedure (by System Owner) : Use Sd Procedure Template and MUST be attached to this document
Work Procedure / Sequence (by Job Owner) :
1. OPen manway
2. Visual inspection
Controlled Doc./ SOP # (if any):
List of manway to be open
1. M1 24 150# man way
2. N10 6 150# man way
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01
SIMPTWW FORM
Task Name Pressure vessel internal inspection
Equip. Name: Glycerine Evaporator
P&ID / A1-314
Equip Tag # : V-306
Drawing #:
Functional Loc.: 300
_______________
Scheduling Info: Major Turnaround
Updated (Rev#):
HSE
Work Order #:
System Owner
(s):
Julaini
Frequency Months
If additional tasks are required, add them on the back of this form. Identify where the additional tasks belong in the sequence and provide details to the Maintenance Planner to update the Schedule.
Material Master #
(Parts)
Bin #
Part #
Qty
Qty
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01
SIMPTWW FORM
Task Name Pressure vessel internal inspection
Equip. Name: Glycerine Evaporator
P&ID /
Equip Tag # : V-306
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:
Major Turnaround
Updated (Rev#):
_______________
System Owner
(s):
Julaini
Frequency Months
Notes:
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01