MCB Work Instruction
MCB Work Instruction
MCB Work Instruction
Approve By:
M.R.
dk;Z %
,lSEcyh M.S Pin, lkbZM iRrh] ySp] LykbMj]
ckbeSVy] ,eSLfiu@,l,lfiu] es DySEi vkSj
ckbesVy ,lsEcyh] LybMj] vVjjsVhax] YkSp
,slkehd IysV] Dokby ,lsEcyh] ukSc ,lsEcyh]
vkWd pSEcj] ,sjkfed IysV] ekmUVhax [kyai]
dk;j vkSj fjeksVA
funsZ'k%
1-pSfll esa yS'k ugha gksuh pkfg,A
2-dEiksuSVL; gkFk ls iQhfVax djus pkfg,]
gFkkSM+k ugha ekjuk pkfg,A
3-LykbMj ewoeSaV iQzh gksuk pkfg, vkSj LykbMj ij
dfVax cj ugha gksuk pkfg,A
4-vkWijsfVax ySp vkmVj vkSj buj ySp VkbV ugha
gksuh pkfg,A
5-J-Clamp ,lsEcyh dks fiQV djs vkSj ckbeSVy pSfll ls
touch ugha gksuk pkfg,A
6dksby ,lsEcyh ds nkSjku ,udj fLizax vkSj
dksby 'khV MS01 ds vuqlkj gksuh pkfg,A
M.R
M.R.
M.R.
M.R.
Q. A Plan MCB
Sr.
No
.
1
Stage
Observations
Extent of
Check
Equipment
Frequency
Acceptance Norms
Resp.
MT
MT
100%
M.T. Bench
Every Lot
QA Incharge
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
10 Pcs / Lot
10 Pcs / Lot
10 Pcs / Lot
10 Pcs / Lot
Operational
M.T. Bench
Operational
Operational
Visual
Calibrating Bench
Calibration Bench
Mannual
Calibration Bench
Operational
Operational
Operational
Operational
Continuity Testing Bench
Operational
Operational
Operational
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
M.T. Bench
Calibration Bench
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Every Lot
Operational
Operational
Operational
Operational
Visual
According to time Band
According to time Band
Operational
Operational
Operational
Operational
Operational
Operational
Operational
Operational
Operational
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Operational
According to time Band (IS 8828)
--- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do----- do---
Calibration
Final Inspection
Final Audit
Authorized Signatory:
Please
Visit
Next page
Start Assembly
Reworking
Cover Assy
Rivetting
100% Magnetic Tripping Test
100% Calibration Test at 2.55 in
Paint Sealing
Printing
100 % Final Inspection
Not O.K.
Packing
Sampling Inspection
Ware House
Dispatch to Customer
End
Approved By:
M.R.
Sr. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Note:
B Curve
C Cruve
Rating
0.5
1
1.5
2
3
4
5
6
8
10
16
20
25
32B
32 C
25
25
21
21
19
19
19
19
17
17
17
15
14
14
13
40 13
50 13
63 13
Coil SWZ
No of Turns
95.5
47.5
35.5
23.5
14.5
14.5
14.5
14.5
9.5
9.5
9.5
7.5
5.5
5.5
4.5
4.5
4.5
4.5
Anchor Spring
A
B
--0.22
--0.22
--0.22
--0.22
--0.22
--0.22
--0.22
0.18
0.25
0.22
0.28
.25
0.27
.27
0.30
.27
0.30
.27
0.35
.30
---0.35
.30
0.4
.35
4.50
.35
0.45
Approved By:
Note: Data change implemented with modified Anchor Depth : 2.1 + 0.5 instead of 2.5 + 0.5
To be Verified
To be Verified
To be Verified
To be Verified
To be Verified
To be Verified
To be Verified
M.R.
Approved by:
M.R.
Approved by:
M.R.
Approved by
M.R.
\
CORPORATE OFFICE : Unit No. 9, Sati Ind. Estate, I.B. Patel Rd, Goregaon (E) Mumbai- 400 063. INDIA
Tel : (022) 2685 8145, 2365 7789, Telefax : (022) 2686 8146 E-mail:elleys_ho@yahoo.com
Work: Assembly of M.S. Pin, Side Strip, Operation Latch Slder, JCALMP & Bimetal
Assy, M.S/s pin, MS Rail, J-Clamp & bimetal assembly, Shider, Operating, Latch,
Caramic plate, Coil assembly, Knob assembly, Arc chambe, Caramicplate, Mounling,
Clip/Spring, Covers & ririt.
1. The Chassis should be flash and ribs free.
2. All the components should be easily fit/thumb fit ie do not use hammering.
3. The slider movement should be free, There should not be cutting burr on the
slider.
4. There should not be flashes on the operating latch and the inner latch movement
should be free.
5. Fit the J-Clam Assy, the bimetal should not touch the chassis.
6. During Coil assembly, Assembly the anchor spring & coil according to
specification as per standard.
7. After this fit the knob & Other parts, There should not be fashes on the knob &
knob movement should be free.
8. During final Inspection set the gat between slider & Bimetal &Slider according to
Standard.
9. Finally fit the cover & rivet the MCB.
10.
The riveted will be sent for further testing M.T. Calibration etc.
Approved By;
M.R.