TP 130
TP 130
TP 130
of Engineers
Hydrologic Engineering Center
June 1990
TP-130
The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive
Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be
subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION.
1. REPORT DATE (DD-MM-YYYY)
2. REPORT TYPE
June 1990
Technical Paper
TP-130
Paper prepared for the International Symposium on the Hydraulics/Hydrology of Arid Lands, ASCE Hydraulics Division,
San Diego, CA, 30 July 3 August 1990.
14. ABSTRACT
This paper summarizes the procedures used for computing the basin wide annual yields and single event sediment
production for ephemeral channels located on an incised alluvial fan in Central California. Unique geomorphic
characteristics of the basin and alluvial fan are discussed in light of data and analytical methods necessary to compute
sediment delivery and yield at a proposed dam site.
alluvial fans, sediment production, sediment yield, transport capacity, geomorophology, single event floods, episodic flows,
average annual sediment yield, flow duration methods, regional methods
16. SECURITY CLASSIFICATION OF:
a. REPORT
b. ABSTRACT
c. THIS PAGE
17. LIMITATION
OF
ABSTRACT
UU
18. NUMBER
OF
PAGES
14
June 1990
TP-130
Papers in this series have resulted from technical activities of the Hydrologic
Engineering Center. Versions of some of these have been published in
technical journals or in conference proceedings. The purpose of this series is to
make the information available for use in the Center's training program and for
distribution with the Corps of Engineers.
The contents of this report are not to be used for advertising, publication, or
promotional purposes. Citation of trade names does not constitute an official
endorsement or approval of the use of such commercial products.
Abstract
This paper summarizes the procedures used for computing the basinwide annual yields
and single event sediment production for ephemoral channels located on an incised alluvial
fan in Central California. Unique geomorphic characteristics of the basin and alluvial fan
are discussed in light of data and analytical methods necessary to compute sediment
delivery and yield a t a proposed damsite.
Introduction
A Sediment Engineering Investigation (SEI) of the Caliente Creek watershed (470 sq.
mi.) in Kern County, California was conducted to determine the watershed sediment yield
upstream from a proposed flood detention reservoir located on the Caliente Fan. Previous
studies estimated annual sediment yields at the proposed reservoir site based on traditional
soil loss methods and sediment accumulation rates observed in impoundments along the
Sierra Nevada, Tehachapi and Transverse Mountain Ranges. Initial project feasibiity was
considered based on preliminary cost/benefit analyses using the rough sediment yield
estimates. Further review of the potential annual maintenance requirements led to the
conclusion that the economic viability of the project depended heavily on annual 0 & M
costs potentially required to remove the yearly accumulation of sediment within the
proposed reservoir. Accurate estimates for the average annual sediment yield and single
event sediment delivery were essential.
Further studies were undertaken to (1) identify specific geomorphic characteristics of
the stream channels and watersheds upstream from the proposed flood control reservoir
that could effect the sediment yield at the damsite, and (2) to relate channel and basin
processes to sediment production and yields for various frequency precipitation and flood
flow events in the watershed. This paper summarizes the procedures used for computing
the basinwide annual yields and single event sediment production, along with conclusions
and recommendations for other project design modifications.
Hydraulic Engineer, U.S. Army Corps of Engineers, Hydrologic Engineering Center,
609 Second Street, Davis, CA 95616 U.S.A.
Principal Geomorphologist,Water Engineering & Technology, Inc., 419 Canyon, Suite
225, Fort Collins, CO 80521, U.S.A.
Hydraulic Engineer, U.S. Army Corps of Engineers, Sacramento District, 650 Capitol
Mall, Sacramento, CA 95814, U.S.A.
Paper prepared for the International Symposium on the Hydraulics/Hydrology
of Arid Lands, ASCE Hydraulics Division, July 30-August 3, 1990, San Diego, CA
Approach
A two element SEI was conducted to address the sediment yield question: (1)
geomorphic analyses (Harvey et al., 1990) were conducted to determine those unique
characteristics of the basin and channels important to estimating sediment yield, and (2)
sedimentation analyses (HEC, 1990) were conducted to determine the sediment yield in
light of the findings from the geomorphic analyses.
To determine the amount of sediment that can possibly enter the proposed reservoir
during its design life (100 years), both the average annual sediment yield and single event
sediment yields are estimated using a variety of sediment engineering procedures as
reported in EM 1110-2-4000, "Sediment Investigations of Rivers and Reservoirs," (COE,
1989) and recommended by others. Available scientific and engineering literature was
reviewed, a three-day field reconnaissance and sediment data collection investigation was
conducted, persons familiar with the Caliente Creek Project and watershed were
intewiewed, and a series of sediment engineering analyses to determine the possible
sedimentation characteristics of the drainage basin at the damsite were carried out.
Morphometric data for the alluvial fan in the vicinity of the proposed reservoir site were
obtained from 2-foot contour mapping. Sixteen bed and bank material samples and two
Wolman Counts were collected at representative locations throughout the drainage basin.
Average Annual Sediment Yield - The possible range of average annual sediment
yield at the proposed reservoir site is estimated from the results from eight different
sources of data and/or methods for estimating sediment yield. The following sources of
data and procedures were used: (1) Previous reports and publications were thoroughly
reviewed, (2) U.S.D.A. (1977) reservoir sedimentation rates were examined, (3) recent COE
reservoir sedimentation survey data were analyzed, (4) sediment yield maps for the
Western United States (U.S.D.A., SCS, 1975) were examined, (5) the average annual
sediment yield was estimated from computations of the total event sediment volumes for
single events ranging from the 2-year event up to the PMF based on channel transport
capacity rather than watershed sediment production and delivery, (6) a similar flow
duration and sediment load curve integration method (see EM 1110-2-4000, COE, 1989)
was used to estimate the average annual sediment production and yield to the reservoir
site, (7) the Pacific Southwest Inter-Agency Committee (PSIAC) method was used to
estimate basin-wide sediment yield from the entire watershed, and (8) the Dendy and
Bolton (1976) Regional Analysis Method for sediment yield was applied. Results from
these analyses are discussed next. Detailed procedures for conducting such investigations
are presented in the references cited and in Engineering Manual 1110-2-4000 (COE, 1989).
Table 1 presents the estimated sediment yields computed using the various
computational procedures listed above and from measured reservoir surveys conducted by
the Corps of Engineers and SCS. Based on measured sediment accumulation rates
recorded in the six Tulare, Kings, and Kern County reservoirs, the approximate range of
observed sediment yields is from 0.2 AF/sq mi/yr to 2.2 AF/sq mi/yr with an average of
approximately 1.0 AF/sq mi/yr. Sediment yield rates determined for the Western United
States are reported by the U.S.DA, SCS (1975). From the mapping of yield rates, it
appears that the upper Caliente watershed area has sediment yield rates from 0.2 to 0.5
AF/sq mi/yr, with pockets as high as 0.5 to 1.0 AJ?/sq mi/yr. In the lower portions of
the basin, on the valley floor and on portions of the broad alluvial fan, the estimated
yields are reported to be in the 0.1 to 0.2 AF/sq mi/yr range. Using area weighting
methods to sum the yields from contributing subbasins, the approximate annual yield
appears to range from 0.2 to about 0.75 AF/sq mi/yr, with an average of about 0.47
AF/sq mi/yr for the entire watershed.
Harvey et al., (1990) determined that the sediment delivery and yield at the damsite
depends on the channel transport capacity in the fan area upstream from the reservoir
rather than the watershed production of sediment. The broad (3,000 to 6,600 feet wide)
alluvial fan contains an unlimited supply of easily mobilized sediment materials. This
result lead to the following approach based on the transport capacity of the channels in
the supply reach. The supply reach is a 4-mile section of the channel considered to be
representative of the channel hydraulic conditions and sediment transport characteristics
TABLE 1
Sediment Surveys for Reservoirs in the Vicinity
of Caliente Creek, Kern County, California,
and Estimated Sediment Yields Based on Various
Computational Methods
Data
Source
See
References
SCS
SCS
CESPK
CESPK
CESPK
CESPK
SCS
Computed
10
10
5
9
9
9
8
Computed
Computed
Computed
Computed
7
7
4
6
Drainage Basin,
Reservoir or
Computational Method Used
Blackburn
Antelope Canyon
Isabella
Pine Flat
Success
Terminus
SCS Yield Map of Western US (HEC)
Integration of the Event Volume vs.
Frequency Curve (HEC)
Flow Duration Method (IIEC)
Dendy & Bolton Method (HEC)
PSIAC Method (HEC)
Kern County Water Agency Study (SLA)
Drainage
Area
mi)
Yield
(AF/sq mi/yr)
7.1
4.4
2,074
1,542
393
560
470
2.20
1.50
0.37
0 20
0.76
0.76
0.47
470
470
470
470
470
0.65
0.90
0.71
0.75
0.97
upstream from the dam site. Single event total sediment volumes were computed for
each of the 2, 5, 10, 20, 50, 100, SPF, and PMF events. The total sediment production
for each event was based on the sediment transport capacity of the alluvial channel
(supply reach) upstream from the reservoir and the flow hydrographs used for each of the
flood events evaluated.
A total sediment load versus percent exceedance curve was developed from these data
and the area under the total load frequency curve was computed to give an estimate for
the expected average annual sediment delivery to the reservoir based on channel transport
capacity upstream from the reservoir. Two different transport relationships were used to
develop the total load curves. The resulting average annual sediment delivery ranged from
0.1 AF/sq mi/yr to 1.0 AF/sq mi/yr due to the differencein transport capacity computed
with the transport functions. Using these results as a representative range in expected
yields based on channel capacity, an average of the two yields seems reasonable.
Therefore, based on the channel transport capacity above the reservoir site and the
estimated total sediment production from a range of single events, an approximate
sediment yield a t the reservoir is 0.55 AF/sq mi/yr. This method does not account for
the additional contribution of sediment from dry ravel erosion, wind-blown sand transport
into the channel or reservoir, channel bank caving, local scour, or toe failure that may
occur along the Sand Hills. Therefore, the sediment yield to the reservoir may be as high
as the higher of the two transport functions predicts, especially during periods of
exceptionally wet years.
The "flow duration sediment discharge rating curve method," (COE, 1989) is a simple
method where the flow duration curve is integrated with the sediment discharge rating
curve developed for the damsite. It is very similar to the method just described, however,
the average annual sediment yield is based on the transport capacity and flow duration
relationship at the darnsite rather than the total event volume frequency. The resulting
annual sediment yield is approximately 438 AF/year, or 0.9 AF/sq mi/yr.
Further exiuninatioa of &the U.S.B.A., SCS (19'75j "Sediment 'field Rates for the
Western United States" shows areas in the vicinity of the proposed damsite with estimated
yields from 0.5 to 1.0 AF/sq mi/yr. These areas may correspond to the broad floodplain
channels (4000 to 6500 feet wide) immediately upstream from the proposed reservoir site.
If that is the case, then the higher yield values estimated with the channel transport
capacity method (1.0 AF/sq mi/yr) and the flow duration method (0.9 AF/sq mi/yr) are
supported by SCS yield mapping estimates.
The Dendy and Bolton (1976) method produces an average annual sediment yield of
approximately 0.71 AF/sq rni/yr for the Caliente Basin at the Sivert damsite, while the
application of PSIAC procedures to the Caliente Creek watershed produces an estimated
average annual sediment yield of 0.75 AF/sq mi/yr at the dam site. These values are
right in line with the range of values predicted from the channel capacity approach and
the measured reservoir accumulation results from Tulare County.
Others (Simons, Li & Associates, 1989) conducted an independent assessment of the
proposed Caliente Creek Project. The authors report the arithmetic average of their yield
estimates (0.97 AF/sq mi/-) in Table 1. Figure 1shows all thirteen yield values and
the drainage basin area associated with each yield. A best fit line through these data
This is more than
points gives an average annual sediment yield of 0.75 M / s q mi/-.
twice the original annual estimate.
Figure 1
Table 2 presents the computed sediment inflow to the proposed damsite for the
various flood events. The 100 year flood event can possibly produce enough sediment
during the single design event to remove 43.7 percent of the gross pool storage capacity
(6992 AF). It also suggests that events greater than about the 15 year event can possibly
remove 10 percent or more of the gross pool storage in one 5 day period. This indicates
that the present design capacity of the reservoir may be undersized. The computed total
sediment loads account for the total bed material load with an additional 15 percent
estimated for the wash load. Typical wash loads can account for as much as 90 to 95
percent of the total load in most sand bed rivers (Vanoni, 1975). However, in the Caliente
River Basin the availability of fines (silts and clays) may be limited due to the nature of
the granitic parent materials throughout the basin (see Harvey et al., 1990). The authors
postulate that the wash load near the damsite will have an inverted bed loadlwash load
relationship, and may only account for approximately 15 percent of the total sediment load
being transported by each event.
TABLE 2
Computed Single Event Sediment Inflow t o t h e Proposed
Reservoir a n d Comparison t o Planned Detention
Storage Volume of 16,000 Feet
Event
6
10
20
50
100
SPF
PMF
Total Load
Per Event (acre-feet)
[dry volume]
Percent of the
Planned Detention
Storage Volume
Associated with
Single Event
Sediment Delivery
245
760
1.794
4,709
6,992
11,615
29,440
1.6%
4.8%
1L2%
29.4%
43.7%
72.3%
184.0%
Harvey et al., (1990) estimate that there may have been approximately 9 inches of
sediment deposited in the reach upstream from the Highway 58 crossing during the 1983
flood event That event is estimated to be approximately a 50 year event according to the
Kern County Water Agency. Comparing the total sediment loads entering and leaving the
reach it is seen that there is approximately 575 acre feet more sediment transported into
the reach from the upstream supply reach than leaves the reach. The approximate surface
area of the reach is one square mile (640 acres). Assuming that the 575 acre feet of
sediment deposits uniformly over the reach, this gives an approximate sediment deposition
thickness of 10.8 inches. This matches the observed deposition depth for a 50 year event
reasonably well.
Large events such as a 50 year flood or greater may produce large amounts of sediment
material that enter the water course due to mass wasting, channel bank failure and
erosion of prograded alluvial fans that often extend into the channel in the upper basin.
It may be that single event sediment production can contribute significant quantities of
sediment materials to the reservoir in a short period of time (a few days) and affect the
operation and storage characteristics of the project.
Conclusions
The following conclusions are drawn from the results of this investigation:
1) The morphology of the Caliente Creek drainage basin and the nature of the
sediments delivered to the channels and the potential for sediment storage within
the drainage basin are controlled by the basin geology (Harvey et al., 1990).
2 ) Sediment transport in the basin is episodic and is governed by the occurrence
of large runoff events. Sediment is stored in the broad valley washes (3000 to
6600 feet wide) in the lower portions of the Caliente Basin. There is sufficient
material located in these expansive washes to provide sediment supply to the
lower fan areas somewhat independently of the production and delivery of
sediments from the upper watershed areas. Therefore, sediment yield at the
proposed damsite may be more dependent upon the transport capacity of the
channels and washes upstream from the damsite, than the watershed production
of sediment materials during a flood event.
3) Examination of eight different sources of yield data and methods for estimating
yield a t the damsite concludes that the approximate average annual sediment
yield at the Sivert Reservoir is 0.75 AF/sq mi/yr. This is more than twice the
initial yield estimate developed during the planning studies. Annual sediment
yields can range from 0.47 AF/sq mi/yr to approximately 1.5 AF/sq mi/yr.
4) Single event floods may produce significantly more sediment per event than the
annual sediment yield would indicate. As much as 43 percent of the total gross
pool storage volume (16,000 AF) may be lost due to sediment deposition during
a 100 year event. This would necessitate the removal of approximately 7,000 AF
of sediment material (dry volume) from the reservoir prior to the next flood
season. It also indicates that the design capacity of the reservoir may be
undersized.
Acknowledgements
The study reported herein was conducted by the Hydrologic Engineering Center,
Davis, California at the request of the Sacramento District, Corps of Engineers. The views
expressed herein are those of the authors and not necessarily those of the U.S. Army
Corps of Engineers.
References
1. Dendy, F.E.and G.C. Bolton (1976). "Sediment Yield - Drainage Area Relationships in the United States,"
Journal of Soil and Water Conservation
2. Harvey, Michael D., E.F. Sing and Robert C. MacArthur (1990). "Sediment Sources, Transport and
Delivery to An Alluvial Fan, Caliente Creek, CA," Proceedings of the International Symposium on
Hydraulics and Hydrology of Arid Lands," ASCE, July 30 Aug 2. San Diego, CA.
3. Hydrologic Engineering Center (1990). "Phase 1Sediment Engineering Investigation of the Caliente Creek
Drainage Bash,"F i Proiect Report No. 90-03, prepared for CESPK Sacramento, CA.
4. Pacific Southwest Inter-Agency Committee (1968). Report of the Water Management Subcommittee on
"Factors Affecting Sediment Yield in the Pacit
Southwest Areas and Selection and Evaluation of Measures
for Reduction of Erosion and Sediment Yield," Sedimentation Task Force, PSIAC.
5. Personal Communication with CESPK-ED-H/Herb Hereth (11/21/89).
6. S i o n s , Li & Associates, I n c (1989). "Sedimentation Study of Caliente Creek Watershed, Kern County,
C c a report prepared for Kern County Water Agency, Bakersfield, CA.
7. U.S. Army Corps of Engineers (1989). "SedimentationInvestigations of Rivers and Reservoirs, Ewineering
Manual EM 1110-2-4000,Office of the Chief of Engineers. Washington, D.C.
8. U.S. Department of Agriculture (1975). "Erosion, Sediment and Related Salt Problems and Treatment
Oooortunities." Soecial Proiects Division. Soil Consemtion Service. Golden CO.
9. U:S. ~ e p a r t m e nof
t ~~riculiure
(1977). "Supplement to Sediment ~ e ~ o s i t i o n -U.S.
i n Reservoirs: Summary
of Data Reported Through 1975," Miscellaneous Publication No. 1362 compiled by the Sedimentation
Committee, Water Resources Council a t the USDA Sedimentation Laboratory, Oxford, MS.
10. U.S. Department of Agriculture (1980). 'Watershed Plan and Environmental Impact Statement Tehachapi Watershed," Soil Conservation Service, Tehachapi, CA.
,
Society of Civil Engineers, New York,
11. Vanoni, Vito A., ed. (1975). Sedimentation E n ~ e e r i n gAmerican
NY.
TP-39
TP-40
TP-41
TP-42
TP-43
TP-44
TP-45
TP-46
TP-47
TP-48
TP-49
TP-50
TP-51
TP-52
TP-53
TP-54
TP-55
TP-56
TP-57
TP-58
TP-59
TP-60
TP-61
TP-62
TP-63
TP-64
TP-65
TP-66
TP-67
TP-68
TP-69
TP-70
TP-71
TP-72
TP-73
TP-74
TP-75
TP-76
TP-77
TP-78
TP-79
TP-80
TP-81
TP-82
TP-83
TP-84
TP-85
TP-86
TP-87
TP-88
TP-89
TP-90
TP-91
TP-92
TP-93
TP-94
TP-95
TP-96
TP-97
TP-98
TP-99
TP-100
TP-101
TP-102
TP-103
TP-104
TP-105
TP-106
TP-107
TP-108
TP-109
TP-110
TP-111
TP-112
TP-113
TP-114
TP-115
TP-116
TP-117
TP-118
TP-119
TP-120
TP-121
TP-122
TP-123
TP-124
TP-125
TP-126
TP-127
TP-128
TP-129
TP-130
TP-131
TP-132
TP-133
TP-134
TP-135
TP-136
TP-137
TP-138
TP-139
TP-140
TP-141
TP-142
TP-143
TP-144
TP-145
TP-146
TP-147
TP-148
TP-149
TP-150
TP-151
TP-152
TP-153
TP-154
TP-155
TP-156
TP-157
TP-158
TP-159
TP-160
TP-161