Volume 04
Volume 04
Volume 04
Schools Complex & Staff Housing at Al Khiysa Umm Salal Doha Qatar
Volume 4
Parcel 2 Secondary School BOQ
December 2014
2014
Contents/(2)
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
SUBSTRUCTUR WORKS
A.EXCVATION WORKS AND EARTH
WORKS
Note:-Excavation and earthworks quantites
have been based upon an average existing site
level of 0.00 the contractor is deemed to have
visited the site and made aware of the
conditions and charcter of the site, nature of
the ground, existing levels etc and satisfied
himself with the ground, existing levels etc
and satisfied himself with extent of the works
evisaged in this section
A
m2
9,702
m3
14,555
Disposal
C
m3
7,130
m3
7,425
m3
4,749
item
item
Filling
E
To summary Q.R
SUB - STRUCTURE
S.B/Page1/5
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
m2
2770
RATE
QR
AMOUNT
QR
Concrete Works
The Contractor is referred to the Specifications
and Drawings for all details related to this
Section of the works and he is to include for
complying with all the requirements contained
therein
For tanks all details and sizes are according to
the drawings and the electro-mechanics work
specifications and the consultant approval.
Structural Drawings shall be read in
conjunction with all relevant architectural,
civil and services drawings and specifications.
Discrepancies shall be brought to the notice of
the Engineer.
The Contractor shall be responsible for the
proper setting out of the works , correctness of
line, levels and for quality control of materials.
The approval of the Consultants Engineer
(The Engineer) shall not in any way relieve
the Contractor of his responsibility and any
errors rectified by the Contractor to the
approval of the Engineer at no cost to the
contract.
All materials shall be as per Engineers
satisfaction and approval. All material
submittals shall be approved by the Engineer
in writing.
All testing shall be at Contractors expenses
and shall be carried out at independent testing
laboratory approved by the Engineer
All drainage lines or sleeves and any other
services shall be laid before casting of the raft
foundation and/or the ground floor slab.
The contractor must refer to service engineers
drawings for positions of all cast in items and
also provide details of how the items are cast
in.
SUBSTRUCTRUE WORKS
plain in- situ concrete Grade 20 SRC
A
100 mm Blinding
To summary Q.R
SUB - STRUCTURE
S.B/Page2/5
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
Item
RATE
QR
AMOUNT
QR
Isolated foundation
m3
1,641
Ground beams
m3
528
Item
Slab on grade
m3
1,100
columns
m3
32
walls
m3
13
Kg
189,048
m2
11,000
Reinforcement
high yield steel reinforcing bas of minimum
strenth 460 N/mm2 as specified
H
Ref.A393
To summary Q.R
SUB - STRUCTURE
S.B/Page3/5
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Formwork
A
m2
6,687
to edges of beds.
m2
369
m2
312
m2
65
m2
7,106
m2
9,486
L.M
457
m2
880
SUNDRIES
1000 Gauge polyethene sheets
E
Expantion Joints
G
To summary Q.R
SUB - STRUCTURE
S.B/Page4/5
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
Page S.B/1/5
Page S.B/2/5
Page S.B/3/5
Page S.B/4/5
S.B/Page5/5
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
SUPERSTRUCTURE
Concrete Works
The Contractor is referred to the
Specifications and Drawings for all details
related to this Section of the works and he is
to include for complying with all the
requirements contained therein
For tanks all details and sizes are according to
the drawings and the electro-mechanics work
specifications and the consultant approval.
Structural Drawings shall be read in
conjunction with all relevant architectural,
civil and services drawings and
specifications. Discrepancies shall be brought
to the notice of the Engineer.
The Contractor shall be responsible for the
proper setting out of the works , correctness
of line, levels and for quality control of
materials. The approval of the Consultants
Engineer (The Engineer) shall not in any way
relieve the Contractor of his responsibility
and any errors rectified by the Contractor to
the approval of the Engineer at no cost to the
contract.
All materials shall be as per Engineers
satisfaction and approval. All material
submittals shall be approved by the Engineer
in writing.
All testing shall be at Contractors expenses
and shall be carried out at independent testing
laboratory approved by the Engineer
All drainage lines or sleeves and any other
services shall be laid before casting of the raft
foundation and/or the ground floor slab.
The contractor must refer to service
engineers drawings for positions of all cast in
items and also provide details of how the
items are cast in.
Reinforced In-situ OPC concrete Grade 40
A
Parapet
SUPER-STRUCTURE
m3
90
To summary Q.R
S.T/Page 1/4
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
SUPERSTRUCTURE (Cont'd)
Reinforced In-situ OPC concrete Grade 50
A
Staircases
m3
164
m3
63
sawtooth slab
m3
223
Beams
m3
361
sawtooth beams
m3
286
Lift Shaft
m3
46
Coulmns
m3
1,280
kg
445,997
Reinforcement
high yield steel reinforcing bas of
minimum strenth 460 N/mm2 as specified
H
m2
235
m2
10,832
Item
horizonatl of slab
m2
365
Sawtooth slab
m2
1,277
m2
2,219
m2
1,718
To summary Q.R
SUPER-STRUCTURE
S.T/Page 2/4
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
m2
12871
Item
RATE
QR
AMOUNT
QR
SUPERSTRUCTURE (Cont'd)
Post tention concrete in superstructure
Supply and casting in-place of post tention
concrete in superstructure including in super
structure including hydrophopic additives
such as PUDLO or similar
approved,necessary preparation works
,protection works, reinforcement and steel
decking " where necessary " , cables , pushing
strands, tensioning and grouting, adequate PT
equipment to comply with the site
requirements, stressing jacks including
pumps, mixer/ grout set, strand dispensers,
formwork, scaffolding, reinforced steel,
expansion and construction joints, joint filler,
sealant, transporting, mixing, pouring,
leveling, finishing, curing of concrete and
testing all in accordance with drawings and
specification. including all of the approval for
the design drawings and shopdrawings from
certified posttension design consultant
To summary Q.R
SUPER-STRUCTURE
S.T/Page 3/4
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
Page ST/1/4
Page ST/2/4
Page ST/3/4
S.T/Page 4/4
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
m2
4,816
RATE
QR
AMOUNT
QR
ROOFING
Supply and apply a water proofing for
Upper Roof and all roofs , with a 10 years
warranty from the supplier supported by a
letter by the main contractor as following :
Slopping concrete with average thick of 8cm
of plain concrete, area not more than 4m2 (1
unit) and mastic in between to be used ,
accordance with drawings.
Cement & sand plaster to form a
rectangular sector at the angle linking the
slab with the parapet or bases on the roof
(slope skirting)
Layer of Cold Primer.
2 Layers of insulating rubber "Membrane"
4 mm thick to be fixed by ISOFLEX-200HP
laid as specified Covering on leveling screed ,
in accordance with constructional details.
Layer of insulating rubber (MEMBRANE) 4
mm thick to be fixed by heat in linking
points between the slab and the parapet
according to details illustrated in the
drawings to the end of skirting, inside wall,
and filling openings with mastic.
Layer of heat-insulating 5 cm thick boards ISOFOAM or ROOFMAT- enduring high
pressure not less than 40 in order to be heat
and water resistant and proof.
1000 gage a polythine sheet to be fixed above.
10cm Screed. as a top layer.
The contractor should do a water test for 48
hours for all insulated places and to be
checked by the consultant before continuing
to the following item, the system is according
to an approved shop drawing.
BUILT UP ROOFING
lightweight screed as specified
A
To summary Q.R
ROOFING
ROF/Page 1/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
m2
4,816
m2
4,816
m2
4,816
m2
4,816
m2
4,816
l.m
904
Item
RATE
QR
AMOUNT
QR
ROOFING (Cont'd)
prepare and apply bituthene primer B1 as
specified to cement and sand screed base
(measured separetley)
A
50 mm(minimum) thick layer laid to falls, crossfalls or slopes not exceeding 10 degree from
horizontal on filter membrane (measured else
where)
Aluminum sheets as specified
To summary Q.R
ROOFING
ROF/Page 2/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
Page ROF/1/3
Page ROF/2/3
ROF/Page 3/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
BLOCK WORKS
Hollow concrete blocks to BS 6073,Part1
bedded and jointinted in class M6/M8 mortar
as specified
A
100 mm walls
m2
1170
200 mm walls
m2
6892
300 mm walls
m2
2354
350 mm walls
m2
956
400 mm walls
m2
4444
500 mm walls
m2
241
600 mm walls
m2
2628
800 mm walls
m2
86
To summary Q.R
BLOCK WORKS
B/Page1/2
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
PageB/1/2
BLOCK WORKS
B/Page2/2
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
RATE
AMOUNT
QR
QR
QTY
No.
No.
L.M
57
Wood skirting
C
To summary Q.R
CARPENTARY
CAR/Page1/2
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
RATE
AMOUNT
QR
QR
QTY
COLLECTION
Page CAR/1/2
CAR/Page2/2
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
NO
NO
NO
NO
NO
NO
NO
47
RATE
QR
AMOUNT
QR
METAL WORK
DOORS
THE CONTRACTOR SHOULD CHECK
THE FIRE SAFETY PLAN FOR THE
FIRE RATED DOORS AND ALL
ACCESSORIES SHOULD BE AS PER
CIVIL DEFENSE REQUIREMENT
45mm thick core flush door comprising
two skins of 1.2 mm thick galvanised sheet
steel painted as specified in filled with
polyurethene insulationfixing to steel
frames(measured elsewhere) complete
with glazing panel (as required).
Aluminum louvered grill (as reequired ).
fire rated as required building in
lintels,cills weather sealing etc. and
assoiciated builders work as specified and
indicated
A
To summary Q.R
METAL WORKS
MET/Page 1/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
NO
NO
22
NO
NO
NO
NO
11
NO
14
NO
NO
75
NO
NO
NO
11
NO
RATE
QR
AMOUNT
QR
F
G
To summary Q.R
METAL WORKS
MET/Page 2/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
NO
NO
NO
RATE
QR
AMOUNT
QR
To summary Q.R
METAL WORKS
MET/Page 3/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
NO
18
RATE
QR
AMOUNT
QR
To summary Q.R
METAL WORKS
MET/Page 4/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
NO
193
NO
NO
42
NO
NO
10
NO
NO
18
NO
RATE
QR
AMOUNT
QR
To summary Q.R
METAL WORKS
MET/Page 5/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
NO
NO
119
NO
283
NO
NO
NO
NO
97
NO
14
NO
I
type W33 as per drawing number P2-A-603
To summary Q.R
METAL WORKS
MET/Page 6/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
NO
26
NO
50
NO
72
NO
NO
To summary Q.R
METAL WORKS
MET/Page 7/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Ref.Set 1 for D1
NO
18
Ref.Set 2 for D2
NO
NO
NO
Ref.Set 5 for D5
NO
NO
NO
53
NO
26
NO
NO
18
NO
15
NO
75
NO
NO
20
NO
16
NO
NO
To summary Q.R
METAL WORKS
MET/Page 8/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
900 mm high
351
194
49
NO
42
m2
223
RATE
QR
AMOUNT
QR
Steel ladder
ALUMIUN BERGOLAA
For the emergency entrance including
artificail columns
Aluminum pergola
Aluminum pergola as mention at AR-08
To summary Q.R
METAL WORKS
MET/Page 9/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
PageMET/1/10
PageMET/2/10
PageMET/3/10
PageMET/4/10
PageMET/5/10
PageMET/6/10
PageMET/7/10
PageMET/8/10
PageMET/9/10
MET/Page 10/10
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
Item
Item
Item
Item
Item
Item
RATE
AMOUNT
QR
QR
B
C
To summary Q.R
SSS/Page 1/3
STEEL STRUCTURE SYSTEM
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
AMOUNT
QR
QR
Item
Item
Item
Item
Protection
D
To summary Q.R
SSS/Page 2/3
STEEL STRUCTURE SYSTEM
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
AMOUNT
QR
QR
COLLECTION
PageSSS/1/3
PageSSS/2/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
PLUMBING DRAINGE
PL/Page 1/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No
156
Shower stall
No
10
Toilet
No
75
PBH
No
75
MobSink
No
50
ablution
No
No.
13
No.
45
No.
113
No.
18
No.
11
No.
38
No.
To summary Q.R
PLUMBING DRAINGE
PL/Page 2/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No.
No.
No.
11
Water Tap
No.
No.
No.
10
No.
24
No.
10
No.
16
No.
Gully Trap
No.
12
No.
18
No.
11
Manhole
To summary Q.R
PLUMBING DRAINGE
PL/Page 3/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No.
Set
No.
RATE
QR
AMOUNT
QR
To summary Q.R
PLUMBING DRAINGE
PL/Page 4/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Pipe diameter 15 mm
No.
520
Pipe diameter 22 mm
No.
472
Pipe diameter 28 mm
No.
418
Pipe diameter 35 mm
No.
260
Pipe diameter 42 mm
No.
63
Pipe diameter 54 mm
No.
226
Pipe diameter 67 mm
No.
108
Pipe diameter 76 mm
No.
136
No.
15
55
Pipe diameter 32 mm
To summary Q.R
PLUMBING DRAINGE
PL/Page 5/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Pipe diameter 40 mm
210
Pipe diameter 50 mm
15
Pipe diameter 75 mm
80
600
10
300
385
To summary Q.R
PLUMBING DRAINGE
PL/Page 6/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
Item
Item
Item
Item
Item
RATE
QR
AMOUNT
QR
Sundries
To summary Q.R
PLUMBING DRAINGE
PL/Page 7/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
Item
Item
Item
RATE
QR
AMOUNT
QR
To summary Q.R
PLUMBING DRAINGE
PL/Page 8/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF HOUSING
at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
Page PL/1/9
Page PL/2/9
Page PL/3/9
Page PL/4/9
Page PL/5/9
Page PL/6/9
Page PL/7/9
Page PL/8/9
PL/Page 9/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
H.V.A.C
FAN COIL UNIT
Supply install , testing, balancing and
commissioning of fan coil units as per
drawings and specifications the price
include.Service and balance
valves,Flexible connections ,Connection
piping, Connections thermal
insulation,Three speed wall mounted
switch , Wiring and power cable and
earthling ,Supports , hangers and
vibration isolators ,Drainage and piping to
the nearest drain point,Identifications and
tags , Any other items are mentioned on
the drawings and specification
A
F.C.U - 01
No
F.C.U - 02
No
10
No
No
To summary Q.R
H.V.A.C SYSTEM
H.V.A.C/Page 1/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No
11
RATE
QR
AMOUNT
QR
H.V.A.C (Cont'd)
AIR HANDLING UNIT (Cont'd)
Arraangemet 3 :
A
No
No
VAV Unit
F
VAV 01
No
VAV 02
No
VAV 03
No
VAV 04
No
VAV 05
No
43
VAV 06
No
30
To summary Q.R
H.V.A.C SYSTEM
H.V.A.C/Page 2/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
H.V.A.C (Cont'd)
FANS
Supply install , testing , balancing and
commissioning supply or exhaust fan
complete with all accessories as per the
drawings and specifications, price include.
drawings.Roof curb , base , support and
mountings Out door disconnecting switch IP55 , cables , wiring and earthling Gravity
shutter , wire mesh on the discharge Duct
connections , identifications and tages Any
other items are mentioned on the drawings
and specifications for fans
A
No
No
Roof Ventilator
No
19
PIPES
Supply and install , testing , balance and
commissioning of chilled water piping
complete as per drawings and
specifications , the price per meter length
include - concrete trench with
cover,Supports , fittings and pipes.Vents at
the top of risers Drains at bottom of risers
Paints , and surface treatment Penetration
curbs at roofs Provisions of penetration
details at walls Any other items are
mentioned on the drawings and
specification
D
- Size 15 mm
56
- Size 20 mm
152
- Size 25 mm
111
- Size 32 mm
H.V.A.C SYSTEM
m
25
To summary Q.R
H.V.A.C/Page 3/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
H.V.A.C (Cont'd)
PIPES (Cont'd)
A
- Size 40 mm
217
- Size 50 mm
119
- Size 65 mm
236
- Size 75 mm
97
- Size 100 mm
136
- Size 150 mm
380
- Size 200 mm
50
DUCTS
Supply and install , testing , balance and
commissioning of air duct complete as per
drawings and specification the price
include Supports , sealers and fittings
Volume dampers and fire damper Any of
sound attenuators to reach the sound level
of 46 DBA inside the conditioned space
(HVAC Impact) Duct curb at duct
penetration of the roof.Provision of duct
penetration details at walls Any other
items are mentioned on the drawings and
specifications
H
- Galvanized Steel
kg
56600
- Flexible connection
25
Item
Smoke Dampers
To summary Q.R
H.V.A.C SYSTEM
H.V.A.C/Page 4/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
H.V.A.C (Cont'd)
AIR OUTLETS
Supply install of air outlet (grilles or diffuser
) as per specification and drawings price
include
- Inlet guide & damper
- Supporting and fixation
- Paint and colours
- Mesh screen on back
Supply Ceiling Diffusers
A
Size 300x300
No
51
Size 600x600
No
432
No
No
10
No
16
No
77
No
10
No
No
45
No
Size 300x150
No
19
Size 300x300
No
To summary Q.R
H.V.A.C SYSTEM
H.V.A.C/Page 5/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No
RATE
QR
AMOUNT
QR
H.V.A.C (Cont'd)
Exhaust Ceiling Diffuser
A
Size 300x150
Supply Jet Diffuser
Size 450mm
No
16
Size 600 mm
No
Size 600 mm
No
28
PIPING INSULATION
Supply and installation and commissioning
of thermal insulation (internal insulation)
for chilled water piping as per drawings
and specifications the price of the item
include.Over Laping , closing up the vapor
barriers gaps Identification of the flow
direction and fluids type on the surface
Insulation of valves and fittings , flanges
and accessories Insulation of pumps and
drainage lines, vent lines Aluminum
clading for all duct pipe work in machine
rooms and outside work Any other items
are mentioned on the drawings or
specifications
F
- Size 15 mm
56
- Size 20 mm
152
To summary Q.R
H.V.A.C SYSTEM
H.V.A.C/Page 6/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
H.V.A.C (Cont'd)
PIPING INSULATION (Cont'd)
A
Size 25 mm
111
Size 32 mm
25
Size 40 mm
217
Size 50 mm
119
Size 65 mm
236
Size 75 mm
97
Size 100 mm
136
Size 150 mm
380
Size 200 mm
50
DUCT INSULATION
Supply and installation and commissioning
of thermal insulation for air duct as per
the drawings and specification the price
include Insulation overlapping , closing up
of vapor barrier gaps Insulation support
wires or belts Identification of flow and
flow direction Aluminum clading for
external duct Insulation of the dampers
and fitings and accessories .Any other
items are mentioned on the drawings , and
specifications for duct
m2
9000
m2
1000
m2
600
To summary Q.R
H.V.A.C SYSTEM
H.V.A.C/Page 7/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
Item
Item
Item
Item
RATE
QR
AMOUNT
QR
H.V.A.C (Cont'd)
SYSTEM FLUSHING
To summary Q.R
H.V.A.C SYSTEM
H.V.A.C/Page 8/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
H.V.A.C/Page 9/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No.
19
RATE
QR
AMOUNT
QR
812
118
Diameter 75 mm (3 Inch)
20
703
Diameter 50 mm (2 Inch)
514
663
918
Diameter 25 mm (1 Inch)
2,377
Diameter 20 mm
m
12
To summary Q.R
F.F/Page 1/6
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No.
1292
No.
48
No.
1304
No.
12
RATE
QR
AMOUNT
QR
To summary Q.R
F.F/Page 2/6
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No.
No.
21
RATE
QR
AMOUNT
QR
100 mm
FLUSHING VALVE
No.
49
No.
12
Fam1
No.
No.
12
FIRE BLANKET
F
To summary Q.R
F.F/Page 3/6
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No.
No.
RATE
QR
AMOUNT
QR
To summary Q.R
F.F/Page 4/6
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
Item
Item
Item
Item
Item
RATE
QR
AMOUNT
QR
GENERAL REQUIREMENTS
To summary Q.R
FIRE FIGHTING SYSTEM
F.F/Page 5/6
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
Page FF 1/6
Page FF 2/6
Page FF 3/6
Page FF 4/6
Page FF 5/6
F.F/Page 6/6
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No
No
Control Panel: CP
No
No
MDB-UPS-ATS-MCC: UPS
No
No
No
25
No
PP Panel Board: DB
No
26
PP Panel Board: DP
No
No
No
75
To summary Q.R
ELECTRICAL SYSTEM
EL/Page 1/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No
No
No
16
No
44
No
15
No
No
33
No
17
No
15
No
20
Surface_Mounted_600x600_Origin_Centered
: F3
No
160
Surface_Mounted_600x600_Origin_Centered
: F3E
No
37
Surface_Mounted_600x600_Origin_Centered
: F4
No
316
Surface_Mounted_600x600_Origin_Centered
: F4E
No
55
Surface_Mounted_600x600_Origin_Centered
: F5
No
70
RATE
QR
AMOUNT
QR
To summary Q.R
ELECTRICAL SYSTEM
EL/Page 2/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Surface_Mounted_600x600_Origin_Centered
: F5E
No
12
Surface_Mounted_600x600_Origin_Centered
: F8
No
Surface_Mounted_1200x150_Centered: F6
No
12
Surface_Mounted_1200x300_Origin_Centere
d: F1
No
312
Surface_Mounted_1200x300_Origin_Centere
d: F1E
No
78
Surface_Mounted_1200x300_Origin_Centere
d: F2
No
22
Surface_Mounted_1200x300_Origin_Centere
d: F2E
No
62
Surface_Mounted_Big_Spot_Origin_Centere
d: C1
No
648
Surface_Mounted_Big_Spot_Origin_Centere
d: C1E
No
229
Surface_Mounted_Big_Spot_Origin_Centere
d: C2
No
167
Surface_Mounted_Big_Spot_Origin_Centere
d: C2E
No
35
Surface_Mounted_Big_Spot_Origin_Centere
d: C3
No
78
Surface_Mounted_Big_Spot_Origin_Centere
d: C4
No
10
Surface_Mounted_Big_Spot_Origin_Centere
d: C5
No
28
To summary Q.R
ELECTRICAL SYSTEM
EL/Page 3/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Surface_Mounted_Big_Spot_Origin_Centere
d: C5E
No
Surface_Mounted_Big_Spot_Origin_Centere
d: C6
No
14
Surface_Mounted_Big_Spot_Origin_Centere
d: C6E
No
Surface_Mounted_Big_Spot_Origin_Centere
d: C7
No
41
Surface_Mounted_Big_Spot_Origin_Centere
d: C7E
No
14
Surface_Mounted_Big_Spot_Origin_Centere
d: C8
No
10
Surface_Mounted_Big_Spot_Origin_Centere
d: C8E
No
Surface_Mounted_Big_Spot_Origin_Centere
d: H1
No
15
Surface_Mounted_Big_Spot_Origin_Centere
d: H1E
No
15
Surface_Mounted_Small_Spot_Origin_Center
ed: D3
No
20
Surface_Mounted_Small_Spot_Origin_Center
ed: D3E
No
No
28
No
63
No
ELECTRICAL SYSTEM
EL/Page 4/11
2
To summary Q.R
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Lighting Switch_One_Way-One_Gang: D
No
176
No
Lighting Switch_One_Way-Two_Gang.0001:
D
Lighting Switch_Two_Way_One_Gang: SW1
No
34
Up: LE01
No
26
No
12
ceiling EO: EO
No
48
Disconnect_Switch: 20A, 2P
No
126
No
No
10
No
No
12
No
No
EO_Switched FCU: AC
No
ELECTRICAL SYSTEM
EL/Page 5/11
16
To summary Q.R
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No
EO_Switched FCU: HD
No
No
58
No
12
SO_Floor: FB-2
No
Socket_Wall_Duplex: RO1
No
203
No
Socket_Wall_Single: SO1
No
424
No
31
EL_Conduit Schedule
Item
Item
Item
To summary Q.R
ELECTRICAL SYSTEM
EL/Page 6/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
To summary Q.R
ELECTRICAL SYSTEM
EL/Page 7/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No
12
ACCESS_DOOR CONTACT: DC
No
12
No
No
12
PUSH BOTTOM: PB
No
12
VGA: C.R
No
48
11
No
153
No
No
11
No
36
No
333
Smoke Detectors: RF
No
No
104
No
17
To summary Q.R
ELECTRICAL SYSTEM
EL/Page 8/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No
No
Control Panel: CP
No
No
MDB-UPS-ATS-MCC: UPS
No
No
No
25
No
PP Panel Board: DB
No
26
PP Panel Board: DP
No
No
No
75
To summary Q.R
ELECTRICAL SYSTEM
EL/Page 9/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No
27
No
91
Item
No
177
No
10
No
251
No
74
To summary Q.R
ELECTRICAL SYSTEM
EL/Page 10/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Page EL/1/11
Page EL/2/11
Page EL/3/11
Page EL/4/11
Page EL/5/11
Page EL/6/11
Page EL/7/11
Page EL/8/11
Page EL/9/11
Page EL/10/11
ELECTRICAL SYSTEM
EL/Page 11/11
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
m2
542
m2
14,919
m2
709
RATE
QR
AMOUNT
QR
To ceilings
Prepare and apply acrylic eggshell
emulsion paint (Interior) and
primer/compound as specified to provide a
smooth finish
To rendered walls
Prepare and apply splatter texture with
acrylic anticarbonation paint and
primer/compound as specified to provide a
weather tough external quality finish
To rendered walls
m2
765
m2
7,217
To summary Q.R
PA/Page 1/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
m2
357
542
57
RATE
QR
AMOUNT
QR
To screeded floors.
To roof deck
Prepare and apply semi-glass finish paint
system consisting of two coats of primer /
undercoat and two coats of semi-glass
enamel paint as specified and the colour to
match with floor finishings.
To wooden skirting
To summary Q.R
PA/Page 2/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
Page PA/1/3
Page PA/2/3
PA/Page 3/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
m2
542
m2
14,919
m2
709
RATE
QR
AMOUNT
QR
To ceilings
Prepare and apply acrylic eggshell
emulsion paint (Interior) and
primer/compound as specified to provide a
smooth finish
To rendered walls
Prepare and apply splatter texture with
acrylic anticarbonation paint and
primer/compound as specified to provide a
weather tough external quality finish
To rendered walls
m2
765
m2
7,217
To summary Q.R
PA/Page 1/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
m2
357
542
57
RATE
QR
AMOUNT
QR
To screeded floors.
To roof deck
Prepare and apply semi-glass finish paint
system consisting of two coats of primer /
undercoat and two coats of semi-glass
enamel paint as specified and the colour to
match with floor finishings.
To wooden skirting
To summary Q.R
PA/Page 2/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
Page PA/1/3
Page PA/2/3
PA/Page 3/3
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No
1131
No
1131
No
47
No
47
RATE
QR
AMOUNT
QR
Provisional Sum
number of items have been included as
provisional sums. The Alandalus schools
reserves the right to either tender them
separately and delegate them to the
contractor or procure them at his end and
supply them to the Contractor for
installation at this (Employers) sole
discretion. These sub-contractors/suppliers
shall be treated as domestic subcontractors/suppliers of the Contractor
and not as nominated subcontractors/suppliers unless designated as
Nominated sub-contractors as per clause
58 from general condtion of contract
AT CLASSES
A
No
47
No
47
To summary Q.R
PROVISIONAL SUM
P.S/Page 1/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
AT SUPERVISOR'S ROOM
A
No
22
No
Sofa
No
No
At Teachers' Room
E
No
116
Chair
No
232
Office
G
No.
16
Office's Chair
No.
34
Canteen
I
No.
47
No.
Chair
No.
282
To summary Q.R
PROVISIONAL SUM
P.S/Page 2/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No.
Chair
No.
Sofa
No.
Head Master
D
No.
Chair
No.
Sofa
No.
Clinic
G
No.
Chair
No.
Sofa
No.
Patient's Bed
No.
Secrtary
K
No.
Chair
No.
Sofa
No.
To summary Q.R
PROVISIONAL SUM
P.S/Page 3/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No.
No.
30
Teacher Chair
No.
No.
14
Sink
No.
No.
Chemistry Lab
G
No.
No.
Lab stool
No.
60
Cupboard
No.
Sink
No.
14
No.
No.
Heater
No.
Eye Wash
No.
To summary Q.R
PROVISIONAL SUM
P.S/Page 4/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No.
No.
Lab stool
No.
62
Cupboard
No.
Sink
No.
14
No.
No.
Heater
No.
No.
Eye Wash
No.
Phiscs Lab
K
No.
No.
Lab stool
No.
30
Cupboard
No.
Sink
No.
Heater
No.
To summary Q.R
PROVISIONAL SUM
P.S/Page 5/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No.
No.
Eye Wash
No.
Computer Lab
D
No.
21
Computer Chair
No.
21
No.
Teacher Chair
No.
Library
H
No.
counter chair
No.
No.
22
student chair
No.
22
No.
16
To summary Q.R
PROVISIONAL SUM
P.S/Page 6/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
No.
10
Computer Chair
No.
30
No.
Teacher Chair
No.
WC
E
Toilets
No.
61
No.
60
No.
84
No.
18
No.
Basin
No.
Showers
K
No.
No.
15
No.
To summary Q.R
PROVISIONAL SUM
P.S/Page 7/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
No.
12
RATE
QR
AMOUNT
QR
No.
10
No.
No.
282
Sofa
No.
No.
No.
30
Cooridor
D
Changing
G
To summary Q.R
PROVISIONAL SUM
P.S/Page 8/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
Page P.S/1/9
Page P.S/2/9
Page P.S/3/9
Page P.S/4/9
Page P.S/5/9
Page P.S/6/9
Page P.S/7/9
Page P.S/8/9
PROVISIONAL SUM
P.S/Page 9/9
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
Tenderer's Adjustment
To summary Q.R
Tenderer's Adjustment
T.A/Page 1/2
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
ITEM
DESCRIPTION
UNIT
QTY
RATE
QR
AMOUNT
QR
COLLECTION
PageTA/1/2
T.A/Page 2/2
Parcel 2
Secondary School
PROJECT:
CONSTRUCTION OF SCHOOLS COMPLEX AND STAFF
HOUSING at Al KHIYSA- UMM SALAL - DOHA QATAR
Division No.
DESCRIPTION
PAGE/NO
Division1
SUB-STRUCTURE
SB/5/5
Division2
SUPER - STRUCTURE
ST/4/4
Division3
ROOFING
Division4
BLOCKWORK
Division5
Division6
METALWORK
Division7
SSS 3/3
Division8
P.L/9/9
Division9
H.V.A.C
Division10
FIRE FIGHTING
Division11
ELECTRICAL INSTALLATION
Division12
FINISHING
FIN/9/9
Division13
PAI/3/3
Division14
PROVISONAL SUM
P.S/9/9
Division15
TENDER'S ADJUSTMENT
TA/2/2
Total Amount
ROF/3/3
B/2/2
CAR/2/2
MET/10/10
H.V.A.C/9/9
FF/6/6
ELC/11/11
Page 1
Parcel 2
Secondary School