Short-Circuit Analysis

This 3 page document provides information on a short-circuit analysis study performed using the Electrical Transient Analyzer Program (ETAP) software. It includes summaries of the project name and location, numbers of buses, branches and machines in the model, and lists bus data, line/cable parameters, transformer parameters and grounding configurations.

Uploaded by

heningputri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views13 pages

Short-Circuit Analysis

This 3 page document provides information on a short-circuit analysis study performed using the Electrical Transient Analyzer Program (ETAP) software. It includes summaries of the project name and location, numbers of buses, branches and machines in the model, and lists bus data, line/cable parameters, transformer parameters and grounding configurations.

Uploaded by

heningputri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

Electrical Transient Analyzer Program


Short-Circuit Analysis
ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
1/2 Cycle Network

Swing

V-Control

Load

Total

38

39

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

17

21

38

Synchronous
Generator

Power
Grid

Synchronous
Motor

Induction
Machines

Lumped
Load

Total

Number of Buses:

Number of Branches:

Number of Machines:

System Frequency:

50 Hz

Unit System:

English

Project Filename:

tugas1~

Output Filename:

C:\ETAP 600\tugas1\BACKUP\Untitled.SA2

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

Adjustments
Apply
Tolerance

Individual

Adjustments

/Global

Transformer Impedance:

Yes

Individual

Reactor Impedance:

Yes

Individual

Overload Heater Resistance:

No

Transmission Line Length:

No

Cable Length:

No

Apply

Individual

Adjustments

/Global

Transmission Line Resistance:

Yes

Individual

Cable Resistance:

Yes

Individual

Temperature Correction

Percent

Degree C

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

Bus Input Data

Bus
ID

Initial Voltage

Type

Nom. kV

Base kV

Sub-sys

%Mag.

Ang.

Bus1

SWNG

150.000

150.000

100.00

0.00

Bus2

Load

0.400

0.400

100.00

-60.00

Bus3

Load

0.400

0.400

100.00

-60.00

Bus4

Load

0.400

0.400

100.00

-60.00

Bus5

Load

0.400

0.400

100.00

-60.00

Bus6

Load

0.400

0.400

100.00

-60.00

Bus7

Load

0.400

0.400

100.00

-60.00

Bus8

Load

0.400

0.400

100.00

-60.00

Bus9

Load

0.400

0.400

100.00

-60.00

Bus10

Load

0.400

0.400

100.00

-60.00

Bus11

Load

0.400

0.400

100.00

-60.00

Bus12

Load

0.400

0.400

100.00

-60.00

Bus13

Load

0.400

0.400

100.00

-60.00

Bus14

Load

0.400

0.400

100.00

-60.00

Bus15

Load

0.400

0.400

100.00

-60.00

Bus16

Load

0.400

0.400

100.00

-60.00

Bus17

Load

0.400

0.400

100.00

-60.00

SR2-01

Load

20.000

20.000

100.00

-30.00

SR2-06

Load

20.000

20.000

100.00

-30.00

SR2-06-S5

Load

20.000

20.000

100.00

-30.00

SR2-08

Load

20.000

20.000

100.00

-30.00

SR2-09

Load

20.000

20.000

100.00

-30.00

SR2-09-U01

Load

20.000

20.000

100.00

-30.00

SR2-11

Load

20.000

20.000

100.00

-30.00

SR2-12

Load

20.000

20.000

100.00

-30.00

SR2-23

Load

20.000

20.000

100.00

-30.00

SR2-25

Load

20.000

20.000

100.00

-30.00

SR2-25-T01

Load

20.000

20.000

100.00

-30.00

SR2-63

Load

20.000

20.000

100.00

-30.00

SR2-64

Load

20.000

20.000

100.00

-30.00

T02

Load

20.000

20.000

100.00

-30.00

T02-B02

Load

20.000

20.000

100.00

-30.00

T02-B04

Load

20.000

20.000

100.00

-30.00

T02-B09

Load

20.000

20.000

100.00

-30.00

T03

Load

20.000

20.000

100.00

-30.00

T 12

Load

20.000

20.000

100.00

-30.00

T 16

Load

20.000

20.000

100.00

-30.00

T023

Load

20.000

20.000

100.00

-30.00

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

Bus
ID
T023-U01

Type

Initial Voltage
Nom. kV

Base kV

20.000

20.000

Load
39 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .

Sub-sys
1

%Mag.

Ang.

100.00

-30.00

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

Line/Cable Input Data

Ohms or Siemens per 1000 ft per Conductor (Cable) or per Phase (Line)
Length

Line/Cable
Size

Adj. (ft)

% Tol.

Cable1

23OALN3

240

902.2

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554

Cable2

23OALN3

70

984.3

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046

ID

Library

#/Phase

T (C)

R1

X1

Y1

R0

X0

Cable3

23OALN3

240

360.9

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554

Cable4

23OALN3

240

180.4

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554
0.5079797

Cable5

23OALN3

35

196.9

0.0

75

0.2561235

0.1155497

0.3012339

Cable6

23OALN3

240

360.9

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554

Cable7

23OALN3

240

180.4

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554

Cable8

23OALN3

240

1984.9

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554

Cable9

23OALN3

240

360.9

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554

Cable10

23OALN3

35

196.9

0.0

75

0.2561235

0.1155497

0.3012339

0.5079797

Cable11

23OALN3

240

6857.0

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554

Cable12

23OALN3

240

180.4

0.0

75

0.0373380

0.0962254

0.0824484

0.4886554

Cable13

23OALN3

70

393.7

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046

Cable14

23OALN3

70

787.4

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046

Cable15

23OALN3

70

393.7

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046

Cable16

23OALN3

70

984.3

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046
0.5013046

Cable17

23OALN3

70

196.9

0.0

75

0.1280770

0.1088746

0.1731874

Cable18

23OALN3

70

1771.7

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046

Cable19

23OALN3

70

1181.1

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046

Cable20

23OALN3

70

1378.0

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046

Cable21

23OALN3

70

1574.8

0.0

75

0.1280770

0.1088746

0.1731874

0.5013046

Line / Cable resistances are listed at the specified temperatures.

Y0

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

2-Winding Transformer Input Data

Transformer
ID

Rating

Z Variation
%Z

X/R

% Tap Setting
Prim.

Sec.

Adjusted

Phase Shift

MVA

Prim. kV

Sec. kV

+ 5%

- 5%

% Tol.

T1

40.000

150.000

20.000

4.00

27.30

4.0000

%Z

Std Pos. Seq.

Type

Angle
-30.0

T2

0.100

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T3

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T4

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T5

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T6

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T7

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T8

0.025

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T9

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T10

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T11

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T12

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T13

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T14

0.025

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T15

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T16

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

T17

0.050

20.000

0.400

4.00

2.47

4.0000

Std Pos. Seq.

-30.0

2-Winding Transformer Grounding Input Data


Grounding
Transformer
ID

Rating

Conn.

Primary
Type

kV

Secondary

MVA

Prim. kV

Sec. kV

Type

Amp

Ohm

Type

T1

40.000

150.000

20.000

D/Y

Solid

T2

0.100

20.000

0.400

D/Y

Solid

T3

0.050

20.000

0.400

D/Y

Solid

T4

0.050

20.000

0.400

D/Y

Solid

T5

0.050

20.000

0.400

D/Y

Solid

T6

0.050

20.000

0.400

D/Y

Solid

T7

0.050

20.000

0.400

D/Y

Solid

T8

0.025

20.000

0.400

D/Y

Solid

T9

0.050

20.000

0.400

D/Y

Solid

T10

0.050

20.000

0.400

D/Y

Solid

T11

0.050

20.000

0.400

D/Y

Solid

T12

0.050

20.000

0.400

D/Y

Solid

T13

0.050

20.000

0.400

D/Y

Solid

T14

0.025

20.000

0.400

D/Y

Solid

kV

Amp

Ohm

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

2-Winding Transformer Grounding Input Data


Grounding
Transformer
ID

Rating
MVA

Prim. kV

Conn.
Sec. kV

Type

Primary
Type

kV

Secondary
Amp

Ohm

Type

T15

0.050

20.000

0.400

D/Y

Solid

T16

0.050

20.000

0.400

D/Y

Solid

T17

0.050

20.000

0.400

D/Y

Solid

kV

Amp

Ohm

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

Branch Connections
CKT/Branch

Connected Bus ID

ID

Type

From Bus

% Impedance, Pos. Seq., 100 MVAb


To Bus

T1

2W XFMR

Bus1

SR2-01

T2

2W XFMR

SR2-06

T3

2W XFMR

T4

2W XFMR

T5
T6

0.37

9.99

10.00

Bus2

1501.08

3707.66

4000.00

SR2-06-S5

Bus3

3002.16

7415.33

8000.00

SR2-08

Bus4

3002.16

7415.33

8000.00

2W XFMR

SR2-09-U01

Bus5

3002.16

7415.33

8000.00

2W XFMR

SR2-11

Bus6

3002.16

7415.33

8000.00

T7

2W XFMR

SR2-12

Bus7

3002.16

7415.33

8000.00

T8

2W XFMR

SR2-23

Bus8

6004.31

14830.65

16000.00

T9

2W XFMR

SR2-25-T01

Bus9

3002.16

7415.33

8000.00

T10

2W XFMR

SR2-64

Bus10

3002.16

7415.33

8000.00

T11

2W XFMR

T02-B02

Bus11

3002.16

7415.33

8000.00

T12

2W XFMR

T02-B04

Bus12

3002.16

7415.33

8000.00

T13

2W XFMR

T02-B09

Bus13

3002.16

7415.33

8000.00

T14

2W XFMR

T03

Bus14

6004.31

14830.65

16000.00

T15

2W XFMR

T 12

Bus15

3002.16

7415.33

8000.00

T16

2W XFMR

T 16

Bus16

3002.16

7415.33

8000.00

T17

2W XFMR

T023-U01

Bus17

3002.16

7415.33

8000.00

Cable1

Cable

SR2-06

SR2-01

0.84

2.17

2.33

Cable2

Cable

SR2-06

SR2-06-S5

3.15

2.68

4.14

Cable3

Cable

SR2-08

SR2-06

0.34

0.87

0.93

Cable4

Cable

SR2-09

SR2-08

0.17

0.43

0.47

Cable5

Cable

SR2-09-U01

SR2-09

1.26

0.57

1.38

Cable6

Cable

SR2-09

SR2-11

0.34

0.87

0.93

Cable7

Cable

SR2-12

SR2-11

0.17

0.43

0.47

Cable8

Cable

SR2-23

SR2-12

1.85

4.77

5.12

Cable9

Cable

SR2-25

SR2-23

0.34

0.87

0.93

Cable10

Cable

SR2-25-T01

SR2-25

1.26

0.57

1.38

Cable11

Cable

SR2-63

SR2-25

6.40

16.50

17.69

Cable12

Cable

SR2-64

SR2-63

0.17

0.43

0.47

Cable13

Cable

T02

SR2-63

1.26

1.07

1.65

Cable14

Cable

T02-B02

T02

2.52

2.14

3.31

Cable15

Cable

T02-B04

T02-B02

1.26

1.07

1.65

Cable16

Cable

T02-B09

T02-B04

3.15

2.68

4.14

Cable17

Cable

T02

T03

0.63

0.54

0.83

Cable18

Cable

T 12

T03

5.67

4.82

7.45

Cable19

Cable

T 16

T 12

3.78

3.21

4.96

Cable20

Cable

T023

T 16

4.41

3.75

5.79

Cable21

Cable

T023-U01

T023

5.04

4.29

6.62

ETAP

Project:

Page:

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Study Case: SC

Filename:

tugas1~

Power Grid Input Data

Power Grid

Connected Bus

ID
U1
Total Power Grids (= 1 )

ID
Bus1
6058.973 MVA

% Positive Seq. Impedance


100 MVA Base

Rating
MVASC
6058.973

kV
150.000

X/R
5.92

R
0.27508

X
1.62736

Grounding
Type
Wye - Solid

% Zero Seq. Impedance


100 MVA Base
X/R
4.71

R0
0.438251

X0
2.06469

ETAP

Project:

Page:

10

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

SHORT- CIRCUIT REPORT


Fault at bus:
Prefault voltage

SR2-08
= 20.000 kV

Contribution
From Bus
ID

= 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

3-Phase Fault
To Bus
ID

%V
From Bus

kA
Symm. rms

Positive & Zero Sequence Impedances


Looking into "From Bus"

Line-To-Ground Fault
% Voltage at From Bus
Va
Vb
Vc

kA Symm. rms
Ia
3I0

R1

% Impedance on 100 MVA base


X1
R0

X0

SR2-08

Total

0.00

19.542

0.00

111.34

110.91

15.706

15.706

1.82E+000

1.47E+001

2.97E+000

2.54E+001

SR2-06

SR2-08

6.30

19.542

11.44

107.38

107.00

15.706

15.706

1.82E+000

1.47E+001

2.97E+000

2.54E+001

SR2-09

SR2-08

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus4

SR2-08

0.00

0.000

64.04

64.28

100.00

0.000

0.000

SR2-01

SR2-06

22.06

19.542

40.03

98.66

98.41

15.706

15.706

1.48E+000

1.38E+001

2.23E+000

2.10E+001

SR2-06-S5

SR2-06

6.30

0.000

11.44

107.38

107.00

0.000

0.000

Bus2

SR2-06

6.30

0.000

66.40

65.54

100.00

0.000

0.000

SR2-09-U01

SR2-09

0.00

0.000

0.00

111.34

110.91

0.000

0.000

SR2-11

SR2-09

0.00

0.000

0.00

111.34

110.91

0.000

0.000
6.41E-001

1.16E+001

3.66E-001

9.99E+000

2.75E-001

1.63E+000

4.38E-001

2.06E+000

Bus1

SR2-01

88.84

19.542

95.68

100.00

95.42

15.706

15.706 *

Bus3

SR2-06-S5

6.30

0.000

66.40

65.54

100.00

0.000

0.000

Bus5

SR2-09-U01

0.00

0.000

64.04

64.28

100.00

0.000

0.000

SR2-12

SR2-11

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus6

SR2-11

0.00

0.000

64.04

64.28

100.00

0.000

0.000

U1

Bus1

100.00

2.606

100.00

100.00

100.00

1.209

0.000

SR2-23

SR2-12

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus7

SR2-12

0.00

0.000

64.04

64.28

100.00

0.000

0.000

SR2-25

SR2-23

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus8

SR2-23

0.00

0.000

64.04

64.28

100.00

0.000

0.000

SR2-25-T01

SR2-25

0.00

0.000

0.00

111.34

110.91

0.000

0.000

SR2-63

SR2-25

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus9

SR2-25-T01

0.00

0.000

64.04

64.28

100.00

0.000

0.000

SR2-64

SR2-63

0.00

0.000

0.00

111.34

110.91

0.000

0.000

T02

SR2-63

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus10

SR2-64

0.00

0.000

64.04

64.28

100.00

0.000

0.000

T02-B02

T02

0.00

0.000

0.00

111.34

110.91

0.000

0.000

T03

T02

0.00

0.000

0.00

111.34

110.91

0.000

0.000

T02-B04

T02-B02

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus11

T02-B02

0.00

0.000

64.04

64.28

100.00

0.000

0.000

T 12

T03

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus14

T03

0.00

0.000

64.04

64.28

100.00

0.000

0.000

ETAP

Project:

Page:

11

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

(Cont.)

Fault at bus:
Prefault voltage

SR2-08
= 20.000 kV

Contribution
From Bus
ID

= 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

3-Phase Fault
To Bus
ID

%V
From Bus

kA
Symm. rms

Positive & Zero Sequence Impedances


Looking into "From Bus"

Line-To-Ground Fault
% Voltage at From Bus
Va
Vb
Vc

kA Symm. rms
Ia
3I0

T02-B09

T02-B04

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus12

T02-B04

0.00

0.000

64.04

64.28

100.00

0.000

0.000

T 16

T 12

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus15

T 12

0.00

0.000

64.04

64.28

100.00

0.000

0.000

Bus13

T02-B09

0.00

0.000

64.04

64.28

100.00

0.000

0.000

T023

T 16

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus16

T 16

0.00

0.000

64.04

64.28

100.00

0.000

0.000

T023-U01

T023

0.00

0.000

0.00

111.34

110.91

0.000

0.000

Bus17

T023-U01

0.00

0.000

64.04

64.28

100.00

0.000

0.000

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

R1

% Impedance on 100 MVA base


X1
R0

X0

ETAP

Project:

Page:

12

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

Short-Circuit Summary Report


1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents
Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus
ID
SR2-08

3-Phase Fault
kV

Real

20.00

2.408

Line-to-Ground Fault

Imag.

Mag.

Real

-19.393

19.542

1.883

All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA
* LLG fault current is the larger of the two faulted line currents

Line-to-Line Fault

Imag.

Mag.

Real

-15.593

15.706

16.795

Imag.
2.085

*Line-to-Line-to-Ground

Mag.

Real

16.924

16.023

Imag.
8.604

Mag.
18.187

ETAP

Project:

Page:

13

Date:

11-11-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
tugas1~

Short-Circuit Summary Report

Bus
ID
SR2-08

Positive Sequence Imp. (ohm)


kV
20.000

Negative Sequence Imp. (ohm)

Zero Sequence Imp. (ohm)

Resistance

Reactance

Impedance

Resistance

Reactance

Impedance

Resistance

Reactance

Impedance

0.07281

0.58637

0.59087

0.07281

0.58637

0.59087

0.11878

1.01696

1.02388

You might also like