Predesigned Steam Turbine SST-040

Power Output: 75-300 kW

The newly developed predesigned steam turbine SST-040 is a generator drive specially
designed for the 75-300 kW power range. This favorably priced turbine features a simple,
extremely compact design, short start-up times and a high degree of operational reliability.

The SST-040 is used as a condensing turbine in decentralized solar facilities or for


waste-heat recovery, e.g. used behind
gas engines and biogas engines. As a backpressure turbine it is used in small combined heat and power (CHP) plants as well
as in decentralized plants to generate process heat and electrical power. The turbine
is capable of rapid-starting i.e. it can be
started from cold without preheating.
When not enough live steam is supplied
anymore or the live steam supply ends, the
turbine will switch off automatically.
Application area
Waste-heat recovery
Small CHP plants
Decentralized solar facilities
Pre-designed steam turbine SST-040

Industrial Steam Turbines

Answers for energy.

Turbine design
The SST-040 is a single-stage impulse turbine. The inlet steam flow is directed onto the turbine rotor blades, where
mechanical power is generated when the steam flow direction changes. The resulting impulse spins the rotor, and the
power is transferred from the turbine via the gear to the generator.

The SST-040 steam turbine is delivered as a


pre-tested turbo generator package-unit.

The control and operating unit with a 12-inch touch panel covers all
necessary monitoring functions.

Turbine

Generator

The turbine casing is centrically slide-mounted on the bearing


casing to permit free radial movements under influence of different temperatures. The vertical split allows easy access to the
rotor disk. The quick acting inlet valve for steam control and
quick-stop is opened and closed by a pneumatically controlled
servomotor. The casing is thermally insulated by zinc-coated
mineral wool lagging.

A highly efficient low-voltage motor is used for power generation


in generator mode. Optimally adjusted to a particular power
range, mechanical power is converted into electrical power. For
protection, thermocouples or electronic resistance temperature
detectors (RTDs) monitor the temperature of the bearings and
windings.
Monitoring and power circuit breaker

Gear
The design of the integral gear, manufactured in our Siemens
workshop, was chosen to fit perfectly to the design of the turbine. The gear box includes the pressure-lubricated sleeve bearings and the gearwheels. Ground gearing and tooth contact
pattern adjustment during assembly guarantee extremely low
vibration levels and low noise.
Oil unit
The integrated oil supply consists of an auxiliary oil pump
with electric start-motor, a mechanically driven main oil
pump, an exchangeable duplex oil filter and air-cooled oil
cooler.

The control and protection unit covers all necessary monitoring functions. A clearly arranged 12-inch touch panel shows
all relevant data. For data transmission to an existing external
control system, the control and protection unit is equipped
with a Profibus interface.
The circuit breaker with motor drive and subvoltage release
establishes the connection with the power network.
Base frame
The SST-040 steam turbine is delivered as a pre-tested packageunit with turbine, gear, generator, oil unit, control and protection unit as well as circuit breaker, built upon a base frame. The
lightweight turbine package has a space requirement of approx.
1.5m x 2.5m x 2m (breadth x length x height) and a weight of
around 4,500 kg.

Technical Data
Technical Data
Power output : 75300 kW (e)
Inlet pressure: 2 up to 40 bar (a)
Inlet temperature: dry saturated
steam up to 400C
Exhaust pressure: max. 7 bar (a)
up to 0,1 bar (a) condensation
Dimensions: 1.5m x 2.5m x 2m
(breadth x length x height)
Weight: approx. 4,500 kg

Advantages
Minimal foundation work thanks to small and compact design
Largely maintenance-free due to stalwart, robust construction
High availability thanks to resilient and sure technology
Quick start without preheating of the turbine due to minimized
gyrating masses
Favorably priced thanks to proven components
Quick development and commissioning due to productionorientated design

The turbine casing is heat-insulated and centrically


slide-mounted on the bearing casing.
Control and operating units

Oil cooler

2m

Inlet valve for steam control


and quick-stop
Generator
Turbine
Oil unit
Gear box

1. 5
m

Baseframe

2.5m

Installation, control and maintenance


Our processes in the areas of sales, development, production, commissioning and service are specially planned and
structured so that we can install the unit in the shortest
possible time.
The SST-040 turbogenerator package is completely approved
and installed in the Siemens test bay, enabling easy, problemfree installation on a base plate or small concrete foundation.
The installation and the connection to the steam pipes and to
the electrical grid can be carried out by our customers themselves with the help of our guidelines. A Siemens technician
will put the turbine into operation a few days later. The complete unit is designed to be simple and reliable, so that power
generation can normally begin only six months after placing
the order with Siemens.
Service
Customer Service is for us more than just a concept, it is a way
of life. If you have any questions about your unit, modification
requirements or if you should experience an operational disturbance, Siemens Frankenthal is at your service around the clock
with its hotline +49 171 51 82 610 wherever the location of
yourunit.

The installation of the turbine can be carried out by the


customers themselves.

Criteria for capital investment decision


Siemens has been manufacturing predesigned steam turbines in Frankenthal for more than 80 years. These turbines
are known worldwide for the best quality at reasonable
prices. With the new, reliable steam turbine SST-040 customers are able to use hidden power sources like small
amounts of w
aste heat.
Important reasons for planning own power generation:
Speak to us, and we will gladly advise you:
Siemens Frankenthal
Telefon: +49 6233 85-22 91
Telefax: +49 6233 85-26 60
E-Mail: [email protected]

Increased efficiency of biogas plants by using the waste heat


of the gas engine for additional power generation (combined
cycle)
Generation of CHP in breweries, in dairies, in paper industry
or for drying processes
Stabilization of the power provision by using peak current
Allocation of governmental cogeneration subsidies in
certain countries for fuel input and power output
Utilization of small amounts of waste-heat (1000 up to
3000 kW thermal) with low exhaust gas temperatures
(from 150C) for power generation

Published and copyright 2011:


Siemens AG
Energy Sector
Freyeslebenstrasse 1
91058 Erlangen, Germany
Siemens AG, Energy Sector
Oil & Gas Division
Wolfgang-Reuter-Platz
47053 Duisburg, Germany

www.siemens.com / energy

Siemens Turbomachinery Equipment GmbH


Heheimer Strae 2
67227 Frankenthal (Pfalz), Germany
For more information, please contact our
Customer Support Center.
Phone: +49 180 524 70 00
Fax:
+49 180 524 24 71
(Charges depending on provider)
E-mail: [email protected]

Oil & Gas Division


Order No. E50001-W410-A113-X-4A00
Printed in Germany
Dispo 34806, c4bs 7477 bdk 110034
P WS 05112.5
Printed on elementary chlorine-free
bleached paper.

All rights reserved.


Trademarks mentiones in this document are
the property of Siemens AG, its affiliates
or their respective owners.
Subject to change without prior notice.
The information in this document contains
general descriptions of the technical options
available, which may not apply in all cases.
The required technical options should therefore
be specified in the contract.