BA Estimating Worksheet 2015 2.1

This document contains an estimating and budgeting worksheet to track costs for a construction project. It includes categories for general requirements, site work, utilities, framing, roofing, and more with spaces to estimate costs for labor, materials, and subcontractors.

Uploaded by

Bert Eng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
232 views45 pages

BA Estimating Worksheet 2015 2.1

This document contains an estimating and budgeting worksheet to track costs for a construction project. It includes categories for general requirements, site work, utilities, framing, roofing, and more with spaces to estimate costs for labor, materials, and subcontractors.

Uploaded by

Bert Eng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 45

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION
GENERAL REQUIREMENTS
Plans and Specifications
Plan Review
Permits: Zoning, Building, Environmental,
Other
Survey
Impact Fee
Administrative Costs
Financing Costs
Legal Fees
Engineering Fees

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Other
Subtotal
SITE PREP
Demolition (Remodel)
Jacking & Shoring (Remodel)
Dust control, Surface Protection (Remodel)
Job-Site Access
Job-Site Security
Dumpster & Removal
Clear Lot
Storage On Site
Portable Toilet
Temporary Power
Temporary Heat

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Scaffolding Rental
Tool/Equipment Rental
Other
Subtotal

ON-SITE WATER/SEWER
Soil & Perc Tests
Septic System Design
Septic Permits, Inspections, Fees
Septic System Onstallation, Tie In To House
Dewatering (High Water Table)
Well, Pump, Trenching, Plumbing To House,
Pressure Tank
Well Permits & Fees
Other
Subtotal

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

UTILITIES
Town Water: Tap Fees & Hookup
Town Sewer: Tap Fees & Hookup
Electrial: Permit, Connection Fee,
Installation
Gas: Permit, Connection Fee, Hookup
LPN: Tank Installation, Hookup
Oil Tank Installation
Telecom Hookup
Other
Subtotal
EXCAVATION & EARTHWORK
Cut & Fill
Blasting
Removal Of Stone/Dirt
Rough Grading
Trenching For Utility Hookups
Foundation Excavation
Foundation Footing Drains
Curtain Drains
Culverts
Swales
Retaining Walls
Ponds
Other Site Drainage

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Backfill
Compaction
Top Soil
Finish Grading
Seeding/Sod
Other
Subtotal
FOUNDATION
Footings/Pads
Foundation walls/stem walls/grade beams
Piers
Slabs - Foundation, Basement, Garage
Steel Reinforcing
Anchor Bolts, Hold Downs
Bulkheads
Sub-Slab Vapor Barrier
Sump Pump
Sub-Slab Vapor Barrier
Crawlspace Vapor Barrier
Crawlspace Vents
Foundation Windows
Damproofing, Waterrproofing
Foundation Drain Board
Waterproofing/Damproofing
Slab insualtion: Edge/Below

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION
Exterior Foundation Insulation
Exterior Insulation Coating/Protection

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Other
Subtotal

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

OTHER MASONRY/PAVING
Patios
Exterior Stairs
Masonry Chimneys
Fireplaces/Hearths
Driveway
Walkways
Other
Subtotal

ROUGH FRAMING
Sill & Seal
Steel/Wood Carrying Beam, Lolly columns
Floor Framing
Exterior & Interior Walls, Rough Stairs
Sheathing, Subflooring
Roof Framing/Trusses
Subfascia
Steel Framing Connectors
Nails, Screws, Fasteners
Prep for Plaster, Drywall
Rough Framing - Labor Only
Other
Subtotal
ROOFING
Underlayment

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION
Membrane
Flashing: Chimney, Vent Pipes, Sidewalls,
Other Penetrations
Drip Edge
Roofing Installation
Gutters & Downspouts
Skylights
Ridge and roof vents
Other
Subtotal
EXTERIOR
Exterior Foam Sheathing
Weather Barrier (Tyvek, etc.)
Membrane & Flashing
Vinyl or Composite Siding
Wood Siding
Brick Vneer
Stone Veneer
Stucco
Fascia, Soffit, Frieze, Corner Boards, Water
Table
Soffit/Gable vents
Window/Door Trim
Other Exterior Trim
Exterior Stairs, Landing

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Exterior Paint, Stain, Caulk


Exterior, labor-only
Other
Subtotal

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

WINDOWS/EXTERIOR DOORS
Membrane & Flashing
Exterior doors, prehung
Exterior door slabs
Exterior door frames, sills
Sidelights, transoms
Locksets, knobs, door hardware
Patio doors: sliding or hinged
Windows
Garage Doors & Opener
Other
Subtotal
PLUMBING
Drain/Waste/Vent
Water Supply Piping
Gas Piping
Water Treatment
Water Heater
Fixtures: Toilets,Tubs, Sinks, Showers
Faucets, Mixing Valves, Shower Heads
Disposal
Other
Subtotal
ELECTRICAL
Service Panel, Sub-Panels

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION
Rough Wiring
Phone, Cable, Internet Wiring
Lighting Fixtures
Low-Voltage Fixtures/transformers
Exterior Lighting
Devices: outlets, switches, dimmers
Lighting control system
Doorbell System
Smoke, CO2 Alarms
Intercom system
Security system
Home Theater/Entertainment
Other
Subtotal
HVAC
Furnace/Heat Pump
Central AC
Air Handler
Ductwork, Grilles, Registers
Air Filter
Boiler, Piping
Radiators
Whole-House Ventilation (HRV, ERV,
Exhaust Only, Other)
HVAC Controls

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Solar hot water


Other
Subtotal

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION
INSULATION & AIR SEALING
Roof/Attic Insulation
Roof/Eave Baffles
Wall Cavity Insulation
Foam Board Insulation
Spray Foam Insulation
Basement Insulation Iinterior)
Crawlspace Insulation
Air Sealing
Energy Diagnostics (Blower Door, Infrared)
Other
Subtotal
DRYWALL/PLASTER

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Walls
Ceilings, Soffits
Decorative Plaster
Drywall Labor Only
Other
Subtotal
INTERIOR FINISH
Interior Doors, prehung
Interor Door slabs
Interior Door frames, thresholds
Door
knobs,
Interior
Trim:hardware
Baseboard, Casings, Crown,
Chair Rail, Other

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION
Wainscotting, Paneling
Built-In Shelving, Cabinets
Closet Shelving, Hardware
Stairs, Railings, Newels
Interior Painting, Staining
Wood Flooring
Carpeting
Resilient/Vinyl
Flooring
Ceramic Tile/Stone
(& Underlayment,
Surface Prep)
Other Flooring
Acoustical, Metal, Decorative Ceilings
Interior Carpentry Labor Only
Other
Subtotal

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION
Kitchen & Bath
Kitchen Cabinets
Bath Cabinets
Cabinet Pulls, Hardware
Countertops, Backsplash
Ceramic Tile, Stone
Raised Tub Platform
Tub Enclosure
Shower enclosure/doors
Medicine Cabinets

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Mirrors
Towel hangers, toilet paper holders,
accessories
K&B Labor Only
Other
Subtotal
Porches & Decks
Open Porch
Screened Porch
Wood or Composite Deck
Fencing
Other Outdoor Structures
Other
Subtotal
Appliances

V2.2.1

ESTIMATING & BUDGETING WORKSHEET

VENDOR
DESCRIPTION

ESTIMATED COST
LABOR
MATERIALS

SUBCONTRACTOR/CONTRACT
OR

Refrigerator
Range, Cooktop
Microwave
Range Hood
Dishwasher
Washer/Dryer
Other
Subtotal

V2.2.1

[New Category]

Subtotal

$
$
TOTAL CONSTRUCTION COSTS
$
$
Note: Add 20% to 25% for contractors overhead and profit, plus 8% for sales and marketing if purchased from a developer.
2015 BuildingAdvisor LLC. All rights reserved. (V2.2.1)

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE

$
$
$

$
$
$

$
$
$
$
$
$

$
$
$
$
$
$

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$
$
$
$
$
$
$

$
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$
$
$
$
$
$
$

$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE

$
$
$

$
$
$

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

$
$
$
$
$

$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE
$
$
$
$
$
$
$
$
$
$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST

ACTUAL
COST

TOTAL

VARIANCE

CURRENT
PAID

%
Complete

AMOUNT
DUE

$
$
$
$
$
$
$
$
$
$

$
$
$
$
$
$
$
$
$
$

$
$
$
$
$
$
$
$
$
$
$
$
$

$
$
$
$
$
$
$
$
$
$
$
$
$

WORKSHEET

V2.2.1

ATED COST
TOTAL

ACTUAL
COST

$
$
$
$
$
$
$
$
- $
$
$
$
$
$
$
$
$
$
$
$
$
- $
$
- $
urchased from a developer.
ved. (V2.2.1)

VARIANCE

CURRENT
PAID

%
Complete

$
$

$
$

AMOUNT
DUE
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

NOTES

You might also like