Little Angel 500LPH
Little Angel 500LPH
Little Angel 500LPH
1536
DATE: 06.08.2015
FROM:
M/S. BRIGHT WETER TECH
SALEM-16
M/S.
:
:
:
:
:
:
:
:
FRP
ONE
Vertical, cylindrical
3000 LPH
2000 LPH
15 MM
4 kg /sq. cm
Top Opening
:
:
:
:
:
15 NB
4 kg / sq .cm
1.5 kg / sq . cm
15 MM
Top Mounted
Media A
Size
Quantity
:
:
:
PEBBLES
and 3/4
10 Litres
Media B
Mesh Size
Quantity
:
:
:
ANTHRACITE (IMPORTED)
0.8 1.6
25 Litres
92 %( Approximate)
:
3.5 5%
:
730 kg /m3 (Approximate)
:
:
:
:
:
:
:
:
ACTIVATED CARBON
ACTIVATE CARBON INDIA LTD (ISO cerf)
8 x 30
25 Litres
1025 Mg / gm
2.75 %
Coconut shells
Steam Air
MICRON FILTER
Flow Rate
Material of Construction
Inlet/Outlet Connection
Number of Catridges
Number of Housing
Working Pressure
Filter Elements
:
:
:
:
:
:
:
2000 Lph
Polypropylene
15 Mm
2nos. Of 20 Long
2nos
2 To 3 Kg / Sq. Cm
5 And 1 Wound Pp
:
:
:
:
80
4
1no.
225 Psi
MEMBRANE
Material of Construction
:
Thin Film Composite
No of Membranes
:
2 Nos.
Dimension
:
4 X 40
Type of Membrane
:
Spiral Wound
HIGH PRESSURE PUMP
TYPE
:
VERTICAL
MOTOR POWER
:
1.5 HP
FLOW RATE
:
2000 LPH
ACCESSORIES
MS POWER COATED SKID
INTERNAL TUBING PVC / SS
LOW PRESSURE CUT OFF SWITCH INDFOS MAKE
HIGH PRESSURE CUT OFF SWITCH INDFOS MAKE
PRESSURE GAUGES. 3 NOS. WAAREE
FLOW METERS 2 NOS. UKL
PRICE SCHEDULE
TOTAL
Tax
Rs 1,29,900/-
P &F
FREIGHT&
INSURANCE
VALIDITY
DELIVERY
PAYMENT
WARRANTY
: ONE YEAR
IMPORTANT NOTICE
Plumbing line (Raw water & Water wastage line) and Electrical line should be kept ready near
the (approximately 2 meters) plant installing point.
The Plant is designed for 3 phase electrical supply for better performance. So, 3 phase line
should be kept ready for Installation. (Incase of non availability of 3 phases, kindly
inform us. So that we may design the plant for single phase.
Plumber and electrician must be available on the installation day.
SCHEDULE OF EXCLUSION
1. All civil works like raw water tank. Plant room, etc.,
2. Raw Water Feed Pump[1 HP] Company scope
3. All types of electrical works like motor control center, switch gear panel, local
push button starters and all kinds of power cabling to other motors, motor
starters, MCC panel, earthing etc.,
4. Local plumbing works for Inlet and Outlet of the R.O plant. (plumber and
plumbing materials)
5. Collection tank for R.O treated water Output. (SS OR HDPE)
6. Unloading, handling and safe storage of the material at site.