Internship at NTPC
Internship at NTPC
Internship at NTPC
ON
DRIVE CONTROL PHILOSOPHY (STATION C&I)
IN NTPC LTD., RAMAGUNDAM SUPER THERMAL POWER STATION.
BY
CERTIFICATE
This is to certify that Mr. GADDE SRIKIRAN student of Lovely Professional University, Phagwara,
Dist. Jalandhar, Punjab, has done project entitled DRIVE CONTROL PHILOSOPHY (STATION C & I)
in NTPC Ltd., RAMAGUNDAM SUPER THERMAL POWER STATION, Jyothinagar, Dist. Karimnagar,
Andhra Pradesh from 01-01-2014 to 15-01-2014.
ACKNOWLEDGEMENT
The success and final outcome of this project required a lot of guidance and assistance from many
people and I am extremely fortunate to have got this all along the completion of my project work.
Whatever I have done is only due to such guidance and assistance and I would not forget to thank
them.
I would like to express profound gratitude to Sri DJ.SAHA, AGM in the C&I Department NTPS Ltd.,
Ramagundam, for allotting me this project in the Organisation and enabling me to complete the same
successfully under his supervision. I am extremely grateful for his valuable guidance and support
throughout the completion of project.
I would like to extend sincere thanks to Sri E.NANDA KISHORE, AGM (HR-EDC), Sri P.M.G.V.SRINIVAS,
DGM (HR-EDC) for giving this wonderful opportunity to do our project at NTPC Limited (RSTPS) also
Sri KESHAVULU Sub-Officer (HR-EDC) and all the EDC staff members.
I heartily thank our internal project guide Sri MANDADI PRASAD, Sr. Manager (O&M) C&I Department
NTPC Ltd., Ramagundam for his guidance and suggestions during this project work.
This acknowledgement will be incomplete if I fail to express my deep sense of obligation and reverence
to my parents. They motivated me and provided me their moral support and encouragement
throughout my career.
Although I have tried to express my gratitude to every person who contributed to my project work,
there may still be someone hiding behind the veils of unknown, whom I may not have been able to
recognize. I would like to thank all of them who have worked for me without my knowledge
INDEX
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
Introduction of NTPC.
Control Philosophy.
Types of Drives.
Bi-Directional Drives.
Uni-Directional LT Drives.
Solenoid Operated Drives.
High Tension Drives.
Input /Output Redundancy.
Sequence Control Philosophy.
Sequence Mode Operation.
Unit Controller.
Functional Group Control.
Sub Group Control.
Sequential Start up Mode.
Analog Drives.
Conclusion.
Bibliography.
INTRODUCTION OF N.T.P.C
N.T.P.C Ltd. is a major corporation of power generation over one fourth of the total thermal
power in the country.
The corporation is maintaining its impeccable record by consistently generating reliable and
quality power establishment in 1975. N.T.P.Cs mission has been to construct commission and operate
power projects most economically and efficiently.
N.T.P.C Ramagundam is situated in the Godavari Valley coalfields and has one of Indias
largest thermal power stations. Ramagundam is considered as Manchester of India in light of the
companies around it. Some of them are Kesoram Cement, Basanth Nagar, N.T.P.C (RSTPSRamagundam Super Thermal Power Station) Sourcing 2600 MW of power 24/7 and APSEB unit
Ramagundam. Around 24 units coal mines belt Godavarikhani stretching 25 km are used in these
open coalmines.
There are many factories around this place that take the raw material from the coal mines
and prepare carbon derivatives and providing employment to more than 15000 people. The
temperature is hotter than most places in India a normal temperature is 40 degrees centigrade.
N.T.P.C has developed a technique to reduce the temperature by reducing the carbon dioxide
in its emissions and helped reduce the average temperature by 2 degrees centigrade from last one
decade.
N.T.P.C has a policy of hiring full time employer according to the production capacity. For the
records its present employers should not be more than 2600.
Total Land
10,000 Acres
Installed Capacity
Stage I : 3X200 MW
Stage II : 3X500 MW
Stage III : 1X500 MW
Coal Source
Water Source
Beneficiary States
Approved Investment
Unit Commissioned
Unit - 1
200MW
Nov 1983
Unit - 2
200MW
May 1984
Unit - 3
200MW
Dec 1984
Unit - 4
500MW
June 1988
Unit - 5
500 MW
March 1989
Unit - 6
500MW
October 1989
Unit - 7
500 MW
August 2004
International Assistance
Other Industries
Heights of chimeney(s)
1. Stage I- 210M
2. Stage II-225 M
3. Stage III-275M
NTPS Ramagundam is considered to be one of the best in the nation. Less than 25% of the power
is provided to the state of Andhra Pradesh. NTPS owns 89.5% of shares and remaining shares are
owned by other public sectors. NTPC is classified as a MAHARATNA(a cash rich) company, meaning
it may run its operations independently and rise commercial financing without explicit government
nod.
NTPS Limited as 463 in the Forbes Global 2000, a listing of the worlds top public companies. It
has the stage of the art control room instrumentation facility. The Ramagundam Unit of the National
Thermal Power Corporation (NTPC) has bagged the Rajbhasa Award for 2002-03. The station has got
the unique distinction of recording 93 days of trip free operation and maximum continuous from run
for 355 days its 500MW unit VI during the year 1994-1995.
Dr. Arup Roy Choudhury, CMD, NTPC received the 'BT-Star Award 2013 given to NTPC for Excellence
in Human Resource Management from Shri Shekhar Dutt, Governor of Chhattisgarh, in the presence
of Bhupinder Singh Hooda, Chief Minister of Haryana.
NTPC Kawas received the first prize in the Thermal Power Stations Sector category in the
National Energy Conservation Award -2012 on 14th December, 2012. The Award was received by Shri
Shankar Das, General Manager, Kawas from President of India Shri Pranab Mukherjee at a function
held in Vigyan Bhawan.
NTPC has been awarded with the prestigious Energize Award 2012-13 as the "Energizer Company
of the Year" on July 27th, 2013. The award was been organized by Talwar Solutions Pvt. Ltd. (TSPL), in
association with CNBC TV18 with Smart Grid partner ABB and process Validation partner E & Y.
CONTROL PHILOSOPHY:
The control philosophy for different type of drives such as Bi-directional, unidirectional, Solenoid
operated ,H.T. drives under station C&I package are detailed below:
BI-DIRECTIONAL DRIVES (INCHING OR OTHERWISE)
1. All bi-directional drives shall be operable from Remote i.e., from Central Control Room
(CCR).Local operation of these drives is not envisaged.
2. Remote manual operation of all drives shall be done from LVS/CRT. Additionally back up
remote operation through PB station mounted on UCP for some of the essential drives is
provided.
3. Remote control commands i.e., open/close, generated from DDCMIS shall be issued to MCC
through interposing relays located in respective MCC.
4. Necessary electrical protections shall be realized at MCC, whereas process interlocks and
protections shall be realized in DDCMIS.
5. Following signal exchange shall take place between MCC & DDCMIS.
- Valve open & close command.
- MCC disturbance (when Overload relay operates or MCC Control power supply fails or
MCC power supply is isolated) for CRT alarm only.
6. Following signal exchange shall take place from valve actuator to DDCMIS.
- Valve status feedback by means of end position contact(open/close)
- Torque switch contacts (open/close).
- Valve position feedback (4-20mA) for inching duty drives.
- Actuators Thermostat contact is wired directly to the MCC control circuit.
UNIDIRECTIONAL LT DRIVES
1.
2.
3.
4.
5.
6.
7.
Unidirectional LT drives shall be operable only from Remote i.e., from CCR. Local operation
of these drives is not envisaged except for LP dosing and Phosphate dosing system.
Remote manual operation of all drives shall be done under LVS/CRT. Backup remote operation
from PB station mounted on UCP is provided for some essential drives.
Remote control commands i.e., start/stop, shall be done from DDCMIS and shall be issued to
MCC through interposing relays located in respective MCC.
Emergency stop of the drive has been envisaged from the local push button provided near the
drive. The stop push button (stay put type) shall be provided with a press to lock and turn to
release type, keyless mechanism. Under locked position the drive operation is inhibited from
remote. The local emergency stop push button shall be wired directly to MCC.
Necessary electrical protections for the drive shall be realized at MCC, whereas process
interlocks and protections are realized in DDCMIS.
Following signal exchange shall take place between MCC & DDCMIS:
- Drive start & stop commands.
- Drive status feedbacks
- MCC disturbance (when thermal overload relay operates, control power supply fails,
Emergency local stop PB is pressed or MCC power supply is isolated) for CRT alarm only.
Suitable current transformer and transducer shall be provided in MCC wherever drive rating
is above 30kW and for a few essential drives below 30kW for remote monitoring in DDCMIS.
H.T.DRIVES
1. HT drives shell be operated only from remote i.e. from CCR. However , the Switchgear has
two modes of operation i.e. Service and Test. Service mode is normal modes of operation
when the drive is operable from remote i.e. from the LVS/CRT/UCP.
2. The Test position is envisaged to test the Switchgear, from swgr as well as remote, during
maintenance/ commission.
3. Remote manual operation of these drives shell be done from LVS/CRT. Back up remote stop
from UCP is provided for some essential drives.
4. Remote control commands i.e. start/stop, shall be generated from DDCMIS and shall be wired
to switchgear through interposing relays housed in respective switchgear.
5. Emergency stop of the drives has been envisaged from the local push button provided near
the drive. The stop button (stay put type) shall be provided with a press to lock and turn to
release type keyless mechanism. Under locked position the drive operation is inhibited from
remote. The local emergency stop pushbutton shall be wired directly to Switchgear.
6. Necessary electrical protection for the drive shall be realized at switchgear, whereas process
interlocks and protections are realized in DDCMIS.
7. Following signal exchange shall take place between Switchgear and DDCMIS:Drive start & stop commands.
Drive status feedbacks by means of ON & OFF contacts (in service/test position of
SWGR).
Switchgear disturbance (control power supply failure, trip coil supervision failure).
Switchgear available (Breaker spring charged, Breaker in service position and SWGR
selected in remote).
Master trip relay operated (86 Relay).
Trip on overload.
Alarm on overload.
Emergency stop PB operated.
8. Current transducer 4-20 mA type shall be mounted in the SWGR for monitoring the current in
DDCMIS. Auxiliary power supply to these transducers shall be from the control supply of the
respective switchgears.
I/O RDUNDANCY
Commands for all drives shell be through redundant outputs.
The drive status feedback for HT and some other important drives (total approximately 40 nos.per
unit) shell be through redundant inputs.
SEQUENCE CONTROL PHILOSOPHY
Sequence control is envisaged for start-up and shutdown of HT drives and LT drives for APH, LPH, HPH,
DMCWP, ACWP etc. and their associated drives for safe and efficient running of main drive. The drives
can be operated manually or automatically thorough group control and the process interlocks shell be
operative in both the modes.
SEQUENCE MODE OPERATION
Sequence controls are organised hierarchically in accordance with the operation concept of the plant
process. Accordingly following levels of sequence control exists.
Unit controller
Functional group control
Sub group control
UNIT CONTROLLER:
It is a level of control above functional group control, which coordinates between various functional
groups of whole plant taking care of the process requirement and the sequences
operation using step and criteria indications. The actual protection shall remain valid during
this mode of operation also.
ANALOG DRIVES
Analog drive interconnection to DDCMIS is established. Electric to Pneumatic converter shell be such
that on loss of control signal, the last set point pressure shell be maintained for stayput position.
A/M, Raise, Lower push buttons on UCP shall be provided for essential drives in line with analog drive
list.
CONCLUSSION
The Uni-Directional, Bi-Directional, Solenoid, High Tension, Low Tension drives are used in various
fields of the Power Plant. Each of the drive are having their own importance and respective uses.
A special type of switches are used for Emergency Stop/Start of the drives. The stop push button
(stay put type) shall be provided with a press to lock and turn to release type mechanism. Under
locked position the drive operation is inhibited from remote. The local emergency stop pushbutton
shall be wired directly to Switchyard.
The use of the spare system in case of emergency is being maintained in each and every type of
drive.
Different voltage level controlled solenoid drives are used in the Plant. E.g. 220V, 240V types of
solenoids drives are used.
BIBLIOGRAPHY
Wikipedia- control logics.
NTPC in plant website.
Modern Power Plant Practice Volume C, G, H.
Power Plant performance by AB GILL.
Power Plant Engineering by PK NAG.