Land Reclamation
Land Reclamation
Land Reclamation
LAND RECLAMATION
Works in Singapore
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
Floating Dock
- For Caisson Launching
27m
31.5m
Main Dimension
6.5 m
1.5 m
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Capacity
: 20,000 Ton
Full Length
: 80.00 m
Width
: 50.00 m
Inner Width
: 38.00 m
Top Deck Height :
31.5 m
Safety Deck Height :
27.0 m
Pontoon Deck
:
6.5 m
Draft (Empty)
:
1.5 m
Ballast System
: 12000 m3/hr
Ballast Tank Capacity: 36,790 tons
Pre-construction activities
-Pre-construction survey
- obtained original seabed level before start work
-Soil Investigation
- boreholes
- in-situ testing
-Toxicity test
- chemical test of the dredged material
Samples grid
As the site is unlikely to be
contaminated----- 200 m x 200 m
As the site is likely to be
contaminated-----100 m x 100 m
2.9 m
Sample size
Every 3 m until 1 m
below design
dredged level
Design dredged
level
1 m below design
dredged level
Coastal Protection
Rough Dredging
Final Dredging
Sea
Trench Dredging
Hard Layer
Grab Dredger
Water level
Tide (mCD)
0.00mCD
Chart datum
Bucket depth
(m)
Dredge depth
(mCD)
Seabed level
E.g.
Bucket depth = 20 m
Tide
= +2.0 mCD
Dredged depth = -18.0 mCD
Chart Datum
Chart Datum is the plane below which all depths are published on a
navigational chart. It is also the plane to which all tidal heights are referred, so
by adding the tidal height to the charted depth, the true depth of water is
determined. By international agreement, Chart Datum is defined as a level so
low that the tide will not frequently fall below it. Chart Datum is shown on
charts as the zero metre contour.
Acceptance
Criteria line
Sand Bund
Qc
value
Sea
Sand Key
Hard Layer
Geo-textile laying
Sand Trimming
Cement mortar
FABRICATION OF CAISSON
CAISSON MOVED BY HIGH TONNAGE CARRIERS
FABRICATION OF CAISSON
Step-4
Step-3
Step-2
Floating Dock
Caisson Launching
Rolled
geotextile
Frequency of Monitoring
Before Infilling ------- Baseline reading
During Infilling/Sand filling behind Caisson ----- 2 times per day
After Filling------ Once daily for 7 days and twice weekly until reading stabilized
Preloading on Caisson----- Once daily
After preloading ----- Twice weekly until reading stabilized
Long term performance monitoring----- Once weekly until end of Defect Liability
Period (DLP)
Rock Filtering
Scour Protection
Seabed
Scour Protection
Land Reclamation
by
Soil Improvement Method
Sand Fill
Compressible
layer
Hard Layer
Sand Fill
Consolidation
settlement
completed
after 5 years
Compressible
layer
Hard Layer
Sand Surcharge
Sand Fill
Compressible layer
Hard Layer
Consolidation
Settlement
completed After 5
months
Reclamation sequences
Soft clay/dredged material filling
Normally allowed up to
-2.0 mCD
Sea
Sand Key
Hard Layer
Reclamation sequences
Sand spreading/spraying at sand mat construction
Sea
Sand Key
Hard Layer
Magnetometer survey
PVD calibration for actual penetration depth and data logger record
PVD installation in
progress
SSP installation
Piezometer
monitoring
Bentonite
pallets and
clean coarsegrained sand
Dynamic
compaction
Roller compaction
and field density
testing (sand cone
method)
Thank you!