Semne Conventionale SCB
Semne Conventionale SCB
SIGNALLING PROJECT
CONVENTIONAL SIGNS
FOR OUTDOOR EQUIPAMENT
a) Turnouts
Pct.
In the signalling
sketch
The name
DENUMIREA
2.1
Macaz necentralizat
neasigurat
2.2
Macaz asigurat
2.3
Macaz centralizat
Centralised turnout
2.5
Macaz dubl
necentralizat
jonciune, Double
junction
centralised turnout
2.6
Macaz dubl
centralizat
jonciune, Double
junction
centralised turnout
2.7
turnout
not
with
1/22
ROMANIA
2.8
SIGNALLING PROJECT
b) Other equipment
Pct.
DENUMIREA
The name
2.11
2.12
Pichet
de
transformator
2.13
2.14
2.15
2.16
releu
In the track
circuits sketch
In the cabling
sketch
2/22
ROMANIA
2.17
2.18
2.19
SIGNALLING PROJECT
Point
machine
and
equipment box for simple
turnout, first coupled, or
derailer
Point
machine
and
Electromecanism
si
pichet
pentru al doilea macaz conjugat equipment box for the
second coupled turnout
Electromecanism i pichet de
macaz simplu, primul conjugat
sau sabot
Distribuitor de cabluri
Distribution
cables
box
for
3/22
ROMANIA
Pct.
SIGNALLING PROJECT
DENUMIREA
The name
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
Conventional sign
4/22
ROMANIA
SIGNALLING PROJECT
2.29
2.30
2.31
2.33
2.34
Light repeater
5/22
ROMANIA
SIGNALLING PROJECT
2.35
2.36
2.37
2.38
2.39
2.40
Coloana de manevra
2.41
2.42
2.43
2.44
Bobina de joanta
6/22
ROMANIA
2.48 Sant pentru cabluri
2.49 Canal pentru cabluri
2.50
SIGNALLING PROJECT
Cables ditch
Cables troughing
Electrical cable (nr. 141 with 24 wires
Cablu electric (nr. 141 cu 24 fire de 1 mm
of 1 mm diameter and 3 reserve wires
diametru si 3 fire rezerva 500 m lungime)
length of 500 m)
2.51
Interstitiu de scanteiere
Lightning arrester
2.52
2.53
Post de centralizare
2.54
2.56
Trecere la nivel
Level crossing
2.57
2.58
7/22
ROMANIA
SIGNALLING PROJECT
2.59
2.61
2.62
Cap de cablu
Cable terminal
2.63
2.64
2.67
Balize avertizoare
2.68
Visual warning
(warning sign) at
entry on the catenary electrified lines
8/22
ROMANIA
SIGNALLING PROJECT
CONVENTIONAL SIGNS
FOR INDOOR EQUIPAMENT
3.1
3.2.
3.3
3.5
3.6
3.7
fara
fixare,
cu
3.8
cu
fixare,
cu
3.9
fara
fixare,
cu
3.11
Contact de maneta
Key contact.
9/22
ROMANIA
SIGNALLING PROJECT
3.12
Releu neutru
Neutral relay
3.13
Relay with
connected
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
Releu termic
Thermal relay
two
coils,
separate
10/22
ROMANIA
SIGNALLING PROJECT
3.22
3.23
3.25
3.27
3.28
3.29
3.30
3.31
3.32
3.35
Sonerie
3.36
Conductoare de conexiune
electrice, fara legatura intre ele
Bell
in
scheme
Connection
wires
in
electrical
diagrams without contact between
them
11/22
ROMANIA
SIGNALLING PROJECT
3.37
Conductoare de conexiune
electrice, cu legatura intre ele
scheme
Connection
wires
in
electrical
diagrams with contact between them
3.38
3.39
Filtru de cale
in
12/22
ROMANIA
SIGNALLING PROJECT
ALTE SIMBOLURI
OTHER SYMBOLS
13/22
ROMANIA
SIGNALLING PROJECT
14/22
ROMANIA
SIGNALLING PROJECT
15/22
ROMANIA
SIGNALLING PROJECT
16/22
ROMANIA
SIGNALLING PROJECT
17/22
ROMANIA
SIGNALLING PROJECT
18/22
ROMANIA
SIGNALLING PROJECT
19/22
ROMANIA
SIGNALLING PROJECT
20/22
ROMANIA
SIGNALLING PROJECT
21/22
ROMANIA
SIGNALLING PROJECT
22/22