STFFD-P1-006002-D10-1001 Rev B HVAC System - Piping & Instrumentation Diagram
STFFD-P1-006002-D10-1001 Rev B HVAC System - Piping & Instrumentation Diagram
STFFD-P1-006002-D10-1001 Rev B HVAC System - Piping & Instrumentation Diagram
04
TBA
REV. NO
DATE
VENDOR'S APPROVAL
STFFD-P1-006002-D10-1001
05.11.2015
Submitted For :
REVIEW
APPROVAL
INFO
FINAL DOCS
VENDOR NAME:
VIETSOVPETRO JV
PACKAGE
DESCRIPTION:
E-HOUSE PACKAGE
1. ACCEPTED
3. NOT ACCEPTED.
REVISE AND RE-SUBMIT.
4. FOR INFORMATION ONLY.
DE
PTSC
CLJOC
PACKAGE NO.
VDRL
CAT.
SEQUENCE
NO.
REV.
STFFD-P1-006002
D10
1001
Name:
Date:
Sign:
PREPARED BY:
SIGNED BY:
REV.:
DATE:
5-Nov-15
VENDOR: VIETSOVPETRO JV
ITEM
DATA CODE
NO.
D10-1001
DOCUMENTS TITLE
REV.
PTSC/CLJOC COMMENTS
VENDOR PROPOSALS
To check with manufacturer that if a shut off valve is used with the
expansion valve, it
Isolate valve after Expansion Valve shall be
affects to performance or not? Normally, elbow or valve is not allowed to removed
mount behind of EXV
Specify insulation material, thickness for refrigerant pipe & drain pipe
A
A
CLJOC RESPONSES
REMARKS
Show different pipe type between Liquid line, Instrument tubing, hardwire Noted & Incorporated in next revision
Add Notes:
- Refrigerant shall be R407c
- Compressor shall be load/unload type to control capacity
- Compressor, motor shall send the status to BPCS through HCP via serial Noted & Incorporated in next revision
link
- Common trip shall be sent from GFS/SIS to HCP. Individual trip action
within HVAC shall be done by HCP
PTSC RESPONSES
1 of 1
E-HOUSE PACKAGE
HVAC SYSTEM
E-HOUSE PACKAGE
HVAC SYSTEM