Sub:- Construction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam District- Detailed
Estimate - Technical Sanction - Rs 128.81 Lakhs - Reg.
Ref :- 1. GO Rt No. 345 dated 06-07-2012 of School Education (SE-PROG 1) Dept, Andhra Pradesh, Hyd,
2. Lr. No: AE1/SE/APEWIDC/HYD/MS-GH/WGL, Dtd 18.9.2012 of the Superintending Engineer,
APEWIDC.
*******
*******
The Principal Secratary to Government, Education(SE-PROG.I) Dept., Government of Andhra Pradesh,
Hyderabad have accorded Administrative Sanction for Construction of (355) Girls hostel Buildings in the
premises of Model Schools through G.O.Rt. No. 345, Dated 06-07-2012 with a unit cost of Rs. 1.288 Crores in
various Places in Andhra Pradesh, includingConstruction of Post Matric Hostel for girls at Paloncha (V&M) in
Khammam District
The Funding Pattern is : 90% of the capital cost will be borne by the Central Government and the
balance 10 % will be provided by the State Government. While planning and designing the building and other
infrastructure for the model school attached Girls hostel buildings all standard norms were adopted thous
altogether 32 rooms are to be constructed with following provisions:
Description
Living rooms with sit-out
Bath rooms with WCs
No of
Rooms
25
16
6.22
Room
Size
x
3.65
1.38
2.31
Area in
Sqm
567.58
51.00
2.38
1.51
3.59
6.10
5.08
30.99
Dining Hall
6.10
6.10
37.21
6.10
3.65
22.27
3.55
3.76
13.35
1
1
6.10
6.10
3.05
x
x
x
Generator Room
3.05
2.43
3.05
3.05
3.05
18.61
18.61
9.30
3.05
9.30
3.65
8.87
790.68
The total plinth area of the builidng including walls & circulation area is arrived as 1097.00 Sqmt
are 11803.00 Sft.
Civil works include construction of security room , Generator room, compound wall and gate, septic tank,
drinking water facilities, electrification including fixtures. This estimate is prepared adopting the type design
communicated . The total plinth area is 1117.14 Sft
Vide reference 2nd cited the Superintending Engineer has submitted the detailed estimate duly adopting
the type design.
crushed graded metal for Footings, Pedestals, Plinth beams and Columns up to plinth level.
Superstructure:
1. VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine crushed graded metal
2. Providing HYSD bars Fe 415 for all diameters more than 6mm for VRCC & RCC work.
3. Providing Mild Steel Fe 250 for 6mm bars for VRCC & RCC work.
4. P.C.C (1:3:6) prop: nominal mix for Bed Blocks and Hold Fasts.
5. RCC (1:2:4) prop. Nominal mix using 12mm HBG machine crushed graded metal for Lintels, 50mm
thick platforms.
6. RCC M 25 grade design mix ( by weigh batching), using 20mm HBG machine crushed graded metal
for sun shades, 7.5cm thick at fixed end and 5.0 cm thick at free end, of any width as per approved
plan.
7. PCC M20 grade Design Mix ( by weigh batching), using 20mm HBG machine crushed graded metal
for steps .
8. Brick masonry in CM(1:8) prop. using 2nd class traditional bricks for Superstructure.
9. Reinforced Brick masonry 115mm thick in CM(1:4) prop. using 2nd class traditional bricks for
Partition walls.
10. Plastering 12 mm thick in two coats, base coat 8mm thick in CM(1:6) and top coat 4mm thick in
11. Plastering 20 mm thick in two coats, base coat 16mm thick in CM(1:6) and top coat 4mm thick in
14. Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a
base coat of CM (1:8), 12mm thick over already laid C.C. bed or R.C.C. roof slabs.
15. Flooring with Ceramic non-skid tiles of 7.3 mm thick 1st. quality of any shade set over a base coat of
16. Providing Skirting to internal walls to 12.5 cm height with Rough Kadapa slabs of minimum 40 mm
thick, size not less than (0.457 x 457M) slabs 15mm to 18mm thick.
17. Dadooing to walls with coloured glazed tiles 1st. quality of size not less than 300mm x 200mm.
18. Flooring with 15 to 18mm thick high polished granite stone slabs of blue colour.
19. Whiting to new walls and ceiling in two coats with Birla white or equavalent quality for internal walls.
20. Painting with Plastic emulsion grade -1 paint to exterior faces of new walls with 3 coats of approved
of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with
commercial ply on both faces of 35mm thick including all fixtures.
24. Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Sal wood Frame
of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with
commercial ply on both faces of 35mm thick including all fixtures.
25. Supply and Fixing of Door with Double leaf shutter, Door Size 1.00x2.13 mtrs with Sal Wood Frame
of sections size 75mm x 100mm with Flush Door Shutters Solid Bond Wood black board type with
commercial ply on both faces of 35mm thick including all fixtures.
26. #REF!
27. #REF!
28. NCL or Equivalent Eco 3000 Series Windows with Galvalume Corrugated sheet with
AMENITIES:
1. The Superintending Engineer has submitted the sub-estimate for Water supply and Sanitary
Arrangements as per the requirements based on approved plan and the same may be allowed.
2. The Superintending Engineer has submitted the sub-estimate for Internal Electrification as per
the requirements based on approved plan and the same may be allowed.
The Data of all the items are adopted as per the Revised Standard Data Part-III (Buildings) and
the rates are worked out based on current SSR i.e Building SSR 2011-2012. Cement and Steel rates are
adopted as approved by the committee of the Chief Engineers for the month of August 2012.
SPECIFICATIONS:
The Standard specifications as per APSS are adopted and the work will be carried out true to the
relevant standard specification of APSS and as per the agreement conditions.
Quarries:
The Superintending Engineer has proposed 20 % on labour charges towards Agency area allowence and
necessaey certificate is enclosed in the lead chart, hence the same may be allowed on the responsibilty of the SE,
APEWIDC Guntur
Overhead Charges & Contractors Profit:
14% towards overhead charges and contractors profit put together has been proposed by the SE
APEWIDC Guntur in the estimates which is as per the Revised Standard Data - Part-III (Buildings),
ordered by the Government of A.P vide G.O.Ms.No.49, IRRIGATION & CAD (PW-REFORMS)
DEPARTMENT Dated: 2-3-2009, for adoption by all Engineering /Public Works Departments and
other organizations. Hence the same may be allowed.
VAT:
Lump sum amounts at the rate of 5% towards VAT has been added in the Abstracts of all the estimates
by the SE APEWIDC,Guntur, which is as per the Revised Standard Data - Part-III (Buildings), and the
same will be allowed at 5% of ECV.
The SE has proposed following other provisions in the estimate
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
:
:
:
:
:
:
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
:
:
#REF!
#REF!
#REF!
#REF!
The Estimate is scrutinized and here-with put up for kind perusal and for according technical sanction for
Rs128.81 Lakhs. The Draft 'Bill of Quantites' and BID document is also here-with put for kind perusal and
approval.
AE/AEE
Dy. EE
EE
SE
CE
Estimate
Section
: Badangi
Sub-Division
: Vizianagaram
Division
: Vizianagaram
Circle
: Guntur
SPECIFICATION REPORT
Estimated cost Rs. 128.81 Lakhs.
Name of work:
Authority:
The Principal Secratary to Government, Education(SE-PROG.I) Dept., Government of
Andhra Pradesh, Hyderabad have accorded Administrative Sanction for Construction of
(355) Girls Hostels attached to Model Schools vide G.O.Rt. No. 345, Dated 06-07-2012
with a unit cost of Rs. 1.288 Crores
:
:
25 nos
1 nos
Recreation room
1 nos
:
:
:
:
:
:
:
:
:
1 nos
1 no.
1 no.
1 no.
1 no.
1 no.
1 no.
16 no.
1 no.
The estimate is prepared dully adopting the type design prepared by the
APEWIDC and approved by the Govt. of India. The required accomdation is
propoaed in Ground floor and first floor
Provisions:
The Detailed Estimates are prepared with the following common provisions:
A)
Superstructure:
1. VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for Columns, Roof Beams, Roof Slabs.
2. Providing HYSD bars Fe 415 for all diameters more than 6mm for VRCC & RCC
work.
3. Providing Mild Steel Fe 250 for 6mm bars for VRCC & RCC work.
4. P.C.C (1:3:6) prop: nominal mix for Bed Blocks and Hold Fasts.
5. RCC (1:2:4) prop. Nominal mix using 12mm HBG machine crushed graded
metal for Lintels, 50mm thick platforms.
6. RCC M 25 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for sun shades, 7.5cm thick at fixed end and 5.0 cm thick
at free end, of any width as per approved plan .
7. PCC M20 grade Design Mix ( by weigh batching), using 20mm HBG machine
crushed gradedmetal for steps .
8. Brick masonry
Superstructure.
in
CM(1:8)
prop.
using
2nd
class
traditional
bricks
for
28. #REF!
29. NCL or Equivalent Eco 3000 Series Windows with Galvalume Corrugated sheet
with
i) Centre fixed both side openable shutter (1500 mm x 1350mm ) (W1)
ii) Double shutter 900 mm x 1350 mm outer frame (W3).
30. Supply and fixing of MS Ventilators with sections made of MS angles of 25mm
X 25mm X 3mm and 10mm X 10mm square rods ( Sizes: 1200 mm x 450 mm
& 900 mm x 450 mm).
AMENITIES:
1) Sub-Estimate is prepared for Water supply and Sanitary Arrangements as per
the requirements based on approved plan.
2) Sub-Estimate is prepared for Internal Electrification as per the requirements
based on approved plan.
Lump sum amounts at the rate of 5% towards VAT has been added in the
Abstracts of all the estimates by the SE APEWIDC,Guntur, which is as per the
Revised Standard Data - Part-III (Buildings), and the same will be provided at
5% of ECV.
LUMP SUM PROVISIONS:
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
AEE/AE
Executive Engineer
TW/ Gundala
TW/SD/ Sudimalla
TW/Division/
Bhadrachalam
0
0
SPECIFICATION REPORT
Specification Report accompanying the work " Special Repairs to ZPHS in Tekulapalli (V) and
Tekulapalli (M) in Khammam District " Was administratively sanctioned for Rs. 12.00Lakhs vide
proceedings RC No. 767/C4/2012 Dt: 16.04.2013 by DEO Khammam Maintenance of High schools in
Khammama District.
The estimate is prepared with following provisions
1
DISMANTLING clearing away and carefully stacking materials useful for reuse. Brick Masonary including
Cost and conveyence of all charges for clearing away the debris etc.,
DISMANTLING clearing away and carefully stacking materials useful for reuse old cement plastering
including Cost and conveyence of all charges for clearing away the debris etc.,
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed
hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse aggregate, water etc., complete for Lintels
Lintels
Sunshades
Roof Beams
Roof Slab 115 mm Thick
Roof Slab 100 mm Thick
Wearing Coat 50 mm Thick
5
6
7
8
9
10
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cm from
approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all
materials etc., complete for finished item of work.
11
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and conveyance of all materials , etc., for Uneven Surfaces
of Brick Wall complete for finished item of work. (APSS 901,903 & 904)
12
Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size
Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and
conveyance of all materials like etc., complete for finished item of work. (APSS No. 402).
13
Flooring with Polished Black Kadapa slabs minimum of 15 mm thick (0.457M x 0.457M) set over a base
coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof
slab only after it is properly cured, etc., complete for finished item of work.(APSS No.703 & 701)
14
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different
diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with
binding wire of 18 SWG, etc., complete for finished item of work in all floors. (APSS No.126)
15
Supply and Fixing of non teak wood door of size 1.05 x 1.95 with fully pannealed including cost and
conveyence of all charges
Supply and Fixing of non teak wood Window of size 0.45 x 1.06 with fully pannealed including cost and
conveyence of all charges
Supply and Fixing of non teak wood Window of size 0.40x1.22 m with fully pannealed including cost and
conveyence of all charges
16
17
18
Asst. Engineer
TW/ Gundala
Executive Engineer
TW/ Division/Bhadrachalam
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem,
Khammam District
GENERAL ABSTRACT
Sl. No.
As per Working
Estimate
Description of Item
01
4646573.00
02
3305345.00
03
1730785.00
04
Septic Tank
05
Compound wall
181370.00
1232679.00
11096752.00
06
1331610.00
07
Electrification at 12%
1331610.00
Sub-Total ::
13759972.00
13759972.00
08
VAT @ 5%
687999.00
09
QC charges @ 0.50%
10
Price Adjustment
11
10000.00
12
15000.00
13
108229.00
68800.00
350000.00
TOTAL ::
Asst. Engineer
PR Kothagudem
Dy.Executive Engineer
PR.SD Kothagudem
15000000.00
Executive Engineer
PR Division Kothagudem
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam District
Construction of Sub division Office (GF )
Sl.
No.
1
1
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, seigniorage charges, labour charges such as
shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as
per SS - 20 B (APSS 308). for Building Foundation
F1
F2
PEDASTALS
F1
F2
1
1
1
1
24
8
24
8
2.40
2.00
24
8
24
8
2.40
2.00
2.40
2.00
2.20
1.80
0.60
0.60
2.40
2.00
2.20
1.80
0.90
0.90
Amount
2013-14
2.40
2.00
253.90
100488
3524.40
89999
69.696
11.664
81.36 cum
7721.50
628221
9.720
3.240
12.96 cum
8038.70
104182
12.395
2.484
6.458
1.130
0.828
23.30 cum
9719.05
226405
20.736
4.800
25.54 cum
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Footings, Pedastal, Plinth beam
FOOTINGS
F1
F2
1
1
Rate
331.776
64.000
395.78 cum
Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using
40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.
to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes
on all materials, all operational, incidental, and labour charges such as laying and ramming
concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc.,
complete for finished item of work. (APSS No. 402).
F1
F2
1
1
UNIT
0.15
0.15
0.600
0.450
0.750
0.750
PLINTH BEAMS
Long walls
Cross walls
294427110.xls
1
1
1
1
1
6
5
13
2
2
19.960
4.800
4.800
5.460
4.000
- GF
0.230
0.230
0.230
0.230
0.230
0.450
0.450
0.450
0.450
0.450
17 of 221
Sl.
No.
1
3
DESCRIPTION OF ITEM
D/H
Quantity
2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Columns
Upto GL
C1
C2
Above GL up to plinth
C1
C2
up to roof
C1
C2
NO'S
UNIT
Rate
1
1
24
8
0.23
0.23
0.575
0.375
1.050
0.650
3.333
0.449
1
1
24
8
0.23
0.23
0.575
0.375
0.900
0.900
2.857
0.621
1
1
24
8
0.23
0.23
0.575
0.375
3.000
3.000
9.522
2.070
18.85 cum
Amount
2013-14
9807.85
184898
9980.85
13085
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering, laying
concrete, curing etc. complete for Lintels
Ground Floor
Over doors
Over windows
1
1
7
12
1.5
1.5
0.23
0.23
0.200
0.200
0.483
0.828
1.31 Cu.M.
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Beams
Long walls
Cross walls
Portico
294427110.xls
1
1
2
2
2
1
1
4
2
3
5
2
10
2
19.960
4.800
2.000
4.800
8.920
2.000
4.000
- GF
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.450
0.450
0.450
0.450
0.450
0.300
0.450
8.260
0.990
1.240
4.970
3.690
1.380
0.830
18 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
3
1
4
5.000
5
0.23
D/H
6
0.450
Quantity
7
UNIT
8
0.520
21.88 Cu.M.
Rate
Amount
2013-14
9
9150.25
200207
1
1
1
2
4.80
4.60
2.20
1.50
10.560
13.800
24.36 Sqm
1382.30
33673
1100.40
855759
786.15
14434
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick
Landing
Flights
2
1
1
1
19.96
5.00
18.98
4.00
757.680
20.000
777.68 Sqm
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering, laying
concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm
thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work.
Ground Floor
1
1
1
294427110.xls
10
2
2
1.50
5.00
2.80
- GF
0.60
0.60
0.60
9.00
6.00
3.36
18.36 Sqm
19 of 221
Sl.
No.
1
9
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11
x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.
294427110.xls
- GF
UNIT
Rate
Amount
2013-14
20 of 221
Sl.
No.
1
DESCRIPTION OF ITEM
2
Ground Floor
Up to Basement
Long walls
cross walls
cross walls
Super structure
Long walls
cross walls
cross walls
NO'S
D/H
Quantity
UNIT
Rate
1
2
2
1
1
1
2
2
1
1
1
1
4
5
2
2
2
19.96
4.8
6.46
5.46
4
0.23
0.23
0.23
0.23
0.23
0.90
0.90
0.90
0.90
0.90
4
5
2
2
2
7
11
19.96
4.80
6.46
5.46
4.00
1.20
1.20
0.23
0.23
0.23
0.23
0.23
0.23
0.23
3.00
3.00
3.00
3.00
3.00
2.10
1.35
0.900
9.940
5.350
2.260
1.660
20.11 Cu.M.
0.900
33.120
17.830
7.530
5.520
Deduction doors
-4.060
Deduction windows
-4.100
56.74 Cu.M.
76.85 Cu.M.
Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x
11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel
bars of 6m dia in every third layer of brick masory, with free joints of the main block work
including cost and seignorage charges and conveyance of all materials and water from
approved sources to work site and all operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but
excluding the cost of steel and its fabrication charges
Ground floor
Toilet
10
2
2
2
2
5.760
3.600
Railing
7.380
Deduction
-2.930
13.81 Cum
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 17861979) of different diameters for RCC works, including labour charges for straightening,
cutting, bending to required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming
grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in position, tying including sales
and other taxes on all materials etc., complete for finished item of work in all floors. (APSS
No.126)
1
1
1
1
1.44
0.90
4.10
0.75
Amount
2013-14
4415.80
339354
554.20
7654
61763.00
1111734
2.00
2.00
0.90
1.95
Ground Floor ::
18.00 Mts
11
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for
finished item of work. (APSS 901,903 & 904)
Ground Floor
DE Room
294427110.xls
2 (7.03+4.8)
- GF
3.60
85.180
21 of 221
Sl.
No.
1
DESCRIPTION OF ITEM
2
Anti room
Computer Room
Staff Room
SO Room
Toilets Room
294427110.xls
NO'S
3
1
1
1
1
2
2
2
2
2
2
4
(2.4+4.8)
(4.8+4.8)
(4.8+6.23)
(4.8+7.03)
(2.2+4.8)
- GF
D/H
6
3.60
3.60
3.60
3.60
3.60
Quantity
7
51.840
69.120
79.420
85.180
103.680
UNIT
Rate
Amount
2013-14
22 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
UNIT
Rate
2.00
1.35
0.45
-16.800
-17.820
-1.080
438.72 Sqm
Deductions Doors
Windows.
Ventilator
12
Portico
1.20
1.20
0.60
317.40
139250
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
1
7.03
2.54
4.80
4.80
4.80
2.20
14.49
9.46
2.00
5.00
4.80
4.80
4.80
6.23
7.03
4.80
2.00
2.00
4.46
4.00
33.740
12.190
23.040
29.900
33.740
21.120
28.980
18.920
17.840
20.000
239.47 Sq.M.
146.10
34987
215.15
75401
1026.68
225325
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer
- in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904)
long wall
cross walls
14
1
1
2
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost
and conveyance of all materials like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental charges and labour
charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
Ground Floor
DE Room
Anti room
Computer Room
Staff Room
SO Room
Toilets Room
Corrider
13
7
11
2
Amount
2013-14
179.640
170.820
350.46 Sqm
Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab,
including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed
with neat cement to full depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of work, .
DE Room
Anti room
Computer Room
Staff Room
SO Room
Toilets Room
Corrider
294427110.xls
1
1
1
1
1
1
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
2
19.96
18.98
7.03
2.54
4.80
4.80
4.80
2.20
14.49
9.46
2.00
- GF
4.50
4.50
4.80
4.80
4.80
6.23
7.03
4.80
2.00
2.00
4.46
33.740
12.190
23.040
29.900
33.740
21.120
28.980
18.920
17.840
219.47 Sq.M.
23 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
UNIT
Rate
15
Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished
shabad / Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length equal to
flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed
with pigment of matching shade to full depth, including cost of all materials like tiles, cement,
sand and water etc., complete including seigniorage charges, etc., complete for finished item
of work,
Ground Floor
DE Room
Anti room
Computer Room
Staff Room
SO Room
Toilets Room
16
1
1
1
1
1
2
2
2
2
2
2
2
(7.03+4.8)
(2.4+4.8)
(4.8+4.8)
(4.8+6.23)
(4.8+7.03)
(2.2+4.8)
0.10
0.10
0.10
0.10
0.10
0.10
2.370
1.440
1.920
2.210
2.370
2.880
13.19 Sqmt
994.30
13115
8843.04
61901
6737.86
74116
Ground Floor
Ground Floor for Door
17
Amount
2013-14
1 X 7
7.00
7.00 Sqm
Supply and fixing of Window of Size 1.20 x 1.35 M shutter with window frame of
Medium Teak wood of Section 100 mm x 75 mm and shutter frame 3 verticals of Medium
Teak wood of section 100mm x 32 mm thick and BISON PANEL CEMENT BONDED
PARTICLE BOARD CONFORMING TO IS 14276 and safety bars of 10 mm square bars at
100mm center to center distance horizantally and Hardware fixtures ie., MSPC Butt Hinges
100mm Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6
Nos, MS Hold Fast 4 Nos Including Labour charges for making Window frame and shutter,
fixing of Fixtures etc., and cost and conveyance of all materials to site, taxes extra complete
for finished item of work.
Ground Floor
Ground Floor
18
11.00
11.00 Sqm
Supply and fixing of Door size 0.75 x 2.00 M Single Leaf with Door Frame of Medium Teak
wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board
type with commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm
Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including Including Labour
charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.
Ground Floor
Ground Floor for Door
294427110.xls
1 X 11
1 X 2
2.00
- GF
24 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
19
8
2.00 Sqm
Supply and fixing of medium teak wood Ventilators of size 0.60x0.40M with safety bars of
10mm square rods at 100mm centre to centre horizontally and vertically as per approved
drawing of Engineer-in-charge including red oxide primer of grade-I quality, sales and other
taxes, cost and conveyance of all materials to site, all labour charges etc., complete for
finished item of work.
21
22
Rate
Amount
2013-14
9
5965.03
11930
1783.95
7136
239.47 Sqm
Painting to new walls with two coats of ready mixed oil bound washable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand, making
three coats in all to give an even shade after thoroughly brushing the surface to remove all dirt
and reminds of loose powedered materials including cost and conveyance of alla materials to
work site and all operational, incidental, labour charges etc.. complete for finished item of
work as per SS911 for internal walls and ceiling.
29.30
7016
438.72 Sqm
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian /
Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after thoroughly brushing the surface
to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS
No. 911)
92.31
40498
350.46 Sqm
130.70
45805
Ground Floor
for G.F
20
UNIT
2 X 2
4.00
4.00
4.00 each
White washing two coats with paint grade white lime for wash or equivalent quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work in all floors for walls
TOTAL AMOUNT
Asst. Engineer
PR Kothagudem
294427110.xls
Dy.Executive Engineer
PR.SD Kothagudem
- GF
4646573
Executive Engineer
PR Division Kothagudem
25 of 221
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam District
Construction of Division Office (FF )
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Columns
UNIT
Rate
Amount
2013-14
24
8
0.23
0.23
0.575
0.375
3.000
3.000
9.522
2.070
11.59 cum
10212.40
118382
10324.30
17809
9434.50
193690
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete, curing
etc. complete for Lintels
Over doors
Over windows
1
1
1
1
10
15
1.5
1.5
0.23
0.23
0.200
0.200
0.690
1.035
1.73 Cu.M.
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Beams
Cross walls
294427110.xls
1
1
2
2
2
1
4
2
3
5
2
10
19.960
4.800
2.000
4.800
8.920
2.000
- FF MAIN
0.23
0.23
0.23
0.23
0.23
0.23
0.450
0.450
0.450
0.450
0.450
0.300
8.260
0.990
1.240
4.970
3.690
1.380
20.53 Cu.M.
26 of 221
Sl.
No.
DESCRIPTION OF ITEM
1
1
D/H
Quantity
19.96
18.98
UNIT
Rate
757.680
757.68 Sqm
10.560
13.800
24.36 Sqm
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete, curing
etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished item of work.
4
16
Amount
2013-14
1133.85
859095
1421.65
34631
816.00
33097
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 175mm thick FF
FIRST FLOOR
Landing
Flights
6
2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm thick
FIRST FLOOR
Ground Floor Slab
NO'S
1
2
294427110.xls
1
2
2
4
5
2
5.45
1.5
2.20
1.50
26.16
14.40
40.56
40.56 Sqm
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11
x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.
FIRST FLOOR
Super structure
Long walls
cross walls
cross walls
2
1
4.80
4.60
19.96
4.80
6.46
- FF MAIN
0.60
0.60
0.23
0.23
0.23
3.00
3.00
3.00
0.900
33.120
17.830
27 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
3
1
1
1
1
Deduction doors
Deduction windows
2
2
10
11
4
5.46
4.00
1.20
1.20
B
5
0.23
0.23
0.23
0.23
D/H
6
3.00
3.00
2.10
1.35
Quantity
UNIT
7
8
7.530
5.520
-5.800
-4.100
55.00 Cu.M.
Rate
Amount
2013-14
4635.05
254928
596.55
8238
62447.00
749364
5039.30
3825
Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x
11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel
bars of 6m dia in every third layer of brick masory, with free joints of the main block work
including cost and seignorage charges and conveyance of all materials and water from approved
sources to work site and all operational, incidental, labour charges such as scaffolding mixing
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel
and its fabrication charges
FIRST FLOOR
Toilet
2
2
2
2
1
1
1
1
5.760
3.600
Railing
7.380
Deduction
-2.930
13.81 Sqm
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 17861979) of different diameters for RCC works, including labour charges for straightening, cutting,
bending to required sizes and shapes, placing in position with cover blocks of approved
materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of
steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental, operational, laour charges
such as cutting, bending placing in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all floors. (APSS No.126)
1.44
0.90
4.10
0.75
2.00
2.00
0.90
1.95
First Floor
12.00 Mts
8
Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4)
proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG
(SS5) metal from approved quarry including cost and conveyance of all materials like cement,
sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour charges such as mixing, laying and
ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing
concrete, etc., complete for finished item of work (APSS No. 402)
Bed blocks
0.166
0.552
0.041
0.76
0.76 Cu.M.
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished
item of work. (APSS 901,903 & 904)
EE Room
Anti room
294427110.xls
4
20
2
1
1
6
4
6
0.20
0.20
0.20
2 (7.03+4.8)
2 (2.4+4.8)
- FF MAIN
0.23
0.23
0.12
0.15
0.15
0.15
3.60
3.60
85.180
51.840
28 of 221
Sl.
No.
DESCRIPTION OF ITEM
2
Computer Room
DAO Room
DB Room
Toilets Room
Supdt Room
Xerox Room
Deductions Doors
Windows.
Ventilator
10
2
2
2
2
2
2
1
1
2
4
5
(4.8+4.8)
(4.8+6.23)
(4.8+7.03)
(2.2+4.8)
(4.8+6.23)
(4.8+3.05)
1.20
1.20
0.60
D/H
6
3.60
3.60
3.60
3.60
3.60
3.60
2.00
1.35
0.45
Quantity
UNIT
7
8
69.120
79.420
85.180
103.680
79.420
56.520
-24.000
-17.820
-1.080
567.46 Sqm
179.640
170.820
350.46 Sq.M.
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost
and conveyance of all materials like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental charges and labour
charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
First Floor
EE Room
Anti room
Computer Room
DAO Room
DB Room
Toilets Room
Supdt Room
Xerox Room
12
3
1
1
1
2
1
1
10
11
2
Rate
Amount
2013-14
340.80
193390
238.60
83620
154.65
61124
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all
operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge,
finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS
901,903 & 904)
First Floor
long wall
cross walls
11
NO'S
1
1
1
1
1
1
1
2
1
1
2
2
2
2
2
2
2
2
2
2
19.96
18.98
7.03
2.40
4.80
4.80
4.8
2.20
4.80
4.80
4.50
4.50
4.8
4.8
4.8
6.23
7.03
4.8
6.23
3.05
67.490
23.040
46.080
59.810
67.490
42.240
59.810
29.280
395.24 Sq.M.
Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab,
including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed
with neat cement to full depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of work, .
First Floor
EE Room
Anti room
Computer Room
DAO Room
DB Room
Toilets Room
Supdt Room
Xerox Room
294427110.xls
1
1
1
1
1
2
1
1
2
2
2
2
2
2
2
2
7.03
2.40
4.80
4.80
4.8
2.20
4.80
4.80
- FF MAIN
4.8
4.8
4.8
6.23
7.03
4.8
6.23
3.05
67.490
23.040
46.080
59.810
67.490
42.240
59.810
29.280
29 of 221
Sl.
No.
13
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
UNIT
7
8
395.24 Sq.M.
Rate
Amount
2013-14
9
1046.87
Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished shabad /
Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length equal to flooring
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed
with pigment of matching shade to full depth, including cost of all materials like tiles, cement,
sand and water etc., complete including seigniorage charges, etc., complete for finished item of
work,
Ground Floor
EE Room
Anti room
Computer Room
DAO Room
294427110.xls
1
1
1
1
2
2
2
2
(7.03+4.8)
(2.4+4.8)
(4.8+4.8)
(4.8+6.23)
- FF MAIN
0.10
0.10
0.10
0.10
2.370
1.440
1.920
2.210
30 of 221
413765
Sl.
No.
DESCRIPTION OF ITEM
NO'S
3
1
2
1
1
DB Room
Toilets Room
Supdt Room
Xerox Room
14
17
4
5
(4.8+7.03)
(2.2+4.8)
(4.8+6.23)
(4.8+3.05)
D/H
6
0.10
0.10
0.10
0.10
Quantity
UNIT
7
8
2.370
2.880
2.210
1.570
7.94 Sqmt
Rate
Amount
2013-14
8073
8843.04
88430
6737.86
74116
395.24 Sqm
Painting to new walls with two coats of ready mixed oil bound washable distemper of approved
brand and shade over a base coat of appropriate primer of approved brand, making three coats
in all to give an even shade after thoroughly brushing the surface to remove all dirt and reminds
of loose powedered materials including cost and conveyance of alla materials to work site and
all operational, incidental, labour charges etc.. complete for finished item of work as per SS911
for internal walls and ceiling.
29.30
11581
567.46 Sqm
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian /
Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after thoroughly brushing the surface to
remove all loose powdered materials, including cost and conveyance of all materials, including
cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all
operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external Walls.(APSS No. 911)
92.31
52382
350.46 Sqm
130.70
45805
1 X 10
10.00
10.00
10.00 Sqm
Supply and fixing of Window of Size 1.20 x 1.35 M Six Leaf shutter with window frame of
Medium Teak wood of Section 100 mm x 75 mm and shutter frame of Medium Teak wood of
section 100mm x 32 mm thick and window planks of medium fiber board exterior both sides
laminated 12mm thick and safety bars of 10 mm square bars at 100mm center to center
distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm Long 12nos,
MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6 Nos, MS Hold Fast 4
Nos Including Labour charges for making Window frame and shutter, fixing of Fixtures etc.,
and cost and conveyance of all materials to site, taxes extra complete for finished item of
work.
First Floor
16
2
2
2
2
1016.75
15
11.00
11.00 Sqm
White washing two coats with paint grade white lime for wash or equivalent quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work in all floors for walls
294427110.xls
1 X 11
- FF MAIN
31 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Asst. Engineer
PR Kothagudem
294427110.xls
Dy.Executive Engineer
PR.SD Kothagudem
- FF MAIN
Quantity
UNIT
Rate
7
8
9
TOTAL AMOUNT
Amount
2013-14
3305345
Executive Engineer
PR Division Kothagudem
32 of 221
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam District
Construction of Superintending Engineer Camp Office (SF )
DESCRIPTION OF ITEM
Sl.
No.
D/H
Quantity
12
0.23
0.58
3.000
UNIT
Rate
Amount
2013-14
10
4.761
4.76 Cu.M.
10667.70
50789
9718.75
199526
1167.35
145461
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402) with minimum cement content @
380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Beams
Long walls
Cross walls
2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402) with minimum cement content @
380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Columns
C1
NO'S
1
1
2
2
2
1
4
2
3
5
2
10
19.960
4.800
2.000
4.800
8.920
2.000
0.23
0.23
0.23
0.23
0.23
0.23
0.450
0.450
0.450
0.450
0.450
0.300
8.260
0.990
1.240
4.970
3.690
1.380
20.53 Cu.M.
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402) with minimum cement content @
380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick
294427110.xls
1
1
14.93
8.76
- SF
5.26
5.26
78.530
46.078
124.61 Sqm
33 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering, laying
concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm
thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work.
UNIT
Rate
Amount
2013-14
10
845.85
10658
4854.20
284699
596.55
8590
Second Floor
1
1
5
9
1.5
1.5
0.60
0.60
4.50
8.10
12.60 Sqm
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11
x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.
Second Floor
Long walls
cross walls
cross walls
0.900
33.120
17.830
7.530
5.520
Deduction doors
-2.900
Deduction windows
-3.350
58.65 Cu.M.
Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x
11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel
bars of 6m dia in every third layer of brick masory, with free joints of the main block work
including cost and seignorage charges and conveyance of all materials and water from
approved sources to work site and all operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but
excluding the cost of steel and its fabrication charges
Second Floor
Toilet
294427110.xls
1
2
2
1
1
1
1
1
2
4
5
2
2
2
5
9
1
1
19.96
4.80
6.46
5.46
4.00
1.20
1.20
2.40
2.40
- SF
0.23
0.23
0.23
0.23
0.23
0.23
0.23
3.00
3.00
3.00
3.00
3.00
2.10
1.35
2.00
2.00
4.800
9.600
14.40 Sqm
34 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 17861979) of different diameters for RCC works, including labour charges for straightening,
cutting, bending to required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming
grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in position, tying including sales
and other taxes on all materials etc., complete for finished item of work in all floors. (APSS
No.126)
UNIT
Rate
Amount
2013-14
10
First Floor
6
5.00 Mts
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost
and conveyance of all materials like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental charges and labour
charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
Rooms
Rooms
Passage
Staircase
Landing
Staircase room
4
4
1
2
1
1
1
2
1
1
1
1
5.45
5.45
19.30
4.10
3.00
3.00
7.90
0.45
2.20
1.50
1.50
1.27
172.220
19.620
42.460
12.300
4.500
3.810
254.91 Sq.M.
254.91 Sq.M.
63131.00
315655
365.10
93068
262.05
Plasterin
62889
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer
- in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904)
Second Floor
Rear long wall
Front wall
Darf wall
1
2
1
2
2
109.380
41.650
17.420
58.450
Toilet room cross wall
13.090
239.99 Sqm
239.99 Sqm
Plastering to even surfaces of wall with CM (1:4) Prop: 12mm thick in single coat including
cost and conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental charges
and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of
work. (APSS 901,906)
1
1
1
1
1
31.25
5.95
19.35
8.35
1.87
3.50
3.50
0.90
3.50
3.50
Second Floor
Hand railing
294427110.xls
4.10
- SF
0.90
7.380
35 of 221
Sl.
No.
DESCRIPTION OF ITEM
2
NO'S
3
2
5
0.12
D/H
Quantity
UNIT
8
0.980
8.36
8.36 Sqm
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for
finished item of work. (APSS 901,903 & 904)
1
4
4.10
Rate
Amount
2013-14
10
262.05
Second Floor
Halls
Staircase Room
Passage
Toilet Room
294427110.xls
4
2
1
2
2 (5.45+7.90)
1
5.70
1
19.30
2 (0.9+1.44)
- SF
3.50
3.50
3.50
3.50
373.800
39.900
67.550
32.760
36 of 221
Plasterin
2191
DESCRIPTION OF ITEM
Sl.
No.
2
Lobby
Deduction Door
Windows
Ventilators
OP
NO'S
3
1
4
20
8
2
1
2 X 1
4
5
2 (0.9+1.44)
1
1.05
1
0.90
1
0.60
1
0.75
1
0.90
4.10
D/H
6
3.50
2.00
1.20
0.45
2.00
2.00
0.90
Quantity
UNIT
7
8
16.380
-8.400
-21.600
-2.160
-3.000
-1.800
493.43 Sqm
7.38
7.38 Sqm
500.81 Sqm
Rate
Amount
2013-14
10
Plaste
364.25
Plaste
182420
369.50
Impe
90105
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with
1kg of water proof compound per bag of cement laid over roof when it is green including cost
of all materials, seigniorage charges, excluding conveyance charges of materials and including
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and
thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item
of work SF
Second Floor
M Top of roof slab
10
30.79
7.92
243.86
243.86 Sq.M.
243.86 Sq.M.
11
1 X 1
1 X 4
4.00
4.00
4.00 Sqm
8843.04
35372
6737.86
134757
Supply and fixing of Window of Size 0.90 x 1.22 M Six Leaf shutter with window frame
of Medium Teak wood of Section 100 mm x 75 mm and shutter frame of Medium Teak
wood of section 100mm x 32 mm thick and window planks of medium fiber board exterior
both sides laminated 12mm thick and safety bars of 10 mm square bars at 100mm center to
center distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm Long
12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6 Nos, MS Hold
Fast 4 Nos Including Labour charges for making Window frame and shutter, fixing of
Fixtures etc., and cost and conveyance of all materials to site, taxes extra complete for
finished item of work.
First Floor
294427110.xls
4 X 5
20.00
20.00 Sqm
- SF
37 of 221
Sl.
No.
12
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian /
Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after thoroughly brushing the surface
to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS
No. 911)
13
294427110.xls
1
4
1
2
1
1
X
X
X
X
X
X
X
X
X
X
1
1
1
1
1
1
X
X
X
X
X
X
2
1
1
2
2
1
1
1
1
1
31.27
5.95
19.35
19.35
1.85
8.35
Amount
2013-14
10
130.70
31938
92.31
45590
29.30
7469
3.50
3.50
0.90
373.80
39.90
67.55
32.76
16.38
Deductions :Doors
-8.40
Windows
-21.60
Ventilators
-2.16
Toilet room
-3.00
-1.35
493.88 Sqm
White washing two coats with paint grade white lime for wash or equivalent quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work in all floors for walls
4
2
1
2
1
4
20
8
2
1
X
X
X
X
X
X
Rate
109.45
41.65
Dawrf wall
17.42
0.23
4.45
Toilets
3.50
12.95
C/W
3.50
58.45
244.36 Sqm
Painting to new walls with two coats of ready mixed oil bound washable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand, making
three coats in all to give an even shade after thoroughly brushing the surface to remove all dirt
and reminds of loose powedered materials including cost and conveyance of alla materials to
work site and all operational, incidental, labour charges etc.. complete for finished item of
work as per SS911 for internal walls and ceiling.
Hall
Stair case room
Passage
Toilet room
1
2
1
1
2
2
UNIT
4
2
1
1
1
1
(5.45+7.90)
5.70
19.30
(0.90+1.44)
(0.90+1.44)
1.05
0.90
0.60
0.75
0.90
5.45
5.45
19.30
4.10
3.00
3.00
- SF
3.50
3.50
3.50
3.50
3.50
2.00
1.20
0.45
2.00
1.50
7.90
0.45
2.20
1.50
1.50
1.27
172.22
19.62
42.46
12.30
4.50
3.81
254.91 Sqm
38 of 221
Sl.
No.
14
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Painting to New wood work with two coats of ready mixed synthetic enamel paint first
quality all shades to give an even shade over base coatof wood Primer finishing with putty
for wood work after thouroughly brushing the surface to remove all remains including cost
and conveyance of all materials to site, sales & other taxes, all operational, incidental and
labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in
All Floors
Windows
60 X 2.75
0.90
1.20
UNIT
Rate
Amount
2013-14
10
166.15
29608
178.20
178.20 Sqm
1730785
Asst. Engineer
PR Kothagudem
294427110.xls
Dy.Executive Engineer
PR.SD Kothagudem
- SF
Executive Engineer
PR Division Kothagudem
39 of 221
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam
District
DETAIL CUM ABSTRACT ESTIMATE - THIRD FLOOR
Sl.
No.
DESCRIPTION OF ITEM
D/H
Quantity
4 X 1
0.300
0.38
UNIT
Rate
Amount
2013-14
10
3.05
1.39
1.39 cum
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement
content @ 380Kgs/Cum from standard suppliers approved by the department including
centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams
L/B
C/B
2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement
content @ 380Kgs/Cum from standard suppliers approved by the department including
centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns
NO'S
2 x 1
2 x 1
5.45
3.00
0.23
0.23
0.45
0.30
1.13
0.41
1.54 Cu.M.
1.54 Cu.M.
11021.50
15320
10003.00
15405
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement
content @ 380Kgs/Cum from standard suppliers approved by the department including
centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm
thick
1 X 1
5.90
3.45
294427110.xls
DORMITORY -TF
20.36
20.36 Sqm
20.36 Sqm
M2
1200.85
40 of 221
24443
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23
x 11 x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item of work.
UNIT
Rate
Amount
2013-14
10
Third Floor
Parapet wall
Parapetwall L/W
Deduct columns
2 x 1
2 x 1
14 x 1
2
2
1
1
x
x
x
x
1
1
1
1
31.25
7.90
0.30
0.23
0.23
0.23
0.90
0.90
0.90
12.94
3.27
-0.87
15.34 Cu.M.
5.45
3.05
1.05
0.90
0.23
0.23
0.23
0.23
3.10
3.10
2.00
1.20
7.77
4.35
-0.48
-0.25
11.39
Cu.M.
5149.95
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and lapsplicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, laour charges such as cutting, bending placing in
position, tying including sales and other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)
769.000 Kgs
0.769 Mts
0.77 Mts
63815.00
49074
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all
materials like cement, screened sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of
Brick Wall complete for finished item of work. (APSS 901,903 & 904)
Third Floor
1
1
1
1
294427110.xls
2
2
2
2
(7.03+4.8)
(2.4+4.8)
(4.8+4.8)
(4.8+6.23)
DORMITORY -TF
3.60
3.60
3.60
3.60
85.180
51.840
69.120 Sqm
79.420
Pla
41 of 221
Sl.
No.
DESCRIPTION OF ITEM
2
NO'S
3
1
4
5
2 (4.8+7.03)
D/H
6
3.60
Quantity
UNIT
7
8
85.180
370.74 Sqm
Rate
Amount
2013-14
10
3808.20
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including
cost and conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing, curing, etc., complete for
finished item of work. (APSS 901,906)
Third Floor
1
1
1
1
1
1
1
7.03
2.54
4.80
4.80
4.80
4.80
4.80
4.80
6.23
7.03
33.740
12.190
23.040
29.900
33.740
57.100
51.520
108.62 Sq.M.
Supply and fixing of Door size 1.20 x 2.00 M Single Leaf with Door Frame of Medium
Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood
block board type with commercial play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt
300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including
Including Labour charges for making of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for finished item of work.
1 X 5
1
1
1
1
1
132.61 Sq.M.
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat
of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all
materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on
all materials,all operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever necessary as
directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of
Wall for finished item of work. (APSS 901,903 & 904)
Second Floor
Hand railing
2
2
7.93
7.36
1.20
3.60
3.50
2.00
294427110.xls
DORMITORY -TF
285.45
5.00
5.00 Sqm
Supply and fixing of Window of Size 0.90 x 1.22 M Six Leaf shutter with window
frame of Medium Teak wood of Section 100 mm x 75 mm and shutter frame of Medium
Teak wood of section 100mm x 32 mm thick and window planks of medium fiber board
exterior both sides laminated 12mm thick and safety bars of 10 mm square bars at 100mm
center to center distance horizantally and Hardware fixtures ie., MSPC Butt Hinges
100mm Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm
long 6 Nos, MS Hold Fast 4 Nos Including Labour charges for making Window frame
and shutter, fixing of Fixtures etc., and cost and conveyance of all materials to site, taxes
extra complete for finished item of work.
1 X 9
1733.35
9.00
9.00 Sqm
3486.00
6737.86
42 of 221
60641
Sl.
No.
10
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Painting to new walls with two coats of ready mixed oil bound washable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand,
making three coats in all to give an even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered materials including cost and conveyance
of alla materials to work site and all operational, incidental, labour charges etc.. complete
for finished item of work as per SS911 for internal walls and ceiling.
UNIT
Rate
Amount
2013-14
10
92.31
370.74 Sqm
11
White washing two coats with paint grade white lime for wash or equivalent quality to
give an even shade after thoroughly brushing the surface to remove all dirt and remains of
loose powdered materials including cost of all materials, labour charges and incidental
such as scaffolding, lift charges etc., complete for finished item of work in all floors for
walls
29.30
108.62 Sqm
TOTAL AMOUNT
Asst. Engineer
TW: Manuguru
294427110.xls
Dy.Executive Engineer
TW : Palvancha
DORMITORY -TF
164883
Executive Engineer
TW : Bhadrachalam
43 of 221
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam
District
DETAIL CUM ABSTRACT ESTIMATE - THIRD FLOOR - PART B
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
2
3
4
5
6
7
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of
size 23 x 11 x 7 Cm from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials,
all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for
finished item of work.
Third Floor
Vide page No 88 of MB No 7506/B/TW Dt: 20.12.2013
2 x 1
31.25
Parapet wall
2 x 1
7.90
Parapetwall L/W
14 x 1
0.30
Deduct columns
0.23
0.23
0.23
0.90
0.90
0.90
0.23
0.23
0.23
0.23
3.10
3.10
2.00
1.20
UNIT
Rate
Amount
2013-14
10
12.94
3.27
-0.87
15.34 Cu.M.
7.77
4.35
-0.48
-0.25
11.39
26.73 Cu.M.
Total qty 2013-14
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing mortar,scaffolding charges, lift charges,
finishing,including cutting of Grooves wherever necessary as directed by Engineer in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished
item of work. (APSS 901,903 & 904)
Third Floor
Vide page No 11 of MB No 7617/B/TW Dt 4.4.2014
05+5.45)
Head room out side
1 X 2
Vide page No 18 of MB No 7617/B/TW Dt 13.5.2014
31.75
Parapet wall
2 X 1
2 x 1
7.90
Sides
3.50
0.90
0.90
Quantity
5149.95
59.50
59.50 Sqm
Plas
57.15
14.22
71.37 Sqm
130.87 Sqm
3808.20
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
Third Floor
294427110.xls
137658
44 of 221
498379
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
UNIT
Rate
Amount
2013-14
2
3
4
Vide page No 11 of MB No 7617/B/TW Dt 4.4.2014
3.05
Head room
1 X 1
10
5.45
16.62
16.62 Sqm
16.62 Sq.M.
Total qty 2013-14
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance
of all materials like cement, sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials,all operational, incidental and labour charges such as
mixing mortar, scaffolding charges, lift charges, including cutting of Grooves
wherever necessary as directed by Engineer - in - charge, finishing, curing, etc.,
complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904)
Second Floor
Vide page No 17 of MB No 7617/B/TW Dt 13.5.2013
2
1
5.90
3.50
41.300
Hand railing
2
1
3.45
3.50
24.150
2
1
30.75
0.90
55.350
2
1
7.90
0.90
14.220
2
1
31.75
0.23
14.610
2
1
7.90
0.23
3.630
153.26 Sq.M.
Supply and fixing of Door size 1.05 x 2.00 M Single Leaf with Door Frame of
Medium Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid
bond wood block board type with commercial play on both faces, Hardware fixtures
ie., MSPC Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 Nos
MSPC Tower Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold
Fast 6 Nos including Including Labour charges for making of door, fixing of fixtures
etc., and cost and conveyance of all materials to site, taxes extra for finished item of
work.
Vide page No 10 of MB No 7617/B/TW Dt 20.3.2014
for Head room doors
13 X 1
1.05
2.00
28813
285.45
43748
3486.00
95168
92.31
5492
29.30
487
27.30
1733.35
59.50
59.50 Sqm
White washing two coats with paint grade white lime for wash or equivalent quality
to give an even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials, labour charges
and incidental such as scaffolding, lift charges etc., complete for finished item of
work in all floors for walls
Head room ceiling
294427110.xls
1 X 1
5.45
3.05
Total qty 2013-14
16.62
16.62 Sqm
45 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
UNIT
Rate
Amount
2013-14
10
245.20
111206
In - situ - Granolithic Concrete Flooring 20mm thick with CC(1:1:2) Prop: using
6mm to 12mm size HBG machine crushed metal laid monolithically over slabs/ CC
flooring bed (1:5:10) with 40mm HBG metal in alternate panels of size not
exceeding 1.50m x 1.50m and finishing the top surface to required smoothness and
slopes, thread lining as directed by the Engineer - in - charge including cost and
conveyance of all materials like cement, sand, water, etc. to site, seigniorage charges,
sales and other taxes on all materials, all operational, incidental and labour charges
such as mixing of cement concrete, laying, curing, lift charges etc., complete for
finished item of work (APSS No.701 & 710)
First Floor
Rooms
Front side
Passage
Staircase room
Second Floor
Rooms
Front side
Passage
Staircase room
4
1
1
1
X 1
X 1
X 1
5.50
3.50
19.30
5.70
7.9
1.70
1.55
3.00
173.80
5.95
29.92
17.10
4
1
1
1
X 1
X 1
X 1
5.50
3.50
19.30
5.70
7.9
1.70
1.55
3.00
173.80
5.95
29.92
17.10
453.53 Sq.M.
Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS / HFFR P.V.C.
insulated
ISI
Copper
Cable
GM/L&T/RPG/Havells/V-Guard/Power
Flex/Polycab/Gold Medal/ Standard /Milion / Vimal/ Suncab/ Paragaon / FortuneArt
make in the existing metallic / non-metallic conduct pipe with 6A 1 Way flush type
switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box
including cost and conveyance of all materials to site, labour charges and sales tax
etc. complete for finished item of work for light, bell, fan and exhaust fan points in
Non-Residential Buildings
(SSR-2012-13, item No.
2.1.1)ing cost and conveyance of all materials to site, labour charges and sales tax
etc. complete for finished item of work
V . P. No 3 of 5282/C/TW
26.4.14
Ground floor 1
1
1
1
1
1
1
1
1
1
1
1
First Floor 1
2
1
3
294427110.xls
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
10
10
2
3
10
3
10
8
29
5
13
6
10
2
4
10
10.00
10.00
2.00
3.00
10.00
3.00
10.00
8.00
29.00
5.00
13.00
6.00
10.00
4.00
4.00
30.00
46 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
2
Second Floor 4
2
1
3
x 10
x 2
x 1
D/H
Total
Quantity
UNIT
7
8
40.00
4.00
1.00
202 each
Rate
Amount
2013-14
10
349.2
70538
each
476.70
24312.00
each
60.25
3374.00
each
6152.12
49217.00
each
6880.12
6880.00
Supply and fixing of 6A 3/2 pin flush type socket with 6A switch control of Anchor /
make with ISI mark on a common switch board with earth continuity including wire
leads, earth connections including cost and conveyance of all materials to site,
labour charges and sales tax etc. complete for finished item of work
V . P. No 4 of 5282/C/TW
26.4.14
Ground floor
Verandah
First Floor
Second Floor
Dining Hall
Kitchen
14.00
1.00
14.00
14.00
6.00
2.00
Total
51.00
Supply and fixing of Batton Holder/Slanting holder in lieu of ceiling rose of light
point complete with allconnetions and all labour charges with 40Watt bulb etc.,
complete for new installation. Anchor Make
V . P. No 5 of 5282/C/TW
26.4.14
Ground floor
Dining Hall
Kitchen
Bathroom
Bathroom
1
1
1
1
1
1
3
1
1
1
1
x
x
x
x
x
x
33.00
2.00
2.00
13.00
6.00
Total
56.00
Supply and fixing of 8 way SPN type distribution board with IP-20 protection of
make Standard / Havells suitable for single phase 40A DP isolator and 6 Nos. 6-32 A
MCB's make Standard / Havells as out going with internal connections including
cost and conveyance of all materials to site, labour charges for surface / flush
mounting etc., sales tax complete for finished item of work.
V . P. No 5 of 5282/C/TW
26.4.14
Ground floor 3
Dining Hall 1
x
x
x
x
x
14
1
14
14
6
2
6.00
2.00
Total
8.00
Supply and fixing of 4 way TPN type distribution board with IP-20 protection of
make Standard / Havells suitable for single phase 40A DP isolator and 6 Nos. 6-32 A
MCB's make Standard / Havells as out going with internal connections including
cost and conveyance of all materials to site, labour charges for surface / flush
mounting etc., sales tax complete for finished item of work.
V . P. No 6 of 5282/C/TW
26.4.14
Ground floor 1
x
x
11
2
2
13
6
2
2
1
Total
294427110.xls
1.00
1.00
47 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRPVC insulated flexible copper cable
of make finolex/ Havells / in existing PVC conduit pipe circuits, MV Lamp/Security
light points including laboiur charges (Phase, Neutral and earth) and run of 1 of 1.0
sqmm copper cable.
V . P. No 6 of 5282/C/TW
26.4.14
Ground floor 3
Dining Hall 1
150.00
450.00
100.00
100.00
Total
550.00
Supply of 1x40W weather proof flourescent streetlight fitting comprising canopy of
sheet Aluminium in stove enamel finish with copper / VPIT ballast, capacitor, tube
and starter etc., complete. Makes: Phillips / GE / Wipro /Thorn
V . P. No 7 of 5282/C/TW
26.4.14
Ground floor
First Floor
Second Floor
Dining Hall
Kitchen
1
1
1
1
1
x
x
10
Rmt
80.85
44468.00
each
1974.90
163917.00
each
4017.25
8035.00
each
476.70
1430.00
1
1
2.00
1.00
3.00
Total
294427110.xls
Amount
2013-14
19
22
22
18
2
1.00
1.00
Total
2.00
Supply and fixing of 16A 3/2 pin flush type socket with 16A switch control of
Anchor / make with ISI mark on a common switch board with earth continuity
including wire leads, earth connections including cost and conveyance of all
materials to site, labour charges and sales tax etc. complete for finished item of work
V . P. No 9 of 5282/C/TW
26.4.14
Kitchen
1
V . P. No 10 of 5282/C/TW
14.5.2014
Dining 1
x
x
Rate
1
1
19.00
22.00
22.00
18.00
2.00
Total
83.00
Providing independent earthing for sophisticated electronic equipment with
600mmx600mmx3.15mm thick copper plate rigidly fixed to 40mm dia G.I pipe of
0.3mtr.length connected with reducer providing G.I funnel with wiremesh as per
national electric code including c.c.chamber of size 400mmx400mmx400mm
covered with r.c.c slab filling with salt and charcoal giving earth connection from
electrode G.I strip of 25mmx6mmx200mm length with all accessories and labour
charges complete as per IS specification 732/1982(part ||)
V . P. No 8 of 5282/C/TW
26.4.14
Ground floor 1
Dining Hall 1
x
x
x
x
x
UNIT
48 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Supply and fixing of 1 X 36/40 W patty tubet light luminaire comprising canopy of
sheet alluminium housing and UV stablised acrylic cover of makes Cromption / Bajaj
/ Surya /HPL/ Havells with copper / VPIT ballast capacitor , 40W tube and starter
with 1.00 meter 25 mm dia GI pipe medium grade with bracket and anti titling MS
flat etc., including cost and conveyance of all materials to site, labour charges and
sales tax etc., complete for finished item of work.
UNIT
Rate
Amount
2013-14
10
V . P. No 9 of 5282/C/TW
26.4.14
4
6
x
x
1
1
4.00
6.00
10.00
Total
each
1974.90
19749.00
each
80.85
9702.00
each
3314.78
3315.00
each
3749.00
3749.00
Rmt
380.20
15968.00
Rmt
998.75
245392.00
Supply and run of 2 of 2.5 Sq mm PVC insulated flexible copper cable and 1 run of
1.00 Sq mm flexible PVC insulated flexible copper cable in the existing conduit
pipe for run of mains from main panel board to TPN DB'S to swithc boards
connections etc.,
V . P. No 11 of 5282/C/TW
16.5.2014
4 x 1
30.00
120.00
Total
120.00
Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete of
makes Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.
1
V . P. No 10 of 5282/C/TW
16.5.2014
ELEC-5.1.12 1 x 1
1.00
Total
1.00
Supply of 150W MH Flood light luminaire with integral weather proof diecast
alluminium housing with IP66 protection with all standard accessories etc of makes
Elton / Style Lamp / Mahita Electro / Capart / Akhil.
V . P. No 10 of 5282/C/TW
16.5.2014
ELEC-3.1.21 1 x 1
1.00
Total
1.00
21
42.00
Total
42.00
Labour charges for roofing of provided with 0.5mm thick galvanized/prepaint
profied sheet fixed to the purlins with 14 size self drilling screws with neopreme
washers are stiched with self tapping/drilling screws end laps are to be sealed with
25X3mm duty tape unit-184.518m2
2
5.85
21.00
Total
294427110.xls
245.70
245.70
49 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Labour charges for roofing of provided with 0.5mm thick galvanized/prepaint
profied sheet fixed to the purlins with 14 size self drilling screws with neopreme
washers are stiched with self tapping/drilling screws end laps are to be sealed with
25X3mm duty tape unit-184.518m2
1
21
UNIT
Rate
Amount
2013-14
10
Rmt
350.00
7350.00
21.00
Total
21.00
TOTAL AMOUNT
Asst. Engineer
TW: Manuguru
294427110.xls
Dy.Executive Engineer
TW : Palvancha
1598347
Executive Engineer
TW : Bhadrachalam
50 of 221
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam
District
GENERAL ABSTRACT PART B
Sl. No.
04
As per Sanctioned
Estimate
Description of Item
Post Matric Hostel (TF )
1598347.00
Sub-Total ::
10
1598347.00
TP @ 5.85% Less
-93503.00
1504844.00
11
VAT @ 5%
75242.00
12
QC charges @ 0.25%
17
3762.00
17321.00
TOTAL ::
Asst. Engineer
TW: Manuguru
1601169.00
Dy.Executive Engineer
TW : Palvancha
Name of the work : Construction of Post Matric Hostel for Boys at Burgampadu (V&M) in Khammam District
TOILET BLOCK
DETAIL CUM ABSTRACT ESTIMATE
Sl.
No.
1
DESCRIPTION OF ITEM
NO'S
D/H
2
3
4 5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with
an initial lead of 10m including all operational, incidental, seigniorage charges,
labour charges such as shoring ,sheeting, planking, strutting, dewatering etc.
complete for finished item of work as per SS - 20 B (APSS 308). for Building
Foundation
5262/C/TW, 1
05-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
5262/C/TW, 1
05-01-2014
For Septic tank
2
8
2
6
2
X
X
X
X
X
1
1
1
1
1
9.80
1.13
7.27
0.83
1.95
0.60
0.60
0.60
0.60
0.45
0.90
0.90
0.90
0.90
0.30
10.58
4.88
7.85
2.69
0.53
26.53 cum
1X1
5.50
3.00
1.80
29.70
29.70
56.23 cum
Quantity UNIT
Rate
Amount
2013-14
10
253.90
14278
#REF!
#REF!
5262/C/TW, 2
10-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
2
8
2
6
2
X
X
X
X
X
1
1
1
1
1
9.80
1.13
7.27
0.83
1.95
0.60
0.60
0.60
0.60
0.45
0.15
0.15
0.15
0.15
0.15
1.76
0.81
1.31
0.45
0.26
4.60 cum
1X1
5.50
3.00
0.15
2.48
2.48 cum
7.07 cum
5262/C/TW, 14
24-04-2014
294427110.xls
TOILET bala
52 of 221
Sl.
No.
4
DESCRIPTION OF ITEM
NO'S
D/H
2
3
4 5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using
20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Footings, Pedestals, Plinth Beam
5262/C/TW, 5
30-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
2
8
2
6
2
X
X
X
X
X
1
1
1
1
1
9.40
1.50
7.10
1.20
1.95
0.23
0.23
0.23
0.23
0.23
0.15
0.15
0.15
0.15
0.15
0.65
0.41
0.49
0.25
0.13
1.94
1.94 Cum
Rate
Amount
2013-14
10
7721.50
M25 P
14945
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such
as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including centering, shuttering, laying concrete, curing
etc. complete for Lintels
5262/C/TW, 9
06-02-2014
Lintels
Quantity UNIT
11 X 1
1.05 0.23
0.15
Total qty 2013-14
0.40
0.40 Cum
9980.85
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such
as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including centering, shuttering, laying concrete, curing
etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick
at Free end and for a width of 0.60 Mts. etc complete for finished item of work.
294427110.xls
TOILET bala
53 of 221
3977
Sl.
No.
DESCRIPTION OF ITEM
2
Slab 300mm depth
5262/C/TW, 9
06-02-2014
Toilet Block
NO'S
D/H
1X1
1.20
0.60
0.72
0.72 Sqm
0.72 Sqm
Rate
Amount
2013-14
10
786.15
M25 s
566
1100.40
M25 s
45430
1X1
1X1
7.70
10.00
2.05
2.55
Quantity UNIT
15.79
25.50
41.29 Sqm
41.29 Sqm
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from
approved source having minimum crushing strength of 40 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item of work.
Ground Floor
5262/C/TW, 2
10-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
Bath room L/W
Bath room C/W
2
8
2
6
2
8
X
X
X
X
X
X
1
1
1
1
1
1
9.80
1.33
7.07
1.03
9.40
1.50
0.40
0.40
0.40
0.40
0.23
0.23
0.60
0.60
0.60
0.60
0.40
0.40
5262/C/TW, 7
30-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
2
2
2
2
X
X
X
X
1
1
1
1
9.40
1.50
7.10
1.20
0.23
0.23
0.23
0.23
2.10
2.10
2.10
2.10
294427110.xls
TOILET bala
4.70
2.55
3.39
1.48
1.73
1.10
14.97 Cu.M.
9.08
1.45
6.86
1.16
54 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
2
Deduct door
5262/C/TW, 7
04-04-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
Deduct
D/H
Quantity UNIT
2
6
1
5
11
3
X
X
X
X
X
1
1
1
1
6
4
1.95
0.75
0.80
0.75
0.20
5
0.23
0.23
0.23
0.23
0.23
6
2.40
1.85
1.85
1.85
0.15
7
8
2.15
-1.91
-0.34
-1.60
-0.46
16.39 Cu.M.
2
2
2
2
12
11
X
X
X
X
X
X
1
1
1
1
1
1
9.40
1.50
7.10
1.20
1.05
0.60
0.23
0.23
0.23
0.23
0.23
0.23
0.40
0.40
0.40
0.40
0.15
0.30
1.73
0.28
1.31
0.22
-0.43
-0.46
2.64 Cu.M.
2
2
2
2
X
X
X
X
1
1
1
1
5.40
5.20
2.10
2.10
0.40
0.35
0.40
0.12
0.90
0.90
1.80
1.05
3.89
3.28
3.02
0.53
10.72 Cu.M.
Rate
Amount
2013-14
10
5262/C/TW, 14
20-04-2014
Septic L/W
Septic L/W
Septic C/W
5262/C/TW, 7
30-01-2014
10
6X1
4X1
1.50 0.12
2.50
1.20 0.12
2.50
Total qty 2013-14
2.59
1.38
3.97
48.69 Cu.M.
Total qty 2013-14
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such
as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors. (APSS No.126)
4415.80
5262/C/TW, 4
10-01-2014
242.92 Kgs
0.24 Mts
5262/C/TW, 8
07-02-2014
270.860 Kgs
0.271 Mts
5262/C/TW, 12
19-04-2014
296.480 Kgs
294427110.xls
TOILET bala
55 of 221
215002
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity UNIT
Rate
Amount
2013-14
7
8
0.296 Mts
0.81 Mts
10
5262/C/TW, 16
04-04-2014
Toilet
Bathroom
1X2
1X1
2X2
(4.6+2
.1)
4.60
2.10
24.12
2.10
9.66
1.05
8.82
42.60 Sqm
42.60 Sqm
Total qty 2013-14
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
Septic tank
5
2
2
7
1
2
2
X
X
X
X
X
X
X
1
1
1
1
1
1
1
1.25
7.20
2.20
1.50
1.20
9.40
2.55
1.80
1.20
0.30
0.30
1.20
1.20
0.30
0.30
50044
Plastering to even surfaces of wall with CM (1:3) Prop: 20mm thick in single coat
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
5262/C/TW, 15
04-04-2014
11
61763.00
7.50
4.32
1.32
12.60
1.44
5.64
1.53
34.35 Sqm
34.35 Sqm
196.75
Plaste
8382
146.10
Plast
5019
121.85
Plast
13226
Plastering to even surfaces of wall with CM (1:4) Prop: 12mm thick in single coat
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
5262/C/TW, 18
04-04-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
2
2
2
2
X
X
X
X
1
1
1
1
9.40
1.95
7.10
1.65
2.70
2.70
2.70
2.70
294427110.xls
TOILET bala
50.76
10.53
38.34
8.91
108.54 Sqm
108.54 Sqm
56 of 221
Sl.
No.
13
DESCRIPTION OF ITEM
NO'S
D/H
Quantity UNIT
2
3
4 5
6
7
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing mortar,scaffolding charges, lift charges,
finishing,including cutting of Grooves wherever necessary as directed by Engineer in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished
item of work. (APSS 901,903 & 904)
Rate
Amount
2013-14
10
5262/C/TW, 17
04-04-2014
7X2
(1.25+
1.20)
(1.20+
1.50)
1X2
(1.20+
1.20)
2.40
11.52
12 X 1
0.75
1.95
-17.55
12 X 1
0.60
0.30
5X2
Deductions
14
58.80
2.40
90.72
-2.16
141.33 Sqm
141.33 Sqm
Total qty 2013-14
Supply and fixing of Door size 0.75 x 2.00 M Single Leaf with Door Frame of
Medium Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid
bond wood block board type with commercial play on both faces, Hardware
fixtures ie., MSPC Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long
2 Nos MSPC Tower Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no,
MS Hold Fast 6 Nos including Including Labour charges for making of door, fixing
of fixtures etc., and cost and conveyance of all materials to site, taxes extra for
finished item of work.
Ground Floor
5262/C/TW, 19
04-04-2014
For Bathroom Doors
For Toilet Doors
16
2.40
7.00
5.00
Total qty 2013-14
12.00 Sqm
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand
and shade as approved by the Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered materials,
including cost and conveyance of all materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external Walls.(APSS No. 911)
317.40
7X1
5X1
5965.03
5262/C/TW, 20
04-04-2014
294427110.xls
Plaste
44858
TOILET bala
57 of 221
71580
Sl.
No.
16
DESCRIPTION OF ITEM
NO'S
D/H
Quantity UNIT
4 5
6
7
8
(1.25+
5X2
1.20)
2.40
58.80
(1.20+
7X2
1.50)
2.40
90.72
(1.20+
1X2
1.20)
2.40
11.52
12 X 1
0.75
1.95
-17.55
Deductions
12 X 1
0.60
0.30
-2.16
Total qty 2013-14
141.33 Sqm
Painting to New Internal Walls with two coats of Polymer Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand
and shade as approved by the Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered materials,
including cost and conveyance of all materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external Walls.(APSS No. 911)
Rate
Amount
2013-14
10
130.70
18472
50.76
10.53
38.34
8.91
108.54 Sqm
108.54 Sqm
130.70
TOTAL AMOUNT
14186
#REF!
5262/C/TW, 18
04-04-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
2
2
2
2
X
X
X
X
1
1
1
1
9.40
1.95
7.10
1.65
2.70
2.70
2.70
2.70
Asst. Engineer
TW: Manuguru
294427110.xls
Dy.Executive Engineer
TW : Palvancha
TOILET bala
Executive Engineer
TW : Bhadrachalam
58 of 221
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam District
Construction of Compound wall
Sl.
No.
1
1
DESCRIPTION OF ITEM
NO'S
250.00
1
1
1
1
250.00
250.00
0.60
UNIT
Rate
1
2
1
84
0.60
0.45
2
84
250
0.4
250
0.4
0.23
0.15
253.90
28564
3524.40
495619
4415.80
414246
215.15
183050
130.70
111200
0.60
0.45
1.50
1.50
750.000
100.800
850.80 Sqm
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian /
Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after thoroughly brushing the surface
to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS
No. 911)
1.50
1.50
850.80 Sqm
TOTAL AMOUNT
294427110.xls
Compound wall
Amount
2013-14
0.75
86.250
7.560
93.81 Cu.M.
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer
- in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904)
Pillers
5
Quantity
90.000
50.625
140.63 cum
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11
x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.
Pillers
4
D/H
112.500
112.50 cum
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite
stones from approved quarry including cost and conveyance of all materials like Granite
stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour charges such as cutting stones to required
size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 615)
1
1
2
3
4
5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, seigniorage charges, labour charges such as
shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as
per SS - 20 B (APSS 308). for Building Foundation
1
1232679
59 of 221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
UNIT
Rate
Asst. Engineer
PR Kothagudem
294427110.xls
Dy.Executive Engineer
PR.SD Kothagudem
Compound wall
Amount
2013-14
Executive Engineer
PR Division Kothagudem
60 of 221
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem,
Khammam District
SEPTIC TANK
DETAIL CUM ABSTRACT ESTIMATE
Sl.
No.
1
DESCRIPTION OF ITEM
NO'S
D/H
Quantity UNIT
5.85
3.70
1X1
5.85
3.70
294427110.xls
1X1
1X1
5.15 3.00
0.05
5.85 1.80
0.05
Total qty 2013-14
Amount
2013-14
10
253.90
11541
3259.09
21163
3670.06
4767
0.30
6.49
6.49 cum
6.49 cum
Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to
(1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using
40mm size HBG (SS5) metal from approved quarry including cost and conveyance
of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental,
and labour charges such as mixing, laying and ramming concrete in layers in
position not exceeding 15cm, finishing top surface, curing concrete, etc., complete
for finished item of work (APSS No. 402)
7610/B/TW, 25
19-04-2014
for septic tank Ist side
plotform
Rate
2.10
45.45
45.45 cum
45.45 cum
Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse
aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed
metal from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete
mixer including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as laying and ramming concrete in
layers in position not exceeding 15cm, finishing top surface, curing concrete, etc.,
complete for finished item of work. (APSS No. 402).
2
3
4 5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with
an initial lead of 10m including all operational, incidental, seigniorage charges,
labour charges such as shoring ,sheeting, planking, strutting, dewatering etc.
complete for finished item of work as per SS - 20 B (APSS 308). for Septic Tank
1X1
0.77
0.53
1.30 cum
61of221
Sl.
No.
4
DESCRIPTION OF ITEM
D/H
Quantity UNIT
1X1
5.85
Rate
Amount
2013-14
3.70
21.65
21.65 Sqm
21.65 Sqm
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from
approved source having minimum crushing strength of 40 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item of work.
Ground Floor
for Septic tank L/W
for septic tank C/W
NO'S
10.24
5.25
15.49 Cu.M.
3.00 0.115
1.20
0.83
Septic tank Baffle wall
1X2
X
2
1.80
0.23
1.20
1.99
for water sump L/w
2
1.34 0.23
1.20
1.48
C/w
2X2
5.85 0.23
1.50
2.02
for Taper wall on septic L/w
1X1
3.47 0.23
1.50
1.20
for Taper wall on septic L/w
1X1
7.51 Cu.M.
23.00 Cu.M.
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such
as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors. (APSS No.126)
294427110.xls
1X2
1X2
5.85
3.00
0.35
0.35
1100.40
M25 slab 1
23818
2.50
2.50
4415.80
101552
62of221
Sl.
No.
DESCRIPTION OF ITEM
NO'S
D/H
Quantity UNIT
0.300 Mts
Rate
61763.00
TOTAL AMOUNT
294427110.xls
Amount
2013-14
18529
181370
63of221
Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam
District
KITCHEN CUM DINING
DETAIL CUM ABSTRACT ESTIMATE
Sl.
No.
1
1
DESCRIPTION OF ITEM
NO'S
D/H
Quantity
2
3
4
5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with an
initial lead of 10m including all operational, incidental, seigniorage charges, labour
charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for
finished item of work as per SS - 20 B (APSS 308). for Building Foundation
UNIT
Rate
Amount
2013-14
10
7510/B/TW/PVC, 1
24-12-2013
2X7
3X1
1.50
1.50
1.50
1.50
1.50
1.50
47.25
10.13
57.38 cum
2X5
2X1
3X1
3.06
3.58
6.03
0.40
0.40
0.40
0.25
0.25
0.25
3.06
0.72
1.81
5.59 cum
1X1
1X1
3.65
6.10
0.40
0.40
0.25
0.25
0.37
0.61
0.98 cum
2X1
1.35
1.00
0.40
1.08
1.08 cum
7510/B/TW/PVC, 5
31-12-2013
7510/B/TW/PVC, 9
09-01-2013
7510/B/TW/PVC, 21
09-04-2014
253.90
16507
3524.40
1427
7510/B/TW/PVC, 22
16-05-2014
2X1
294427110.xls
1.35
K&D
1.00
0.15
0.41
0.41 cum
64of221
Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate)
using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from
approved quarry including cost and conveyance of all materials like cement, sand,
coarse aggregate, water etc. to site, mixing concrete in concrete mixer including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and
labour charges such as laying and ramming concrete in layers in position not exceeding
15cm, finishing top surface, curing concrete, etc., complete for finished item of work.
(APSS No. 402).
7510/B/TW/PVC, 2
24-12-2013
2X7
3X1
1.50
1.50
1.50
1.50
0.10
0.10
3.15
0.68
3.83 cum
2X5
2X1
3X1
3.06
3.58
6.03
0.40
0.40
0.40
0.08
0.08
0.08
0.98
0.23
0.58
1.79 cum
1X1
1X1
3.65
6.10
0.40
0.40
0.08
0.08
0.12
0.20
0.31 cum
1
1
1
1
1
6.10 10.65
6.10 3.10
2.45 6.10
2.55 3.65
3.35 3.65
0.08
0.08
0.08
0.08
0.08
5.20
1.51
1.20
0.74
0.98
9.63 cum
15.55 cum
7510/B/TW/PVC, 6
24-12-2013
7510/B/TW/PVC, 9
09-01-2013
7510/B/TW/PVC, 9
09-01-2013
X
X
X
X
X
1
1
1
1
1
#REF!
#REF!
#REF!
#REF!
Filling with useful available excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. APSS No.309 & 310
7510/B/TW/PVC, 9
09-01-2013
1
1
1
1
1
X
X
X
X
X
1
1
1
1
1
6.10 10.65
6.10 3.10
2.45 6.10
2.55 3.65
3.35 3.65
0.40
0.40
0.40
0.40
0.40
294427110.xls
K&D
25.99
7.56
5.98
3.72
4.89
48.14
48.14 cum
65of221
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding
cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the
department including centering, shuttering, laying concrete, vibrating, curing etc.
complete for Footings, Pedestals, Plinth Beam
7510/B/TW/PVC, 4
24-12-2013
FOOTINGS
7X2
3X1
1.50
1.50
1.50
1.50
0.33
0.33
10.40
2.23
12.62 Cum
7721.50
97465
3.67
3.67 Cum
8038.70
29518
7510/B/TW/PVC, 4
24-12-2013
PEDASTALS
17 X 1
0.60
0.60
0.60
7510/B/TW/PVC, 8
06-01-2014
PLINTH BEAM
2X1
3X1
14 X 1
20.95
6.10
0.07
0.23
0.23
0.23
0.30
0.30
0.30
2.89
1.26
0.07
4.22 Cum
M25 Plin
0.25
0.25 Cum
4.47 Cum
M25 Plin
43476
7510/B/TW/PVC, 11
31-01-2014
PLINTH BEAM
1X1
3.65
0.23
0.30
9719.05
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding
cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the
department including centering, shuttering, laying concrete, vibrating, curing etc.
complete for Columns
7510/B/TW/PVC, 4
24-12-2013
Columns upto GL
17 X 1
0.30
0.30
0.50
0.77
0.77 Cum
M25 Co
2.84
2.84 Cum
M25 Co
7510/B/TW/PVC, 11
31-01-2014
Columns
294427110.xls
14 X 1
0.30
K&D
0.30
2.25
66of221
7510/B/TW/PVC, 17
06-02-2014
Columns
0.30
0.30
0.45
0.57
0.57 Cum
4.17 Cum
Total qty 2013-14
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the
department including centering, shuttering, laying concrete, curing etc. complete for
Lintels
7510/B/TW/PVC, 16
07-02-2014
Lintels beam
14 X 1
2X1
1X1
21.00
3.35
0.23
0.23
9807.85
M25 Co
40869
0.20
0.20
1.93
0.15
2.09 Cum
2.09 Cum
Total qty 2013-14
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the
department including centering, shuttering, laying concrete, curing etc. complete for
Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a
width of 0.60 Mts. etc complete for finished item of work.
M25 L
9980.85
20821
7510/B/TW/PVC, 16
07-02-2014
2X1
1X1
21.00
3.35
0.60
0.60
25.20
2.01
27.21 Sqm
27.21 Sqm
Total qty 2013-14
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lapsplicing with binding wire
of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such as
overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, laour charges such as cutting, bending
placing in position, tying including sales and other taxes on all materials etc., complete
for finished item of work in all floors. (APSS No.126)
786.15
M25 Sun
21391
5271/C/TW, 3 to 4
24-12-2013
294427110.xls
K&D
67of221
1263.97 Kgs
1.264 Mts
5271/C/TW, 7
15-01-2014
510.882
0.511
344.780
0.345
2.12
Total qty 2013-14
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size
23 x 11 x 7 Cm from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of
work.
Kgs
Mts
Kgs
Mts
Mts
61763.00
130915
4415.80
88802
7510/B/TW/PVC, 18
21-04-2014
2
2
3
1
1
Deduct lintels
x
x
x
x
x
5
1
1
1
1
3 x 1
2 x 1
1 x 1
3.050
3.580
6.030
3.650
6.030
0.230
0.230
0.230
0.230
0.230
1.250
1.250
1.250
1.250
0.950
(0.00+1.
6.500 0.230 20)/2
21.000 0.230
0.200
3.350 0.230
0.200
8.77
2.06
5.20
1.05
1.32
2.69
-1.93
-0.15
19.01 Cu.M.
7510/B/TW/PVC, 22
16-05-2014
2 x 1
2 x 1
2 x 1
1.350 1.000
1.350 0.700
1.350 0.350
0.250
0.150
0.150
0.68
0.28
0.14
1.10 Cu.M.
20.11 Cu.M.
single coat
etc., to site,
operational,
curing, etc.,
7510/B/TW/PVC, 20
17-04-2014
2X1
2X1
2X1
21.00
6.50
6.50
3.50
3.50
(0.00+1.20/2)
294427110.xls
K&D
147.00
45.50
7.80
200.30 Sqm
200.30 Sqm
121.85
Plasterin
24407
68of221
10
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of
all materials like cement, screened sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour charges such as
mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves
wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven
Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904)
7510/B/TW/PVC, 20
17-04-2014
127.73
15.73
11.50
23.73
21.78
16.58
14.52
-3.29
-2.20
-17.29
-2.07
-8.40
198.30 Sqm
Supply and fixing of Door size 0.98 x 2.00 M Single Leaf with Door Frame of Medium
Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood
block board type with commercial play on both faces, Hardware fixtures ie., MSPC
Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower
Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos
including Including Labour charges for making of door, fixing of fixtures etc., and cost
and conveyance of all materials to site, taxes extra for finished item of work.
1
1
1
1
2
2
2
2
2
7
1
4
10
X
x
x
x
x
x
x
x
x
x
x
x
2
2
2
2
1
1
2
1
1
1
1
1
(13.60+6.05)
3.25
6.05
1.30
6.05
0.95
3.65
3.25
3.35
3.25
2.55
3.25
6.05
(0.00+1.20)/2
1.22
1.35
1.83
0.60
1.83
1.35
1.53
1.35
1.05
2.00
317.40
62939
8843.04
35372
1026.68
90533
7510/B/TW/PVC, 23
16-05-2014
4X1
10
4.00
4.00
Total qty 2013-14
4.00 each
Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of
size (0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC
Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per
sqm. & Jointed with neat cement to full depth including cost of all materials like cement,
sand, and water and flooring stones etc., complete, including seigniorage charges, labour
charges for dressing of flooring stones etc., complete for finished item of work, .
7510/B/TW/PVC, 24
16-05-2014
1X1
1X1
1X1
294427110.xls
6.10 10.60
6.10 2.30
2.60 3.65
Total qty 2013-14
K&D
64.66
14.03
9.49
88.18 each
69of221
10
Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished
shabad / Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length
equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry
of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white
cement paste mixed with pigment of matching shade to full depth, including cost of all
materials like tiles, cement, sand and water etc., complete including seigniorage charges,
etc., complete for finished item of work,
7510/B/TW/PVC, 25
16-05-2014
(6.10+10.60)
0.10
3.34
(6.10+2.30)
0.10
1.68
(2.60+3.65)
0.10
1.25
1.35
0.45
3.65
1.05
Deduct
0.10
-0.32
Total qty 2013-14
9.60 each
Flooring with ceramic tiles 7.3mm thick of 1st quality all shades of makes Jhonson &
Jhonson, Kajaria, Nitco and Marbonite, set over base coat of cement mortar (1:8), 12
mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
paste to full depth mixed with pigment of matching shade, including cost of all materials
like cement, sand water and tiles etc., complete, including seigniorage charges, etc.,
complete for finished item of work.
1
1
1
3
3
10
X
X
X
X
X
2
2
2
2
1
994.30
9545
869.25
16177
524.35
5280
7510/B/TW/PVC, 25
16-05-2014
6.10 3.05
18.61
Total qty 2013-14
18.61 each
Dadooing to walls with Decorated white back ground glazed tiles 200mm x 152mm 1st.
quality of any bramd as approved by Engineer - in - charge and set over a base coat of
CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed
with white cement paste mixed with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage
charges, sales and other taxes on all materials, C921 such as mixing of cement mortar,
laying in position, curing, lift charges etc., complete for finished item of work
1X1
10
7510/B/TW/PVC, 26
16-05-2014
6.10
1.65
10.07
Total qty 2013-14
10.07 each
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and
shade as approved by the Engineer - in - Charge over base coat of cement primer water
base grade -II exterior making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and
conveyance of all materials, including cost and conveyance of all materials, cost of
brushes, water to site, etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc., complete for finished item
of work in all floors for external Walls.(APSS No. 911)
1X1
10
7510/B/TW/PVC, 27
17-04-2014
1
1
1
1
294427110.xls
X
x
x
x
2
2
2
2
(13.60+6.05)
6.05
6.05
3.65
K&D
3.25
1.30
0.95
3.25
127.73
15.73
11.50
23.73
70of221
2
2
2
2
2
7
1
4
x
x
x
x
x
x
x
x
1
1
2
1
1
1
1
1
3.35
2.55
6.05
1.22
1.83
1.83
1.53
1.05
3.25
3.25
(0.00+1.20)/2
1.35
0.60
1.35
1.35
2.00
21.78
16.58
14.52
-3.29
-2.20
-17.29
-2.07
-8.40
198.30 Sqm
Painting to New Internal Walls with two coats of Polymer Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and
shade as approved by the Engineer - in - Charge over base coat of cement primer water
base grade -II exterior making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and
conveyance of all materials, including cost and conveyance of all materials, cost of
brushes, water to site, etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc., complete for finished item
of work in all floors for external Walls.(APSS No. 911)
130.70
25917
130.70
26179
166.15
4129
7510/B/TW/PVC, 28
17-04-2014
2X1
2X1
2X1
30
21.00
6.50
6.50
147.00
45.50
7.80
200.30 Sqm
Total qty 2013-14
200.30 Sqm
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first
quality all shades to give an even shade over base coatof wood Primer finishing with
putty for wood work after thouroughly brushing the surface to remove all remains
including cost and conveyance of all materials to site, sales & other taxes, all
operational, incidental and labour charges etc., complete for finished item of work.(3
coats) (APSS No. 1201 & 1212).in All Floors
2
2
7
1
X
X
X
X
1
1
1
1
3.50
3.50
(0.00+1.20/2)
1.22
1.35
1.83
0.60
1.83
1.35
1.53
1.35
Total qty 2013-14
3.29
2.20
17.29
2.07
24.85 Sqm
TOTAL AMOUNT
Asst. Engineer
TW: Manuguru
294427110.xls
Dy.Executive Engineer
TW : Palvancha
K&D
#REF!
Executive Engineer
TW : Bhadrachalam
71of221
Name of the work : Construction of Post Matric Hostel for Girls at Palvancha (V&M) in Khammam
District
WATER SUPPLY AND SANITARY ARRANAGEMENTS- KITCHEN CUM DINNING (2013-14)
TRIBAL WELFARE BUILDING
Sl.
No.
Description of Work
Amount
(Rs.)
Total Qty
Unit
Rate
3.00
Each Nos
5488.00
16464
12
Each No
1553.40
18641
TOTAL :
35105.00
294427110.xls
KD-WS
72 of 221
Name of the work : Construction of PR Division Office anf Sub Division Office in
Kothagudem, Khammam District
WATER SUPPLY AND SANITARY ARRANAGEMENTS- TOILET BLOCK (2013-14)
TRIBAL WELFARE BUILDING
Sl. No.
Description of Work
Total Qty
Unit
Rate
Amount
(Rs.)
x
x
1
1
95.00
90.00
95
90
2
1
x
x
1
1
10.00
15.00
20
15
220.00
m Rmt
386.95
85129
5.00
3.00
4.50
2.30
8.30
5.00
28.10
Each Nos
243.30
6837
Each Nos
175.00
3045
5281/C/TW, P.10
x
x
x
x
x
x
1
1
1
1
1
1
5.00
3.00
4.50
2.30
8.30
5.00
x
x
1
1
8.60
4.80
8.6
4.8
4
17.40
5281/C/TW, P.11
294427110.xls
294427110.xls
73 of 221
Sl. No.
4
Description of Work
Total Qty
Unit
Rate
Amount
(Rs.)
5281/C/TW, P.3
1
1
x
x
1
1
26.55
17.00
26.55
17
5.80
17.4
60.95
5281/C/TW, P.9
Each Nos
225.75
13759
5281/C/TW, P.4
7
3
5
x
x
x
1
1
1
7
3
5
4
19.00
Each Nos
361.45
6868
9
9.00
Each Nos
5488.00
49392
5281/C/TW, P.11
5281/C/TW, P.4
9
7
294427110.xls
294427110.xls
15
74 of 221
Sl. No.
Description of Work
Amount
(Rs.)
Total Qty
Unit
Rate
2
17.00
Each Nos
3442.80
58528
5281/C/TW, P.11
2
8
5281/C/TW, P.5
1
11 x
11
17.00
Each Nos
1553.40
26408
1
1.00
Each Nos
174.50
175
3
1
4.00
Each Nos
812.85
3251
5281/C/TW, P.6
5281/C/TW, P.7
1
10
5281/C/TW, P.8
3
1
11
x
x
1
1
294427110.xls
294427110.xls
75 of 221
Sl. No.
Description of Work
11 x
16 x
12
1
1
Amount
(Rs.)
Total Qty
Unit
Rate
11
16
33.00
Each Nos
254.90
8412
14
26
30
13.4
24.4
107.80
Rmt Nos
329.50
35520
1
1
1
1
1
x
x
x
x
x
2
2
2
2
2
7.00
13.00
15.00
6.70
12.20
TOTAL :
294427110.xls
294427110.xls
297324.00
76 of 221
Name of the work : Construction of Post Matric Hostel for Girls at Palvancha (V&M) in Khammam
District
DETAILED CUM ABSTRACT ELECTRICAL ESTIMATE
GROUND FLOOR
SL.
NO
Description of Item.
No.
Length
Qty.
Unit
Rate
per
Amount
2013-14
GROUND FLOOR
1 Supply and fixing of ISI mark 25mm dia
2.2mm thick PVC conduit pipe Sudhakar /
Macoplast / Modimake concealed in roof
slab with all required acessories including
No.14 SWG GI wire for earth continuity
including chiseling the wall wherever
necessary , including necessary masonery
work for light/fan point and seperate plug
point with teak wood deep box including
cost and conveyance of all materials to site
and labour charges, sales tax etc., complete
for finished item of work.
(SSR
2012-13, item No.1.4.1)
GROUND FLOOR
Vide page No 34 of MB No7506/B/TW Dt 4.112013
30 x
3.05
183.00
183.00
3.05
183.00
183.00
60 x
3.05
183.00
183.00
Ground Floor
First Floor
Second Floor
Dining Hall
Toilet
40
40
40
20
2
x
x
x
x
x
1
1
1
1
5
3.05
3.05
3.05
3.05
3.05
122
122
122
61
30.5
457.50
Toilet
Toilet
Toilet
9x
10 x
1
1
3.05
3.05
27.45
30.5
57.95
FIRST FLOOR
Vide page No 52 of MB No7506/B/TW Dt 20.112013
60 x
SECOND FLOOR
Vide page No 72 of MB No7506/B/TW Dt 3.12.2013
P. No. 1. 5282/C/TW
17.5.14
1064.45 Mt.
70.35 1Rmt
74884
74884.00
294427110.xls
Ele.Dor.GF bala
77
Sl.
No.
1
Description
UNIT
GF Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m
including all operational, incidental, seigniorage
charges, labour charges such as shoring ,sheeting, 1
planking, strutting, dewatering etc. complete for
finished item of work as per SS - 20 B (APSS 308).
for Building Foundation
GF Plain Cement Concrete (1:5:10) proportion (cement:
fine aggregate: Coarse aggregate) using 40mm size
Hard Broken Granite (IS383, 1970) machine crushed
metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, mixing concrete in
concrete mixer including seigniorage charges, sales &
other taxes on all materials, all operational, incidental, 1
and labour charges such as laying and ramming
concrete in layers in position not exceeding 15cm,
finishing top surface, curing concrete, etc., complete
for finished item of work (APSS No. 402) for Levelling
Course and Flooring Bed
1
Cu
m
QTY
485.00
RATE
Excess
AMOUNT
224.3
GF
108786
FF
SF
395.78
TF
TB
KD
ST
QTY
56.23
65.02
45.45
562.48
RATE
Less
Remarks
AMOUNT
253.90
142813
34027
###
1
Cu
m
69.00
3060.35
211164
#REF!
7.07
15.55
6.49
#REF!
#REF!
#REF!
#REF!
#REF!
###
3
1
Cu
m
456.00
17.7
8071
#REF!
48.14
#REF!
#REF!
#REF!
#REF!
#REF!
###
4
1
Cu
m
202.00
252.65
51035
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
5
1
Cu
m
2.30
4579.45
10533
#REF!
1.30
#REF!
#REF!
#REF!
#REF!
#REF!
###
294427110.xls
CS
78of221
Sl.
No.
6
Description
UNIT
FF Plain Cement Concrete M15 grade nominal mix
(1:2.5:5) proportion (cement: fine aggregate: Coarse
aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from
from approved quarry including cost and conveyance
of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales
& other taxes on all materials, all operational, 1
incidental and labour charges such as mixing, laying,
curing concrete, etc., complete for finished item of
work for Bed Blocks and Hold Fasts (APSS No. 402)
FIRST FLOOR
1
Cu
m
QTY
1.00
RATE
4743.3
Excess
AMOUNT
GF
4743
FF
SF
TF
TB
KD
0.76
ST
QTY
0.76
RATE
Less
Remarks
AMOUNT
5039.30
3825
918
###
7
1
Cu
m
1.00
5215.85
5216
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
5
25.54
0.41
25.94
3524.40
91426
91426
###
8
1
Cu
m
1.00
6513.6
6514
0.00
6514
##
294427110.xls
CS
79of221
Sl.
No.
9
Description
UNIT
FF Plain Cement Concrete M25 Grade of Concrete
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Steps FIRST FLOOR
1
Cu
m
QTY
1.00
RATE
6751.2
Excess
AMOUNT
GF
FF
SF
6751
TF
TB
KD
ST
QTY
0.00
RATE
Less
Remarks
AMOUNT
6751
###
10
1
Cu
m
1.00
7333.3
7333
0.00
7333
##
11
1
Cu
m
2.00
6360.9
12722
0.00
12722
##
294427110.xls
CS
80of221
Sl.
No.
12
Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Footings,
1
Cu
m
QTY
61.50
RATE
6715.25
Excess
AMOUNT
412988
GF
FF
SF
81.36
TF
TB
KD
1.94
12.62
ST
QTY
95.92
RATE
7721.50
Less
Remarks
AMOUNT
740630
327642
###
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Pedastal
1
Cu
m
8.00
6715.25
53722
12.96
3.67
16.63
8038.70
133700
79978
###
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Plinth beam
1
Cu
m
18.50
6715.25
124232
23.30
4.47
27.77
9719.05
269881
145649
###
294427110.xls
CS
81of221
Sl.
No.
13
Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Columns GROUND
FLOOR
1
Cu
m
QTY
16.00
RATE
7703
Excess
AMOUNT
123248
GF
FF
SF
18.85
TF
TB
KD
4.17
ST
QTY
23.02
RATE
Less
Remarks
AMOUNT
9807.85
225767
102519
###
14
1
Cu
m
8.00
8084.25
64674
11.59
11.59
10212.40
118382
53708
###
15
1
Cu
m
8.00
8808.65
70469
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
294427110.xls
CS
82of221
Sl.
No.
16
Description
UNIT
TF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Columns THIRD
FLOOR
1
Cu
m
QTY
1.50
RATE
9534.4
Excess
AMOUNT
GF
FF
SF
14302
TF
TB
KD
1.39
ST
QTY
1.39
RATE
11021.50
Less
Remarks
AMOUNT
15320
1018
###
17
GF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Lintels GROUND FLOOR
1
Cu
m
4.80
7772.7
37309
1.31
0.40
2.09
3.80
9980.85
37883
574
###
18
FF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Lintels FIRST FLOOR
1
Cu
m
2.00
8093.75
16188
1.73
1.73
10324.30
17809
1621
###
294427110.xls
CS
83of221
Sl.
No.
19
Description
UNIT
SF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Lintels SECOND FLOOR
1
Cu
m
QTY
2.00
RATE
8757.95
Excess
AMOUNT
GF
FF
SF
17516
4.76
TF
TB
KD
ST
QTY
4.76
RATE
10667.70
Less
Remarks
AMOUNT
50789
33273
###
20
1
Cu
m
15.00
6868.25
103024
21.88
21.88
9150.25
200207
97183
###
21
1
Cu
m
15.00
7138.35
107075
20.53
20.53
9434.50
193690
86615
###
294427110.xls
CS
84of221
Sl.
No.
22
Description
UNIT
SF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Beams SECOND
FLOOR
1
Cu
m
QTY
15.00
RATE
7753
Excess
AMOUNT
GF
116295
FF
SF
TF
20.53
TB
KD
ST
QTY
20.53
RATE
9718.75
Less
Remarks
AMOUNT
199526
83231
###
23
1
Cu
m
1.50
8367.6
12551
1.54
1.54
10003.00
15405
2854
###
24
24.36
24.36
1382.30
33673
33673
###
294427110.xls
CS
85of221
Sl.
No.
24
Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm
thick GROUND FLOOR
QTY
295.00
RATE
809.45
Excess
AMOUNT
238788
GF
FF
SF
777.68
TF
TB
41.29
KD
ST
QTY
21.65
840.61
RATE
Less
Remarks
AMOUNT
1100.40
925007
686219
###
21
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
##
25
245.00
841.2
206094
757.68
757.68
1133.85
859095
653001
###
294427110.xls
CS
86of221
Sl.
No.
26
Description
UNIT
SF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm
thick SECOND FLOOR
QTY
245.00
RATE
916.05
Excess
AMOUNT
GF
224432
FF
SF
TF
124.61
TB
KD
ST
QTY
124.61
RATE
Less
Remarks
AMOUNT
1167.35
145461
78971
###
27
19.00
990.85
18826
20.36
20.36
1200.85
24443
5617
###
24
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
294427110.xls
CS
87of221
Sl.
No.
28
Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 100mm
thick GROUND FLOOR
QTY
6.00
RATE
Excess
AMOUNT
712
GF
FF
SF
4272
TF
TB
KD
ST
QTY
RATE
0.00
Less
Remarks
AMOUNT
4272
##
25
24.36
24.36
1421.65
34631
34631
##
29
6.00
741.4
4448
0.00
4448
###
294427110.xls
CS
88of221
Sl.
No.
26
Description
UNIT
SF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 140mm
thick SECOND FLOOR
QTY
RATE
Excess
AMOUNT
GF
204.09
FF
SF
#REF!
TF
TB
KD
ST
QTY
#REF!
RATE
Less
Remarks
AMOUNT
#REF!
#REF!
#REF!
#REF!
###
26
59.86
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
30
6.00
805.25
4832
0.00
4832
##
294427110.xls
CS
89of221
Sl.
No.
31
Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 150mm
thick GROUND FLOOR
QTY
23.00
RATE
954.15
Excess
AMOUNT
GF
FF
SF
21945
TF
TB
KD
ST
QTY
0.00
RATE
Less
Remarks
AMOUNT
21945
##
32
23.00
988.25
22730
0.00
22730
###
33
23.00
1074.05
24703
0.00
24703
##
294427110.xls
CS
90of221
Sl.
No.
34
Description
UNIT
GF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with 1 Sqm
t
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Sunshades / Chajjas for
75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished
item of work GROUND FLOOR
QTY
20.00
RATE
Excess
AMOUNT
563.3
11266
GF
FF
SF
18.36
TF
TB
KD
0.72
27.21
ST
QTY
46.29
RATE
786.15
Less
Remarks
AMOUNT
36391
25125
###
35
FF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with 1 Sqm
t
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Sunshades / Chajjas for
75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished
item of work FIRST FLOOR
20.00
592
11840
40.56
40.56
816.00
33097
21257
###
36
SF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with 1 Sqm
t
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Sunshades / Chajjas for
75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished
item of work SECOND FLOOR
20.00
620.7
12414
12.60
12.60
845.85
10658
1756
###
294427110.xls
CS
91of221
Sl.
No.
37
Description
UNIT
GF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Shelves of 25mm thick
GROUND FLOOR
QTY
10.00
RATE
380.3
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
3803
QTY
RATE
0.00
Less
Remarks
AMOUNT
3803
##
38
1
Cu
m
158.00
4020.55
635247
76.85
48.69
20.11
23.00
168.65
4415.80
744710
109463
###
39
1
Cu
m
56.00
4241.55
237527
55.00
55.00
4635.05
254928
17401
###
40
1
Cu
m
56.00
4462.45
249897
58.65
58.65
4854.20
284699
34802
###
41
1
Cu
m
5.00
4683.4
23417
0.00
0.00
5149.95
23417
##
294427110.xls
CS
92of221
Sl.
No.
42
Description
UNIT
GF Reinforced Brick Masonary walls of 11.5cm in CM(1:6)
using second class bricks of size 23 x 11 x 7 Cm
having a crushing strength of not less than
35.00kg/cm2 and using two mild steel bars of 6m dia
in every third layer of brick masory, with free joints of
the main block work including cost and seignorage
10
charges and conveyance of all materials and water
from approved sources to work site and all 10 Sqm
ts
operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift
charges, curing etc. complete but excluding the cost
of steel and its fabrication charges. GROUND FLOOR
QTY
217.00
RATE
4917.55
Excess
AMOUNT
106711
GF
FF
SF
13.81
TF
TB
KD
ST
QTY
13.81
RATE
554.20
Less
Remarks
AMOUNT
7654
99057
###
43
168.00
5359.65
90042
13.81
13.81
596.55
8238
81804
###
44
168.00
5801.65
97468
14.40
14.40
596.55
8590
88878
###
45
79.00
6243.75
49326
0.00
49326
##
294427110.xls
CS
93of221
Sl.
No.
Description
UNIT
STEELG
46
STEELF
46
QTY
RATE
Excess
AMOUNT
1
MT
17.20
63293.55
1088649
1
MT
6.50
63293.55
411408
GF
FF
SF
18.00
12.00
TF
RATE
Less
Remarks
TB
KD
ST
QTY
AMOUNT
0.81
2.12
0.3
21.23
61763.00
1311222
222573
12.00
62447.00
749364
337956
###
STEELS
46
294427110.xls
1
MT
6.50
63293.55
411408
5.00
CS
5.00
63131.00
315655
95753
94of221
Sl.
No.
46
47
Description
UNIT
ST Providing High Yield Strength Deformed (HYSD) steel
EEL bars (Fe 500 grade as per IS 1786-1979) of different
T diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing
with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and
drawings, including cost and conveyance of steel
bars, including all wastages such as overlaps, 1
couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all
incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and
other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)
1
MT
QTY
0.30
634.00
RATE
Excess
AMOUNT
63293.55
18988
2755
174667
GF
FF
SF
TF
TB
KD
0.77
438.72
ST
QTY
0.77
141.33
198.30
778.35
RATE
Less
Remarks
AMOUNT
63815.00
49074
30086
317.40
247047
72380
###
48
380.00
2968.75
112813
567.46
567.46
340.80
193390
80577
###
44
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
294427110.xls
CS
95of221
Sl.
No.
49
Description
UNIT
SF Plastering 20mm thick in two coats with base coat of
16mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental
10
and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of 10 Sqm
ts
Grooves wherever necessary as directed by Engineer
- in - charge, curing, etc., for Uneven Surfaces of
Brick Wall complete for finished item of work. (APSS
901,903 & 904) SECOND FLOOR
QTY
380.00
RATE
3182.7
Excess
AMOUNT
GF
FF
120943
SF
TF
TB
500.81
KD
ST
QTY
500.81
RATE
364.25
Less
Remarks
AMOUNT
182420
61477
###
50
50.00
3396.45
16982
370.74
370.74
3808.20
1411852
1394870
###
.
42.60
42.60
196.75
8382
8382
###
51
290.00
1104.55
32032
239.47
34.35
273.82
146.10
40005
7973
###
48
350.46
350.46
238.60
83620
83620
##
294427110.xls
CS
96of221
Sl.
No.
52
Description
UNIT
FF Ceiling Plastering with CM(1:3) Prop: 12mm thick in
single coat spong finish
including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
10
other taxes on all materials, all operational, incidental 10 Sqm
charges and labour charges such as mixing mortar,
ts
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) FIRST FLOOR
QTY
240.00
RATE
1153.45
Excess
AMOUNT
GF
27683
FF
SF
TF
395.24
TB
KD
ST
QTY
395.24
RATE
154.65
Less
Remarks
AMOUNT
61124
33441
###
53
240.00
1202.35
28856
254.91
254.91
365.10
93068
64212
###
50
42.00
1275.75
5358
5358
##
50
16.00
1265.85
2025
132.61
132.61
1733.35
229860
227835
###
50
108.62
108.62
285.45
31006
31006
###
50
3.00
3011.00
9033
5.00
5.00
3486.00
17430
8397
###
294427110.xls
CS
97of221
Sl.
No.
50
Description
UNIT
TF Painting to new Wood with two coats of ready mixed
oil bound washable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making three coats in all to give an
even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered
materials including cost and conveyance of alla
materials to work site and all operational, incidental,
labour charges etc.. complete for finished item of work
as per SS911 for internal walls and ceiling.k. THITD
FLOOR
10
Sqm
ts
QTY
2.00
RATE
1295.1
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
259
259
##
50
50
10
Sqm
ts
100.00
257.65
25765
25765
##
10
Sqm
ts
42.00
1066.8
4481
4481
##
50
10
Sqm
ts
50.00
816.4
4082
370.74
370.74
92.31
34223
30141
###
54
294427110.xls
16.00
238.8
382
108.62
108.62
29.30
3183
2801
###
CS
98of221
Sl.
No.
51
Description
UNIT
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
350.46
ST
QTY
350.46
RATE
Less
Remarks
AMOUNT
215.15
75401
75401
###
55
589.00
1059.8
62422
#REF!
108.54
200.30
#REF!
#REF!
#REF!
#REF!
#REF!
###
56
380.00
1131.75
43007
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
57
0.00
1173.25
239.99
239.99
262.05
62889
62889
###
58
294427110.xls
126.00
1684.45
21224
0.00
0.00
21224
##
CS
99of221
Sl.
No.
60
Description
UNIT
GF Flooring and Treads with Polished shabad / Tandur
stone minimum 15 to 18 mm thick of size (0.254M
x0.254M) set over base coat of CM (1:8) over already
laid CC bed / RCC Roof Slab, including neat cement
slurry of honey like consistency spread @ 3.3 kgs per
sqm. & Jointed with neat cement to full depth
10
including cost of all materials like cement, sand, and 10 Sqm
water and flooring stones etc., complete, including
ts
seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of
work. GROUND FLOOR
QTY
399.00
RATE
5458.15
Excess
AMOUNT
217780
GF
FF
SF
219.47
TF
TB
KD
88.18
ST
QTY
307.65
RATE
Less
Remarks
AMOUNT
1026.68
315858
98078
###
61
250.00
5629.7
140743
395.24
395.24
1046.87
413765
273022
###
57
380.00
1203.8
45744
8.36
8.36
262.05
2191
43553
###
57
250.00
5801.3
145033
0.00
0.00
0.00
145033
##
57
20.00
6220.55
12441
0.00
0.00
0.00
12441
##
294427110.xls
CS
100of221
Sl.
No.
57
Description
UNIT
QTY
RATE
Excess
AMOUNT
GF
FF
SF
243.86
TF
TB
KD
ST
QTY
243.86
RATE
Less
Remarks
AMOUNT
369.50
90105
90105
###
57
8.00
3011.00
24088
4.00
4.00
8843.04
35372
11284
###
57
8.00
3369.00
26952
0.00
0.00
0.00
26952
##
57
20.00
4253.00
85060
20.00
20.00
6737.86
134757
49697
###
294427110.xls
CS
101of221
Sl.
No.
57
Description
UNIT
SF Painting to New External Walls with two coats of
Polymer Plastic Emulsion paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered
materials, including cost and conveyance of all
materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all
floors for external Walls.(APSS No. 911).. SECOND
FLOOR
QTY
320.00
RATE
1066.80
Excess
AMOUNT
GF
34138
FF
SF
TF
TB
KD
244.36
ST
QTY
244.36
RATE
Less
Remarks
AMOUNT
130.70
31938
2200
###
57
440.00
816.40
35922
493.88
493.88
92.31
45590
9668
###
57
62
63
240.00
238.80
5731
254.91
254.91
29.30
7469
1738
###
90.00
1295.1
11656
178.20
178.20
166.15
29608
17952
###
20.00
5829.35
11659
13.19
9.60
22.79
994.30
22660
11001
###
294427110.xls
CS
102of221
Sl.
No.
61
Description
UNIT
FF Providing Skirting to internal walls and Risers of Steps
to 15 cm height with Polished shabad / Tandur stone
minimum 15 to 18 mm thick of size (0.254M x0.254M)
length equal to flooring stones, set over base coat of
CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm
and jointed with white cement paste mixed with
pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water
etc., complete including seigniorage charges, etc.,
complete for finished item of work. FIRST FLOOR
QTY
20.00
RATE
Excess
AMOUNT
6024.95
GF
12050
FF
SF
7.94
TF
TB
KD
ST
QTY
7.94
RATE
Less
Remarks
AMOUNT
1016.75
8073
3977
###
61
8.00
3011
24088
10.00
10.00
8843.04
88430
64342
###
61
8.00
3369
26952
0.00
0.00
0.00
26952
###
61
20.00
4305
86100
11.00
11.00
6737.86
74116
11984
###
61
294427110.xls
240.00
238.8
5731
395.24
395.24
29.30
11581
5850
###
CS
103of221
Sl.
No.
61
Description
UNIT
FF Painting to new walls with two coats of ready mixed oil
bound washable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making three coats in all to give an
even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered
materials including cost and conveyance of alla
materials to work site and all operational, incidental,
labour charges etc.. complete for finished item of work
as per SS911 for internal walls and ceiling.. FIRST
FLOOR
QTY
440.00
RATE
816.4
Excess
AMOUNT
GF
35922
FF
SF
TF
TB
KD
567.46
ST
QTY
567.46
RATE
Less
Remarks
AMOUNT
92.31
52382
16460
###
61
61
90.00
1295.1
11656
0.00
11656
###
320.00
1066.8
34138
350.46
350.46
130.70
45805
11667
###
63
12.00
3011
36132
7.00
4.00
11.00
8843.04
97273
61141
###
294427110.xls
CS
104of221
Sl.
No.
63
Description
UNIT
GF Supply and fixing of Window of Size 0.90 x 1.22 M
shutter with window frame of Medium Teak wood of
Section 100 mm x 75 mm and shutter frame 3
verticals of Medium Teak wood of section 100mm x
32 mm thick and BISON PANEL CEMENT BONDED
PARTICLE BOARD CONFORMING TO IS 14276 and
safety bars of 10 mm square bars at 100mm center
to center distance horizantally and Hardware fixtures
ie., MSPC Butt Hinges 100mm Long 12nos, MSPC
Handles 125 mm Long 6 Nos MSPC Tower Bolt ###
150mm long 6 Nos, MS Hold Fast 4 Nos Including
Labour charges for making Window frame and
shutter, fixing of Fixtures etc., and cost and
conveyance of all materials to site, taxes extra
complete for finished item of work.. GROUND FLOOR
QTY
20.00
RATE
4253
Excess
AMOUNT
85060
GF
FF
SF
TF
TB
KD
11.00
ST
QTY
11.00
RATE
Less
Remarks
AMOUNT
6737.86
74116
10944
###
63
33.00
3369.00
111177
2.00
12.00
14.00
5965.03
83510
27667
###
63
4.00
4.00
1783.95
7136
7136
###
63
25.00
1143.00
28575
0.00
0.00
0.00
28575
##
63
64.00
7873.55
50391
#REF!
18.61
#REF!
#REF!
#REF!
#REF!
#REF!
###
294427110.xls
CS
105of221
Sl.
No.
63
Description
UNIT
GF Dadooing to walls with Decorated white back ground
glazed tiles 200mm x 152mm 1st. quality of any
bramd as approved by Engineer - in - charge and set
over a base coat of CM (1:5), 12mm thick and neat
cement paste at the rate of 3.3 Kg/Sqmt. and jointed
with white cement paste mixed with pigment of
matching shade including cost and conveyance of all
materials like cement, sand, water, tiles, etc. to site, ###
seigniorage charges, sales and other taxes on all
materials, C921 such as mixing of cement mortar,
laying in position, curing, lift charges etc., complete for
finished item of work . GROUND FLOOR
QTY
153.00
RATE
9077.75
Excess
AMOUNT
138890
GF
FF
SF
TF
TB
#REF!
KD
10.07
ST
QTY
#REF!
RATE
Less
Remarks
AMOUNT
#REF!
#REF!
#REF!
#REF!
###
63
63
533.00
238.80
12728
239.47
239.47
29.30
7016
5712
###
535.00
816.40
43677
438.72
438.72
92.31
40498
3179
###
63
108.54
200.30
308.84
130.70
40365
40365
###
63
294427110.xls
165.00
1295
21368
21368
##
CS
106of221
Sl.
No.
63
66
Description
UNIT
GF Painting to New Iron work with two coats of ready
mixed synthetic enamel paint first quality all shades
to give an even shade over base coatof wood Primer
finishing with putty for wood work after thouroughly
brushing the surface to remove all remains including
cost and conveyance of all materials to site, sales &
other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3
coats) (APSS No. 1201 & 1212).in All Floors .
GROUND FLOOR
GF Painting to New External Walls with two coats of
Polymer Plastic Emulsion paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered
10
materials, including cost and conveyance of all 10 Sqm
materials, including cost and conveyance of all
ts
materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all
floors for external Walls.(APSS No. 911) . GROUND
FLOOR
QTY
21.00
RATE
723.60
Excess
AMOUNT
GF
FF
SF
TF
TB
1520
KD
24.85
ST
QTY
24.85
RATE
166.15
Less
Remarks
AMOUNT
4129
2609
###
574.00
1066.8
61234
350.46
141.33
198.30
690.09
130.70
90194
28960
###
67 ALL Dadooing to walls with Decorated white back ground
glazed tiles 200mm x 152mm 1st. quality of any
bramd as approved by Engineer - in - charge and set
over a base coat of CM (1:5), 12mm thick and neat
cement paste at the rate of 3.3 Kg/Sqmt. and jointed
with white cement paste mixed with pigment of
10
matching shade including cost and conveyance of all
materials like cement, sand, water, tiles, etc. to site, 10 Sqm
ts
seigniorage charges, sales and other taxes on all
materials, C921 such as mixing of cement mortar,
laying in position, curing, lift charges etc., complete for
finished item of work. ALL FLOORS
69 ALL White washing two coats with paint grade white lime
for wash or equivalent quality to give an even shade
after thoroughly brushing the surface to remove all dirt
10
and remains of loose powdered materials including
cost of all materials, labour charges and incidental 10 Sqm
ts
such as scaffolding, lift charges etc., complete for
finished item of work in all floors for walls
294427110.xls
9136.25
0.00
837.9
0.00
247.2
0.00
CS
279.10
107of221
Sl.
No.
Description
UNIT
294427110.xls
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
1099.9
0.00
1240.45
3023
0.00
3486.00
3380
0.00
3786.00
4266
0.00
4681.00
CS
108of221
Sl.
No.
Description
UNIT
76 ALL Supply and fixing of 110mm dia ISI mark PVC rain
water spouts of 2.5mm thick including
cost of
necessary PVC bends, shoes and pipe clips and all
other accessories and fixing in position including cost
and conveyance of all materials to site sales and
other taxes on all materials, all operational, incidental
and labour charges for laying, fixing and
1
commissioning the PVC pipes including couplers/ 1
Rmt
bends/ tees etc any diameter including fixing
necessary fittings like bends, plugs, couplers,
junctions, tees, etc with solvent jointing as per
standard practicesuch as fixing in alignment etc.,
complete for finished item of work. (APSS NO. 1328)
294427110.xls
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
QTY
743.35
0.00
1329.2
0.00
257.65
1143
CS
RATE
Less
Remarks
AMOUNT
0.00
0.00
1481.50
109of221
Sl.
No.
Description
KD-WS
UNIT
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
3.00
ST
QTY
3.00
RATE
5488.00
Less
Remarks
AMOUNT
16464
16464
KD-WS
###
Supplying & Fixing Orissa Pan 580 mm x 440 mm
white glazed W.C 1st quality ISI marked conforming to
IS:2556-Part-3-1981 with "P" or "S" trap Hindware/
Parryware/ Neycer - ISI mark 580 mm x 440mm as
approved by the Engineer-in-charge fixed in brick
masonry with necessary S trap of water closet, shall
be encased in C.C. (1:2:4) 6" alround well above the 1 Eac
h
joint, to stop leakage at the joint, cost & conveyance
of all materials and labour charges etc., including
sales and other taxes on all materials complete for
finished item of work for all floors
12
12.00
1553.40
18641
18641
TB-WS
TB-WS
TB-WS
###
Supplying, laying, jointing and testing 152.4 mm SWG
pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1:5:1 prop. including
excavation of trenches and socket pits in any soil
(except rock requiring blasting) upto 914.4 mm (3'0")
depth and refilling with watering and tamping including 1 Rmt
cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S.No. 1301
& 1318)
Supplying, laying, jointing and testing 101.6 mm SWG
pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1:5:1 prop. including
excavation of trenches and socket pits in any soil
(except rock requiring blasting) upto 914.4 mm (3'0")
Eac
depth and refilling with watering and tamping including 1
h
cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S.No. 1301
& 1318)
Supplying, laying, jointing and testing 63 mm SWG
pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1:5:1 prop. including
excavation of trenches and socket pits in any soil
(except rock requiring blasting) upto 914.4 mm (3'0")
Eac
depth and refilling with watering and tamping including 1
h
cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S.No. 1301
& 1318)
294427110.xls
10.00
363.7
3637
220.00
220.00
386.95
85129
81492
###
40.00
220
8800
28.10
28.10
243.30
6837
1963
###
17.40
17.40
175.00
3045
3045
###
CS
110of221
Sl.
No.
TB-WS
UNIT
TB-WS
Description
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
60.95
KD
ST
QTY
60.95
RATE
225.75
Less
Remarks
AMOUNT
13759
13759
###
16.00
318.1
5090
19.00
19.00
361.45
6868
1778
TB-WS
###
Constructing 904.0 mm (30) dia brick masonry
inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a
minimum crushing strength of 5 N/sq.mm including
plastering with cement mortar 1:3 prop; thick both
inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a
depth of 904 mm (3'-0") in all sorts of soils (exculding
rock) and laying cement conrete (1:4:8) 150 mm thick
using 40 mm HBG Metal and P.C.C. 1:2:4 benching
Eac
and channel 100 mm thick as per Standard 1
h
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site,
cost of seigniorage charges on all materials and all
incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges,
curing etc., complete for finished item of work as per
Standard specification.
3.00
4669.5
14009
9.00
9.00
5488.00
49392
35383
TB-WS
###
Supplying and fixing 150.00mmx100.00mm SWG
gully trap 1st class confirming to ISI 651 & 4127with
CI grating and constructing single brick masonry wall
chamber of size 20" x 14" x 12 in CM (1:6) prop.
Over a CC (1:5:10)prop. bed, and plastering 12mm
thk. in CM (1:4) prop. both inside and outside
surfaces and fitted with 304.8MM X 288.6 MM
(12"X9") CI frame and hinged cover including labour 1 Eac
h
for fixing and laying the SWG junctions/plugs/bends
with air tightcement joints etc., complete including
cost and conveyance of all materials to site, labour
charges etc., complete for finished item of work as
directed by Engineer-in-charge.
2.00
604.2
1208
1208
TB-WS
##
Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick
in CM (1:6) prop. Masonry inspection chamber upto
914.4mm (3'-0") and fitted with light weight 457.2mm
x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg.,
Eac
including cost and convenyance of all materials to 1
h
site, all labour charges, sales and otehr taxes on all
materials etc., complete for finished item of work
17.00
17.00
3442.80
58528
58528
###
294427110.xls
CS
111of221
Sl.
No.
UNIT
TB-WS
Description
Supplying and fixing 580 mm x 440 mm long Orissa
pan white glazed Water Closet 1st qualityISI marked
confirming to IS:2556-Part-3-1981 with "P" or "S" trap
Hindware / Parryware / Neycer with brick masonry
seat, CC squatting plate and fixing 12.70mm dia NP
Push cock 1st quality , P trap or S trap of Indian W.C.
Eac
1
shall be encased on CC (1:2:4) 150mm alround well
h
above the joint to stop leakage at the joint etc.,
complete including cost and conveyance of all
materials to site, cost of CC bed, labour charges and
seigniorage charg
QTY
6.00
RATE
Excess
AMOUNT
1487.7
GF
FF
SF
8926
TF
TB
17.00
KD
ST
QTY
17.00
RATE
1553.40
Less
Remarks
AMOUNT
26408
17482
TB-WS
###
2.00
3593.3
7187
1.00
1.00
174.50
175
7012
10
TB-WS
###
Supplying & Fixing 550 x 400 mm Indian make Flat
Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st
quality conforming to IS:2556-Part-4:1972 with waste
fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
single Chromium Plated Pillar Tap of 1st quality Indian
make 400 grams Seiko/ Esso/Nice/Senior or
equivalent complete with standard CI brackets
Eac
including wooden block, 12.7mm PVC connection with
1
h
Brass union nut CP coated, 12.7mm dia first qualifty
NP angle stop cock, 38.1mm CP waste coupling ,
31.75mm dia PVC flexible waste pipe of 914.4mm
length of first quality including cost and conveyance
of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished
item of work. for All Floors (.BMW-G.08)
8.00
2321.05
18568
4.00
4.00
812.85
3251
15317
11
8.00
8.00
TB-WS
10
TB-WS
10
16.00
TB-WS
10
TB-WS
###
Supplying and fixing NP soap dish heavy type of
approved make ISI quality with NP screws etc.,
complete including cost and conveyance of all
Eac
materials, labour charges for fixing etc., complete for 1
h
finished item of work in all floors as per ssr item no
598
234.8
3757
3757
##
496
3968
3968
##
158.5
1268
1268
##
12.00
249.7
2996
33.00
33.00
254.90
8412
5416
0
###
294427110.xls
CS
112of221
Sl.
No.
UNIT
TB-WS
11
Description
Supplying and fixing NP bib taps of size 12.70mm dia
of Indian make Seiko or equivalent including cost and
conveyance of all materials, labour charges etc., 1 Eac
h
complete for finished item of work in all floors.
QTY
12.00
RATE
393.3
Excess
AMOUNT
GF
FF
SF
4720
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
4720
11
TB-WS
##
Supplying & fixing GI pipe Medium Grade properties
& weight as per IS 1239 ISI mark with GI fittings in
ground or on wall including cost of tees, elbows,
bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all
types of soils except rock requiring blasting, refilling,
chiselling masonry walls and making good the walls & 1 Eac
h
floors to the original surface and fixing MS clamps on
TW blocks on walls including cost and conveyance of
all materials and labour charges complete for finished
item of work.(15mm Dia)
44.00
172.2
7577
7577
11
TB-WS
##
Supplying & fixing GI pipe Medium Grade properties
& weight as per IS 1239 ISI mark with GI fittings in
ground or on wall including cost of tees, elbows,
bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all
types of soils except rock requiring blasting, refilling,
chiselling masonry walls and making good the walls & 1 Eac
h
floors to the original surface and fixing MS clamps on
TW blocks on walls including cost and conveyance of
all materials and labour charges complete for finished
item of work.(20mm Dia)
24.00
191.6
4598
4598
11
TB-WS
##
Supplying & fixing GI pipe Medium Grade properties
& weight as per IS 1239 ISI mark with GI fittings in
ground or on wall including cost of tees, elbows,
bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all
types of soils except rock requiring blasting, refilling,
chiselling masonry walls and making good the walls & 1 Eac
h
floors to the original surface and fixing MS clamps on
TW blocks on walls including cost and conveyance of
all materials and labour charges complete for finished
item of work.(25mm Dia)
32.00
250.82
8026
8026
11
TB-WS
##
Supplying & fixing GI pipe Medium Grade properties
& weight as per IS 1239 ISI mark with GI fittings in
ground or on wall including cost of tees, elbows,
bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all
types of soils except rock requiring blasting, refilling,
chiselling masonry walls and making good the walls & 1 Eac
h
floors to the original surface and fixing MS clamps on
TW blocks on walls including cost and conveyance of
all materials and labour charges complete for finished
item of work.(32mm Dia)
4.00
352.3
1409
1409
11
TB-WS
##
Supplying and fixing Gunmetal Gate ( GM peet ) valve
as per IS-778 Class - I , Indian make heavy type
including cost and conveyance of all materials , labour 1 Eac
h
charges etc. complete for finished item of work.
4.00
695.4
2782
2782
##
294427110.xls
CS
113of221
Sl.
No.
TB-WS
UNIT
TB-WS
11
11
Description
Providing and placing on terrace (at all floor levels)
polyetheylene water storage tank with double layer
approved brand and manufacture with cover and
suitable locking arrangement and making necessary
holes for inlet and outlets and over flow pipes but 1 Eac
h
without fittings and base support for tanks including
cost and conveyance of all materials and labour
charges for placing and fixing in position as directed
by Engineer-in-Charge.
Supply and fixing of stainless steel sink with drain
board of size 914.4 mm x 457.2 mm 1 mm thick of
indian make on cantilever brackets including 32 mm
CP waste coupling including supply & fixing of 31.75
mm dia PVC flexible waste pipe of 914.4 mm length
of 1st quality, chasing brick masonry wall and making
Eac
1
good after construction i.e., restoring to original
h
srufaces etc., complete including cost and
conveyance of all materials and labour charges for all
operations etc., complete for finished item of work in
all floors
QTY
3000.00
RATE
Excess
AMOUNT
5.7
GF
FF
SF
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
17100
17100
##
1.00
5237
5237
5237
Elec
12
TB-WS
##
Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard
or equivalent CPVC Pipes and Fittings to meet the
requirement of ASTM-D 2846 and are produced in
CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad
Eac
Flowgurard SDR 11 and SDR 13.5 pipes are made 1
h
from idential CPVC compounds having the same
physical Properties for Hot and Cold Water (IS
15778:2007
Supply and fixing of ISI mark 25mm dia 2.2mm thick
PVC conduit pipe Sudhakar / Macoplast / Modimake
concealed in roof slab with all required acessories
including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary ,
including necessary masonery work for light/fan point
1 Rmt
and seperate plug point with teak wood deep box
including cost and conveyance of all materials to site
and labour charges, sales tax etc., complete for
finished item of work.
(SSR 2012-13,
item No.1.4.1)
107.80
107.80
329.50
35520
35520
###
755.00
59.78
45134 1064.45
1064.45
70.35
74884
29750
Elec
Elec
###
Supply and Fixing of 25mm dia 1.5mm thick P.V.C.
pipe (ISI MARK) concealed in wall with all required
accessories including masonary work for light, fan and
separate plug point with well seasoned TW box 1 Rmt
including all labour charges etc., complete. Make :
Sudhakar/ Maco Plast / Modi
Supplying and wiring with 2 runs of 14/0.3m (1.00
Sq.mm) FRLS / HFFR P.V.C. insulated ISI Copper
Cable
GM/L&T/RPG/Havells/V-Guard/Power
Flex/Polycab/Gold Medal/ Standard /Milion / Vimal/
Suncab/ Paragaon / FortuneArt make in the existing
metallic / non-metallic conduct pipe with 6A 1 Way
flush type switch, Ceiling rose and 3mm thick hylam
sheet covering to switch control box including cost
and conveyance of all materials to site, labour 1 Rmt
charges and sales tax etc. complete for finished item
of work for light, bell, fan and exhaust fan points in
Non-Residential Buildings
(SSR-2012-13, item No. 2.1.1)ing cost and
conveyance of all materials to site, labour charges
and sales tax etc. complete for finished item of work
535.00
70.24
37578
0.00
37578
##
197.00
357.96
70518
0.00
349.20
70518
##
294427110.xls
CS
114of221
Sl.
No.
UNIT
Elec
Description
Supply and fixing of 6A 3 pin wall plug socket with 6A
switch control on a common switch board with earth
continuity including wire leads, earth connections
Eac
1
along with all labour charges etc., complete.
h
Makes : Anchor / Gold Medal Olive /Million Zoom
QTY
32.00
RATE
Excess
AMOUNT
100.18
GF
3206
FF
SF
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
3206
Elec
##
Supply and Fixing of 16A 3pin and 6A 3pin plug
socket with and 16A switch control duly recessed in
wall with MS switch deep box of 6" x8" x2 1/2" size
covered with hylam sheet including earth connections
Eac
1
and all labour charges etc., complete. Plug Socket.
h
Makes : Gold Medal / ANCHOR/ OLIVE/Million
ZOOM.
2.00
332.08
664
664
Elec
62.00
9.00
Elec
Elec
##
Supply and fixing of batten holder / slanting holder in
lieu of ceiling rose of light point complete with all
connections and all labour charges with 40W bulb (for 1 Eac
h
new installation).
Makes : Gold Medal /Million / Vimal
71.82
4453
4453
##
2863.91
25775
25775
##
1.00
5662
5662
5662
Elec
##
Supply and 2 runs of 2.5 sq mm PVC insulated
flexible copper cable and 1 run of 2.5 sq.mm flexible
PVC insulated copper cable for earthing in the
existing conduit pipe for power point including labour 1 Rmt
charges for 16A sockets. Make: Finolex / L&T
150.00
74.73
11210
11210
Elec
Elec
4.00
Elec
91.00
2.00
Elec
1.00
Elec
##
Supply, Transportation and fixing of 4' - 40 Watt box
type flourescent single Tube Light fitting with Energy
saving electronic ballast, consuming 28 W suitable
Eac
for 40 Watt tube on varnished teak wood round blocks 1
h
with flexible 3 core wire etc.,, complet Makes :
Chowk: Trinic , tube : Philips / crompton
10.00
294427110.xls
448
40768
40768
##
2593.5
10374
10374
##
3314.72
6629
6629
##
1838.42
1838
1838
##
2035.38
20354
20354
##
CS
115of221
Sl.
No.
UNIT
Elec
Description
Supply of 1x40W Flood light fitting comprising canopy
of sheet Aluminium in stove enamel finish with copper
/ VPIT ballast, capacitor, tube and starter etc.,
Eac
complete. Makes: Phillips / GE / Wipro /Thornes tax 1
h
etc. complete for finished item of work
QTY
1.00
RATE
Excess
AMOUNT
7894.61
GF
FF
SF
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
7895
7895
##
79
80
81
294427110.xls
0.00
220
0.00
363.7
0.00
4669.5
0.00
604.2
0.00
CS
5698.90
116of221
Sl.
No.
82
83
84
85
86
87
Description
UNIT
Supplying & fixing CI Nahani traps 1st quality ISI
marked conforming to IS:1729-1979 with C.P. Grating
fixing with white cement as per site requirements with
standard practice 100 mm dia Inlet- 75 mm (3") outlet
pipe - 4 Kgs with N.P. Cover for all floors, including
Eac
cost and conveyance of all materials to site, all labour 1
h
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (APSS No 1326)
for All Floors.
294427110.xls
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
318.1
0.00
3593.3
0.00
2321.05
0.00
234.8
0.00
496
0.00
158.5
0.00
CS
258.80
174.50
117of221
Sl.
No.
88
89
90
91
92
Description
UNIT
Supplying & Fixing 12.7mm N.P bib tap Indian make
300 grams Seiko / Nice/ Senior or equivalent including
cost and conveyance of all materials to site, all labour
Eac
charges, sales and other taxes on all materials etc., 1
h
complete for finished item of work for All Floors.
Supplying & Fixing 12.7mm N.P bib tap Indian make
400 grams Seiko / Nice/ Senior or equivalent including
cost and conveyance of all materials to site, all labour
Eac
charges, sales and other taxes on all materials etc., 1
h
complete for finished item of work for All Floors.
Supplying & fixing 15mm nominal bore GI pipe
Medium Grade properties & weight as per IS 1239 ISI
mark in ground or on wall including cost of tees,
elbows, bends, reducers, couplings, running joints,
union flanges, unions etc. with necessary excavation
in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the
1
walls & floors to the original surface and fixing MS 1 Rmt
clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished
item of work.
294427110.xls
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
QTY
249.7
0.00
393.3
172.2
RATE
Remarks
0.00
0.00
191.6
0.00
250.8
0.00
CS
274.75
Less
AMOUNT
118of221
Sl.
No.
93
94
95
96
97
Description
UNIT
Supplying & fixing 32mm nominal bore GI pipe
Medium Grade properties & weight as per IS 1239 ISI
mark in ground or on wall including cost of tees,
elbows, bends, reducers, couplings, running joints,
union flanges, unions etc. with necessary excavation
in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the
1
walls & floors to the original surface and fixing MS 1 Rmt
clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished
item of work.
294427110.xls
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
352.3
0.00
695.4
0.00
5.7
0.00
1487.7
0.00
5237.2
0.00
0.00
1635.90
163.00
0.00
CS
85.00
119of221
Sl.
No.
Description
UNIT
QTY
RATE
99
100
101
102
103
294427110.xls
Excess
AMOUNT
GF
FF
SF
59.78
0 1064.45
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
0.00
90.00
1064.45
70.35
74884
74884
59.80
59
0.00
70.24
0.00
357.96
0.00
357.96
100.18
0.00
100.20
71.82
0.00
71.85
CS
120of221
Sl.
No.
104
105
106
107
108
109
Description
UNIT
Supply and fixing of 8 way SPN type distribution
board with IP-20 protection of make Standard /
Havells /HPL / Toyoma suitable for single phase 40A
DP isolator and 6 Nos. 6-32 A MCB's make Standard /
Havells / HPL / Toyoma / C &S as out going with 1 Eac
h
internal connections including cost and conveyance of
all materials to site, labour charges for surface / flush
mounting etc., sales tax complete for finished item of
work.
Supply and fixing 4 way TPN Distribution board
horizontal with IP-20 protection of make Standard /
Havells / HPL/Toyoma/ C &S suitable for three phase
63A Four pole Isolator of make Standard / Havells /
HPL/Toyoma/ C &S as incomer and 10kA single pole
miniature circuit breakers twelve numbers(12Nos ) as
Eac
1
out going with internal connections including cost and
h
conveyance of all materials to site, labour charges for
surface / flush mounting etc., sales tax complete for
finished item of work.
294427110.xls
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
QTY
2863.91
0.00
5662
0.00
74.73
0.00
448
0.00
2593.5
0.00
7894.61
0.00
CS
RATE
Less
Remarks
AMOUNT
2863.95
74.75
2593.5
121of221
Sl.
No.
110
111
112
113
Description
UNIT
Supply and fixing of 16A 3pin / 6A 3pin plug socket
with indicator lamp and 16Amps fuse unit and 16
Amps switch control (5 in one) of Milltec / Vimal opel /
Maru mantero / Starex smil / CPL make with ISI mark
duly recessed in wall with wooden deep box of 8" X 6"
Eac
X 2 1/2" size covered with hylam sheet including 1
h
earth continuity including cost and conveyance of all
materials to site, labour charges and sales tax etc.
complete for finished item of work
294427110.xls
QTY
RATE
Excess
AMOUNT
GF
FF
SF
TF
TB
KD
ST
QTY
332.08
0.00
2035.38
0.00
1838.42
3314.72
RATE
Less
Remarks
AMOUNT
0.00
0.00
0.00
CS
2035.40
2205.00
122of221
Sl.
No.
Description
UNIT
QTY
RATE
Excess
AMOUNT
TO
TOTAL ::
GF
FF
SF
TF
TB
KD
ST
QTY
RATE
Less
Remarks
AMOUNT
0.00
1248.30
0.00
110.50
#REF!
#REF!
#REF!
8676213
S
U
B
T
O
T
A
L
###
###
STEEL
Sanctioned Estimate ::
Working Estimate ::
#REF!
Difference ::
#REF!
Asst. Engineer
TW: Manuguru
294427110.xls
8676213
Excess ::
#REF!
###
Less ::
#REF!
###
#REF!
###
Dy.Executive Engineer
TW : Palvancha
Executive Engineer
TW : Bhadrachalam
CS
Executive Engineer
TW : Bhadrachalam
123of221
LEAD CHART
Construction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam District
RATES AS PER COMMON SSR OF 2013-14 with cement and steel rates of
Lead in KM
Sl. No.
(1)
1
Description
Avg.
SSR Sl.No. Thickness
in mm
Total
Convence
Charges
Initial Cost
including
Add
Stacking
Differenc in 1% towards Loading
Charges
Seigniostorage
charges
wherever rage Charges
necesssary
Area
allowence on
unloading loading &
charges
unloading
charges @
25 %
Total
Unit per
MR
CT
(5)
Bhadrachalam
(6)
39.00
(7)
0.00
(8)
39.00
(9)
412.28
(10)
385.00
(11)
45.00
(12)
0.00
(13)
0.00
(14)
7.60
(15)
1.90
(16)
851.78
(17)
Cum.
(2)
Sand for Mortar
(3)
M-005
M-004
Bhadrachalam
39.00
0.00
39.00
412.28
285.00
45.00
0.00
0.00
7.60
1.90
751.78
Cum.
M-006
Bhadrachalam
39.00
0.00
39.00
412.28
505.00
45.00
0.00
0.00
7.60
1.90
971.78
Cum.
Gravel
M-008
Local
10.00
0.00
10.00
122.81
98.00
22.00
0.00
15.20
7.60
1.90
267.51
Cum.
R.R. Stone(Granite,
Dolamite &Trap variety)
M-148
Thoggudem
21.00
0.00
21.00
238.60
245.00
50.00
0.00
30.35
15.17
3.79
582.91
Cum.
C.R. Stone(Granite,
Dolamite &Trap variety)
CSSR-A.14
Thoggudem
21.00
0.00
21.00
238.60
407.41
50.00
0.00
30.35
15.17
3.79
745.32
Cum.
CSSR-A.76
Thoggudem
21.00
0.00
21.00
238.60
933.33
50.00
0.00
30.35
15.17
3.79
1271.24
Cum.
Thoggudem
21.00
0.00
21.00
238.60
805.00
50.00
0.00
0.00
0.00
0.00
1093.60
Cum.
Thoggudem
21.00
0.00
21.00
238.60
1300.00
50.00
0.00
0.00
0.00
0.00
1588.60
Cum.
Thoggudem
21.00
0.00
21.00
238.60
1045.00
50.00
0.00
0.00
0.00
0.00
1333.60
Cum.
Thoggudem
21.00
0.00
21.00
238.60
890.00
50.00
0.00
0.00
0.00
0.00
1178.60
Cum.
Thoggudem
21.00
0.00
21.00
238.60
700.00
50.00
0.00
0.00
0.00
0.00
988.60
Cum.
Gondigudem
40.00
0.00
40.00
673.95
3707.00
0.00
0.00
41.72
41.72
10.43
4474.82
1000 Nos
Local
1.00
0.00
1.00
96.72
10000.00
0.00
0.00
95.64
95.64
23.91
10311.92
1000 Nos
Local
1.00
0.00
1.00
217.62
19000.00
0.00
0.00
215.20
215.20
53.80
19701.81
1000 Nos
Bethamcherla
400.00
0.00
400.00
257.30
257.30
7.00
0.00
0.76
0.38
0.09
522.83
1Sqm.
Thandur
400.00
0.00
400.00
210.41
90.00
4.00
0.00
1.21
0.61
0.15
306.38
1Sqm.
8
9
10
11
12
13
(4)
Source of Material
14
15
16
17
LEAD
BMT-b08
BMT-B.01
Rough Kadapa slabs of
minimum 40 mm thick, size
not less than (0.457 x 457M)
2.29249
25
40
124
Lead in KM
Sl. No.
Description
Avg.
SSR Sl.No. Thickness
in mm
18
18
BMT-B.11
17
19
20
water
21
Cement
22
Source of Material
MR
CT
Total
Convence
Charges
Initial Cost
including
Add
Stacking
Differenc in 1% towards Loading
Charges
Seigniostorage
charges
wherever rage Charges
necesssary
Local
1.00
0.00
1.00
0.67
681.00
0.00
0.00
Local
5.00
0.00
5.00
1.76
2033.00
0.00
M-189
Local
0.50
0.00
0.50
0.00
100.00
CSSR-A.05
At Site
0.00
0.00
0.00
0.00
4500.00
0.00
0.00
36.89
M-126
At Site
0.00
0.00
0.00
0.00
44000.00
0.00
0.00
23
CSSR-A.62
At Site
0.00
0.00
0.00
0.00
44000.00
0.00
24
CSSR-A.68
At Site
0.00
0.00
0.00
0.00
44500.00
25
M.S. Plates
CSSR-A.69
At Site
0.00
0.00
0.00
0.00
43000.00
Area
allowence on
unloading loading &
charges
unloading
charges @
25 %
Total
Unit per
0.55
0.27
0.07
682.56
1Sqm.
0.52
0.26
0.06
2035.59
1Sqm.
0.00
100.00
KL
7.38
1.85
4546.12
M.T
0.00
0.00
0.00
44000.00
M.T
0.00
44.23
8.84
2.21
44055.29
M.T
0.00
0.00
0.00
0.00
0.00
44500.00
M.T
0.00
0.00
0.00
0.00
0.00
43000.00
M.T
CERTIFICATES:1 Certified that the above leads are true and correct to the best of my knowledge
2 Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal
3 Certified that the 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing
4 Certified that the work site does not falls within 12 Kms belt of any municipality/ Corporation Limits and hence no extra allowence is required
AEE/AE
TW/ Gundala
LEAD
Executive Engineer
TW/Division/ Bhadrachalam
125
DATA
Construction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam District
Overheads
14%
COMMON STANDARD SCHEDULE OF RATES FOR THE YEAR 2013-14
25%
Sl.No
Description
LABOUR CHARGES
SSR
Initial Final Rate
Sl.No.
Rate
Unit
1.05 Cum
720 Kgs
971.78
4546.12
1 Cum
1000 Kgs
1020.37
3273.21
0.20 Nos
25%
280.00
56.00
1 Day
56.00
14.00
4363.58
1.05 Cum
480 Kgs
971.78
4546.12
1 Cum
1000 Kgs
1020.37
2182.14
0.20 Nos
25%
280.00
56.00
1 Day
56.00
14.00
3272.51
1.05 Cum
360 Kgs
971.78
4546.12
1 Cum
1000 Kgs
1020.37
1636.60
0.20 Nos
25%
280.00
56.00
1 Day
56.00
14.00
2726.97
1.05 Cum
288 Kgs
971.78
4546.12
1 Cum
1000 Kgs
1020.37
1309.28
0.20 Nos
25%
280.00
56.00
1 Day
56.00
14.00
2399.65
1.05 Cum
240 Kgs
971.78
4546.12
1 Cum
1000 Kgs
1020.37
1091.07
0.20 Nos
25%
280.00
56.00
1 Day
56.00
14.00
2181.44
1.05 Cum
180 Kgs
971.78
4546.12
1 Cum
1000 Kgs
1020.37
818.30
0.20 Nos
25%
280.00
56.00
1 Day
56.00
14.00
1908.67
Page 126
C-data
0.6
0.15
0.15
0.10
Cum
Cum
Cum
Cum
1588.60
1333.60
1178.60
988.60
1
1
1
1
Description of machinery
Units
Cum
Cum
Cum
Cum
953.16
200.04
176.79
98.86
Total
1428.85
total
0.364
25%
1
1
200.36
Nos
cu.m.
cum
cu.m.
280.00
101.92
76.440
22.00
0.14
0.364
1
1
246.22
Nos
cu.m.
cum
cu.m.
280.00
122.304
22.00
0.14
1 Day
1 cu.m.
1 cum
1 cu.m.
Total
1
1
1
1
Day
cu.m.
cum
cu.m.
Total
101.92
25.48
76.44
22.00
28.05
253.90
101.92
122.30
22.00
34.47
280.70
C) Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey
Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour
charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour
charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc.,
complete for Septic tank soak pit and sump.(APSS No. 308)
Light Mazdoor
Add Agency area allowence
add seigniorage charges
0.364 nos
25%
1 cum
280.00
1 nos
101.92
101.92
22.00
25.48
1 cum
22.00
149.40
149.40
Page 127
0.14
20.92
C-data
Total
170.35
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including
cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
Light Mazdoor
0.052 Nos
280.00
1 Nos
14.56
Add Agency area allowence
25%
14.56
3.64
Add 14% over heads
14.56
0.14
1
2.04
Rate per 1 cu.m.
Total
20.25
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm
thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the
work site and all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)
Cost of Gravel
Light Mazdoor
Add Agency area allowence
Add 14% over heads
Rate per Cu.m.
Filling with Sand Cushion under
footings with initial lead in layers not
exceeding 15cm thick, consolidating
each deposited layer by watering and
ramming including cost and conveyence
of water to the work site and all
operational & incidental charges, labour
charges, seignorage charges, hire and
opertaional charges of T & P etc.,
complete for finished item of work.
(APSS NO. 309 & 310)
1 cu.m.
0.052 Nos
25%
282.07 cu.m.
267.51
280.00
14.56
0.14
Cost of Sand
Light Mazdoor
Add 14% over heads
1 cu.m.
0.052 Nos
766.34 cu.m.
751.78
280.00
0.14
1 cu.m.
1 Nos
267.51
14.56
3.64
39.49
325.20
1 cu.m.
Total
1 cu.m.
751.78
1 Nos
14.56
1 cu.m.
107.29
Rate per Cu.m.
Total
873.65
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved
quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as
mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete,
etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
material
Metal 40mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add Agency area allowence
Add 14% over heads
0.9
0.45
129.6
1.2
cu.m.
cu.m.
Kgs.
KL
1093.60
851.78
4546.12
100.00
1 Hour
25%
cu.m.
cu.m.
Kgs.
KL
984.24
383.30
589.18
120.00
303.10
174.20
1 Hour
1
303.10
43.55
0.1 Nos.
1.39 Nos.
380.00
280.00
1 Each
1 Each
38.00
389.20
25%
427.20
2850.57 cu.m.
Rate per Cu.m.
0.14
1
1
1000
1
106.80
1 cu.m.
Total
Page 128
399.08
3356.45
C-data
Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved
quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as
mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete,
etc., complete for finished item of work for Foundations (APSS No. 402)
material
Metal 40mm
0.9 cu.m.
1093.60
1 cu.m.
984.24
Sand
0.45 cu.m.
851.78
1 cu.m.
383.30
Cement
162 Kgs.
4546.12
1000 Kgs.
736.47
Water
1.2 KL
100.00
1 KL
120.00
Machinery
concrete mixer300/200 (diesel)
1 Hour
303.10
1 Hour
303.10
LA oncrew charges
25%
174.20
1
43.55
Labour
1st class mason
0.1 cu.m.
380.00
1 cu.m.
38.00
Light Mazdoor
1.39 Nos.
280.00
1 Each
389.20
Add Agency area allowence
25%
427.20
106.80
Add 14% over heads
2997.86 cu.m.
0.14
1 cu.m.
419.70
Rate per Cu.m.
Total
3524.40
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental, and labour charges such as mixing, laying concrete, finishing top surface, curing concrete, etc., complete
for finished item of work for Dummy Columns. (APSS No. 402)
materal
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add Agency area allowence
0.9
0.45
129.6
1.2
cu.m.
cu.m.
Kgs.
KL
1428.85
851.78
4546.12
100.00
1 Hour
25%
0.1 cu.m.
1.39 Nos.
25%
1
1
1000
1
cu.m.
cu.m.
Kgs.
KL
1285.97
383.30
589.18
120.00
303.10
174.20
1 Hour
1
303.10
43.55
380.00
280.00
427.20
1 cu.m.
1 Each
38.00
389.20
106.80
3259.09
Total
GF
FF
SF
TF
3259.09
3259.09 3259.09
3259.09
296.00
296.00
296.00
296.00
1491.00
1640.10 1789.20
1938.30
25%
372.75
410.03
447.30
484.58
0.00
42.72
85.44
128.16
5418.84
5647.94 5877.03
6106.13
Add 14% over heads
0.14
758.64
790.71
822.78
854.86
Rate per cu.m.
Total
6177.50
6438.70 6699.85
6961.00
Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for
Bed Blocks and Hold Fasts (APSS No. 402)
Rate for other Floors
Basic Rate of P.C.C(1:5:10) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
10
Material
Graded Metal 20 to 6 mm
Sand
0.9 cu.m.
0.45 cu.m.
Page 129
1428.85
851.78
1 cu.m.
1 cu.m.
1285.97
383.30
C-data
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add Agency area allowence
Basic rate per Cum.
Rate for other Floors
Basic Rate of P.C.C(1:3:6) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
Add 14% over heads
Rate per cu.m.
11
4546.12
100.00
1000 Kgs.
1 KL
1000.15
120.00
1 Hour
25%
303.10
174.20
1 Hour
1
303.10
43.55
0.1 cu.m.
1.39 Nos.
25%
380.00
280.00
427.20
1 Each
1 Each
38.00
389.20
106.80
3670.06
GF
3670.06
137.00
415.00
103.75
0.00
4325.81
605.61
4931.45
25%
0.14
Total
FF
3670.06
137.00
456.50
114.13
42.72
4420.41
618.86
5039.30
SF
3670.06
137.00
498.00
124.50
85.44
4515.00
632.10
5147.15
Total
TF
3670.06
137.00
539.50
134.88
128.16
4609.60
645.34
5254.95
Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS
No. 402)
Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
men &women Mazdoor
Add Agency area allowence
Basic rate per Cum.
Rate for other Floors
Basic Rate of P.C.C(1:2:4) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
10
220 Kgs.
1.2 KL
0.9
0.45
331.2
1.2
cu.m.
cu.m.
Kgs.
KL
1428.85
851.78
4546.12
100.00
1 Hour
25%
0.1 cu.m.
1.39 Nos.
25%
1
1
1000
1
cu.m.
cu.m.
Kgs.
KL
1285.97
383.30
1505.68
120.00
303.10
174.20
1 Hour
1
303.10
43.55
380.00
280.00
427.20
1 cu.m.
1 Each
38.00
389.20
106.80
4175.59
Total
GF
FF
SF
TF
4175.59
4175.59 4175.59
4175.59
137.00
137.00
137.00
137.00
415.00
456.50
498.00
539.50
25%
103.75
114.13
124.50
134.88
0.00
42.72
85.44
128.16
4831.34
4925.94 5020.53
5115.13
Add 14% over heads
0.14
676.39
689.63
702.87
716.12
Rate per cu.m.
Total
5507.75
5615.60 5723.45
5831.30
Plain Cement Concrete M20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine
crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per
1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering,
machine mixing, laying concrete, lift charges, curing etc., complete for finished item of work for steps (APSS No. 402
)
Material
Graded Metal 20mm to 6mm
Sand
0.8 cu.m.
0.4 cu.m.
Page 130
1428.85
851.78
1 cu.m.
1 cu.m.
1143.08
340.71
C-data
Cement
Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges
Labour
1st class Masons
Man and Mazdoor
Add Agency area allowence
Basic rate per Cum.
Rate for other Floors
Basic Rate of P.C.C(1:1.5:3) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
Add 14% over heads
Rate per cu.m.
11
380 kgs
1.2 KL
4546.12
100.00
1.333 Hour
1.333 Hour
25%
503.90
152.20
526.40
1 Hour
1 Hour
1
671.70
202.88
131.60
0.1 Nos.
1.39 Nos.
25%
380.00
280.00
427.20
1 Each
1 Each
38.00
389.20
106.80
4871.50
GF
4871.50
137.00
415.00
103.75
0.00
5527.25
773.81
6301.10
25%
0.14
Total
FF
4871.50
137.00
456.50
114.13
42.72
5621.85
787.06
6408.95
1000 kgs
1 KL
SF
4871.50
137.00
498.00
124.50
85.44
5716.44
800.30
6516.75
1727.53
120.00
TF
4871.50
137.00
539.50
134.88
128.16
5811.04
813.55
6624.60
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from
approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site
including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such
as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 615)
cost of cement
59.4 Kgs
4546.12
1000 Kgs
RR Stone
CR
Through stones 25 x 25x 45 to 60
cms
Sand
1st Class Mason
Light Mazdoor
Add Agency area allowence
0.5
0.44
0.16
0.33
1.2
2.0
25%
Cum
Cum
Cum
cu.m.
Nos
Nos
582.91
745.32
1271.24
851.78
380.00
280.00
1016.00
1
1
1
1
1
1
2389.92 cu.m.
0.14
Cum
Cum
Cum
cu.m.
Each
Each
1 cu.m.
270.04
291.46
327.94
203.40
281.09
456.00
560.00
254.00
2643.92
334.59
2978.55
Coursed Rubble stone masonry 2nd sort, in CM (1:8) prop: (Cement: Sand) using hard blasted granite stones from
approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site
including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such
as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 612)
cost of cement
57.6 Kgs
4546.12
1000 Kgs
CR Stone
Through stones 25 x 25x 45 to 60
cms
Sand
1st Class Mason
Light Mazdoor
Add Agency area allowence
0.94
0.16
0.32
1.5
2.32
25%
Cum
Cum
cu.m.
Nos
Nos
745.32
1271.24
851.78
380.00
280.00
1219.60
1
1
1
1
1
2658.03 cu.m.
0.14
Page 131
Cum
Cum
cu.m.
Each
Each
1 cu.m.
261.86
700.60
203.40
272.57
570.00
649.60
304.90
2962.93
372.12
3335.10
C-data
13
Flush Pointing to CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS
901,906)
cost of cement
Sand
1st Class Mason
Man mazdoor
Add Agency area allowence
14
1.44
0.003
0.05
0.074
25%
Kgs
cu.m.
Nos.
Nos.
4546.12
971.78
320.00
280.00
36.72
Material
Graded Metal 20mm to 6mm
Sand
Cement
0.8 cu.m.
0.4 cu.m.
380 kgs
1428.85
851.78
4546.12
Water
1.2 KL
100.00
1 KL
120.00
1.333 Hour
503.90
1 Hour
671.70
1.333 Hour
152.20
1 Hour
202.88
526.40
131.60
1000
1
1
1
Kgs
cu.m.
Each
Each
6.55
2.92
16.00
20.72
9.18
3762.59
Add 14% over heads
46.18 cu.m.
0.14
1 sqm
6.47
3769.10
Rate per 1 Sqmt.
Or say
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard
blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of
380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using
Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine
mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403)
1 cu.m.
1 cu.m.
1000 kgs
1143.08
340.71
1727.53
Machinery
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cum.
a) VRCC M20 grade design mix for foot
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
Rate per cu.m.
25%
0.133 Nos.
0.267 Nos.
4.6 Nos.
25%
380.00
320.00
280.00
1423.98
1 Each
1 Each
1 Each
Total
50.54
85.44
1288.00
356.00
6117.47
1 cu.m.
6117.47
1 cu.m.
6117.47
1 cu.m.
25%
6773.22 cu.m.
552.00
415.00
0.14
1 cu.m.
Say
552.00
103.75
948.25
7721.50
Say
6117.47
2158.00
250.00
1193.57
9719.05
1 cu.m.
1 cu.m.
1 cu.m.
25%
8525.47 cu.m.
6117.47
2158.00
1000.00
0.14
1 cu.m.
1 cu.m.
1 cu.m.
1 cu.m.
6117.47
1 cu.m.
6117.47
1 cu.m.
769.00
1 cu.m.
769.00
25%
7051.47 cu.m.
660.00
0.14
1 cu.m.
165.00
987.21
8038.70
Say
Page 132
C-data
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5)
hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of
380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using
Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine
mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402 & 403) For coloumns , Lintels, Water tanks, Rcc walls in
building
Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cum.
a) For columns / RCC walls and Water tank
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per cu.m.
0.8
0.4
380
1.2
cu.m.
cu.m.
kgs
KL
1428.85
851.78
4546.12
100.00
1.333 Hour
1.333 Hour
25%
0.167 Nos.
0.167 Nos.
5.6 Nos.
25%
1
1
1000
1
cu.m.
cu.m.
kgs
KL
1143.08
340.71
1727.53
120.00
503.90
152.20
526.40
1 Hour
1 Hour
1
671.70
202.88
131.60
380.00
320.00
280.00
1684.90
1 Each
1 Each
1 Each
63.46
53.44
1568.00
421.23
6443.62
Total
25%
GF
6443.62
296.00
1491.00
372.75
0.14
8603.37
1204.47
Total
9807.85
FF
6443.62
296.00
1640.10
410.03
168.49
8958.24
1254.15
SF
6443.62
296.00
1789.20
447.30
336.98
9313.10
1303.83
TF
6443.62
296.00
1938.30
484.58
505.47
9667.97
1353.52
10212.40 10616.95
11021.50
b) For Lintels
Rate for other Floors
GF
FF
25%
6443.62
984.00
1062.00
265.50
6443.62
984.00
1168.20
292.05
168.49
0.14
Total
8755.12
1225.72
9980.85
SF
TF
6443.62
984.00
1274.40
318.60
336.98
6443.62
984.00
1380.60
345.15
505.47
9056.36 9357.60
1267.89 1310.06
10324.30 10667.70
9658.84
1352.24
11011.10
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard
blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of
380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using
Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine
mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402 & 403) For beams and slabs
Material
Page 133
C-data
0.8
0.4
380
1.2
cu.m.
cu.m.
kgs
KL
1428.85
851.78
4546.12
100.00
0.308 Hour
0.308 Hour
25%
0.067 Nos.
0.133 Nos.
3.077 Nos.
25%
1
1
1000
1
cu.m.
cu.m.
kgs
KL
1143.08
340.71
1727.53
120.00
503.90
152.20
121.63
1 Hour
1 Hour
1
155.20
46.88
30.41
380.00
320.00
280.00
929.58
1 Each
1 Each
1 Each
25.46
42.56
861.56
232.40
4725.78
Total
25%
GF
4725.78
1737.00
1251.00
312.75
0.14
Total
8026.53
1123.71
9150.25
FF
4725.78
1737.00
1376.10
344.03
92.96
8275.87
1158.62
9434.50
SF
4725.78
1737.00
1501.20
375.30
185.92
8525.20
1193.53
9718.75
TF
4725.78
1737.00
1626.30
406.58
278.87
8774.53
1228.43
10003.00
0.075 cu.m.
25%
GF
354.43
197.00
142.00
35.50
0.14
Total
728.93
102.05
831.00
0.1 cu.m.
25%
GF
472.58
197.00
142.00
35.50
0.14
Total
847.08
118.59
965.70
0.11 cu.m.
GF
519.84
Page 134
4725.78
FF
354.43
197.00
156.20
39.05
6.97
753.65
105.51
859.20
4725.78
FF
472.58
197.00
156.20
39.05
9.30
874.13
122.38
996.55
4725.78
FF
519.84
1 cu.m.
SF
354.43
197.00
170.40
42.60
13.94
778.37
108.97
887.35
TF
354.43
197.00
184.60
46.15
20.92
803.10
112.43
915.55
1 cu.m.
SF
472.58
197.00
170.40
42.60
18.59
901.17
126.16
1027.35
472.58
TF
472.58
197.00
184.60
46.15
27.89
928.22
129.95
1058.20
1 cu.m.
SF
519.84
354.43
519.84
TF
519.84
C-data
25%
197.00
142.00
35.50
0.14
Total
894.34
125.21
1019.55
197.00
156.20
39.05
10.23
922.32
129.12
1051.45
197.00
170.40
42.60
20.45
950.29
133.04
1083.35
197.00
184.60
46.15
30.68
978.27
136.96
1115.25
0.12 cu.m.
25%
GF
567.09
197.00
142.00
35.50
0.14
Total
941.59
131.82
1073.45
4725.78
FF
567.09
197.00
156.20
39.05
11.15
970.49
135.87
1106.40
1 cu.m.
SF
567.09
197.00
170.40
42.60
22.31
999.40
139.92
1139.35
567.09
TF
567.09
197.00
184.60
46.15
33.46
1028.30
143.96
1172.30
0.12 cu.m.
25%
GF
567.09
197.00
142.00
35.50
0.14
Total
941.59
131.82
1073.45
0.125 cu.m.
25%
GF
590.72
197.00
142.00
35.50
0.14
Total
965.22
135.13
1100.40
0.14 cu.m.
Page 135
4725.78
FF
567.09
197.00
156.20
39.05
11.15
970.49
135.87
1106.40
4725.78
FF
590.72
197.00
156.20
39.05
11.62
994.59
139.24
1133.85
4725.78
1 cu.m.
SF
567.09
197.00
170.40
42.60
22.31
999.40
139.92
1139.35
TF
567.09
197.00
184.60
46.15
33.46
1028.30
143.96
1172.30
1 cu.m.
SF
590.72
197.00
170.40
42.60
23.24
1023.96
143.35
1167.35
567.09
590.72
TF
590.72
197.00
184.60
46.15
34.86
1053.33
147.47
1200.85
1 cu.m.
661.61
C-data
25%
GF
661.61
197.00
142.00
35.50
0.14
Total
1036.11
145.06
1181.20
FF
661.61
197.00
156.20
39.05
13.01
1066.87
149.36
1216.25
4725.78
25%
GF
543.46
197.00
142.00
35.50
0.14
Total
917.96
128.52
1046.50
0.1 cu.m.
FF
543.46
197.00
156.20
39.05
10.69
946.40
132.50
1078.95
4725.78
SF
661.61
197.00
170.40
42.60
26.03
1097.64
153.67
1251.35
TF
661.61
197.00
184.60
46.15
39.04
1128.40
157.98
1286.40
1 cu.m.
SF
543.46
197.00
170.40
42.60
21.38
974.84
136.48
1111.35
543.46
TF
543.46
197.00
184.60
46.15
32.07
1003.28
140.46
1143.75
1 cu.m.
472.58
GF
472.58
197.00
FF
472.58
197.00
SF
472.58
197.00
TF
472.58
197.00
142.00
156.20
170.40
184.60
35.50
39.05
42.60
46.15
9.30
18.59
27.89
0.14
847.08
118.59
874.13
122.38
901.17
126.16
928.22
129.95
Total
965.70
996.55
1027.35
1058.20
25%
0.05 cu.m.
4725.78
1 cu.m.
236.29
GF
236.29
FF
236.29
SF
236.29
TF
236.29
236.29
33.08
269.40
236.29
33.08
269.40
236.29
33.08
269.40
236.29
33.08
269.40
25%
0.14
Total
0.175 cu.m.
Page 136
4725.78
1 cu.m.
827.01
C-data
25%
0.14
Total
GF
827.01
203.00
146.00
36.50
1212.51
FF
827.01
203.00
160.60
40.15
16.27
1247.03
SF
827.01
203.00
175.20
43.80
32.54
1281.55
TF
827.01
203.00
189.80
47.45
48.80
1316.06
169.75
1382.30
174.58
1421.65
179.42
1461.00
184.25
1500.35
0.18 cu.m.
25%
GF
850.64
203.00
146.00
36.50
0.14
Total
1236.14
173.06
1409.25
0.2 cu.m.
25%
GF
945.16
203.00
146.00
36.50
0.14
Total
1330.66
186.29
1516.95
0.3 cu.m.
25%
GF
1417.73
203.00
146.00
36.50
0.14
Total
1803.23
252.45
2055.70
4725.78
FF
850.64
203.00
160.60
40.15
16.73
1271.12
177.96
1449.10
4725.78
FF
945.16
203.00
160.60
40.15
18.59
1367.50
191.45
1558.95
4725.78
FF
1417.73
203.00
160.60
40.15
27.89
1849.37
258.91
2108.30
1 cu.m.
SF
850.64
203.00
175.20
43.80
33.46
1306.10
182.85
1489.00
TF
850.64
203.00
189.80
47.45
50.20
1341.09
187.75
1528.85
1 cu.m.
SF
945.16
203.00
175.20
43.80
37.18
1404.34
196.61
1600.95
945.16
TF
945.16
203.00
189.80
47.45
55.77
1441.18
201.76
1642.95
1 cu.m.
SF
1417.73
203.00
175.20
43.80
55.77
1895.50
265.37
2160.90
850.64
1417.73
TF
1417.73
203.00
189.80
47.45
83.66
1941.64
271.83
2213.50
Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite
machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of
cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand),
coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using
Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine
mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402 & 403)
Page 137
C-data
Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cum
a) For Lintels
Rate for other Floors
11
0.8
0.4
380
1.2
cu.m.
cu.m.
kgs
KL
1428.85
851.78
4546.12
100.00
1.333 Hour
25%
0.167 Nos.
0.167 Nos.
5.6 Nos.
25%
cu.m.
cu.m.
kgs
KL
1143.08
340.71
1727.53
120.00
503.90
359.24
1 Hour
1
671.70
89.81
380.00
320.00
280.00
1684.90
1 Each
1 Each
1 Each
63.46
53.44
1568.00
421.23
6198.95
GF
FF
6198.95
6198.95
984.00
1062.00
265.50
1
1
1000
1
SF
TF
6198.95
6198.95
984.00
984.00
984.00
1168.20 1274.40
1380.60
25%
292.05
318.60
345.15
168.49
336.98
505.47
8510.45
8811.69 9112.93
9414.17
Add 14% over heads
0.14
1191.46
1233.64 1275.81
1317.98
Rate per Cum.
Total
9701.95 10045.35 10388.75
10732.20
Reinforced cement concrete with M 25 grade Design mix ( by weigh batching ) using 20mm size (SS 5) machine
crushed hard blasted granite graded metal (coarse aggregate) from approved quarry using a minimum quantity of
380 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate
(sand) ,coarse aggregate, water etc. to site and cost of seigniorage charges on all materials including centering
using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering,
machine mixing, laying concrete, 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of
6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its
fabrication charges for finished item of work
for sun-shades of any width as per approved plan / design and of average thickness of 62.50mm ( thickness at
support 75mm and thickness at edge 50mm) (APSS No. 402, 403)
material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cu.m
a) Chajja / Sunshade
Cost of RCC for 62.5 mm thick
sunshade
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
0.8
0.4
380
1.2
cu.m.
cu.m.
kgs
KL
1428.85
851.78
4546.12
100.00
0.308 Hour
25%
0.067 Nos.
0.133 Nos.
3.077 Nos.
25%
0.0625 cu.m.
25%
Page 138
1
1
1000
1
cu.m.
cu.m.
kgs
KL
1143.08
340.71
1727.53
120.00
503.90
83.01
1 Hour
1
155.20
20.75
380.00
320.00
280.00
929.58
1 Each
1 Each
1 Each
Total
25.46
42.56
861.56
232.40
4669.25
1 cu.m.
291.83
4669.25
GF
FF
SF
291.83
194.00
163.00
40.75
291.83
194.00
179.30
44.83
291.83
194.00
195.60
48.90
TF
291.83
194.00
211.90
52.98
C-data
689.58
96.54
786.15
0.14
Total
5.81
11.62
17.43
715.77
100.21
816.00
741.95
103.87
845.85
768.14
107.54
875.70
12
0.05 cu.m.
25%
GF
233.46
197.00
142.00
35.50
0.14
Total
607.96
85.11
693.10
0.025 cu.m.
GF
116.73
197.00
142.00
25%
35.50
491.23
68.77
560.05
0.14
Total
4669.25
1 cu.m.
FF
233.46
197.00
156.20
39.05
4.65
630.36
88.25
718.65
SF
233.46
197.00
170.40
42.60
9.30
652.76
91.39
744.20
4669.25
FF
116.73
197.00
156.20
39.05
2.32
511.30
71.58
582.90
1 cu.m.
SF
TF
116.73
116.73
197.00
197.00
170.40
184.60
42.60
46.15
4.65
6.97
531.38
551.45
74.39
77.20
605.80
628.70
233.46
TF
233.46
197.00
184.60
46.15
13.94
675.15
94.52
769.70
116.73
Pointing to Cuddapah / Shahabad slabs in CM(1:3) Prop: including cost and conveyance of all materials like
cost of cement for Cement Mortar (1:3)
0.96 Kgs
4.55
1 Kgs
4.36
cost of sand for Cement Mortar (1:3)
0.002 cu.m.
851.78
1 cu.m.
1st Class Mason
0.048 Nos.
380.00
1 Each
18.24
2nd Class Mason
0.112 Nos.
320.00
1 Each
35.84
Man mazdoor
0.05 Nos.
280.00
1 Each
14.00
Woman mazdoor
0.11 Nos.
280.00
1 Each
30.80
Rate per 1 Sqmt.
Total
103.20
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having
minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and
labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc.,
complete for finished item of work. (APSS No. 501 & 504).
wall thickness
Material
Cement
Second class Bricks
sand for mortor
B Labour
1st class mason
2nd class mason
Man Mazdoor
Add Agency area allowence
Basic Rate per Cum.
Rate for other Floors
Basic rate per Cum
0.225
36 kgs
512 Nos
0.2 cu.m.
4546.12
4474.82
851.78
1000 kgs
1000 Nos
1 cu.m.
163.66
2291.11
170.36
0.24 Nos.
0.56 Nos.
380.00
320.00
1 Each
1 Each
91.20
179.20
1.89 Nos.
25%
280.00
799.60
1 Each
529.20
199.90
3624.62
GF
3624.62
Page 139
FF
3624.62
SF
3624.62
TF
3624.62
C-data
20
24.27
24.27
24.27
269.56
359.38
449.24
25%
67.39
89.85
112.31
79.96
159.92
239.88
3873.50
4065.80 4258.04
4450.32
Add 14% over heads
0.14
542.29
569.21
596.13
623.05
Rate per Cum.
Total
4415.80
4635.05 4854.20
5073.40
Reinforced Brick Masonry 11.5cm (4 1/2") thick for partition walls in CM (1:4) prop: using second class bricks
from approved source having minimum crushing strength of 40 Kg/Sqcm. and placing 2nos. of 6mm dia MS bars
embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work
whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing
cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance
of steel and its fabrication charges complete for finished item of work. (APSS No. 501 & 504).
wall thickness
Material
Cement
Second class Bricks
sand for mortor
B Labour
1st class mason
21
24.27
179.69
44.92
0.115
7.56 kgs
51.2 Nos
0.021 cu.m.
4546.12
4474.82
851.78
1000 kgs
1000 Nos
1 cu.m.
34.37
229.11
17.89
0.06 Nos.
380.00
1 Each
22.80
0.06 Nos.
0.275 Nos.
25%
320.00
280.00
119.00
1 Each
1 Each
19.20
77.00
29.75
430.12
Wall thickness
Material
Fly Ash Bricks 290x225x140mm
Cement for Cement Mortar (1:8)
Sand for Cement Mortar (1:8)
Labour
1st class mason
2nd class mason
Man Mazdoor
Woman Mazdoor
Add Agency area allowence
Basic Rate per Cum.
Rate for other Floors
Basic rate per Cum
Hire charges of stage scafflding per cum
Labour charges for stage scaffolding per
cum
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
0.225
GF
430.12
5.46
40.43
10.11
FF
SF
TF
430.12
430.12
430.12
5.46
5.46
5.46
60.65
80.86
101.08
25%
15.16
20.22
25.27
11.90
23.80
35.70
486.12
523.29
560.46
597.63
Add 14% over heads
0.14
68.06
73.26
78.46
83.67
Rate per One Sqmt.
Total
554.20
596.55
638.95
681.30
Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with
compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement,
sand, fly ash bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges,
lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
110 Nos
18 Kgs
0.1 cu.m.
0.42
0.92
0.7
2.1
25%
cu.m.
Nos.
Nos.
Nos.
25%
GF
3881.78
24.27
179.69
44.92
4130.66
Page 140
19701.81
4.55
851.78
1000 Nos
1 Kgs
1 cu.m.
380.00
320.00
280.00
280.00
1238.00
1
1
1
1
FF
3881.78
24.27
269.56
67.39
123.80
4366.80
SF
3881.78
24.27
359.38
89.85
247.60
4602.88
cu.m.
Each
Each
Each
2167.20
81.90
85.18
159.60
294.40
196.00
588.00
309.50
3881.78
TF
3881.78
24.27
449.24
112.31
371.40
4839.00
C-data
578.29
4708.95
611.35
4978.15
644.40
5247.30
677.46
5516.50
Brick Masonry in superstructure with CM (1:6) prop: using Fly ASH Bricks of size 290x225x140mm with
compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement,
sand, fly ash bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges,
lift charges, curing, etc., complete for finished item of work. for basement (APSS No. 501 & 504).
Wall thickness
Material
Fly Ash Bricks 290x225x140mm
Cement for Cement Mortar (1:8)
Sand for Cement Mortar (1:8)
Labour
1st class mason
2nd class mason
Man Mazdoor
Woman Mazdoor
Add Agency area allowence
total
Add 14% over heads
Basic Rate per Cum.
22
0.14
Total
0.225
110 Nos
24 Kgs
0.1 cu.m.
0.42
0.92
0.7
2.1
25%
cu.m.
Nos.
Nos.
Nos.
19701.81
4.55
851.78
380.00
320.00
280.00
280.00
1238.00
1000 Nos
1 Kgs
1 cu.m.
1
1
1
1
cu.m.
Each
Each
Each
0.14
2167.20
109.20
85.18
159.60
294.40
196.00
588.00
309.50
3909.08
547.27
4456.35
Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: Fly Bricks of size
290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS
bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick
work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc.,
to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges
such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but
excluding cost and conveyance of steel and its fabrication charges complete for finished item of work. (APSS
No. 501 & 509).
Material
Fly Ash Bricks 290x100x140mm
24 Nos
10311.92
1000 Nos
247.49
7.2 Kgs
4.55
Kgs
32.76
13
0.02 cu.m.
851.78
1 cu.m.
17.04
0.06 cu.m.
0.06 Nos.
0.275 Nos.
380.00
320.00
280.00
1 cu.m.
1 Each
1 Each
22.80
19.20
77.00
416.28
GF
416.28
5.46
40.43
10.11
FF
SF
TF
416.28
416.28
416.28
5.46
5.46
5.46
60.65
80.86
101.08
25%
15.16
20.22
25.27
11.90
23.80
35.70
472.28
509.45
546.62
583.79
Add 14% over heads
0.14
66.12
71.32
76.53
81.73
Rate per One Sqmt.
Total
538.45
580.80
623.20
665.55
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm
diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost
and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as
cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished
item of work (APSS No.126) in all floors.
Page 141
C-data
Material
Cost of steel including 5% wastage and
overlaps
cost of binding wire
Labour
Blacksmith/Tin Smith/Rivetor
Light mazdoor
Add Agency area allowence
Rate per MT
Rate for other Floors
Basic rate per MT
Lift Charges per MT @10% extra on
labour per floor
14
44055.29
1 MT
46258.05
6 Kg
70.00
1 Kg
420.00
10 Nos
10 Nos
25%
GF
54178.05
320.00
280.00
6000.00
1 Nos
1 Nos
FF
SF
54178.05 54178.05
600.00 1200.00
Total
TF
54178.05
1800.00
3200.00
2800.00
1500.00
54178.05
14
1.05 MT
1.05 MT
44000.00
1 MT
46200.00
6 Kg
70.00
1 Kg
420.00
10 Nos
10 Nos
25%
GF
54870.00
0.14
Total
54870.00
7681.80
62551.80
380.00
280.00
6600.00
1 Nos
1 Nos
FF
SF
54870.00 54870.00
660.00 1320.00
62410.00 56191.00
8737.40 7866.74
71147.40 64057.75
Total
TF
54870.00
1980.00
56850.00
7959.00
64809.00
3800.00
2800.00
1650.00
54870.00
Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick
in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing
mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in
- charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904)
Material
Base coat 8mm thick in C.M. (1:5)
Cement
3.17 kgs
4546.12
0.011 cu.m.
971.78
1.92 kgs
4546.12
0.004 cu.m.
971.78
1 cu.m.
3.89
Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Add Agency area allowence
0.063 Nos.
0.147 Nos.
0.39 Nos.
25%
380.00
320.00
280.00
180.18
1 Each
1 Each
1 Each
23.94
47.04
109.20
45.05
1000 kgs
14.41
1 cu.m.
10.69
Page 142
1000 kgs
8.73
C-data
15
GF
262.94
1.28
FF
262.94
1.28
SF
262.94
1.28
TF
262.94
1.28
8.00
12.00
16.00
20.00
2.00
3.00
18.02
4.00
36.04
5.00
54.05
25%
274.22
297.24
320.26
343.27
Add 14% over heads
0.14
38.39
41.61
44.84
48.06
Rate per 1 Sqmt.
Total
312.61
338.85
365.10
391.33
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing
mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in
- charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904)
Material
Base coat 8mm thick in C.M. (1:6)
Cement
cost of sand for mortor
Top Coat 4mm thick in C.M. (1:4)
Cement
cost of sand for mortor
Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Add Agency area allowence
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers
qm
Labour charges for access scaffolding
per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
262.94
2.64 kgs
0.011 cu.m.
4546.12
971.78
1000 kgs
1 cu.m.
12.00
10.69
1.44 kgs
0.004 cu.m.
4546.12
971.78
1000 kgs
1 cu.m.
6.55
3.89
0.04 Nos.
0.1 Nos.
0.26 Nos.
25%
380.00
320.00
280.00
120.00
1 Each
1 Each
1 Each
15.20
32.00
72.80
30.00
183.12
GF
183.12
0.55
FF
183.12
0.55
SF
183.12
0.55
TF
183.12
0.55
4.04
6.06
8.09
10.11
25%
1.01
1.52
18.02
2.02
36.04
2.53
54.05
0.14
Total
188.72
26.42
215.15
209.27
29.30
238.60
229.82
32.18
262.05
250.36
35.05
285.45
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work.
(APSS 901,903 & 904)
Base coat 16 mm thick in C.M. (1:6)
Cement
cost of sand for mortor
Top Coat 4mm thick in C.M. (1:4)
Cement
cost of sand for mortor
4.32 kgs
0.018 cu.m.
4546.12
971.78
1000 kgs
1 cu.m.
19.64
17.49
1.44 kgs
0.004 cu.m.
4546.12
971.78
1000 kgs
1 cu.m.
6.55
3.89
Page 143
C-data
Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Add Agency area allowence
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers
qm
Labour charges for access scaffolding
per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
0.063 Nos.
0.147 Nos.
0.39 Nos.
25%
10.08
0.015
0.06
0.096
25%
380.00
320.00
280.00
180.18
1 Each
1 Each
1 Each
23.94
47.04
109.20
45.05
272.79
GF
272.79
0.55
FF
272.79
0.55
SF
272.79
0.55
TF
272.79
0.55
4.04
6.06
8.09
10.11
1.52
2.02
2.53
18.02
36.04
54.05
278.39
298.94
319.49
340.03
Add 14% over heads
0.14
38.97
41.85
44.73
47.60
Rate per 1 Sqmt.
Total
317.40
340.80
364.25
387.65
Ornamental Plastering with CM(1:3) Prop: 12mm thick in single coat including cost and conveyance of all
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
25%
1.01
kg
cu.m.
Nos.
Nos.
25%
GF
122.55
0.55
4.04
1.01
0.14
Total
128.15
17.94
146.10
4546.12
971.78
380.00
280.00
49.68
1000
1
1
1
FF
122.55
0.55
6.06
1.52
4.97
135.65
18.99
154.65
SF
122.55
0.55
8.09
2.02
9.94
143.15
20.04
163.20
kg
cu.m.
Each
Each
Total
TF
122.55
0.55
10.11
2.53
14.90
150.64
21.09
171.75
45.82
14.58
22.80
26.88
12.42
122.55
Plastering with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of
work. (APSS 901,906)
5.4 kg
0.015 cu.m.
0.06 Nos.
0.096 Nos.
25%
4.55
25%
GF
101.25
0.55
4.04
1.01
0.14
106.85
14.96
Page 144
971.78
380.00
280.00
49.68
FF
101.25
0.55
6.06
1.52
4.97
114.35
16.01
24.57
kg
1 cu.m.
1 Each
1 Each
SF
101.25
0.55
8.09
2.02
9.94
121.85
17.06
Total
TF
101.25
0.55
10.11
2.53
14.90
129.34
18.11
14.58
22.80
26.88
12.42
101.25
C-data
29
30
17
10.08 kg
4.55
0.021 cu.m.
0.094 Nos.
0.16 Nos.
25%
25%
GF
166.95
0.55
4.04
1.01
0.14
Total
172.55
24.16
196.75
971.78
380.00
280.00
80.52
FF
166.95
0.55
6.06
1.52
8.05
183.13
25.64
208.80
45.86
kg
1 cu.m.
1 Each
1 Each
SF
166.95
0.55
8.09
2.02
16.10
193.71
27.12
220.85
Total
TF
166.95
0.55
10.11
2.53
24.16
204.30
28.60
232.90
20.41
35.72
44.80
20.13
166.95
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average)
mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at
1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and
thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand,
water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering
smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
cost of cement for Cement Mortar (1:3)
sand for Cement Mortar (1:3)
Water proof compound
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
10.08
0.021
0.2
0.066
0.154
0.37
25%
0.14
Say
kg
cu.m.
Kgs
Nos.
Nos.
Nos.
GF
293.52
293.52
41.09
334.65
4.55
971.78
24.00
380.00
320.00
280.00
177.96
1
1
1
1
1
1
FF
293.52
15.29
308.81
43.23
352.05
SF
293.52
30.58
324.10
45.37
369.50
kg
cu.m.
Kgs
Each
Each
Each
45.86
20.41
4.80
25.08
49.28
103.60
44.49
293.52
TF
293.52
45.86
339.38
47.51
386.90
0.1 day
25%
0.00
0.31 Nos.
0.11 Nos.
0.086 Nos.
25%
1%
GF
842.37
380.00
320.00
280.00
177.08
177.08
FF
842.37
17.89
1 day
0.00
0.00
1 Each
1 Each
1 Each
SF
842.37
35.77
117.80
35.20
24.08
44.27
1.77
842.37
TF
842.37
53.66
842.37
860.26
878.14
896.03
Add 14% over heads
0.14
117.93
120.44
122.94
125.44
Rate per 1 Sqmt.
Total
960.35
980.75 1001.10
1021.50
laid over existing CC bed or roof slab set over a base coat of CM (1:8), 12mm thick and pointing with CM(1:3) to full
32 #REF! Flooring with Rough Kadapa slabs of minimum 40 mm thick, size not less than (0.457 x 457M)laid over
existing CC bed or roof slab set over a base coat of CM (1:8), 12mm thick and pointing with CM(1:3) to full
depth of flooring slabs dully filling joints neatly , including cost and conveyance of all materials like flooring
stones, cement, sand, water, etc. to site, seigniorage charges, sales and other taxes on all materials, all
operational, incidental and labour charges such as mixing of cement mortar, laying, pointing, curing, lift
charges etc., complete for finished item of work.(APSS No.703 & 701)
33
1.1 Sqmt.
2.16 kg
306.38
4.55
10 Sqmt.
1
kg
33.70
9.83
0.012 cu.m.
1 Sqmt.
851.78
103.20
1 cu.m.
1 Sqmt.
10.22
103.20
0.096
0.224
0.22
0.11
380.00
320.00
280.00
280.00
1
1
1
1
36.48
71.68
61.60
30.80
357.51
Nos.
Nos.
Nos.
Nos.
Each
Each
Each
Each
FF
SF
TF
357.51
357.51
357.51
20.06
40.11
60.17
357.51
377.57
397.62
417.68
Add 14% over heads
0.14
50.05
52.86
55.67
58.48
Rate per 1 Sqmt.
Total
407.60
430.45
453.30
476.20
with length
equaltotointernal
flooringwalls
stones
over
a base
coat of CM
(1:3), 12mm
thick
with15cement
slurry
Providing
skirting
12.5setCm
high
withPolished
Shabad/Tandur
blue
Slabas
to 18 mm
thickof honey
like
consistency
spread
3.3 Kgs
andstones
jointed
cement
with pigment
ofcement
matching
(0.457M
x 0.457M)
with @
length
equalper
to sqm
flooring
setwith
overneat
a base
coat ofpaste
CM mixed
(1:3), 12mm
thick with
shade of
tohoney
full depth
(joints of spread
stone @
should
be per
flushed),
costneat
and
conveyance
of allwith
materials
slurry
like consistency
3.3 Kgs
sqm andincluding
jointed with
cement
paste mixed
pigmentlike
of
cement, sand,
stones
etc. toshould
site, seigniorage
charges, sales
andconveyance
other taxesofon
materials,
matching
shadewater,
to full flooring
depth (joints
of stone
be flushed), including
cost and
all all
materials
like all
operational,
and stones
labouretc.
charges
as dressing
of flooring
to theonrequired
sizes,allmixing of
cement,
sand,incidental
water, flooring
to site,such
seigniorage
charges,
sales andstones
other taxes
all materials,
cement mortar,
laying,
jointing,
curing,such
lift charges
etc.,
for finished
item ofsizes,
work.(APSS
operational,
incidental
and
labour charges
as dressing
of complete
flooring stones
to the required
mixing ofNo.701
cement&
707) laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707)
mortar,
Material
Cost of Polished Shabad/Tandur blue
Slabas 15 to 18 mm thick (0.457M x
0.457M)
sand for Cement Mortar (1:3)
cement for Cement Mortar (1:3) base
coat
Cement for slurry
Labour
1st Class Mason
2nd Class Mason
GF
357.51
1.1 Sqmt.
522.83
1 Sqmt.
575.12
0.012 cu.m.
5.76 Kgs
3.3 Kgs
851.78
4546.12
4546.12
1 cu.m.
1000 Kgs
1000 Kgs
10.22
26.19
15.00
0.096 Nos.
0.224 Nos.
380.00
320.00
1 Each
1 Each
36.48
71.68
Page 146
C-data
Man Mazdoor
Add Agency area allowence
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
34
0.31 Nos.
25%
1%
1 Each
86.80
48.74
1.95
872.17
FF
SF
TF
872.17
872.17
872.17
19.69
39.38
59.07
872.17
891.86
911.55
931.24
Add 14% over heads
0.14
122.10
124.86
127.62
130.37
Rate per 1 Sqmt.
Total
994.30
1016.75 1039.20
1061.65
Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece
with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement
paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges,
sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the
required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of
work For raisers (APSS No.701 & 707)
For Raisers of 0.15 Mt. Height
Material
Cost of Polished Shabad/Tandur blue
Slabas
to 18 Mortar
mm thick
sand for15
Cement
(1:3)(0.457M x
0.457M)
cement for Cement Mortar (1:3) base
coat
Cement for slurry
Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Flat nosing edges as per BMM-V.14
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
GF
872.17
1.1
0.012
5.76
3.3
Sqmt.
cu.m.
Kgs
Kgs
522.83
851.78
4546.12
4546.12
1
1
1000
1000
0.096
0.224
0.31
13.33
1%
Nos.
Nos.
Nos.
Rmt.
380.00
320.00
280.00
8.00
194.96
1
1
1
1
35
280.00
194.96
194.96
GF
FF
930.07
930.07
19.69
949.76
132.97
1082.73
930.07
130.21
1060.28
0.14
Sqmt.
cu.m.
Kgs
Kgs
575.12
10.22
26.19
15.00
Each
Each
Each
Rmt.
36.48
71.68
86.80
106.64
1.95
930.07
SF
TF
930.07
39.38
969.45
135.72
1105.17
930.07
59.07
989.14
138.48
1127.62
0.1 day
0.00
1 day
0.00
25%
0.00
Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Flat nosing edges
0.31
0.11
0.086
6.67
Nos.
Nos.
Nos.
Rmt.
Page 147
380.00
320.00
280.00
8.00
1
1
1
1
Each
Each
Each
Rmt.
117.80
35.20
24.08
53.36
C-data
36
900.60
FF
SF
TF
900.60
900.60
900.60
17.71
35.42
53.12
900.60
918.31
936.02
953.72
Add 14% over heads
0.14
126.08
128.56
131.04
133.52
Rate per Sqmt.
Say
1026.68
1046.87 1067.06
1087.24
In - situ - Granolithic Concrete Flooring 20mm thick with CC(1:1:2) Prop: using 6mm to 12mm size HBG machine
crushed metal laid monolithically over slabs/ CC flooring bed (1:5:10) with 40mm HBG metal in alternate panels of
size not exceeding 1.50m x 1.50m and finishing the top surface to required smoothness and slopes, thread lining as
directed by the Engineer - in - charge including cost and conveyance of all materials like cement, sand, water, etc. to
site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as
mixing of cement concrete, laying, curing, lift charges etc., complete for finished item of work (APSS No.701 &
710)
6mm to 12mm HBG metal
Sand
Cement
PCC bed (1:5:10) 100mm thick
1st Class Mason
2nd Class Mason
Manand women Mazdoor
37
GF
900.60
19.84
7.24
54.55
0.00
47.50
1.92
84.00
215.05
Add 14% over heads
0.14
215.05
30.11
Rate per 1 Sqmt.
Total
245.20
Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as approved by Engineer - in - charge set
over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like
consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth
mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water,
ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and
labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete for finished item of work.
(APSS No.701 & 707) in All Floors
Material
Ceramic Tiles
Sand
Cement
Grey Cement for slurry
White Cement for pointing
0.017
0.0085
12
0.00
0.125
0.006
0.3
cum
cum
Kgs
cum
Nos.
Nos.
Nos.
1166.93
851.78
4546.12
2850.57
380.00
320.00
280.00
1
1
1000
1
1
1
1
cum
cum
Kgs
cum
Each
Each
Each
1.05
0.012
2.16
3.3
0.2
Sqmt.
cum
Kgs
Kgs
Kgs
447.00
851.78
4546.12
4546.12
27.00
1
1
1000
1000
1
Sqmt.
cum
Kgs
Kgs
Kgs
469.35
10.22
9.82
15.00
5.40
Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
0.096 Nos.
0.224 Nos.
0.33 Nos.
25%
1%
0.14
Rate per Sqmt.
Page 148
380.00
320.00
280.00
200.56
200.56
1 Each
1 Each
1 Each
36.48
71.68
92.40
50.14
2.01
762.50
GF
762.50
FF
762.50
20.26
SF
762.50
40.51
TF
762.50
60.77
762.50
106.75
869.25
782.76
109.59
892.35
803.01
112.42
915.45
823.27
115.26
938.55
C-data
38
Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge
and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with
white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like
cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing
of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 &
707) in All Floors
white glazed tiles
1.05 Sqmt
Grey cement
White cement
Cement for Cement Mortar CM (1:5)
Sand Mortar CM (1:5)
0.33
0.6
3.45
0.012
335.00
Kgs
Kgs
Kgs
Cum
4546.12
27.00
4.55
851.78
0.077 Nos.
0.08 Nos.
25%
1 Sqmt
1000
1
1
1
351.75
Kgs
Kgs
Kgs
Cum
1.50
16.20
15.70
10.22
380.00
1 Each
29.26
280.00
51.66
1 Each
22.40
12.92
459.94
Labour
1st Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
Add 14% over heads
GF
459.94
0.14
Rate per Sqmt.
18
SF
459.94
10.33
470.27
65.84
TF
459.94
15.50
475.44
66.56
524.35
530.25
536.15
542.00
Whiting to new walls and ceiling in two coats with Birla White or equavalent quality to give an even shade after
thoroughly brushing the surface to remove all loose powdered materials including cost and conveyance of all
materials and water to site, sales & other taxes, all operational, incidental and labour charges such as cleaning the
surface, painting, curing etc., complete for finished item of work for internal walls. (APSS No.901 & 908) in All
Floors
Surya Cem
Painter
Man Mazdoor
Add Agency area allowence
sundries including brushes,ladders, etc.,
Add 14% over heads
Rater per 1 Sqmt. for all floors
19
459.94
64.39
FF
459.94
5.17
465.11
65.12
0.2 kgs
0.021 Nos.
0.032 Nos.
25%
1%
0.14
27.00
338.00
280.00
16.06
21.46
1 kgs
1 Each
1 Each
5.40
7.10
8.96
4.01
0.21
25.69
3.60
29.30
25.69
Total
Painting to New walls with two coats of Snowcem cement paint of superior quality of approved brand and shade
over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing
the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and
labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors
for External Walls.(APSS No. 912) in All Floors
Material
Cement Primer Grade I
0.1 Kgs
134.00
1 Kgs
13.40
Snowcem Paint
Labour for Priming Coat
1st class painter
2nd class painter
Add Agency area allowence
Labour for Two Coats
1st class painter
0.35 Kgs
44.24
1 Kgs
15.48
0.021 Nos.
0.049 Nos.
25%
400.00
320.00
24.08
1 Each
1 Each
8.40
15.68
6.02
0.015 Nos.
400.00
1 Each
6.00
0.035 Nos.
0.15 Nos.
25%
320.00
280.00
59.20
1 Each
1 Each
11.20
42.00
14.80
132.98
Page 149
C-data
132.98
Total
0.11 Ltr
0.033 Nos.
0.077 Nos.
25%
0.14
230.00
400.00
320.00
37.84
1 Ltr
1 Each
1 Each
25.30
13.20
24.64
9.46
72.60
10.16
82.80
72.60
Total
Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5 Kg/cm2 pressure including Cost of
necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and
conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational,
incidental and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in
All Floors
Cost of 110mm dia PVC Pipe.(page
274)
Cost of P.V.C.Bend 391 BMW-F.57
Cost PVC shoe 397 BMW-G.63
Cost of Clips 440 BMW-G.106
Plumber 1st Class
Plumber 2nd class
Man Mazdoor
3.00
1.00
1.00
3.00
0.30
0.70
1.00
0.14
Rmt.
No.
No.
Nos.
Nos.
Nos.
No.
70.00
1 Rmt
65.00
1 No
56.00
1 No
14.00
1 No
380.00
1 Each
320.00
1 Each
280.00
1 Each
Rate per 3 Rmt.
330.33
18.62
151.65
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an
existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational
and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
Cost of Synthetic Enamel Paint
1st Class Painter
2nd Class Painter
Add Agency area allowence
42
0.14
Total
210.00
65.00
56.00
42.00
114.00
224.00
280.00
991.00
330.33
46.25
376.60
Reinforced cement mortar Facia 5 cm thick in CM (1:3) for drop walls, Fins & staircase railing with rabbit wire
mesh & nominal reinforcement as directed by Engineer-in-charge with dubara spong finishing including cost &
conveyence of all materials to site, including seigniorage charges, sales and other taxes on all materials and all
operational, incidental charges such as labour charges, like mixing cement mortar, scaffolding charges, lift charges,
curing, for making 50 mm thick RCM Paradah walls (RCM Drop walls) including tying Rabbit (chicken) wire mesh
to the existing mild steel / HYSD Steel reinforcement applying mortar lumps, finishing, plastering to both faces,
sponge finishing etc complete for finished item of work but excluding cost of steel and its fabrication charges in All
Floors
materials
Costof rabit wire mesh
43 Grade cement
Cost of coarse sand
Labour
1st Class Mason
Miller operator
Man Mazdoor
Add Agency area allowence
Hire charges of miller
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
1.33 Sqmt
31.91 Kgs
0.06 Cum
0.80
0.10
1.00
25%
0.20
Nos.
Nos.
Nos.
Hour
0.14
Rate per Sqmt.
Page 150
16.00
4546.12
851.78
1 Sqmt
1000 Kgs
1 Cum
21.28
145.07
49.40
380.00
380.00
280.00
622.00
89.00
1 Each
1 Each
1 Each
304.00
38.00
280.00
155.50
17.80
1011.05
1 Hour
GF
1011.05
FF
1011.05
63.98
SF
1011.05
127.96
TF
1011.05
191.94
1011.05
141.55
1152.60
1075.03
150.50
1225.55
1139.01
159.46
1298.50
1202.99
168.42
1371.45
C-data
21
Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give
an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all
remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and
labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
PRIMARY COAT
Luppam finish
Ready mixed primer
Ist class painter
2nd class painter
TWO COATS OF PAINTING
Synthetic enamel paint
1st class painter
2nd class painter
Add Agency area allowence
Add 14% over heads
Rate per 1 Sqmt. for all Floors
0.1
0.07
0.021
0.049
Kg.
lit
Nos.
Nos.
330.00
135.00
400.00
320.00
1
1
1
1
Kg
Lt
Each
Each
33.00
9.45
8.40
15.68
0.12 lit
0.036 Nos.
0.084 Nos.
25%
230.00
400.00
320.00
41.28
1 lit
1 Each
1 Each
27.60
14.40
26.88
10.32
145.73
20.40
166.15
0.14
145.73
Total
AEE/AE
Executive Engineer
TW/ Gundala
TW/SD/ Sudimalla
TW/Division/ Bhadrachalam
Page 151
C-data
Supply and fixing of Door size 1.05 x 2.00 M Single Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board type with
commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm Long 6 nos,
MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm
long 1 no, MS Hold Fast 6 Nos including Including Labour charges for making of door, fixing of
fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.
Size : 1.05 x 2.00 BMT
E.01
Vertical port
Horizontal Port
1X
1X
2 X
1X
1x
2.00 X
1.05 X
1.01
1.01
0.075 X
0.075 X
0.10
0.10
=
=
1.96
0.03
0.008
0.037875
63567
2407.6
771
1526.27
376
1488.66
1.9796
1.96
3.96
Hold fasts
MS aldrom MBT G45
MS Tower bolts MBT G17
MH Butt hinges MBT G50
MS handles 125mm long MBT G35
Door stopper
Labour charges
20 % agency allowence
6.00
2.00
2.00
3.00
2.00
1.00
2.10
1262.10
7757.05
20
164
78
40
31
34
601
0.14
120.00
328.00
156.00
120.00
62.00
34.00
1262.10
252.42
7757.05
1085.99
8843.04
Supply and fixing of Window of Size 0.90 x 1.22 M shutter with window frame of Medium Teak
wood of Section 100 mm x 75 mm and shutter frame 3 verticals of Medium Teak wood of section
100mm x 32 mm thick and BISON PANEL CEMENT BONDED PARTICLE BOARD
CONFORMING TO IS 14276 and safety bars of 10 mm square bars at 100mm center to center
distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm Long 12nos, MSPC
Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6 Nos, MS Hold Fast 4 Nos Including
Labour charges for making Window frame and shutter, fixing of Fixtures etc., and cost and
conveyance of all materials to site, taxes extra complete for finished item of work.
Window frame
Size : 1.05 x 2.00 BMT
E.01
Vertical port
Horizontal Port
Shutter frame
Styles
Rails
CEMENT BONDED
PARICLE BOARD
CONFORMING TO IS
14276- 12 mm thick
BMT k89
1
1
1
1
3
2
4
4
0.90
1.22
0.41
1.115
0.27
0.075
0.075
0.07
0.07
0.975
0.10 =
0.10
0.035
0.035
0.02025
0.018
0.03855
63567
2450.51
0.004018
0.010927
0.014945
63567
950.01
0.5265
356
187.43
Grills flats
Horizantal
Verticals
2
2
2
2
0.77
1.09
Equalent wt.
Sq. bars
Horizantal
Verticals
1
1
5
7
0.79
0.77
1.07
Hold fasts
MS aldrom MBT G45
MS Tower bolts MBT G15
MH Butt hinges MBT G50
MS handles 125mm long MBT G35
Delux stay alluminium BMT G56
Labour charges
20 % agency allowence
3.85
7.49
11.34
8.845
14.686
6.00
2.00
2.00
3.00
2.00
2.00
0.98
586.58
5910.396
Equalent wt.
Total weght
3.08
4.36
7.44
5.840
0.78
46.75
20
164
35
40
31
116
601
0.14
686.55
120.00
328.00
70.00
120.00
62.00
232.00
586.58
117.32
5910.40
827.46
6737.86
Supply and fixing of Door size 0.75 x 2.00 M Single Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board type with
commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm Long 6 nos,
MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm
long 1 no, MS Hold Fast 6 Nos including Including Labour charges for making of door, fixing of
fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.
Size : 1.05 x 2.00 BMT
E.01
Vertical port
Horizontal Port
1X
1X
2 X
1X
1x
Hold fasts
MS aldrom MBT G45
MS Tower bolts MBT G17
MH Butt hinges MBT G50
MS handles 125mm long MBT G35
Labour charges
20 % agency allowence
Add 14% over heads
0.75
1.05 X
0.74
1.01
0.075 X
0.075 X
1.96
1.96
0.10
0.10
=
=
0.01125
0.008
0.019125
63567
1215.72
771
1118.26
376
1090.7
1.4504
2.90
3.00
2.00
2.00
3.00
2.00
1.50
901.50
5232.48
20
164
78
40
31
601
0.14
60.00
328.00
156.00
120.00
62.00
901.50
180.30
5232.48
732.55
5965.03
Supply and fixing of medium teak wood Ventilators of size 0.60x0.40M with safety bars of 10mm
square rods at 100mm centre to centre horizontally and vertically as per approved drawing of
Engineer-in-charge including red oxide primer of grade-I quality, sales and other taxes, cost and
conveyance of all materials to site, all labour charges etc., complete for finished item of work.
Size
Vertical port
Horizontal Port
Glass
Sq. bars
Horizantal
Verticals
1
1
2
2
0.40
0.6
0.075
0.075
1X
0.48
0.28
1
1
5
7
0.77
1.07
Equalent wt.
Total weght
Labour charges
0.78
0.006
0.009
0.015
0.06
3.85
7.49
11.34
8.845
8.860
0.24
63567
401
46.75
601
144.24
20 % agency allowence
Add 14% over heads
0.10
0.10
1564.868
0.14
953.51
24.06
414.21
144.24
28.85
1564.87
219.08
1783.95
Supply and Fixing of MS Hallow square pipe purlin of 40mmX40mmX4mm as required no. of sheets
of size 120mmX50mmX6mm welded to the ends of the purlin for fixing purlins including cost and
conveyance of all materials and all labour charges etc complete
Calculation of weight
of Purlins
40mmX40mm Square
medium hallow pipe
125X50X6mm
3.45
3.75
12.9375
0.125
2.4
0.6000
13.5375
Abstract
40mmX40mm Square
medium hallow pipe
125X50X6mm
Cost of MS bolts
Fabrication
Redoxide paint
Synthetic enamel
12.94
57.00
0.60
4.00
13.54
0.50
0.50
57.00
6.00
18.00
253.40
750.00
737.58
34.20
24.00
243.72
12.67
37.50
243.72
25 % agency allowence
Add 14% over heads
1150.6
60.93
0.14
RMT
1150.60
161.08
1311.68
380.20
Labour charges for roofing of provided with 0.5mm thick galvanized/prepaint profied sheet fixed to
the purlins with 14 size self drilling screws with neopreme washers are stiched with self
tapping/drilling screws end laps are to be sealed with 25X3mm duty tape unit-184.518m2
Material
GI Scan bolts & nuts
2X27
limpet washers
Abstract
884.00
5.00
1694.00
1.00
4420.00
1694.00
193.74
799.00
154801.37
0.84
0.91
385.00
295.00
323.40
268.45
25 % agency allowence
Add 14% over heads
591.85
161655.183
147.96
0.14
161655.18
22631.73
184286.91
998.75
Supply of roof accessories medium size ridge with 0.50mm thick 0.585 width
Rate as per BMS-W-59
Add 14% over heads
307.00
307.00
0.14
307.00
42.98
349.98
350.00
Qty
Description of Item
Rate
Unit
Per
Amount
1.52
2.13
3.24
0.03195
0.01140
0.04335
cum
cum
cum
2.89
sqm
40012.00
40012.00
1
1
Cum
Cum
1278.38
456.14
734.00
10.00
124.00
51.00
34.00
23.00
50.00
34.00
1
1
1
1
1
1
1
1
Sqm
Each
Each
Each
Each
Each
Each
Each
2121.26
60.00
124.00
102.00
68.00
138.00
50.00
68.00
380.00
320.00
280.00
1
1
1
day
day
day
87.47
171.87
106.81
295.00
Sqm
852.55
2.13
0.03195
0.01500
cum
cum
Supply and Fixing of Door with Double leaf shutter, Door Size 1.52x2.13 mtrs
with Sal wood Frame of sections size 75mm x 100mm with Flush Door Shutter
Solid Bond Wood black board type with commercial ply on both faces of 35mm
thick including cost of fixtures such as M.S.Powder Coated Tower Bolts 250mm
long 2 Nos, M.S.Powder Coated Handles 150mm long 2 Nos, 300mm long
M.S.Powder Coated Aldrops 1No, 125mm long M.S.Powder Coated butt
hinges 6Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers
2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of
all materials to site all Labour charges such as Fixing of Door Frame and
shutter Fixing in position , with Hardware fixtures etc., complete for finsihed
1
2
utem of work.
DOOR SIZE 1.52 x 2.13 mtrs : Area = 3.24 Sqm
Sal Wood for Frame
Verticals 2 x 2.13 x 0.075 x 0.10
= 0.0319
Horizental 1 x 1.52 x 0.075 x 0.10
= 0.00864
Total
= 0.04054
35mm thick flush door shutter of soild wood block board type with commercial
play on both faces
1x1.41x2.05 = 2.89 Sqm
ABSTRACT
a)MATERIAL
0.03195 Cost of Sal wood scantling of any size BMT-E-015 Item Sl No 122
0.01140 Cost of Sal wood scantling of any size BMT-E-015
3
4
5
6
7
8
9
10
2.89
6.00
1.00
2.00
2.00
6.00
1.00
2.00
11
12
13
0.23
0.54
0.38
2.89
Flush door shutters, solid bond wood block board type with commercial ply on
both faces.: 35 mm thick conforming to IS:2202 of ANAND/ RAAVILA/ KUTTY/
STANDARD/ SHUBHDWAR/ ITP (BMT-N.17)
MS Hold Fasts
Cost of 300mm Long M.S.Powder Coated Aldrops(BMT-G.45)
Cost of 250 long M.S.Powder Coated Towerbolts (BMT-G.17)
Cost of 150mm Long M.S.Powder Coated Handles (BMT-G.36)
Cost of 125mm long M.S.Powder Coated but hinges (BMT-G29)
Cost of Flat latch M.S.Powder Coated 300long (BMT-G.52)
Cost of Door Stoper (BMT-G.53)
a) LABOUR
Carpenter class I
Carpenter class II
Light mazdoor
Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter
14
Add overheads @
14%
long M.S.Powder Coated Aldrops 1No, 125mm long M.S.Powder Coated butt
hinges 6Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers
2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of
all materials to site all Labour charges such as Fixing of Door Frame on shutter
Fixing in position , with Hardware fixtures etc., complete for finsihed utem of
work.
DOOR SIZE 2.00 x 2.13 mtrs : Area = 4.26 Sqm
Sal Wood for Frame
Verticals 2 x 2.13 x 0.075 x 0.10
=
Horizental 1 x 2.00 x 0.075 x 0.10
=
4.26
P No 156
Total of soild
= wood block board type with commercial
35mm thick flush door shutter
play on both faces
1x1.89x2.05 = 3.87 Sqm
ABSTRACT
0.04695
cum
3.87
sqm
a)MATERIAL
1
40012.00
Cum
1278.38
40012.00
Cum
600.18
3.87
Flush Door Shutter Solid Bond Wood black board type with commercial ply on
both faces of 35mm thick
734.00
Sqm
2840.58
6.00
MS Hold Fasts
10.00
Each
60.00
1.00
134.00
Each
134.00
2.00
55.00
Each
110.00
2.00
37.00
Each
74.00
6.00
25.00
Each
150.00
1.00
54.00
Each
54.00
10
2.00
37.00
Each
74.00
11
0.22
Carpenter class I
380.00
day
82.93
12
0.51
Carpenter class II
320.00
day
162.95
13
0.36
Light mazdoor
280.00
day
101.27
3.87
Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter
295.00
Sqm
1141.65
14
Add overheads @
6863.94
960.95
7824.90
14%
hinges 6Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers
2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of
all materials to site all Labour charges such as Fixing of Door Frame on shutter
Fixing in position , with Hardware fixtures etc., complete for finsihed utem of
work.
DOOR SIZE 1.22 x 2.13 mtrs : Area = 2.60 Sqm
Sal Wood for Frame
Verticals 2 x 2.13 x 0.075 x 0.10
=
Horizental 1 x 1.22 x 0.075 x 0.10
=
Total
=
35mm thick flush door shutter of soild wood block board type with commercial
play on both faces
1x1.11x2.05 = 2.28 Sqm
ABSTRACT
1.22
0.03195
0.00915
0.04110
cum
cum
cum
2.28
sqm
2.13
2.6
a)MATERIAL
0.03195 Cost of Sal wood scantling of size 2.0 to 3.0 M
40012.00
Cum
1278.38
3
4
2.28
6.00
Flush door shutters, solid bond wood block board type with commercial ply on
both faces.: 35 mm thick conforming to IS:2202 of ANAND/ RAAVILA/ KUTTY/
STANDARD/ SHUBHDWAR/ ITP (BMT-N.17)
MS Hold Fasts
1.00
40012.00
Cum
366.11
734.00
10.00
1
1
Sqm
Each
1673.52
60.00
134.00
Each
134.00
P No 157
2.00
55.00
Each
110.00
2.00
37.00
Each
74.00
6.00
25.00
Each
150.00
1.00
54.00
Each
54.00
10
2.00
37.00
Each
74.00
11
0.22
Carpenter class I
380.00
day
82.93
12
0.51
Carpenter class II
320.00
day
162.95
13
0.36
Light mazdoor
280.00
day
101.27
2.28
Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter
295.00
Sqm
672.60
14
Add overheads @
4993.76
699.13
5692.90
14%
0.9
2.13
1.92
0.03195
cum
0.00675
cum
0.03870
cum
1.6
sqm
Total
35mm thick flush door shutter of soild wood block board type with commercial
play on both faces
1x0.78x2.05 = 1.599
ABSTRACT
a)MATERIAL
1
40012.00
Cum
1278.38
0.00675 Cost
Sal wood
scantling
size up
2.0 wood
M
Cost of
35mm
thick flush
doorofshutter
of to
soild
block board type with
commercial play on both faces
1.6
(BMT-N.17)
40012.00
Cum
270.08
734.00
Sqm
1174.40
3
4
6.00
MS Hold Fasts
10.00
Each
60.00
1.00
134.00
Each
134.00
2.00
55.00
Each
110.00
1.00
37.00
Each
37.00
3.00
25.00
Each
75.00
1.00
54.00
Each
54.00
10
1.00
37.00
Each
37.00
11
0.21
Carpenter class I
380.00
day
78.09
12
0.48
Carpenter class II
320.00
day
153.44
13
0.34
Light mazdoor
280.00
day
95.36
1.60
Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter
295.00
Sqm
472.00
a) LABOUR
4028.75
14
Add overheads @
14%
564.03
P No 158
4592.80
Supply and Fixing of Door with Double leaf shutter, Door Size 1.00x2.13 mtrs
with Sal Wood Frame of sections size 75mm x 100mm with Flush Door
Shutters Solid Bond Wood black board type with commercial ply on both faces
of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower
Bolts 200mm long 2 Nos, M.S.Powder Coated Handels 150mm long 1 No,
4
1
2
3
4
5
1.79
6.00
1.00
6
7
8
2.00
1.00
6.00
9
10
1.00
2.00
11
12
13
0.21
0.49
0.35
1.79
Cost 35mm thick flush door shutter of soild wood block board type with
commercial play on both faces
(BMT-N.17)
MS Hold Fasts
Cost of 300mm Long M.S.Powder Coated Aldrops(BMT-G.45)
Cost of MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 200 mm Long
(BMT-G.16)
Cost of 150mm Long M.S.Powder Coated Handles (BMT-G.36)
Cost of 125mm long M.S.Powder Coated but hinges (BMT-G29)
Cost of Flat latch M.S.Powder Coated 300long (BMT-G.52)
Cost of Door Stoper (BMT-G.53)
a) LABOUR
Carpenter class I
Carpenter class II
Light mazdoor
Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter
14
Add overheads @
0.9
2.13
1.92
0.03195
0.00750
0.03945
cum
cum
cum
1.79
sqm
40012.00
40012.00
1
1
Cum
Cum
1278.38
300.09
734.00
10.00
134.00
1
1
1
Sqm
Each
Each
1313.86
60.00
134.00
41.00
37.00
25.00
1
1
1
Each
Each
Each
82.00
37.00
150.00
54.00
37.00
1
1
Each
Each
54.00
74.00
380.00
320.00
280.00
1
1
1
day
day
day
79.60
156.41
97.20
295.00
Sqm
528.05
4344.59
608.24
4952.85
14%
1 rmt
303.00
Add overheads @
Rmt
303.00
14%
303.00
P No 159
Providing and fixing 30mm thick Solid panel PVC door shutter consisting of
frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x
19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have
a coat of steel primers of approved make and manufacture. M.S. frame shall
be covered with 5mm thick heat moulded PVC C channel of size 30 x 50mm
forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &
bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC
sheet as gap insert for top rail & bottom rail. Panelling of 10mm thick PVC
sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with
30mm wide x 5mm thick PVC sheet beading on either side, and joined together
with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm
width is to be stuck on the interior side of the C Channel using PVC solvent
adhesive. Complete as per direction of Engineer-in-charge, manufacturers
specification & drawing for finished item of work .
2205.00
14%
sqm
2205.00
2205.00
a)
b)
4450
SQM
Total
14%
4423.00
4450.00
-427.00
400.00
4423.00
5050.00
-427.00
400.00
5023.00
Total
14%
5023.00
Supply and Fixing of Ventilator of size 1.22 x 0.45 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods
@ 150mm c/c fixing in position ,complete for finsihed item of work
VENTILATOR SIZE 1.20 x 0.45 mtrs : Area = 0.54
1.2
0.45
0.54
P No 160
0.90
2.40
0.30
3.60
m
m
m
3.96
Kgs
=
=
total
3.15
2.40
5.55
4.357
Kgs
44.50
Cum
370.10
18.00
3.50
1
1
Kg
Kg
Add overheads @
Rate per / Each
14%
149.70
29.11
548.91
76.85
625.75
ABSTRACT
a)MATERIAL
8.32
a) LABOUR
8.32
8.32
Supply and Fixing of Ventilator of size 1.00 x 0.45 with 25mm x 25mm x 3mm thick equal L angles and 10mm square
rods @ 150mm c/c fixing in position ,complete for finsihed item of work
VENTILATOR SIZE 1.00 x 0.45 mtrs : Area = 0.45
1
X
Angular frame 25 x 25 x 3mm thick
Verticals 1 x 2 x 0.45
=
0.90
m
Horizental 1 x2 x 1.00
=
2.00
m
For Hold fasts 1 x 2 x 0.15 =
0.30
Total
=
3.20
m
10 mm square rods @ 150 mm c/c
Verticals 1 x 5 x 0.45
Horizental 1 x2 x 1.00
0.45
0.45
3.52
Kgs
=
=
total
2.25
2.00
4.25
3.336
Kgs
44.50
Cum
305.10
18.00
3.50
1
1
Kg
Kg
Add overheads @
Rate per / Each
14%
123.41
24.00
452.51
63.35
515.86
ABSTRACT
a)MATERIAL
6.86
a) LABOUR
6.86
6.86
10
Supply and Fixing of Ventilator of size 0.90 x 0.45 with 25mm x 25mm x 3mm thick equal L angles and 10mm
@ 150mm c/c fixing in position ,complete for finsihed item of work
VENTILATOR SIZE 0.90 x 0.45 mtrs : Area = 0.41
0.9
Angular frame 25 x 25 x 3mm thick
Verticals 1 x 2 x 0.45
=
0.90
Horizental 1 x2 x 0.90
=
1.80
For Hold fasts 1 x 2 x 0.15 =
0.30
Total
=
3.00
10 mm square rods @ 150 mm c/c
Verticals 1 x 5 x 0.45
Horizental 1 x2 x 0.90
square rods
X
0.45
0.405
3.3
Kgs
m
m
=
=
total
2.25
1.80
4.05
3.179
Kgs
44.50
Cum
288.33
18.00
3.50
1
1
Kg
Kg
Add overheads @
Rate per / Each
14%
116.63
22.68
427.63
59.87
487.50
ABSTRACT
a)MATERIAL
6.48
a) LABOUR
6.48
6.48
11
Supply and Fixing of Balcony Grill of size 3.60 x 1.50 with 25mm x 25mm x 3mm thick equal L angles and 10mm square
rods @ 150mm c/c fixing in position ,complete for finsihed item of work
GRILL SIZE 3.60x1.50 mtrs : Area = 5.40
Angular frame 25 x 25 x 3mm thick
Verticals 1 x 2 x 1.50
=
3.6
3.00
1.5
5.4
P No 161
Total
Horizental 1 x2 x 3.60
=
For Hold fasts 1 x 2 x 0.15 =
=
7.20
0.30
10.50
m
m
11.55
Kgs
=
=
total
28.50
32.40
60.90
47.81
Kgs
44.50
Cum
2641.36
18.00
3.50
1
1
Kg
Kg
Add overheads @
Rate per / Each
14%
1068.42
207.75
3917.53
548.45
4465.98
ABSTRACT
a)MATERIAL
59.36
a) LABOUR
59.36
59.36
12
Supply and fixing Sintex or equivalen PVC door frames made from extruded sections in overall dimensions of 40 X 48mm
having a wall thickness of 1.5mm with usual process variation of 0.3mm, complete, for finished item of work t.
1 rmt
228.00
14%
Rmt
13
228.00
228.00
PVC Door shutter conforming to IS: 10151-1982, the infill panel made of seamless one piece multi chamber PVC extruded
sections having overall dimensions of 610 mm x 20 mm with wall thickness of 1mm + 0.2mm with the top and bottom edges
of the shutter covered with end cap of the size 20 mm x 11 mm with the door shutter to be reinforced with special polymeric
reinforcements as per drawing for hardwares and fixtures. Stickers indicating the locations of hardware will be pasted at
appropriate places.for finished item of work.
1.4
2
3
2
1
1.4
1100.00
37.00
25.00
29.00
86.00
1
1
1
1
1
1 Sqm
Sqm
Each
Each
Each
Each
1540.00
74.00
75.00
58.00
86.00
1.4
Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter
295.00
Sqm
413.00
14%
2246.00
1604.00
224.56
1829.00
AEE/AE
Executive Engineer
Badangi
Vizianagaram
Vizianagaram
0
Guntur
P No 162
0%
14%
Amount
(Rs.)
Supplying and laying, filling, jointing and testing SWG SP-1 pipes of ISI make confirming to IS 1651 & 4127 1st
quality with air tight Cement joints in CM (1.5:1)prop. including excavation of trenches and socket pits in any soil
(except rock requiring blasting) and refilling with watering and tamping including cost and conveyance of all materials
to site and all labour charges for finished item of work (APSS NO 1301 & 1318)
DESCRIPTION
ITEM CODE
BMW-A.05
COEF.
1.00
UNIT
Rmt
20%
RATE
PER
UNIT
193.00
1.00 Rmt
102.00
1.00
0.00
193.00
20.40
213.40
add overheads @
14.00%
29.88
243.30
BMW-A.03
BMW-A.06
1.00
Rmt
20%
471.00
1.00 Rmt
138.00
1.00
0.00
471.00
27.60
498.60
add overheads @
14.00%
69.80
568.40
1.00
Rmt
20%
348.00
1.00 Rmt
138.00
1.00
0.00
348.00
27.60
375.60
add overheads @
14.00%
52.58
428.20
BMW-A.04
BMW-A.05
1.00
20%
Rmt
319.00
1.00 Rmt
102.00
1.00
0.00
319.00
20.40
339.40
add overheads @
Total rate per 1 Rmt
2
14.00%
47.52
386.95
Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement
mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing
strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with
20 dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils
(exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching
and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour
charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as
per Standard specification.
WS-DATA
P No 163
Sl.
No
DESCRIPTION
basic rate as per ssr item
ITEM CODE
BMW-B.03
COEF.
1.00
UNIT
Nos
20%
RATE
4814.00
0.00
PER
UNIT
1.00 Nos
1.00
0.00
Amount
(Rs.)
4814.00
0.00
4814.00
add overheads @
14.00%
673.96
Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement
mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing
strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with
20 dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of
soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.
basic rate as per ssr item
Area allowence on labour charges
5488.00
BMW-B.04
Nos
20%
7455.00
0.00
1.00 Nos
7455.00
1.00
0.00
7455.00
1043.70
8498.70
0.00
14.00%
add overheads @
Total rate per 1 Nos
Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using fly ash blocks of 225mm thick from approved source having a minimum crushing
strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with
20 dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of
soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.
basic rate as per ssr item
Area allowence on labour charges
BMW-B.02
1.00
Nos
20%
8288.00
0.00
1.00 Nos
8288.00
1.00
0.00
8288.00
1160.32
9448.35
0.00
14.00%
add overheads @
Total rate per 1 Nos
5
1.00
Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using fly ash blocks of 225mm thick from approved source having a minimum crushing
strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with
20 dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (3'-0") in all sorts of
soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.
basic rate as per ssr item
Area allowence on labour charges
add overheads @
Total rate per 1 Nos
WS-DATA
BMW-B.01
1.00
20%
14.00%
Nos
5246.00
0.00
1.00 Nos
5246.00
1.00
0.00
5246.00
734.44
5980.45
0.00
P No 164
Sl.
No
6
Amount
(Rs.)
Supplying and fixing 150.00mmx100.00mm SWG gully trap 1st class confirming to ISI 651 & 4127 with CI grating
and constructing single brick masonry wall chamber of size 20" x 14" x 12 in CM (1:6) prop. Over a CC (1:5:10)prop.
bed, and fitted with 304.8 mm x 225.6 mm(12" x 9") CI frame and hinged cover and plastering 12mm thk. in CM (1:4)
prop. both inside and outside surfaces and including cost and conveyance of all materials to site, labour charges etc.,
complete for finished item of work. SSR ITEM NO.527
DESCRIPTION
ITEM CODE
BMW-A.72
BMW-A.74
COEF.
1.00
UNIT
Nos
20%
RATE
PER
UNIT
530.00
1.00 Nos
530.00
23.00
1.00
4.60
534.60
74.84
609.45
0.00
14.00%
add overheads @
Total rate per 1 Nos
Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated
Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including
wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms
Seiko or equivalent including cost and conveyance of all materials to site, labour charges etc. complete for finished item
of work
A Basic rate as per ssr item
Area allowence on labour charges
BMW-D24
BMW-D28
add overheads @
Total rate per 1 Nos
B Basic rate as per ssr item 12.7MM
DIA PVC conection with brass
union nut CP coated
BMW-I.48
Area allowence on labour charges
BMW-I.49
BMW-E 05
BMW-E 06
add overheads @
Total rate per 1 Nos
D Basic rate as per ssr item 38.1 MM
CP WASTE COUPLING half or full
thread 1st quality indian make
paryware or equivalent
BMW-E31
Area allowence on labour charges
BMW-E32
add overheads @
Total rate per 1 Nos
E Basic rate as per ssr item 31.75 MM
dia PVC fleible waste pipe of 914.4
mm length of first quality
BMW-G05
WS-DATA
Nos
1323.00
1.00 Nos
1323.00
288.00
1.00
57.60
1380.60
193.28
1573.90
85.00
1.00 Nos
16.00
1.00
403.00
1.00 Nos
403.00
35.00
1.00
7.00
410.00
57.40
467.40
201.00
1.00 Nos
201.00
23.00
1.00
4.60
205.60
28.78
234.40
21.00
1.00 Nos
0.00
14.00%
1.00
Nos
20%
0.00
14.00%
add overheads @
Total rate per 1 Nos
C Basic rate as per ssr item 12.7 MM
ANGLE STOP COCK first quality
Indian make 400 gms Seiko
Area allowence on labour charges
1.00
20%
1.00
Nos
20%
0.00
14.00%
1.00
Nos
20%
0.00
14.00%
1.00
Nos
85.00
3.20
88.20
12.35
100.55
21.00
P No 165
Sl.
No
DESCRIPTION
20%
add overheads @
Total rate per 1 Nos
TOTAL COST (A+B+C+D+E)
14.00%
RATE
0.00
PER
1.00
UNIT
0.00
Rs
BMW-I.28
BMW-I.29
Amount
(Rs.)
0.00
21.00
2.94
23.95
2400.20
1.00
Nos
20%
206.00
1.00 Nos
206.00
10.00
1.00
2.00
208.00
29.12
237.15
0.00
14.00%
add overheads @
Total rate per 1 Nos
Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP
screws 1st quality including cost and conveyance of all materials, labour charges etc., complete for finished item of work
in all floors.
BMW-I 105
BMW-I.106
1.00
Nos
20%
435.00
1.00 Nos
435.00
95.00
1.00
19.00
454.00
63.56
0.00
14.00%
add overheads @
Total rate per 1 Nos
11
UNIT
Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws etc., complete including
cost and conveyance of all materials, labour charges for fixing etc., complete for finished item of work in all floors as per
ssr item no 598
10
COEF.
ITEM CODE
517.60
Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with brackets and aluminium
screws including cost and conveyance of all materials, labour charges etc., complete for finished item of work.
Basic rate as per ssr item
BMW-I 20
BMW-I 21
1.00
Nos
20%
139.00
1.00 Nos
139.00
36.00
1.00
7.20
146.20
20.47
166.70
0.00
14.00%
add overheads @
Total rate per 1 Nos
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and
conveyance of all materials, labour charges etc., complete for finished item of work in all floors.
a) 300 grams
Basic rate as per ssr item
Area allowence on labour charges
BMW-E 09
BMW-E 10
add overheads @
Total rate per 1 Nos
b) 400 gms
BMW-E 07
Basic rate as per ssr item
Area allowence on labour charges
BMW-E 08
add overheads @
Total rate per 1 Nos
WS-DATA
1.00
Nos
20%
219.00
1.00 Nos
219.00
23.00
1.00
4.60
223.60
31.30
254.90
345.00
1.00 Nos
345.00
23.00
1.00
4.60
349.60
48.94
398.55
0.00
14.00%
1.00
20%
14.00%
Nos
0.00
P No 166
Sl.
No
12
Amount
(Rs.)
Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and
fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement,
fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all
materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
DESCRIPTION
ITEM CODE
BMW-G12
BMW-G.152
add overheads @
Total rate per 1 RMT
(b) 110mm dia 3 Mts single socket
BMW-G13
Basic rate as per ssr item
Area allowence on labour charges
BMW-G.152
13
COEF.
UNIT
1.00 RM
20%
RATE
PER
UNIT
368.00
3.00 RMT
122.67
58.00
1.00
11.60
134.27
18.80
153.10
440.00
3.00 RMT
146.67
58.00
1.00 RM
11.60
158.27
22.16
180.45
0.00
14.00%
1.00 RM
20%
RM
14.00%
add overheads @
Total rate per 1 RMT
Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings in ground or
on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with
necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making
good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges complete for finished item of work.
a) 15mm Nominal bore
Basic rate as per ssr item
Area allowence on labour charges
BMW-F79
BMW-F80
add overheads @
Total rate per 1 RMT
b) 20mm Nominal bore
BMW-F81
Basic rate as per ssr item
Area allowence on labour charges
BMW-F82
1.00 Rmt
151.00
1.00 Rmt
151.00
Rmt
33.00
1.00
6.60
157.60
22.06
179.70
1.00 Rmt
168.00
1.00 Rmt
168.00
Rmt
33.00
1.00 Rmt
6.60
174.60
24.44
199.05
1.00 Rmt
220.00
1.00 RMT
220.00
33.00
1.00 Rmt
20%
14.00%
20%
14.00%
add overheads @
Total rate per 1 RMT
c) 25mm Nominal bore
Basic rate as per ssr item
BMW-F83
BMW-F84
20%
Rmt
6.60
226.60
add overheads @
Total rate per 1 RMT
D 40mm Nominal bore
Basic rate as per ssr item
Area allowence on labour charges
14.00%
BMW-F87
BMW-F88
31.72
258.35
1.00 Rmt
20%
Rmt
346.00
1.00 RMT
36.00
1.00 Rmt
346.00
7.20
353.20
add overheads @
Total rate per 1 RMT
14.00%
49.45
402.65
WS-DATA
P No 167
Sl.
No
DESCRIPTION
Basic rate as per ssr item
Area allowence on labour charges
ITEM CODE
BMW-F89
BMW-F90
1.00 Rmt
20%
Rmt
RATE
PER
UNIT
373.00
1.00 RMT
55.00
1.00 Rmt
Amount
(Rs.)
373.00
11.00
384.00
53.76
437.80
BMW-F91
BMW-F90
1.00 Rmt
20%
Rmt
661.00
1.00 RMT
661.00
55.00
1.00 Rmt
11.00
672.00
94.08
14.00%
add overheads @
Total rate per 1 RMT
14
UNIT
14.00%
add overheads @
Total rate per 1 RMT
F 65mm Nominal bore
Basic rate as per ssr item
Area allowence on labour charges
COEF.
766.10
Supplying and fixing Gunmetal Gate ( GM peet ) valve as per IS-778 Class - I , Indian make heavy type including cost
and conveyance of all materials , labour charges etc. complete for finished item of work.
15 mm dia nominal bore
Basic rate as per ssr item
Area allowence on labour charges
BMW-F21
BMW-F22
1.00
20%
add overheads @
Total rate per 1 No
a) 20mm Nominal bore
BMW-F19
Basic rate as per ssr item
Area allowence on labour charges
BMW-F20
14.00%
add overheads @
Total rate per 1 No
b) 25mm Nominal bore
BMW-F17
Basic rate as per ssr item
Area allowence on labour charges
BMW-F18
14.00%
add overheads @
Total rate per 1 No
c) 40mm Nominal bore
BMW-F25
Basic rate as per ssr item
Area allowence on labour charges
BMW-F26
add overheads @
Total rate per 1 No
d) 50mm Nominal bore
BMW-F27
Basic rate as per ssr item
Area allowence on labour charges
BMW-F28
WS-DATA
1.00
Nos
0%
1.00
Nos
20%
306.00
1.00 Nos
306.00
36.00
1.00
7.20
313.20
43.85
357.05
414.00
1.00 Nos
414.00
36.00
1.00
0.00
414.00
57.96
472.00
610.00
1.00 Nos
610.00
36.00
1.00
7.20
617.20
86.41
703.65
0.00
0.00
0.00
14.00%
1.00
Nos
20%
1243.00
55.00
1.00 Nos
1243.00
1.00
11.00
1254.00
175.56
1429.60
0.00
14.00%
1.00
Nos
20%
1795.00
74.00
1.00 Nos
1795.00
1.00
14.80
1809.80
253.37
2063.20
0.00
14.00%
add overheads @
Total rate per 1 No
e 65 mm nominal bore
Basic rate as per ssr item
Nos
BMW-F29
1.00
Nos
3424.00
1.00 Nos
3424.00
P No 168
Sl.
No
DESCRIPTION
Area allowence on labour charges
ITEM CODE
BMW-F30
COEF.
UNIT
20%
RATE
92.00
PER
1.00
UNIT
0.00
Amount
(Rs.)
18.40
3442.40
add overheads @
14.00%
481.94
3924.35
Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement
of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5
pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS
15778:2007
28.60mm OD Pipe - SDR 13.5
Basic rate as per ssr item
BMW-l 222
BMW-F30
1.00
Rmt
20%
198.00
0.00
1.00 Rmt
1.00
0.00
198.00
0.00
198.00
add overheads @
14.00%
27.72
225.75
BMW-l 229
BMW-F30
1.00
Rmt
20%
289.00
0.00
1.00 Rmt
1.00
0.00
289.00
0.00
289.00
add overheads @
14.00%
40.46
Supply and fixing of white glazed flat back bowl urinals of size 440 mm x 265 mm x 315 mm with internal rim flushing
mm fixied with screws complete inidan make (HS W/Parry/Neycer) conforming to IS 2556 -1995 as approved be
Engineer - in - charge 12.7 mm PVC connection with brass plumber union nuts CM Coated. including 12.70 mm push
cock 1st qulaity of approved make including supply & fixing 31.75 m dia PVC flexible waser pipe of 914.40 mm lenght
of 1st including cost and conveyance of all materials to site labour charges etc., complete for finished item of work for all
floors
Basic rate as per ssr item
Area allowence on labour charges
16
BMW-D33
BMW-D36
1.00
Nos
20%
690.00
1.00 Nos
690.00
115.00
1.00
23.00
713.00
99.82
812.85
0.00
14.00%
add overheads @
Total rate per 1 No
Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop
including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all
labour charges etc. complete
Basic rate as per ssr item
Area allowence on labour charges
17
329.50
BMW-i63
BMW-i64
1.00
Nos
20%
62.00
1.00 Nos
62.00
18.00
1.00
3.60
65.60
9.18
74.80
0.00
14.00%
add overheads @
Total rate per 1 No
Supplying and fixing 150.00mmx100.00mm SWG gully trap 1st class confirming to ISI 651 & 4127with CI grating and
constructing single brick masonry wall chamber of size 20" x 14" x 12 in CM (1:6) prop. Over a CC (1:5:10)prop. bed,
and plastering 12mm thk. in CM (1:4) prop. both inside and outside surfaces and fitted with 304.8MM X 288.6 MM
(12"X9") CI frame and hinged cover including labour for fixing and laying the SWG junctions/plugs/bends with air
tightcement joints etc., complete including cost and conveyance of all materials to site, labour charges etc., complete for
finished item of work as directed by Engineer-in-charge.
Basic rate as per ssr item
WS-DATA
BMW-A72
1.00
Nos
530.00
1.00 Nos
530.00
P No 169
Sl.
No
DESCRIPTION
Area allowence on labour charges
ITEM CODE
BMW-A74
BMW-C41
BMW-C42
23.00
PER
1.00
UNIT
0.00
Amount
(Rs.)
4.60
534.60
74.84
609.45
1.00
Nos
20%
279.00
1.00 Nos
279.00
45.00
1.00
9.00
288.00
40.32
328.35
26.00
1.00 Nos
15.00
1.00
0.00
BMW-i12
BMW-i13
1.00
Nos
20%
0.00
26.00
3.00
29.00
4.06
33.10
361.45
14.00%
add overheads @
Total rate per 1 No
Total cost (A +B)
Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to
IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and
fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm
alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to
site, cost of CC bed, labour charges and seigniorage charges etc., complete for finished item of work.
Basic rate as per ssr item
Area allowence on labour charges
Providing brick masonry seat
BMW-D04
BMW-D06
BMW-D09
1.00
Nos
1052.00
1.00 Nos
1052.00
Nos
288.00
253.00
1.00 0.00
1.00 Nos
57.60
253.00
1362.60
190.76
1553.40
20%
1.00
14.00%
add overheads @
21
20%
RATE
14.00%
add overheads @
Total rate per 1 No
20
UNIT
14.00%
add overheads @
Total rate per 1 No
Supplying and fixing CI Nahani traps 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs 1st quality ISI marked
conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice
for all floors including cost and conveyance of all materials to site, labour charges etc., complete for finished item of
work.
18
19
COEF.
BMW-G01
BMW-G02
1.00
Lit
20%
5.00
1.00 Lit
5.00
0.00
1.00
0.00
5.00
0.70
5.70
0.00
14.00%
add overheads @
Total rate per 1 Ltr
Supplying and fixing 609.6 mm x 457.2 mm x 254 mm RCC terrazo finished sink (or constructed at site with 50.80 mm
thick) brass plug and chain incluiding CI cantilever brackets, 31.75 mm dia PVC flexible waste pipe 914.4 mmm length
of 1st quality including cost and conveyance fo all materials labour charges etc., complete for finished item of work
Basic rate as per ssr item
Area allowence on labour charges
WS-DATA
BMW-D40
BMW-D41
1.00
0%
Nos
587.00
1.00 Nos
184.00
1.00
0.00
587.00
0.00
P No 170
Sl.
No
DESCRIPTION
ITEM CODE
COEF.
UNIT
RATE
PER
UNIT
Amount
(Rs.)
587.00
82.18
669.20
14.00%
add overheads @
Total rate per 1 No
Supply and fixing of stainless steel sink with drain board of size 914.4 mm x 457.2 mm 1 mm thick of indian make on
cantilever brackets including 32 mm CP waste coupling including supply & fixing of 31.75 mm dia PVC flexible waste
pipe of 914.4 mm length of 1st quality, chasing brick masonry wall and making good after construction i.e., restoring to
original srufaces etc., complete including cost and conveyance of all materials and labour charges for all operations etc.,
complete for finished item of work in all floors
22
BMW-I119
BMW-I120
1.00
Nos
20%
5826.00
1.00 Nos
5826.00
414.00
1.00
82.80
5908.80
827.23
6736.05
0.00
14.00%
add overheads @
Total rate per 1 No
Supply & Fixing of 22" dia RCC Cover for manhole with nominal reinforecement 3" thick with hooks for lfifting
including cost and conveyance of all materials, labour charges etc., complete for finished tiem of work
23
BMW-I130
1.00
Nos
20%
598.00
0.00
1.00 Nos
598.00
1.00
0.00
598.00
83.72
681.75
0.00
14.00%
add overheads @
Total rate per 1 No
Supply and fixing of 100 mm dia CI Vent pipe of 3 mts length double socket fitted with AC cowl and mosquito proof
wire mesh including cost and conveyance of all materials to site and labour charges for placing and fixing in position
etc., complete for finished item of work.
BMW-H05
1.00
Nos 1765.00
1.00 Nos
1765.00
Basic rate as per ssr item
24
20%
0.00
1.00
0.00
0.00
1765.00
247.10
2012.10
14.00%
add overheads @
Total rate per 1 No
Supply and fixing of 75 mm dia CI Vent pipe of 3 mts lenth fitted with AC cowl and mosquito proof wire mesh including
cost and conveyance of all materials to site and labour charges for placing and fixing in position etc., complete for
finished item of work.
BMW-H04
1.00
Nos 1308.00
1.00 Nos
1308.00
Basic rate as per ssr item
25
20%
0.00
1.00
0.00
0.00
1308.00
183.12
1491.15
14.00%
add overheads @
Total rate per 1 No
Supply and fixing of CI pipes 101.6mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with
cement caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the masoery
walls in CM (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc., complete
including cost and conveyance of all materials to site all labour charges sales and other taxes on all materials etc.,,
complete for finished item of work all Floors
26
a
Basic rate as per ssr item
Area allowence on labour charges
add overheads @
Total rate per 1 No
WS-DATA
BMW-CO2
BMW-CO7
1.00
20%
14.00%
Nos
737.00
1.00 Nos
737.00
173.00
1.00
34.60
771.60
108.02
879.65
0.00
P No 171
Sl.
No
27
Amount
(Rs.)
Supply and fixing of CI pipes 76.2 mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with
cement caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the masoery
walls in CM (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc., complete
including cost and conveyance of all materials to site all labour charges sales and other taxes on all materials etc.,,
b complete for finished item of work all Floors
BMW-CO1
1.00
Nos
645.00
1.00 Nos
645.00
Basic rate as per ssr item
DESCRIPTION
28
BMW-CO7
COEF.
UNIT
20%
RATE
173.00
PER
1.00
UNIT
0.00
34.60
679.60
95.14
774.75
14.00%
add overheads @
Total rate per 1 No
Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm
(3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and
convenyance of all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished
item of work
Basic rate as per ssr item
Area allowence on labour charges
29
ITEM CODE
BMW-B06
1.00
0%
Nos
3020.00
0.00
1.00 Nos
1.00 0.00
3020.00
0.00
3020.00
422.80
3442.80
14.00%
add overheads @
Total rate per 1 No
Supply and Fixing of AC Cowls 88.9 mn dia with all necessary requirements including all operational , incidental sales
and other taxes and all labour charges etc., complete including cost and convenyance of all materials complete for
finished item of work for all Floors.
BMW-I36
1.00
Nos
60.00
1.00 Nos
60.00
Basic rate as per ssr item
12.00
1.00 0.00
2.40
Area allowence on labour charges BMW-I37
20%
62.40
14.00%
8.74
add overheads @
71.15
Total rate per 1 No
30
Supply and Fixing of AC Cowls 63.50 mn dia with all necessary requirements including all operational , incidental sales
and other taxes and all labour charges etc., complete including cost and convenyance of all materials complete for
finished item of work for all Floors.
BMW-I38
1.00
Nos
41.00
1.00 Nos
41.00
Basic rate as per ssr item
9.00
1.00 0.00
1.80
Area allowence on labour charges BMW-I39
20%
42.80
14.00%
5.99
add overheads @
48.80
Total rate per 1 No
31
Construction of 50.8mm thick RCM Baffle wall with 2.267 Kg steel and rabit wire mesh in CM (1:3) prop: with fine
rendering in neat cement in septic tank including cost and convenyance of all materials to site, seigonarage charges sales
and othe taxes on all materials , and all labour charges etc., complete for finished item of work.
BMW-I95
1.00
Nos
213.00
1.00 Nos
213.00
Basic rate as per ssr item
Area allowence on labour charges
32
BMW-I97
20%
36.00
1.00
0.00
7.20
220.20
30.83
251.05
14.00%
add overheads @
Total rate per 1 No
Supply and Fixing of C.I. (Spun ) Soil waste and ventilating pipe of 3.00 Mt length of 100mm dia with double socket for
vent over septic tank including cost and convenyance of all materials to site, all labour charges sales and all other taxes
on all materials etc., complete for finished item of work.
BMW-H05
1.00
Nos 1765.00
1.00 Nos
1765.00
Basic rate as per ssr item
WS-DATA
P No 172
Sl.
No
DESCRIPTION
ITEM CODE
33
37
BMW-I36
BMW-I37
1.00
Nos
20%
PER
UNIT
0.00
60.00
1.00 0.00
1.00 Nos
12.00
1.00
0.00
Amount
(Rs.)
0.00
60.00
2.40
1827.40
255.84
2083.25
BMW-I88
20%
BMW-I90
20%
115.00
1.00
0.00
9.00
1.00
0.00
1.80
54.80
7.67
62.50
14.00%
add overheads @
Total rate per 1 No
Supply and Fixing 10 Litres capacity Single Flush white PVC low level flushing system parryware, slimline with internal
components and short bend including cost and conveyance of all materials to site, all labour charges, sales and other
taxes on all materials etc., complete for finished item of work for all floors.
Basic rate as per ssr item
Area allowence on labour charges
36
20%
RATE
23.00
1668.00
14.00%
233.52
add overheads @
Total
1 Noof CI Steps for Septic Tank / Manhole complete for finished item of work including cost and 1901.55
Supplyrate
andper
Fixing
conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished
item of work.
BMW-I89
1.00
Nos
53.00
1.00 Nos
53.00
Basic rate as per ssr item
Area allowence on labour charges
35
UNIT
14.00%
add overheads @
Total rate per 1 No
Supply and Fixing of 914.4mm x 457.2mm Light Weight CI Manhole Frame and Cover (30 Kgs) complete for finished
item of work including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all
materials etc., complete for finished item of work.
BMW-I86
1.00
Nos 1645.00
1.00 Nos
1645.00
Basic rate as per ssr item
Area allowence on labour charges
34
COEF.
BMW-G08
1.00
Nos
20%
1323.00
0.00
1.00 Nos
1323.00
1.00
0.00
1323.00
185.22
1508.25
0.00
14.00%
add overheads @
Total rate per 1 No
Supply & Fixing 4" dia (101.6 mm) CI Plug (Door) bends 1st quality ISI marked conforming to IS : 1729-1979 with
cement caulked joints and fixing as per site requirements with standard practice including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for all
floors.
Basic rate as per ssr item
BMW-C12
BMW-C14
1.00
Nos
20%
332.00
1.00 Nos
332.00
55.00
1.00
11.00
343.00
48.02
391.05
0.00
14.00%
add overheads @
Total rate per 1 No
Supply & Fixing 3" dia (76.2 mm) CI Plug (Door) bends 1st quality ISI marked conforming to IS : 1729-1979 with
cement caulked joints and fixing as per site requirements with standard practice including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for all
floors.
Basic rate as per ssr item
Area allowence on labour charges
add overheads @
Total rate per 1 No
WS-DATA
BMW-C11
BMW-C14
1.00
20%
14.00%
Nos
284.00
1.00 Nos
284.00
55.00
1.00
11.00
295.00
41.30
336.30
0.00
P No 173
Sl.
No
38
Amount
(Rs.)
Manufacture, supply & delivery of 50mm of outer dia HDPE pipes of 6Kg/Sqcm. conforming to IS 4984 - 1995
including transportation to site including laying and jointing of HDPE pipes as per BIS No.7634 Part -II/75 including
fixing required specials /fittings including excavation of trenches up to 0.50 mts depth in all soils except rock requires
blasting and refilling trenches after laying and jointing of pipes as per standard specifications including cost and
conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished
item of work.
DESCRIPTION
ITEM CODE
COEF.
UNIT
RATE
PER
UNIT
Table 17.1/PH
1.00
RMT
49.00
1.00 RMT
12-b / PH
1.00
RMT
21.00
1.00
20%
RMT
21.00
49.00
21.00
4.20
74.20
10.39
84.60
14.00%
add overheads @
Total rate per 1Rmt
Construction of 60,000 liters capacity OHSR(VRCC) with 12.7 mts staging without seismic analysis including fixtures
OF rcc OR ALLUMINIUM LADDER INSIDE 0.45 Mtrs wide, MS ladder on the outside . Lighting including condutor
& earthing etc., RCC ventilators with copper or stainless steel skyproof mesh, Manhole frame and cover 0.75x0.75mts
with frame as per IS specifications (light duty - 2 Nos), Ralling with 32mm dia GI pipes (A class in 2 nos alround OHSR
fixed in RCC (1:2:4) poles of size 100x75x75mm with 1.50mts intervals alround periphery on top of the OHSR for
smaller capacities,Water level indicator of good quality with ebonite /copper float approved pattern - 1 no
39
1.00
Lt
20.94
1.00 Lt
-0.01
0.02
20.95
(42000-41000)*0.00002
a)
2.10
23.05
3.23
26.30
14.00%
add overheads @
Total rate per 1 Lt
40
20.94
WS-DATA
1.00
14.00%
Kg
58.00
1.00 Kg
58.00
8.12
66.15
P No 174
Sl.
No
DESCRIPTION
ITEM CODE
COEF.
UNIT
RATE
PER
UNIT
Amount
(Rs.)
1.00 Kg
Kg
58.00
1.00 Kg
14.00%
Table 27.1
Add overheads @
1.00
nos
4468.00
1.00 nos
Add overheads @
Kg
88.00
1.00 Kg
14.00%
Add overheads @
1.00
88.00
12.32
100.35
4468.00
625.52
5093.55
58.00
8.12
66.15
14.00%
Table 24-VI /
PH
58.00
8.12
66.15
f)
58.00
14.00%
1.00
e)
Kg
kg
77.00
1.00 kg
14.00%
77.00
10.78
87.80
41
Add overheads @
Total rate per 1 Kg
Construction of Perforated Dry
Brick Masonry without using CM
and keeping vertical dry joints of 15
to 20mm as directed by the
Engineer in Charge including
cost and conveyance of all amterials
to site seignorage charges, sales and
other taxes, all labour charges etc.,
complete item of work for Soak Pit.
Cost of Bricks
1.00
14.00%
Kg
93.00
1.00 Kg
93.00
13.02
106.05
322.50
654 Nos.
4474.82
1000 Nos.
2926.53
98.10 Nos.
4474.82
-1000 Nos.
-438.98
Brick layer
1.28 Each
380.00
1 Each
486.40
Man Mazdoor
0.64 Each
280.00
1 Each
179.20
Women Mazdoor
1.93 Each
280.00
1 Each
540.40
WS-DATA
3693.55
P No 175
20%
14%
Index Specific
-code
ation No.
1
1
1.4.2
(C)
Description
QTY
Rate Rs.
Amount Rs.
100 M
Each
1
12
3030.00
24.00
3030.00
288.00
Each
12
6.00
0.00
72.00
3390.00
0.00
3390.00
2
2
2
400.00
320.00
320.00
800.00
640.00
640.00
416.00
1.4.2
(b)
elec-1.2.3
elec-8.1.10
elec-1.4.12
ele-1.2.39
day
day
day
20%
Each
kg
0.00
El Data
ohr
2
3
4
5
6
Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs
with all required accessories including masonary work and labour charges etc., complete.
Make : Sudhakar/ Maco Plast / Modi
Unit
day
day
day
12
50
6.00
5.60
72.00
280.00
3228.00
0.00
3228.00
2
2
2
400.00
320.00
320.00
800.00
640.00
640.00
P No 176
Description
Index Specific
-code
ation No.
1
2
elec-8.1.79 Mason Ist class
Add area allowence on labour charges @
2.1.1
Unit
QTY
Rate Rs.
3
day
20%
4
2
5
350.00
6
700.00
556.00
each
each
no
1001.00
1001.00
6
6
1
18.00
21.00
44.00
108.00
126.00
44.00
0.00
day
day
day
20%
0.6
1.2
0.6
14%
400.00
320.00
320.00
240.00
384.00
192.00
163.20
979.20
137.09
2095.00
349.20
Wiring with 2 runs of1.0 Sqmm PVC insulated flexible copper cable,(phase,neutral) in the
metalic/nonmetalic conduit pipe with 6A flush type two way switch control, ceiling rose and 3mm thick
hylam sheet covering to MS switch control box including all labour charges etc., complete for staircase
in Residential buildings as required. Make: Finolex L&T.
Rate as per light point in non residential
Building=327.40
For stair case
2.1.4
1.5
327.40
491.10
Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with
earth continuity including wire leads, earth connections along with all labour charges etc., complete.
Makes : Anchor / Gold Medal Olive /Million Zoom
Taking Output = each
a) Material
1279.00
0.00
1279.00
ohr
Amount Rs.
each
each
0.00
1
1
27.00
18.00
27.00
18.00
45.00
0.00
P No 177
Index Specific
-code
ation No.
Description
Unit
QTY
Rate Rs.
Amount Rs.
6
45.00
ohr
day
0.067
400.00
26.80
elec-8.1.85 Helpers
Add area allowence on labour charges @
day
20%
0.067
320.00
21.44
9.65
57.89
8.10
14%
111.00
wiring with 2 runs of 14/0.3(1.0 Sqmm) PVC insulated FR flexible copper cable,
(phase,neutral) in the metalic/nonmetalic conduit pipe with 6A flush type switch control,
switch control box including all labour Charges etc., complete. Make : Phinolex / L&T
Taking out put=15 Points
a) Materials
elec 1.5.1 14/0.3(1.0Sqmm)FRLS
flexible copper wire
elec 1.7.1 6A switch@ 18/- each
PVC
insulated 100M
1001.00
1001.00
each
15
18.00
270.00
each
15
27.00
405.00
0.00
0.00
1676.00
Labour charges :
elec 8.1.77 Skilled Electrician
day
1.5
400.00
600.00
day
1.5
320.00
480.00
day
20%
0%
1.5
320.00
480.00
312.00
0.00
3548.00
2.1.5
236.53
Supply and Fixing of 16A 3pin and 6A 3pin plug socket with and 16A switch control duly
recessed in wall with MS switch deep box of 6" x8" x2 1/2" size covered with hylam sheet
including earth connections and all labour charges etc., complete. Plug Socket.
Makes : Gold Medal / ANCHOR/ OLIVE/Million ZOOM.
Taking Output = each
a) Material
elec-1.3.5 20 x 15 cms (8" x6") MS switch deep box
elec-1.4.18 21.6 x 16.6 cms (8.5 x 6.5") 3mm thick hylam
sheet
each
each
1
1
162.00
26.40
162.00
26.40
each
146.00
0.00
146.00
334.40
0.00
334.40
0.1
400.00
40.00
El Data
day
P No 178
Description
Index Specific
-code
ation No.
1
2
elec-8.1.78 Semi Skilled Electrician
elec-8.1.85 Helpers
Unit
QTY
Rate Rs.
3
day
day
4
0.1
0.1
5
320.00
320.00
20%
14%
Amount Rs.
ohr
6
32.00
32.00
20.80
124.80
17.47
476.70
elec-1.3.1 MS box
54.00
54.00
0.00
394.00
0.00
394.00
0.00
day
0.2
400.00
80.00
day
0.2
320.00
64.00
elec-8.1.85 Helpers
day
0.12
320.00
38.40
3.1.2
20%
36.48
100 M
1001.00
0.00
1001.00
0.00
1001.00
b) Labour charges :
elec-8.1.77 Skilled Electrician
day
0.34
400.00
136.00
day
320.00
320.00
elec-8.1.85 Helpers
day
0.34
320.00
108.80
20%
14%
112.96
677.76
94.89
1773.65
17.75
El Data
P No 179
Description
Index Specific
-code
ation No.
1
3.1.4.a
10
Unit
QTY
Rate Rs.
Amount Rs.
ohr
2
3
4
5
6
Supply and run of 2 of 2.5 Sq mm PVC insulated flexible copper cable and 1 run of 1.00 Sq
mm flexible PVC insulated flexible copper cable in the existing conduit pipe for run of
mains from main panel board to TPN DB'S to swithc boards connections etc.,
Taking Output = 100 M
a) Material
100 M
2389.20
4778.40
100 M
1001.00
1001.00
5779.40
0.00
5779.40
0.00
day
1.005
400.00
402.00
day
320.00
960.00
day
1.005
320.00
321.60
11
3.1.5
20%
14%
2020.32
282.84
8082.56
80.85
Supply and 2 runs of 4.0 sq mm PVC insulated flexible copper cable and 1 run of 2.5 sq.mm
flexible PVC insulated copper cable for earthing in the existing conduit pipe for power point
including labour charges for 16A sockets. Make: Finolex / L&T
12
336.72
1
1
2
1
3650.00
2390.00
7300.00
2390.00
9690.00
0.00
9690.00
1.34
4
1.34
400.00
320.00
320.00
536.00
1280.00
428.80
0.00
0.00
11934.80
119.35
day
day
day
0%
0%
Supply and run of 4 of 10 Sq mm PVC insulated flexible copper cable and 1 run of 4 Sq mm
PVC insulated flexible copper cable in the existing conduit pipe for run of mains from main
panel board to TPN DB'S with pin type lugs and connections etc.,complete
Taking Output = 100 M
a) Material
8600.00
34400.00
3650.00
3650.00
P No 180
Description
Index Specific
-code
ation No.
Unit
QTY
Rate Rs.
Amount Rs.
2
Add contr profit @14% on material
Total material cost
b) Labour charges :
elec-8.1.77 Skilled Electrician (2.0 + 0.5)
day
400.00
800.00
day
320.00
1920.00
day
320.00
640.00
20%
14%
ohr
6
0.00
38050.00
672.00
4032.00
564.48
42646.48
426.50
8.2.2
Supply, Transportation and fixing of 4' - 40 Watt box type flourescent single Tube Light
fitting with Energy saving electronic ballast, consuming 28 W suitable for 40 Watt tube on
varnished teak wood round blocks with flexible 3 core wire etc.,, complet Makes : Chowk:
Trinic , tube : Philips / crompton
a) Material
elec-3.6.8 4' x 40 watts box type flourscent light fitting.
14
each
850.50
850.50
each
20.00
20.00
each
12.00
12.00
each
21.00
-21.00
11.00
0.00
0.00
11.00
b) Labour charges :
elec-8.1.77 Skilled Electrician
day
0.05
400.00
20.00
elec-8.1.85 Helpers
day
0.05
320.00
16.00
El Data
P No 181
Description
Unit
QTY
Rate Rs.
2
Add area allowence on labour charges @
3
20%
6
7.20
14%
43.20
6.05
Index Specific
-code
ation No.
1
Amount Rs.
ohr
60.25
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball
bearings with all standard accessories.
Makes: Crompton Decora / Bajaj Ultima /Havells Velocity / Usha Astra / Orient PSPO.
a) Material
elec-5.1.1 1200 mm (48") Ceiling Fan
each
16
33
1600.00
1%
16.00
220.00
1600
16.00
1616.00
Add contr profit @14% on material
0.00
0.00
Total material cost
1616.00
Supply and erecting Electronic type regulator for ceiling fans 1200 mm sweep complete
erected on existing board.Make : Anchor / Gold Medal Olive / Million Zoom
a) Material
M
0.00
0.00
220.00
220.00
day
0.1
320.00
Sundries.
32.00
21.20
20%
10.64
14%
0.00
283.85
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving
connections with twin core wire etc., complete.
a) Material
elec-1.6.8 23/0060 Twin Core wire
Unforseen item works, such as painting to
down rod, screws etc.,
Add contr profit @14% on material
Total for material
b) Labour charges.
elec-8.1.77 Skilled Electrician
elec-8.1.85 Helper
El Data
M
LS
1
1
9.90
3.00
12.90
0.00
12.90
0.00
day
day
9.90
3.00
0.125
0.125
400.00
320.00
50.00
40.00
P No 182
Index Specific
-code
ation No.
1
18
Description
Unit
QTY
Rate Rs.
Amount Rs.
2
Add area allowence on labour charges @
3
20%
6
18.00
14%
108.00
15.12
136.05
ohr
Supply of fresh air exhaust fan of heavy duty 250V A.C.50Hz.. 300mm size (12") 900 R.P.M
etc., complete.
Makes: CG / Bajaj / Havells/ Orient.
a) Material
elec-5.1.14 300mm (12") 900 RPM H.D. Exhaust Fan
each
19
36
elec-1.6.8
elec-8.1.54
elec-8.1.77
elec-8.1.85
elec-8.1.79
2645.00
1%
26.45
2645.00
26.45
14%
321.00
44.94
3314.78
Supply of 1x40W weather proof flourescent streetlight fitting comprising canopy of sheet
Aluminium in stove enamel finish with copper / VPIT ballast, capacitor, tube and starter etc.,
complete. Makes: Phillips / GE / Wipro /Thorn
a) Material
elec-3.1.1 1x40W WP flourscent street light fitting.
elec-3.7.16 Lamp cost of 40W
Add contr profit @14% on material
Total for material
El Data
each
each
0.14
1
1
1400.00
45.00
1400.00
45.00
1445.00
202.30
1647.30
P No 183
Index Specific
-code
ation No.
1
21
Description
Unit
QTY
Amount Rs.
ohr
2
3
4
5
6
Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm dia GI pipe bracket and
anti tilting MS flat etc., including giving connections and labour charges etc., complete.
a) Material
elec-8.1.59 25mm dia G.I pipe light grade
elec-1.6.8 23/0060 twin core flexible copper cable
Pipe bending charges
M.S flat and welding charges
Add contr profit @14% on material
Total for material
b) Labour charges
elec-8.1.77 Skilled Electrician/carpenter
elec-8.1.79 Mason
elec-8.1.78 Semi skilled Electrician / Helper
Add area allowence on labour charges @
M
M
LS
LS
1
2
1
1
205.00
9.90
25.00
35.00
205.00
19.80
25.00
35.00
284.80
0.00
284.80
0.2
0.2
0.2
400.00
350.00
320.00
80.00
70.00
64.00
42.80
256.80
35.95
1974.90
0.00
day
day
day
20%
Rate Rs.
Supply and fixing TPN - Vertical type Distribution board with IP -43 Protection with 125A,
4 Pole 25 kA MCCB as incomer with 4Nos 63A TP MCBs and 12 Nos. 10 kA SPMCBs as
outgoing including internal connection and labour charges for flush mounting etc.
8 way TPN Vertical DB
a) Material
elec.2.12.3 8 Way TPN Vertical DB with IP -43 (Metal
7
door) protection suitable for 125A, 4 Pole,
25kA MCCB as incomer.
Nos
9100.00
9100.00
Nos
Nos
Nos
0
1
24
7194.00
1477.00
201.00
0.00
1477.00
4824.00
15401.00
0.00
15401.00
day
day
day
1
1
1
400.00
320.00
320.00
400.00
320.00
320.00
0.00
0.00
19.00
16460.00
16460.00
El Data
LS
1040.00
19.00
Say
P No 184
Index Specific
-code
ation No.
1
b
1/4
bag cement
23
Description
Unit
QTY
Rate Rs.
Amount Rs.
ohr
6
Supply and fixing TPN Distribution board with IP-43 protection (Metal Door) suitable for 3
phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including
internal connection and labour charges for flush mounting etc., complete. 40A 4 Pole isolater
1 No 10KA 6-32 A range SPMCBS 8Nos for Outgoing. Make: MDS/GE/L&T
40A FP Isolator - 1 No for incomer, 10kAHanger/SIEMANS/SCHNEIDERS.
6-32A SP MCBs - 12Nos for outgoing.
Taking Output = each
a) Material
elec.2.12.2 4way TPN, D.B with IP-43 Protection (MD)
4
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.
each
2491.00
2491.00
each
each
1
12
814.00
201.00
0.00
814.00
2412.00
5717.00
0.00
5717.00
0.5
1
1
400.00
320.00
320.00
200.00
320.00
320.00
168.00
1008.00
14.00
141.12
14.00
day
day
day
20%
24
each
2491.00
2491.00
each
each
1
8
890.00
201.00
890.00
1608.00
4989.00
0.00
4989.00
0.00
P No 185
Description
Index Specific
-code
ation No.
1
Unit
QTY
Rate Rs.
ohr
2
b) Labour charges :
elec-8.1.77 Skilled Electrician
elec-8.1.78 Semi Skilled Electrician
day
day
0.5
1
400.00
320.00
200.00
320.00
elec-8.1.85 Helpers
day
320.00
320.00
20%
14%
168.00
Amount Rs.
1008.00
141.12
14.00
14.00
6152.12
SSR rateRs.246.20.
246.20
26
Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per
size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary
accessories with hume pipe ring duly providing staggered holes
a) Material
Earth Work Excavation of Hard gravel Soil
with small boulder for trench 1st step of size
1.5 x 0.9 x 0.9 m
cum
1.21
122.11
147.75
cum
0.9
150.00
135.00
25.00
25.00
2.5
1
301.00
75.00
752.50
75.00
16
5.00
80.00
Set
Each
Kg
Kg
4
1
20
20
12.00
100.00
8.00
4.00
48.00
100.00
160.00
80.00
1603.25
0.00
1603.25
0.5
0.5
320.00
320.00
160.00
160.00
El Data
P No 186
Index Specific
-code
ation No.
1
Description
2
Add area allowence on labour charges @
Unit
QTY
Rate Rs.
3
20%
Amount Rs.
ohr
6
64.00
27
a) Material
elec-2.6.4 100 A Fuse units
100 A neutral links
elec-1.4.7 T.W blocks ( 12" x 15" )
Add contr profit @14% on material
Total for material
b) Labour charges
elec-8.1.77 Skilled Electrician
elec-8.1.85 Helper
Add area allowence on labour charges @
each
each
each
3
1
1
484.00
118.00
99.00
1452.00
118.00
99.00
1669.00
0.00
1669.00
1
4
400.00
320.00
400.00
1280.00
336.00
2016.00
282.24
50.00
4017.25
0.00
day
day
20%
28
Makes: million/payal/goldmedal/powerflex
elec-7.1.1
elec-8.1.77
elec-8.1.78
elec-8.1.85
100 M
0.00
1010.00
1010.00
0.00
1010.00
day
day
day
20%
0.34
1
0.34
315.00
285.00
285.00
107.10
285.00
96.90
97.80
586.80
82.15
14%
29
El Data
1678.95
16.80
Supply and fixing of telephone jack type socket with top on MS box with modular plate
cover with screws connections etc., Makes: Gold Medal Olive / Million zoom
P No 187
Description
Unit
QTY
Rate Rs.
48.00
48.00
elec-1.3.1 MS box
54.00
54.00
13.20
13.20
Index Specific
-code
ation No.
1
2
Taking Output = 100 M
Amount Rs.
ohr
6
a) Material
115.20
0.00
0.00
115.20
b) Labour charges :
elec-8.1.77 Skilled Electrician
day
0.1
315.00
31.50
day
0.1
285.00
28.50
elec-8.1.85 Helpers
day
0.1
285.00
28.50
20%
14%
17.70
106.20
14.87
Sundries
C) Cost for each
30
236.30
31
115.00
115.00
Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing metallic/non metallic
conduit pipe with connections etc.,complete
Makes:D Link/Finolex
elec-7.1.4
elec-8.1.77
elec-8.1.78
elec-8.1.85
100 M
0.00
2580.00
2580.00
0.00
2580.00
day
day
day
20%
0.34
1
0.34
315.00
285.00
285.00
107.10
285.00
96.90
97.80
586.80
82.15
El Data
3248.95
32.50
P No 188
Index Specific
-code
ation No.
1
El Data
Description
Unit
QTY
Rate Rs.
Amount Rs.
ohr
6
P No 189
Name of the work : Sub Estiate for the work Providing Electrification to Model School
S.
NO
.
Quantity
Description of Work
Unit
Rate (Rs.)
in fig.
Amount
(Rs.)
CONDUIT PIPE
1 1250 RM
#REF!
ONE
RM
#REF!
#REF!
#REF!
ONE
RM
#REF!
#REF!
500 RM
WIRING
3
POINT
#REF!
#REF!
82 PTS #REF!
POINT
#REF!
#REF!
Supply and fixing of 3 Nos 6A 3 pin wall plug socket with 3 Nos. 6A EACH
switch control on a common switch board with earth continuity
including wire leads, earth connections along with all labour charges
etc., complete.
Makes : Anchor / Gold Medal Olive /Million Zoom
#REF!
#REF!
57
207 PTS Wiring with three runs of 1.0 sq.mm insulated PVC flexible
copper conductor cable (phase, neutral, earth) in the existing
conduit pipe with 6 Amps flush type switch, and 6 A 3/2 pin
socket on Separate switch board etc.,complete as required
Make:Million / Gold Medal
POINT
#REF!
#REF!
6
7
27 NOS #REF!
7 NOS Supply and fixing single phase DB in sheet steel enclosure
with metalic plug and socket with 1 No. 20/32A,10KA
SPMCB ( Motor characteristics MCBs) control including
making connections etc., complete concealing in wall.
Makes : MDS / L&T Hager.
EACH
EACH
#REF!
#REF!
#REF!
#REF!
57 NOS Supply and fixing of cat-6 RJ-45information outlets including dual EACH
#REF!
#REF!
face plate with MS box with modular plate cover with screws
connections etc., Makes: Belden/D link/Legrand
RUN OF MAINS
9
628 RM
ONE
RM
#REF!
#REF!
10 1985 RM
ONE
RM
#REF!
#REF!
11
420 RM
ONE
RM
#REF!
#REF!
12
44 RM
ONE
RM
#REF!
#REF!
13
50 RM
ONE
RM
#REF!
#REF!
14
224 RM
ONE
RM
#REF!
#REF!
ONE
RM
#REF!
#REF!
Makes: million/payal/goldmedal/powerflex
15
538 RM
Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing
metallic/non metallic conduit pipe with connections etc.,complete
Makes:D Link/Finolex
16
50 NOS Supply of 3feet length patch cords of make D link make / Beldan / EACH
200.00
10000.00
17
11 NOS Supply and fixing of telephone jack type socket with top on MS box EACH
#REF!
#REF!
Krone
with modular plate cover with screws connections etc., Makes: Gold
Medal Olive / Million zoom
LIGHT FITTINGS
18
306 NOS Supply, Transportation and fixing of 4' - 40 Watt box type flourescent EACH
#REF!
#REF!
19
85 NOS Supply and fixing of batten holder / slanting holder in lieu of ceiling EACH
#REF!
#REF!
20
157 NOS Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 EACH
#REF!
#REF!
21
157 NOS Supply and erecting Electronic type regulator for ceiling fans 1200 EACH
#REF!
#REF!
rose of light point complete with all connections and all labour
charges with 40W bulb (for new installation).
Makes : Gold Medal /Million / Vimal
Blades and double ball bearings with all standard accessories.
Makes: Crompton Aura / Bajaj R Gold / Havells Festiva / Usha
Premium.
22
157 NOS Labour charges for Fixing of Ceiling fan and regulator including EACH
#REF!
#REF!
23
14 NOS Supply of fresh air exhaust fan of heavy duty 250V A.C.50Hz.. EACH
#REF!
#REF!
24
14 NOS Labour charges for fixing of Exhaust fan in wall with necessary EACH
#REF!
#REF!
25
#REF!
#REF!
26
12 NOS Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm EACH
#REF!
#REF!
27
1 NOS Supply of Integral street light luminaire of 150W HPSV lamp fitting EACH
#REF!
#REF!
28
1 NOS Fixing of MV / SV/MH luminaire on wall with 1.0mt 40mm dia GI EACH
#REF!
#REF!
dia GI pipe bracket and anti tilting MS flat etc., including giving
connections and labour charges etc., complete.
DISTRIBUTION BOARDS
29
2 NOS Supply and fixing TPN - Vertical type Distribution board with IP -43 EACH
#REF!
#REF!
30
EACH
#REF!
#REF!
ONE
RM
#REF!
#REF!
#REF!
#REF!
31
32
33
34
250 RM
2 Nos Supply and fixing of 24 port switches of D link make including EACH
making connections and etc., complete
2 Nos Supply of 17U floor mounting net work rack with power spike
including all accessries of make HCL / Vall
2 Nos Supply and fixing TPN - Vertical type Distribution board with IP -43 EACH
Protection with 1 No. 63A TP MCB as incomer with 24 Nos. 10 kA
SPMCBs as outgoing including internal connection and labour
charges for flush mounting etc., complete.
Makes: MDS/ L&T Hager
CABLES
#REF!
#REF!
#REF!
35
100 Mtrs Supply of 3.5 Core 95 Sq. mm PVC XLPE armoured cable 1100 V.
36
upto 50 Sq,mm
200 Mtrs Earth work excavation of Trench in hard ground soil, laying of U.G cables
1 Mtr
#REF! on sand cushion
#REF! covering th
1 Mtr
#REF!
#REF!
EARTHING
37
38
1 NO
EACH
Supply and Fixing of 3 phase meter Box, 3 Nos 100 A fuse units, EACH
Neutral link, on T.W block with all accessaries etc., complete for
finished items of work.
#REF!
2521.00
TOTAL:
#REF!
2521.00
#REF!
Description
Quantity
Amount (Rs.)
Painting to new walls with two coats of ready mixed oil bound washable distemper of approved brand and
shade over a base coat of appropriate primer of approved brand, making three coats in all to give an even
shade after thoroughly brushing the surface to remove all dirt and reminds of loose powedered materials
including cost and conveyance of alla materials to work site and all operational, incidental, labour charges
1 etc.. complete for finished item of work as per SS911 for internal walls and ceiling.
Cost of Primer
Lts
0.5
134 Lts
67
Painter 1st Class
Nos
0.08
400.00 No
32
Painter 2nd Class
Nos
0.19
320.00 No
60.8
Add 20% Agency allowence
92.8
0.2
18.56
Cost of Washable Oil Bound Distemper
Lts
1.7
80 Lts
136
Painter 1st Class
Nos
0.36
400.00 No
144
Painter 2nd Class
Nos
0.84
320.00 No
268.8
Add 20% Agency allowence
412.8
0.2
82.56
Cost for 10Sqm
809.72
Add Over Heads 14%
0.14
113.36
Total Cost for 10 Sqm
923.08
Cost for 1 Sqm
92.31
Sl.
No
##
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
PCC
Rubble/Size Cement/Steel/RC
Earth/Sand/
Slabs/Shabad
Lead in
Stone/Cut
C poles/A.C & G.I
Gravel/Murru
Slabs/CC &
Kms
Stone/Coarse
Sheets/Packed
m/Lime/Surki
Laterite
aggregates
materials
Blocks/Wood
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00
26.32
36.84
49.12
59.65
70.18
80.70
91.23
101.75
112.28
122.81
133.33
143.86
154.39
164.91
175.44
185.96
196.49
207.02
217.54
228.07
238.60
249.12
259.65
270.18
280.70
291.23
301.75
312.28
322.81
333.33
342.11
350.88
359.65
368.42
377.19
385.96
394.74
403.51
412.28
421.05
429.82
438.60
447.37
456.14
464.91
473.68
482.46
491.23
500.00
508.77
517.54
526.32
535.09
543.86
25.35
35.44
49.12
59.65
70.18
80.70
91.23
101.75
112.28
122.81
133.33
143.86
154.39
164.91
175.44
185.96
196.49
207.02
217.54
228.07
238.60
249.12
259.65
270.18
280.70
291.23
301.75
312.28
322.81
333.33
342.11
350.88
359.65
368.42
377.19
385.96
394.74
403.51
412.28
421.05
429.82
438.60
447.37
456.14
464.91
473.68
482.46
491.23
500.00
508.77
517.54
526.32
535.09
543.86
0.00
7.50
16.26
23.76
31.26
38.76
46.26
53.76
61.26
68.76
76.26
83.76
91.26
98.76
106.26
113.76
121.26
128.76
136.26
143.76
151.26
158.76
166.26
173.76
181.26
188.76
196.26
203.76
211.26
218.76
225.01
231.26
237.51
243.76
250.01
256.26
262.51
268.76
275.01
281.26
287.51
293.76
300.01
306.26
312.51
318.76
325.01
331.26
337.51
343.76
350.01
356.26
362.51
368.76
37.19
52.11
72.28
87.72
103.25
118.68
134.12
149.56
165.00
180.44
195.88
211.32
226.75
242.19
257.63
273.07
288.51
303.95
319.39
334.82
350.26
365.70
381.14
396.58
412.02
427.46
442.89
458.33
473.77
489.21
502.11
515.00
527.89
540.79
553.68
566.58
579.47
592.37
605.26
618.16
631.05
643.95
656.84
669.74
682.63
695.53
708.42
721.32
734.21
747.11
760.00
772.89
785.79
798.68
Water
15.61
21.84
29.12
35.35
41.58
47.81
54.04
60.26
66.49
72.72
78.95
85.18
91.40
97.63
103.86
110.09
116.32
122.54
128.77
135.00
141.23
147.46
153.68
159.91
166.14
172.37
178.60
184.82
191.05
197.28
202.46
207.63
212.81
217.98
223.16
228.33
233.51
238.68
243.86
249.04
254.21
259.39
264.56
269.74
274.91
280.09
285.26
290.44
295.61
300.79
305.96
311.14
316.32
321.49
Bricks
42.19
59.04
78.77
95.61
112.54
129.39
146.23
163.07
179.91
196.75
213.60
230.44
247.28
264.12
280.96
297.81
314.65
331.49
348.33
365.18
382.02
398.86
415.70
432.54
449.39
466.23
483.07
499.91
516.75
533.60
547.63
561.67
575.70
589.74
603.77
617.81
631.84
645.88
659.91
673.95
687.98
702.02
716.05
730.09
744.12
758.16
772.19
786.23
800.26
814.30
828.33
842.37
856.40
870.44
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
55.00
56.00
57.00
58.00
59.00
60.00
61.00
62.00
63.00
64.00
65.00
66.00
67.00
68.00
69.00
70.00
71.00
72.00
73.00
74.00
75.00
76.00
77.00
78.00
79.00
80.00
81.00
82.00
83.00
84.00
85.00
86.00
87.00
88.00
89.00
90.00
91.00
92.00
93.00
94.00
95.00
96.00
97.00
98.00
99.00
100.00
101.00
102.00
103.00
104.00
105.00
106.00
107.00
108.00
109.00
110.00
111.00
112.00
113.00
114.00
115.00
552.63
561.40
570.18
578.95
587.72
596.49
605.26
614.04
622.81
631.58
640.35
649.12
657.89
666.67
675.44
684.21
692.98
701.75
710.53
719.30
728.07
736.84
745.61
754.39
763.16
771.93
780.70
789.47
798.25
807.02
815.79
824.56
833.33
842.11
850.88
859.65
868.42
877.19
885.96
894.74
903.51
912.28
921.05
929.82
938.60
947.37
956.14
964.91
973.68
982.46
991.23
1000.00
1008.77
1017.54
1026.32
1035.09
1043.86
1052.63
1061.40
1070.18
1078.95
552.63
561.40
570.18
578.95
587.72
596.49
605.26
614.04
622.81
631.58
640.35
649.12
657.89
666.67
675.44
684.21
692.98
701.75
710.53
719.30
728.07
736.84
745.61
754.39
763.16
771.93
780.70
789.47
798.25
807.02
815.79
824.56
833.33
842.11
850.88
859.65
868.42
877.19
885.96
894.74
903.51
912.28
921.05
929.82
938.60
947.37
956.14
964.91
973.68
982.46
991.23
1000.00
1008.77
1017.54
1026.32
1035.09
1043.86
1052.63
1061.40
1070.18
1078.95
375.01
381.26
387.51
393.76
400.01
406.26
412.51
418.76
425.01
431.26
437.51
443.76
450.01
456.26
462.51
468.76
475.01
481.26
487.51
493.76
500.01
506.26
512.51
518.76
525.01
531.26
537.51
543.76
550.01
556.26
562.51
568.76
575.01
581.26
587.51
593.76
600.01
606.26
612.51
618.76
625.01
631.26
637.51
643.76
650.01
656.26
662.51
668.76
675.01
681.26
687.51
693.76
700.01
706.26
712.51
718.76
725.01
731.26
737.51
743.76
750.01
811.58
824.47
837.37
850.26
863.16
876.05
888.95
901.84
914.74
927.63
940.53
953.42
966.32
979.21
992.11
1005.00
1017.89
1030.79
1043.68
1056.58
1069.47
1082.37
1095.26
1108.16
1121.05
1133.95
1146.84
1159.74
1172.63
1185.53
1198.42
1211.32
1224.21
1237.11
1250.00
1262.89
1275.79
1288.68
1301.58
1314.47
1327.37
1340.26
1353.16
1366.05
1378.95
1391.84
1404.74
1417.63
1430.53
1443.42
1456.32
1469.21
1482.11
1495.00
1507.89
1520.79
1533.68
1546.58
1559.47
1572.37
1585.26
326.67
331.84
337.02
342.19
347.37
352.54
357.72
362.89
368.07
373.25
378.42
383.60
388.77
393.95
399.12
404.30
409.47
414.65
419.82
425.00
430.18
435.35
440.53
445.70
450.88
456.05
461.23
466.40
471.58
476.75
481.93
487.11
492.28
497.46
502.63
507.81
512.98
518.16
523.33
528.51
533.68
538.86
544.04
549.21
554.39
559.56
564.74
569.91
575.09
580.26
585.44
590.61
595.79
600.96
606.14
611.32
616.49
621.67
626.84
632.02
637.19
884.47
898.51
912.54
926.58
940.61
954.65
968.68
982.72
996.75
1010.79
1024.82
1038.86
1052.89
1066.93
1080.96
1095.00
1109.04
1123.07
1137.11
1151.14
1165.18
1179.21
1193.25
1207.28
1221.32
1235.35
1249.39
1263.42
1277.46
1291.49
1305.53
1319.56
1333.60
1347.63
1361.67
1375.70
1389.74
1403.77
1417.81
1431.84
1445.88
1459.91
1473.95
1487.98
1502.02
1516.05
1530.09
1544.12
1558.16
1572.19
1586.23
1600.26
1614.30
1628.33
1642.37
1656.40
1670.44
1684.47
1698.51
1712.54
1726.58
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
116.00
117.00
118.00
119.00
120.00
121.00
122.00
123.00
124.00
125.00
126.00
127.00
128.00
129.00
130.00
131.00
132.00
133.00
134.00
135.00
136.00
137.00
138.00
139.00
140.00
141.00
142.00
143.00
144.00
145.00
146.00
147.00
148.00
149.00
150.00
151.00
152.00
153.00
154.00
155.00
156.00
157.00
158.00
159.00
160.00
161.00
162.00
163.00
164.00
165.00
166.00
167.00
168.00
169.00
170.00
171.00
172.00
173.00
174.00
175.00
176.00
1087.72
1096.49
1105.26
1114.04
1122.81
1131.58
1140.35
1149.12
1157.89
1166.67
1175.44
1184.21
1192.98
1201.75
1210.53
1219.30
1228.07
1236.84
1245.61
1254.39
1263.16
1271.93
1280.70
1289.47
1298.25
1307.02
1315.79
1324.56
1333.33
1342.11
1350.88
1359.65
1368.42
1377.19
1385.96
1394.74
1403.51
1412.28
1421.05
1429.82
1438.60
1447.37
1456.14
1464.91
1473.68
1482.46
1491.23
1500.00
1508.77
1517.54
1526.32
1535.09
1543.86
1552.63
1561.40
1570.18
1578.95
1587.72
1596.49
1605.26
1614.04
1087.72
1096.49
1105.26
1114.04
1122.81
1131.58
1140.35
1149.12
1157.89
1166.67
1175.44
1184.21
1192.98
1201.75
1210.53
1219.30
1228.07
1236.84
1245.61
1254.39
1263.16
1271.93
1280.70
1289.47
1298.25
1307.02
1315.79
1324.56
1333.33
1342.11
1350.88
1359.65
1368.42
1377.19
1385.96
1394.74
1403.51
1412.28
1421.05
1429.82
1438.60
1447.37
1456.14
1464.91
1473.68
1482.46
1491.23
1500.00
1508.77
1517.54
1526.32
1535.09
1543.86
1552.63
1561.40
1570.18
1578.95
1587.72
1596.49
1605.26
1614.04
756.26
762.51
768.76
775.01
781.26
787.51
793.76
800.01
806.26
812.51
818.76
825.01
831.26
837.51
843.76
850.01
856.26
862.51
868.76
875.01
881.26
887.51
893.76
900.01
906.26
912.51
918.76
925.01
931.26
937.51
943.76
950.01
956.26
962.51
968.76
975.01
981.26
987.51
993.76
1000.01
1006.26
1012.51
1018.76
1025.01
1031.26
1037.51
1043.76
1050.01
1056.26
1062.51
1068.76
1075.01
1081.26
1087.51
1093.76
1100.01
1106.26
1112.51
1118.76
1125.01
1131.26
1598.16
1611.05
1623.95
1636.84
1649.74
1662.63
1675.53
1688.42
1701.32
1714.21
1727.11
1740.00
1752.89
1765.79
1778.68
1791.58
1804.47
1817.37
1830.26
1843.16
1856.05
1868.95
1881.84
1894.74
1907.63
1920.53
1933.42
1946.32
1959.21
1972.11
1985.00
1997.89
2010.79
2023.68
2036.58
2049.47
2062.37
2075.26
2088.16
2101.05
2113.95
2126.84
2139.74
2152.63
2165.53
2178.42
2191.32
2204.21
2217.11
2230.00
2242.89
2255.79
2268.68
2281.58
2294.47
2307.37
2320.26
2333.16
2346.05
2358.95
2371.84
642.37
647.54
652.72
657.89
663.07
668.25
673.42
678.60
683.77
688.95
694.12
699.30
704.47
709.65
714.82
720.00
725.18
730.35
735.53
740.70
745.88
751.05
756.23
761.40
766.58
771.75
776.93
782.11
787.28
792.46
797.63
802.81
807.98
813.16
818.33
823.51
828.68
833.86
839.04
844.21
849.39
854.56
859.74
864.91
870.09
875.26
880.44
885.61
890.79
895.96
901.14
906.32
911.49
916.67
921.84
927.02
932.19
937.37
942.54
947.72
952.89
1740.61
1754.65
1768.68
1782.72
1796.75
1810.79
1824.82
1838.86
1852.89
1866.93
1880.96
1895.00
1909.04
1923.07
1937.11
1951.14
1965.18
1979.21
1993.25
2007.28
2021.32
2035.35
2049.39
2063.42
2077.46
2091.49
2105.53
2119.56
2133.60
2147.63
2161.67
2175.70
2189.74
2203.77
2217.81
2231.84
2245.88
2259.91
2273.95
2287.98
2302.02
2316.05
2330.09
2344.12
2358.16
2372.19
2386.23
2400.26
2414.30
2428.33
2442.37
2456.40
2470.44
2484.47
2498.51
2512.54
2526.58
2540.61
2554.65
2568.68
2582.72
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
177.00
178.00
179.00
180.00
181.00
182.00
183.00
184.00
185.00
186.00
187.00
188.00
189.00
190.00
191.00
192.00
193.00
194.00
195.00
196.00
197.00
198.00
199.00
200.00
201.00
202.00
203.00
204.00
205.00
206.00
207.00
208.00
209.00
210.00
211.00
212.00
213.00
214.00
215.00
216.00
217.00
218.00
219.00
220.00
221.00
222.00
223.00
224.00
225.00
226.00
227.00
228.00
229.00
230.00
231.00
232.00
233.00
234.00
235.00
236.00
237.00
1622.81
1631.58
1640.35
1649.12
1657.89
1666.67
1675.44
1684.21
1692.98
1701.75
1710.53
1719.30
1728.07
1736.84
1745.61
1754.39
1763.16
1771.93
1780.70
1789.47
1798.25
1807.02
1815.79
1824.56
1833.33
1842.11
1850.88
1859.65
1868.42
1877.19
1885.96
1894.74
1903.51
1912.28
1921.05
1929.82
1938.60
1947.37
1956.14
1964.91
1973.68
1982.46
1991.23
2000.00
2008.77
2017.54
2026.32
2035.09
2043.86
2052.63
2061.40
2070.18
2078.95
2087.72
2096.49
2105.26
2114.04
2122.81
2131.58
2140.35
2149.12
1622.81
1631.58
1640.35
1649.12
1657.89
1666.67
1675.44
1684.21
1692.98
1701.75
1710.53
1719.30
1728.07
1736.84
1745.61
1754.39
1763.16
1771.93
1780.70
1789.47
1798.25
1807.02
1815.79
1824.56
1833.33
1842.11
1850.88
1859.65
1868.42
1877.19
1885.96
1894.74
1903.51
1912.28
1921.05
1929.82
1938.60
1947.37
1956.14
1964.91
1973.68
1982.46
1991.23
2000.00
2008.77
2017.54
2026.32
2035.09
2043.86
2052.63
2061.40
2070.18
2078.95
2087.72
2096.49
2105.26
2114.04
2122.81
2131.58
2140.35
2149.12
1137.51
1143.76
1150.01
1156.26
1162.51
1168.76
1175.01
1181.26
1187.51
1193.76
1200.01
1206.26
1212.51
1218.76
1225.01
1231.26
1237.51
1243.76
1250.01
1256.26
1262.51
1268.76
1275.01
1281.26
1287.51
1293.76
1300.01
1306.26
1312.51
1318.76
1325.01
1331.26
1337.51
1343.76
1350.01
1356.26
1362.51
1368.76
1375.01
1381.26
1387.51
1393.76
1400.01
1406.26
1412.51
1418.76
1425.01
1431.26
1437.51
1443.76
1450.01
1456.26
1462.51
1468.76
1475.01
1481.26
1487.51
1493.76
1500.01
1506.26
1512.51
2384.74
2397.63
2410.53
2423.42
2436.32
2449.21
2462.11
2475.00
2487.89
2500.79
2513.68
2526.58
2539.47
2552.37
2565.26
2578.16
2591.05
2603.95
2616.84
2629.74
2642.63
2655.53
2668.42
2681.32
2694.21
2707.11
2720.00
2732.89
2745.79
2758.68
2771.58
2784.47
2797.37
2810.26
2823.16
2836.05
2848.95
2861.84
2874.74
2887.63
2900.53
2913.42
2926.32
2939.21
2952.11
2965.00
2977.89
2990.79
3003.68
3016.58
3029.47
3042.37
3055.26
3068.16
3081.05
3093.95
3106.84
3119.74
3132.63
3145.53
3158.42
958.07
963.25
968.42
973.60
978.77
983.95
989.12
994.30
999.47
1004.65
1009.82
1015.00
1020.18
1025.35
1030.53
1035.70
1040.88
1046.05
1051.23
1056.40
1061.58
1066.75
1071.93
1077.11
1082.28
1087.46
1092.63
1097.81
1102.98
1108.16
1113.33
1118.51
1123.68
1128.86
1134.04
1139.21
1144.39
1149.56
1154.74
1159.91
1165.09
1170.26
1175.44
1180.61
1185.79
1190.96
1196.14
1201.32
1206.49
1211.67
1216.84
1222.02
1227.19
1232.37
1237.54
1242.72
1247.89
1253.07
1258.25
1263.42
1268.60
2596.75
2610.79
2624.82
2638.86
2652.89
2666.93
2680.96
2695.00
2709.04
2723.07
2737.11
2751.14
2765.18
2779.21
2793.25
2807.28
2821.32
2835.35
2849.39
2863.42
2877.46
2891.49
2905.53
2919.56
2933.60
2947.63
2961.67
2975.70
2989.74
3003.77
3017.81
3031.84
3045.88
3059.91
3073.95
3087.98
3102.02
3116.05
3130.09
3144.12
3158.16
3172.19
3186.23
3200.26
3214.30
3228.33
3242.37
3256.40
3270.44
3284.47
3298.51
3312.54
3326.58
3340.61
3354.65
3368.68
3382.72
3396.75
3410.79
3424.82
3438.86
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
238.00
239.00
240.00
241.00
242.00
243.00
244.00
245.00
246.00
247.00
248.00
249.00
250.00
251.00
252.00
253.00
254.00
255.00
256.00
257.00
258.00
259.00
260.00
261.00
262.00
263.00
264.00
265.00
266.00
267.00
268.00
269.00
270.00
271.00
272.00
273.00
274.00
275.00
276.00
277.00
278.00
279.00
280.00
281.00
282.00
283.00
284.00
285.00
286.00
287.00
288.00
289.00
290.00
291.00
292.00
293.00
294.00
295.00
296.00
297.00
298.00
2157.89
2166.67
2175.44
2184.21
2192.98
2201.75
2210.53
2219.30
2228.07
2236.84
2245.61
2254.39
2263.16
2271.93
2280.70
2289.47
2298.25
2307.02
2315.79
2324.56
2333.33
2342.11
2350.88
2359.65
2368.42
2377.19
2385.96
2394.74
2403.51
2412.28
2421.05
2429.82
2438.60
2447.37
2456.14
2464.91
2473.68
2482.46
2491.23
2500.00
2508.77
2517.54
2526.32
2535.09
2543.86
2552.63
2561.40
2570.18
2578.95
2587.72
2596.49
2605.26
2614.04
2622.81
2631.58
2640.35
2649.12
2657.89
2666.67
2675.44
2684.21
2157.89
2166.67
2175.44
2184.21
2192.98
2201.75
2210.53
2219.30
2228.07
2236.84
2245.61
2254.39
2263.16
2271.93
2280.70
2289.47
2298.25
2307.02
2315.79
2324.56
2333.33
2342.11
2350.88
2359.65
2368.42
2377.19
2385.96
2394.74
2403.51
2412.28
2421.05
2429.82
2438.60
2447.37
2456.14
2464.91
2473.68
2482.46
2491.23
2500.00
2508.77
2517.54
2526.32
2535.09
2543.86
2552.63
2561.40
2570.18
2578.95
2587.72
2596.49
2605.26
2614.04
2622.81
2631.58
2640.35
2649.12
2657.89
2666.67
2675.44
2684.21
1518.76
1525.01
1531.26
1537.51
1543.76
1550.01
1556.26
1562.51
1568.76
1575.01
1581.26
1587.51
1593.76
1600.01
1606.26
1612.51
1618.76
1625.01
1631.26
1637.51
1643.76
1650.01
1656.26
1662.51
1668.76
1675.01
1681.26
1687.51
1693.76
1700.01
1706.26
1712.51
1718.76
1725.01
1731.26
1737.51
1743.76
1750.01
1756.26
1762.51
1768.76
1775.01
1781.26
1787.51
1793.76
1800.01
1806.26
1812.51
1818.76
1825.01
1831.26
1837.51
1843.76
1850.01
1856.26
1862.51
1868.76
1875.01
1881.26
1887.51
1893.76
3171.32
3184.21
3197.11
3210.00
3222.89
3235.79
3248.68
3261.58
3274.47
3287.37
3300.26
3313.16
3326.05
3338.95
3351.84
3364.74
3377.63
3390.53
3403.42
3416.32
3429.21
3442.11
3455.00
3467.89
3480.79
3493.68
3506.58
3519.47
3532.37
3545.26
3558.16
3571.05
3583.95
3596.84
3609.74
3622.63
3635.53
3648.42
3661.32
3674.21
3687.11
3700.00
3712.89
3725.79
3738.68
3751.58
3764.47
3777.37
3790.26
3803.16
3816.05
3828.95
3841.84
3854.74
3867.63
3880.53
3893.42
3906.32
3919.21
3932.11
3945.00
1273.77
1278.95
1284.12
1289.30
1294.47
1299.65
1304.82
1310.00
1315.18
1320.35
1325.53
1330.70
1335.88
1341.05
1346.23
1351.40
1356.58
1361.75
1366.93
1372.11
1377.28
1382.46
1387.63
1392.81
1397.98
1403.16
1408.33
1413.51
1418.68
1423.86
1429.04
1434.21
1439.39
1444.56
1449.74
1454.91
1460.09
1465.26
1470.44
1475.61
1480.79
1485.96
1491.14
1496.32
1501.49
1506.67
1511.84
1517.02
1522.19
1527.37
1532.54
1537.72
1542.89
1548.07
1553.25
1558.42
1563.60
1568.77
1573.95
1579.12
1584.30
3452.89
3466.93
3480.96
3495.00
3509.04
3523.07
3537.11
3551.14
3565.18
3579.21
3593.25
3607.28
3621.32
3635.35
3649.39
3663.42
3677.46
3691.49
3705.53
3719.56
3733.60
3747.63
3761.67
3775.70
3789.74
3803.77
3817.81
3831.84
3845.88
3859.91
3873.95
3887.98
3902.02
3916.05
3930.09
3944.12
3958.16
3972.19
3986.23
4000.26
4014.30
4028.33
4042.37
4056.40
4070.44
4084.47
4098.51
4112.54
4126.58
4140.61
4154.65
4168.68
4182.72
4196.75
4210.79
4224.82
4238.86
4252.89
4266.93
4280.96
4295.00
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
299.00
300.00
301.00
302.00
303.00
304.00
305.00
306.00
307.00
308.00
309.00
310.00
311.00
312.00
313.00
314.00
315.00
316.00
317.00
318.00
319.00
320.00
321.00
322.00
323.00
324.00
325.00
326.00
327.00
328.00
329.00
330.00
331.00
332.00
333.00
334.00
335.00
336.00
337.00
338.00
339.00
340.00
341.00
342.00
343.00
344.00
345.00
346.00
347.00
348.00
349.00
350.00
351.00
352.00
353.00
354.00
355.00
356.00
357.00
358.00
359.00
2692.98
2701.75
2710.53
2719.30
2728.07
2736.84
2745.61
2754.39
2763.16
2771.93
2780.70
2789.47
2798.25
2807.02
2815.79
2824.56
2833.33
2842.11
2850.88
2859.65
2868.42
2877.19
2885.96
2894.74
2903.51
2912.28
2921.05
2929.82
2938.60
2947.37
2956.14
2964.91
2973.68
2982.46
2991.23
3000.00
3008.77
3017.54
3026.32
3035.09
3043.86
3052.63
3061.40
3070.18
3078.95
3087.72
3096.49
3105.26
3114.04
3122.81
3131.58
3140.35
3149.12
3157.89
3166.67
3175.44
3184.21
3192.98
3201.75
3210.53
3219.30
2692.98
2701.75
2710.53
2719.30
2728.07
2736.84
2745.61
2754.39
2763.16
2771.93
2780.70
2789.47
2798.25
2807.02
2815.79
2824.56
2833.33
2842.11
2850.88
2859.65
2868.42
2877.19
2885.96
2894.74
2903.51
2912.28
2921.05
2929.82
2938.60
2947.37
2956.14
2964.91
2973.68
2982.46
2991.23
3000.00
3008.77
3017.54
3026.32
3035.09
3043.86
3052.63
3061.40
3070.18
3078.95
3087.72
3096.49
3105.26
3114.04
3122.81
3131.58
3140.35
3149.12
3157.89
3166.67
3175.44
3184.21
3192.98
3201.75
3210.53
3219.30
1900.01
1906.26
1912.51
1918.76
1925.01
1931.26
1937.51
1943.76
1950.01
1956.26
1962.51
1968.76
1975.01
1981.26
1987.51
1993.76
2000.01
2006.26
2012.51
2018.76
2025.01
2031.26
2037.51
2043.76
2050.01
2056.26
2062.51
2068.76
2075.01
2081.26
2087.51
2093.76
2100.01
2106.26
2112.51
2118.76
2125.01
2131.26
2137.51
2143.76
2150.01
2156.26
2162.51
2168.76
2175.01
2181.26
2187.51
2193.76
2200.01
2206.26
2212.51
2218.76
2225.01
2231.26
2237.51
2243.76
2250.01
2256.26
2262.51
2268.76
2275.01
3957.89
3970.79
3983.68
3996.58
4009.47
4022.37
4035.26
4048.16
4061.05
4073.95
4086.84
4099.74
4112.63
4125.53
4138.42
4151.32
4164.21
4177.11
4190.00
4202.89
4215.79
4228.68
4241.58
4254.47
4267.37
4280.26
4293.16
4306.05
4318.95
4331.84
4344.74
4357.63
4370.53
4383.42
4396.32
4409.21
4422.11
4435.00
4447.89
4460.79
4473.68
4486.58
4499.47
4512.37
4525.26
4538.16
4551.05
4563.95
4576.84
4589.74
4602.63
4615.53
4628.42
4641.32
4654.21
4667.11
4680.00
4692.89
4705.79
4718.68
4731.58
1589.47
1594.65
1599.82
1605.00
1610.18
1615.35
1620.53
1625.70
1630.88
1636.05
1641.23
1646.40
1651.58
1656.75
1661.93
1667.11
1672.28
1677.46
1682.63
1687.81
1692.98
1698.16
1703.33
1708.51
1713.68
1718.86
1724.04
1729.21
1734.39
1739.56
1744.74
1749.91
1755.09
1760.26
1765.44
1770.61
1775.79
1780.96
1786.14
1791.32
1796.49
1801.67
1806.84
1812.02
1817.19
1822.37
1827.54
1832.72
1837.89
1843.07
1848.25
1853.42
1858.60
1863.77
1868.95
1874.12
1879.30
1884.47
1889.65
1894.82
1900.00
4309.04
4323.07
4337.11
4351.14
4365.18
4379.21
4393.25
4407.28
4421.32
4435.35
4449.39
4463.42
4477.46
4491.49
4505.53
4519.56
4533.60
4547.63
4561.67
4575.70
4589.74
4603.77
4617.81
4631.84
4645.88
4659.91
4673.95
4687.98
4702.02
4716.05
4730.09
4744.12
4758.16
4772.19
4786.23
4800.26
4814.30
4828.33
4842.37
4856.40
4870.44
4884.47
4898.51
4912.54
4926.58
4940.61
4954.65
4968.68
4982.72
4996.75
5010.79
5024.82
5038.86
5052.89
5066.93
5080.96
5095.00
5109.04
5123.07
5137.11
5151.14
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
360.00
361.00
362.00
363.00
364.00
365.00
366.00
367.00
368.00
369.00
370.00
371.00
372.00
373.00
374.00
375.00
376.00
377.00
378.00
379.00
380.00
381.00
382.00
383.00
384.00
385.00
386.00
387.00
388.00
389.00
390.00
391.00
392.00
393.00
394.00
395.00
396.00
397.00
398.00
399.00
400.00
401.00
402.00
403.00
404.00
405.00
406.00
407.00
408.00
409.00
410.00
411.00
412.00
413.00
414.00
415.00
416.00
417.00
418.00
419.00
420.00
3228.07
3236.84
3245.61
3254.39
3263.16
3271.93
3280.70
3289.47
3298.25
3307.02
3315.79
3324.56
3333.33
3342.11
3350.88
3359.65
3368.42
3377.19
3385.96
3394.74
3403.51
3412.28
3421.05
3429.82
3438.60
3447.37
3456.14
3464.91
3473.68
3482.46
3491.23
3500.00
3508.77
3517.54
3526.32
3535.09
3543.86
3552.63
3561.40
3570.18
3578.95
3587.72
3596.49
3605.26
3614.04
3622.81
3631.58
3640.35
3649.12
3657.89
3666.67
3675.44
3684.21
3692.98
3701.75
3710.53
3719.30
3728.07
3736.84
3745.61
3754.39
3228.07
3236.84
3245.61
3254.39
3263.16
3271.93
3280.70
3289.47
3298.25
3307.02
3315.79
3324.56
3333.33
3342.11
3350.88
3359.65
3368.42
3377.19
3385.96
3394.74
3403.51
3412.28
3421.05
3429.82
3438.60
3447.37
3456.14
3464.91
3473.68
3482.46
3491.23
3500.00
3508.77
3517.54
3526.32
3535.09
3543.86
3552.63
3561.40
3570.18
3578.95
3587.72
3596.49
3605.26
3614.04
3622.81
3631.58
3640.35
3649.12
3657.89
3666.67
3675.44
3684.21
3692.98
3701.75
3710.53
3719.30
3728.07
3736.84
3745.61
3754.39
2281.26
2287.51
2293.76
2300.01
2306.26
2312.51
2318.76
2325.01
2331.26
2337.51
2343.76
2350.01
2356.26
2362.51
2368.76
2375.01
2381.26
2387.51
2393.76
2400.01
2406.26
2412.51
2418.76
2425.01
2431.26
2437.51
2443.76
2450.01
2456.26
2462.51
2468.76
2475.01
2481.26
2487.51
2493.76
2500.01
2506.26
2512.51
2518.76
2525.01
2531.26
2537.51
2543.76
2550.01
2556.26
2562.51
2568.76
2575.01
2581.26
2587.51
2593.76
2600.01
2606.26
2612.51
2618.76
2625.01
2631.26
2637.51
2643.76
2650.01
2656.26
4744.47
4757.37
4770.26
4783.16
4796.05
4808.95
4821.84
4834.74
4847.63
4860.53
4873.42
4886.32
4899.21
4912.11
4925.00
4937.89
4950.79
4963.68
4976.58
4989.47
5002.37
5015.26
5028.16
5041.05
5053.95
5066.84
5079.74
5092.63
5105.53
5118.42
5131.32
5144.21
5157.11
5170.00
5182.89
5195.79
5208.68
5221.58
5234.47
5247.37
5260.26
5273.16
5286.05
5298.95
5311.84
5324.74
5337.63
5350.53
5363.42
5376.32
5389.21
5402.11
5415.00
5427.89
5440.79
5453.68
5466.58
5479.47
5492.37
5505.26
5518.16
1905.18
1910.35
1915.53
1920.70
1925.88
1931.05
1936.23
1941.40
1946.58
1951.75
1956.93
1962.11
1967.28
1972.46
1977.63
1982.81
1987.98
1993.16
1998.33
2003.51
2008.68
2013.86
2019.04
2024.21
2029.39
2034.56
2039.74
2044.91
2050.09
2055.26
2060.44
2065.61
2070.79
2075.96
2081.14
2086.32
2091.49
2096.67
2101.84
2107.02
2112.19
2117.37
2122.54
2127.72
2132.89
2138.07
2143.25
2148.42
2153.60
2158.77
2163.95
2169.12
2174.30
2179.47
2184.65
2189.82
2195.00
2200.18
2205.35
2210.53
2215.70
5165.18
5179.21
5193.25
5207.28
5221.32
5235.35
5249.39
5263.42
5277.46
5291.49
5305.53
5319.56
5333.60
5347.63
5361.67
5375.70
5389.74
5403.77
5417.81
5431.84
5445.88
5459.91
5473.95
5487.98
5502.02
5516.05
5530.09
5544.12
5558.16
5572.19
5586.23
5600.26
5614.30
5628.33
5642.37
5656.40
5670.44
5684.47
5698.51
5712.54
5726.58
5740.61
5754.65
5768.68
5782.72
5796.75
5810.79
5824.82
5838.86
5852.89
5866.93
5880.96
5895.00
5909.04
5923.07
5937.11
5951.14
5965.18
5979.21
5993.25
6007.28
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
421.00
422.00
423.00
424.00
425.00
426.00
427.00
428.00
429.00
430.00
431.00
432.00
433.00
434.00
435.00
436.00
437.00
438.00
439.00
440.00
441.00
442.00
443.00
444.00
445.00
446.00
447.00
448.00
449.00
450.00
451.00
452.00
453.00
454.00
455.00
456.00
457.00
458.00
459.00
460.00
461.00
462.00
463.00
464.00
465.00
466.00
467.00
468.00
469.00
470.00
471.00
472.00
473.00
474.00
475.00
476.00
477.00
478.00
479.00
480.00
481.00
3763.16
3771.93
3780.70
3789.47
3798.25
3807.02
3815.79
3824.56
3833.33
3842.11
3850.88
3859.65
3868.42
3877.19
3885.96
3894.74
3903.51
3912.28
3921.05
3929.82
3938.60
3947.37
3956.14
3964.91
3973.68
3982.46
3991.23
4000.00
4008.77
4017.54
4026.32
4035.09
4043.86
4052.63
4061.40
4070.18
4078.95
4087.72
4096.49
4105.26
4114.04
4122.81
4131.58
4140.35
4149.12
4157.89
4166.67
4175.44
4184.21
4192.98
4201.75
4210.53
4219.30
4228.07
4236.84
4245.61
4254.39
4263.16
4271.93
4280.70
4289.47
3763.16
3771.93
3780.70
3789.47
3798.25
3807.02
3815.79
3824.56
3833.33
3842.11
3850.88
3859.65
3868.42
3877.19
3885.96
3894.74
3903.51
3912.28
3921.05
3929.82
3938.60
3947.37
3956.14
3964.91
3973.68
3982.46
3991.23
4000.00
4008.77
4017.54
4026.32
4035.09
4043.86
4052.63
4061.40
4070.18
4078.95
4087.72
4096.49
4105.26
4114.04
4122.81
4131.58
4140.35
4149.12
4157.89
4166.67
4175.44
4184.21
4192.98
4201.75
4210.53
4219.30
4228.07
4236.84
4245.61
4254.39
4263.16
4271.93
4280.70
4289.47
2662.51
2668.76
2675.01
2681.26
2687.51
2693.76
2700.01
2706.26
2712.51
2718.76
2725.01
2731.26
2737.51
2743.76
2750.01
2756.26
2762.51
2768.76
2775.01
2781.26
2787.51
2793.76
2800.01
2806.26
2812.51
2818.76
2825.01
2831.26
2837.51
2843.76
2850.01
2856.26
2862.51
2868.76
2875.01
2881.26
2887.51
2893.76
2900.01
2906.26
2912.51
2918.76
2925.01
2931.26
2937.51
2943.76
2950.01
2956.26
2962.51
2968.76
2975.01
2981.26
2987.51
2993.76
3000.01
3006.26
3012.51
3018.76
3025.01
3031.26
3037.51
5531.05
5543.95
5556.84
5569.74
5582.63
5595.53
5608.42
5621.32
5634.21
5647.11
5660.00
5672.89
5685.79
5698.68
5711.58
5724.47
5737.37
5750.26
5763.16
5776.05
5788.95
5801.84
5814.74
5827.63
5840.53
5853.42
5866.32
5879.21
5892.11
5905.00
5917.89
5930.79
5943.68
5956.58
5969.47
5982.37
5995.26
6008.16
6021.05
6033.95
6046.84
6059.74
6072.63
6085.53
6098.42
6111.32
6124.21
6137.11
6150.00
6162.89
6175.79
6188.68
6201.58
6214.47
6227.37
6240.26
6253.16
6266.05
6278.95
6291.84
6304.74
2220.88
2226.05
2231.23
2236.40
2241.58
2246.75
2251.93
2257.11
2262.28
2267.46
2272.63
2277.81
2282.98
2288.16
2293.33
2298.51
2303.68
2308.86
2314.04
2319.21
2324.39
2329.56
2334.74
2339.91
2345.09
2350.26
2355.44
2360.61
2365.79
2370.96
2376.14
2381.32
2386.49
2391.67
2396.84
2402.02
2407.19
2412.37
2417.54
2422.72
2427.89
2433.07
2438.25
2443.42
2448.60
2453.77
2458.95
2464.12
2469.30
2474.47
2479.65
2484.82
2490.00
2495.18
2500.35
2505.53
2510.70
2515.88
2521.05
2526.23
2531.40
6021.32
6035.35
6049.39
6063.42
6077.46
6091.49
6105.53
6119.56
6133.60
6147.63
6161.67
6175.70
6189.74
6203.77
6217.81
6231.84
6245.88
6259.91
6273.95
6287.98
6302.02
6316.05
6330.09
6344.12
6358.16
6372.19
6386.23
6400.26
6414.30
6428.33
6442.37
6456.40
6470.44
6484.47
6498.51
6512.54
6526.58
6540.61
6554.65
6568.68
6582.72
6596.75
6610.79
6624.82
6638.86
6652.89
6666.93
6680.96
6695.00
6709.04
6723.07
6737.11
6751.14
6765.18
6779.21
6793.25
6807.28
6821.32
6835.35
6849.39
6863.42
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
482.00
483.00
484.00
485.00
486.00
487.00
488.00
489.00
490.00
491.00
492.00
493.00
494.00
495.00
496.00
497.00
498.00
499.00
500.00
501.00
502.00
503.00
504.00
505.00
506.00
507.00
508.00
509.00
510.00
511.00
512.00
513.00
514.00
515.00
4298.25
4307.02
4315.79
4324.56
4333.33
4342.11
4350.88
4359.65
4368.42
4377.19
4385.96
4394.74
4403.51
4412.28
4421.05
4429.82
4438.60
4447.37
4456.14
4464.91
4473.68
4482.46
4491.23
4500.00
4508.77
4517.54
4526.32
4535.09
4543.86
4552.63
4561.40
4570.18
4578.95
4587.72
4298.25
4307.02
4315.79
4324.56
4333.33
4342.11
4350.88
4359.65
4368.42
4377.19
4385.96
4394.74
4403.51
4412.28
4421.05
4429.82
4438.60
4447.37
4456.14
4464.91
4473.68
4482.46
4491.23
4500.00
4508.77
4517.54
4526.32
4535.09
4543.86
4552.63
4561.40
4570.18
4578.95
4587.72
3043.76
3050.01
3056.26
3062.51
3068.76
3075.01
3081.26
3087.51
3093.76
3100.01
3106.26
3112.51
3118.76
3125.01
3131.26
3137.51
3143.76
3150.01
3156.26
3162.51
3168.76
3175.01
3181.26
3187.51
3193.76
3200.01
3206.26
3212.51
3218.76
3225.01
3231.26
3237.51
3243.76
3250.01
6317.63
6330.53
6343.42
6356.32
6369.21
6382.11
6395.00
6407.89
6420.79
6433.68
6446.58
6459.47
6472.37
6485.26
6498.16
6511.05
6523.95
6536.84
6549.74
6562.63
6575.53
6588.42
6601.32
6614.21
6627.11
6640.00
6652.89
6665.79
6678.68
6691.58
6704.47
6717.37
6730.26
6743.16
2536.58
2541.75
2546.93
2552.11
2557.28
2562.46
2567.63
2572.81
2577.98
2583.16
2588.33
2593.51
2598.68
2603.86
2609.04
2614.21
2619.39
2624.56
2629.74
2634.91
2640.09
2645.26
2650.44
2655.61
2660.79
2665.96
2671.14
2676.32
2681.49
2686.67
2691.84
2697.02
2702.19
2707.37
6877.46
6891.49
6905.53
6919.56
6933.60
6947.63
6961.67
6975.70
6989.74
7003.77
7017.81
7031.84
7045.88
7059.91
7073.95
7087.98
7102.02
7116.05
7130.09
7144.12
7158.16
7172.19
7186.23
7200.26
7214.30
7228.33
7242.37
7256.40
7270.44
7284.47
7298.51
7312.54
7326.58
7340.61
Total
Per
456.20
280.70
140.40
877.30
Hour
422.80
280.70
140.40
843.90
Hour
411.00
280.70
140.40
832.10
Hour
424.50
239.10
117.00
780.60
Hour
Hour
2 Lead up to 2 Km:
Out put
=
5.00 Cum
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
Per
Hour
Hour
Hour
36.85
Hour
1.00 Cum
3 Lead up to 3 Km:
Out put
=
5.00 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
4 Lead up to 4 Km:
Out put
=
Rate
456.20
280.70
140.40
29.48
Rate
456.20
280.70
140.40
39.31
Per
Hour
Hour
Hour
49.13
Hour
1.00 Cum
5.00 Cum
Rate
Per
0.00%
0.00%
0.00%
0.00%
14.00%
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
68.43
42.11
21.06
0.00
131.60
26.32
3.68
Rs.
30.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
95.80
58.95
29.48
0.00
184.23
36.85
5.16
Rs.
42.01
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
127.74
78.60
39.31
0.00
245.65
49.13
6.88
Rs.
56.01
Amount
0.34
0.34
0.34
0.00
Hour
Rate
456.20
280.70
140.40
56.16
Per
Hour
Hour
Hour
70.18
Hour
Rate
456.20
280.70
140.40
8.42
Per
Hour
Hour
Hour
10.53
Hour
1.00 Cum
59.66
1.00 Cum
Hour
Hour
Hour
1.00 Cum
5 Lead up to 5 Km:
Out put
=
5.00 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
456.20
280.70
140.40
47.74
Rate
456.20
280.70
140.40
7.02
Per
Hour
Hour
Hour
8.77
1.00 Cum
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
155.11
95.44
47.74
0.00
298.29
59.66
8.35
Rs.
68.01
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
182.48
112.28
56.16
0.00
350.92
70.18
9.83
Rs.
80.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
27.37
16.84
8.42
0.00
52.63
10.53
1.47
Rs.
12.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
22.81
14.04
7.02
0.00
43.87
8.77
1.23
Rs.
10.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
68.43
42.11
21.06
0.00
131.60
26.32
3.68
Rs.
28.90
Rate
456.20
280.70
140.40
21.06
26.32
Per
Hour
Hour
Hour
2 Lead up to 2 Km:
Out put
=
5.00 Cum
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
Rate
456.20
280.70
140.40
39.31
Per
Hour
Hour
Hour
49.13
Hour
Rate
456.20
280.70
140.40
47.74
Per
Hour
Hour
Hour
59.66
Hour
Rate
456.20
280.70
140.40
56.16
Per
Hour
Hour
Hour
70.18
Hour
1.00 Cum
Hour
1.00 Cum
5 Lead up to 5 Km:
Out put
=
5.00 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
36.85
1.00 Cum
4 Lead up to 4 Km:
Out put
=
5.00 Cum
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
Per
Hour
Hour
Hour
1.00 Cum
3 Lead up to 3 Km:
Out put
=
5.00 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
Rate
456.20
280.70
140.40
29.48
1.00 Cum
Rate
456.20
280.70
140.40
8.42
Per
Hour
Hour
Hour
10.53
Hour
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
95.80
58.95
29.48
0.00
184.23
36.85
5.16
Rs.
40.40
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
127.74
78.60
39.31
0.00
245.65
49.13
6.88
Rs.
56.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
155.11
95.44
47.74
0.00
298.29
59.66
8.35
Rs.
68.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
182.48
112.28
56.16
0.00
350.92
70.18
9.83
Rs.
80.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
27.37
16.84
8.42
0.00
52.63
10.53
1.47
Rs.
12.00
Rate
456.20
280.70
140.40
7.02
Per
Hour
Hour
Hour
8.77
1.00 Cum
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
22.81
14.04
7.02
0.00
43.87
8.77
1.23
Rs.
10.00
Per
Hour
Hour
Hour
16.45
Rate
456.20
280.70
140.40
29.48
Per
Hour
Hour
Hour
23.03
Hour
1.00 MT
3 Lead up to 3 Km:
Out put
=
8.00 MT
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
Rate
456.20
280.70
140.40
21.06
Rate
456.20
280.70
140.40
39.31
Per
Hour
Hour
Hour
30.71
Hour
1.00 MT
4 Lead up to 4 Km:
Out put
=
8.00 MT
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
Rate
456.20
280.70
140.40
47.74
Per
Hour
Hour
Hour
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
68.43
42.11
21.06
0.00
131.60
16.45
2.30
Rs.
18.75
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
95.80
58.95
29.48
0.00
184.23
23.03
3.22
Rs.
26.25
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
127.74
78.60
39.31
0.00
245.65
30.71
4.30
Rs.
35.01
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
155.11
95.44
47.74
0.00
298.29
37.29
Per
Hour
Hour
Hour
43.87
Hour
Rate
456.20
280.70
140.40
8.42
Per
Hour
Hour
Hour
6.58
Hour
1.00 MT
Rate
456.20
280.70
140.40
56.16
1.00 MT
Hour
1.00 MT
5 Lead up to 5 Km:
Out put
=
8.00 MT
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
37.29
Rate
456.20
280.70
140.40
7.02
Per
Hour
Hour
Hour
5.48
1.00 MT
Rs.
5.22
Rs.
42.51
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
182.48
112.28
56.16
0.00
350.92
43.87
6.14
Rs.
50.01
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
27.37
16.84
8.42
0.00
52.63
6.58
0.92
Rs.
7.50
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
22.81
14.04
7.02
0.00
43.87
5.48
0.77
Rs.
6.25
Rate
456.20
280.70
140.40
21.06
Per
Hour
Hour
Hour
38.71
Rate
456.20
280.70
140.40
29.48
Per
Hour
Hour
Hour
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
68.43
42.11
21.06
0.00
131.60
38.71
5.42
Rs.
42.40
Rs.
Rs.
Rs.
Rs.
Amount
95.80
58.95
29.48
0.00
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
72.25
Hour
Rate
456.20
280.70
140.40
47.74
Per
Hour
Hour
Hour
87.73
Hour
Rate
456.20
280.70
140.40
56.16
Per
Hour
Hour
Hour
103.21
Hour
1.00 Cum
Per
Hour
Hour
Hour
1.00 Cum
5 Lead up to 5 Km:
Out put
=
3.40 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
Rate
456.20
280.70
140.40
39.31
1.00 Cum
4 Lead up to 4 Km:
Out put
=
3.40 Cum
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
Hour
1.00 Cum
3 Lead up to 3 Km:
Out put
=
3.40 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
54.19
Rate
456.20
280.70
140.40
8.42
Per
Hour
Hour
Hour
15.48
Hour
1.00 Cum
Rate
456.20
280.70
140.40
Per
Hour
Hour
Hour
Rs.
Rs.
Rs.
184.23
54.19
7.59
Rs.
59.40
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
127.74
78.60
39.31
0.00
245.65
72.25
10.12
Rs.
82.40
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
155.11
95.44
47.74
0.00
298.29
87.73
12.28
Rs.
100.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
182.48
112.28
56.16
0.00
350.92
103.21
14.45
Rs.
117.70
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Amount
27.37
16.84
8.42
0.00
52.63
15.48
2.17
Rs.
17.60
Rs.
Rs.
Rs.
Amount
22.81
14.04
7.02
7.02
12.90
1.00 Cum
Rs.
Rs.
Rs.
Rs.
0.00
43.87
12.9
1.81
Rs.
14.70
Rate
411.00
Per
Hour
Rs.
Amount
61.65
280.70
Hour
Rs.
42.11
140.40
Hour
Rs.
21.06
21.06
Rs.
Rs.
Rs.
Rs.
0.00
124.82
15.60
2.18
Rs.
17.80
2 Lead up to 2 Km:
Out put
=
8000 Ltrs
0.21 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.
15.60
Rate
411.00
Per
Hour
Rs.
Amount
86.31
280.70
Hour
Rs.
58.95
140.40
Hour
Rs.
29.48
29.48
Rs.
Rs.
Rs.
Rs.
0.00
174.74
21.84
3.06
Rs.
24.90
3 Lead up to 3 Km:
Out put
=
8000 Ltrs
0.28 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.
21.84
Rate
411.00
Per
Hour
Rs.
Amount
115.08
280.70
Hour
Rs.
78.60
140.40
Hour
Rs.
39.31
39.31
Rs.
Rs.
Rs.
Rs.
0.00
232.99
29.12
4.08
Rs.
33.20
Rs.
Amount
139.74
4 Lead up to 4 Km:
Out put
=
8000 Ltrs
0.34 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.
29.12
Rate
411.00
Per
Hour
280.70
Hour
Rs.
95.44
140.40
Hour
Rs.
47.74
47.74
Rs.
Rs.
Rs.
Rs.
0.00
282.92
35.37
4.95
Rs.
40.30
5 Lead up to 5 Km:
Out put
=
8000 Ltrs
0.40 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.
35.37
Rate
411.00
Per
Hour
Rs.
Amount
164.40
280.70
Hour
Rs.
112.28
140.40
Hour
Rs.
56.16
56.16
Rs.
Rs.
Rs.
Rs.
0.00
332.84
41.61
5.83
Rs.
47.40
41.61
Rate
411.00
Per
Hour
Rs.
Amount
24.66
280.70
Hour
Rs.
16.84
140.40
Hour
Rs.
8.42
8.42
Rs.
Rs.
Rs.
Rs.
0.00
49.92
6.24
0.87
Rs.
7.10
6.24
Rate
411.00
Per
Hour
Rs.
Amount
20.55
280.70
Hour
Rs.
14.04
140.40
Hour
Rs.
7.02
7.02
Rs.
Rs.
Rs.
Rs.
0.00
41.61
5.20
0.73
Rs.
5.90
5.20
Out put
=
3000 Nos
0.15 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.
Rate
424.50
Per
Hour
Rs.
Amount
63.68
239.10
Hour
Rs.
35.87
117.00
Hour
Rs.
17.55
17.55
Rs.
Rs.
Rs.
Rs.
0.00
117.10
39.03
5.46
Rs.
48.10
2 Lead up to 2 Km:
Out put
=
3000 Nos
0.21 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.
39.03
Rate
424.50
Per
Hour
Rs.
Amount
89.15
239.10
Hour
Rs.
50.21
117.00
Hour
Rs.
24.57
24.57
Rs.
Rs.
Rs.
Rs.
0.00
163.93
54.64
7.65
Rs.
67.30
3 Lead up to 3 Km:
Out put
=
3000 Nos
0.28 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.
54.64
Rate
424.50
Per
Hour
Rs.
Amount
118.86
239.10
Hour
Rs.
66.95
117.00
Hour
Rs.
32.76
32.76
Rs.
Rs.
Rs.
Rs.
0.00
218.57
72.86
10.20
Rs.
89.80
4 Lead up to 4 Km:
Out put
=
3000 Nos
0.34 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.
72.86
Rate
424.50
Per
Hour
Rs.
Amount
144.33
239.10
Hour
Rs.
81.29
117.00
Hour
Rs.
39.78
39.78
Rs.
Rs.
Rs.
Rs.
0.00
265.40
88.47
12.39
Rs.
109.00
88.47
5 Lead up to 5 Km:
Out put
=
3000 Nos
0.40 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.
Rate
424.50
Per
Hour
Rs.
Amount
169.80
239.10
Hour
Rs.
95.64
117.00
Hour
Rs.
46.80
46.80
Rs.
Rs.
Rs.
Rs.
0.00
312.24
104.08
14.57
Rs.
128.30
104.08
Rate
424.50
Per
Hour
Rs.
Amount
25.47
239.10
Hour
Rs.
14.35
117.00
Hour
Rs.
7.02
7.02
Rs.
Rs.
Rs.
Rs.
0.00
46.84
15.61
2.19
Rs.
19.20
15.61
Rate
424.50
Per
Hour
Rs.
Amount
21.23
239.10
Hour
Rs.
11.96
117.00
Hour
Rs.
5.85
5.85
Rs.
Rs.
Rs.
Rs.
0.00
39.04
13.01
1.82
Rs.
16.00
13.01
LOADING & UNLOADING CHARGES BY MANUAL MEANS (EXCLUDING IDLE HIRE CHARGES
OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
Rate
a) Labour:
0.01 day Head mazdoor
320.00
0.25 day Mazdoor
280.00
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
73.20
Per
day
day
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
3.20
70.00
73.20
0.00
73.20
73.20
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum
(ii) Unloading charges:
Out put
=
5.50 Cum
a) Labour:
0.005 day Head mazdoor
0.125 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum
13.31
Rate
Per
320.00
280.00
day
day
36.60
6.65
Rs.
Rs.
13.31
1.86
Rs.
15.20
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
1.60
35.00
36.60
0.00
36.60
36.60
6.65
0.93
Rs.
7.60
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for masonry work (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
a) Labour:
0.02 day Head mazdoor
0.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum
(ii) Unloading charges:
Out put
=
5.50 Cum
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum
C) For Cement (per Tonne):
(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate
Per
320.00
280.00
day
day
146.40
26.62
Rate
Per
320.00
280.00
day
day
73.20
13.31
Rate
Per
320.00
280.00
day
day
439.20
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
6.40
140.00
146.40
0.00
146.40
146.40
26.62
3.73
Rs.
30.35
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
3.20
70.00
73.20
0.00
73.20
73.20
13.31
1.86
Rs.
15.17
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
19.20
420.00
439.20
0.00
439.20
439.20
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT
(ii) Unloading & Stacking charges:
Out put
=
10.00 MT
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT
D) For Structural steel, Steel bars (per Tonne):
(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT
(ii) Unloading & Stacking charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT
43.92
Rate
Per
320.00
280.00
day
day
439.20
43.92
Rate
Per
320.00
280.00
day
day
526.40
52.64
Rate
Per
320.00
280.00
day
day
526.40
52.64
73.20
Rs.
Rs.
43.92
6.15
Rs.
50.07
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
19.20
420.00
439.20
0.00
439.20
439.20
43.92
6.15
Rs.
50.07
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
22.40
504.00
526.40
0.00
526.40
526.40
52.64
7.37
Rs.
60.01
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
22.40
504.00
526.40
0.00
526.40
526.40
52.64
7.37
Rs.
60.01
Per
day
day
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
3.20
70.00
73.20
0.00
73.20
73.20
36.60
36.60
Rate
Per
320.00
280.00
day
day
73.20
36.60
Rs.
5.12
Rs.
41.72
Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
3.20
70.00
73.20
0.00
73.20
73.20
36.60
5.12
Rs.
41.72
LOADING & UNLOADING CHARGES BY MANUAL MEANS (INCLUDING IDLE HIRE CHARGES
OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
Rate
a) Labour:
0.01 day Head mazdoor
320.00
0.25 day Mazdoor
280.00
Per
Amount
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
3.20
70.00
73.20
0.00
73.20
424.50
Hour
Rs.
212.25
239.10
Hour
Rs.
119.55
117.00
Hour
Rs.
58.50
58.50
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
390.30
463.50
463.50
84.27
11.80
Rs.
96.07
73.20
84.27
Rate
Per
320.00
280.00
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
1.60
35.00
36.60
0.00
36.60
424.50
Hour
Rs.
70.47
239.10
Hour
Rs.
39.69
36.60
Amount
117.00
19.42
Hour
30.21
Rs.
19.42
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
129.58
166.18
166.18
30.21
4.23
Rs.
34.44
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
a) Labour:
0.02 day Head mazdoor
0.50 day Mazdoor
Rate
Per
Amount
320.00
280.00
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
6.40
140.00
146.40
0.00
146.40
146.40
424.50
Hour
Rs.
212.25
239.10
Hour
Rs.
119.55
117.00
Hour
Rs.
58.50
58.50
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
390.30
536.70
536.70
97.58
13.66
Rs.
111.24
97.58
Rate
Per
320.00
280.00
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
3.20
70.00
73.20
0.00
73.20
424.50
Hour
Rs.
106.13
239.10
Hour
Rs.
59.78
117.00
Hour
Rs.
29.25
29.25
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
195.16
268.36
268.36
48.79
6.83
73.20
48.79
Amount
1.00 Cum
Rs.
55.62
Rate
Per
Amount
320.00
280.00
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
19.20
420.00
439.20
0.00
439.20
439.20
424.50
Hour
Rs.
424.50
239.10
Hour
Rs.
239.10
117.00
Hour
Rs.
117.00
117.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
780.60
1219.80
1219.80
121.98
17.08
Rs.
139.06
121.98
Rate
Per
Amount
320.00
280.00
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
22.40
504.00
526.40
0.00
526.40
526.40
424.50
Hour
Rs.
424.50
239.10
Hour
Rs.
239.10
117.00
Hour
Rs.
117.00
117.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
780.60
1307.00
1307.00
130.70
18.30
Rs.
149.00
130.70
Rate
Per
320.00
280.00
day
day
526.40
Amount
Rs.
Rs.
Rs.
Rs.
22.40
504.00
526.40
0.00
Rs.
526.40
424.50
Hour
Rs.
424.50
239.10
Hour
Rs.
239.10
117.00
Hour
Rs.
117.00
117.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
780.60
1307.00
1307.00
130.70
18.30
Rs.
149.00
130.70
Rate
Per
Amount
320.00
280.00
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
22.40
504.00
526.40
0.00
526.40
526.40
424.50
Hour
Rs.
424.50
239.10
Hour
Rs.
239.10
117.00
Hour
Rs.
117.00
117.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
780.60
1307.00
1307.00
130.70
18.30
Rs.
149.00
130.70
Per
Amount
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
3.20
70.00
73.20
0.00
73.20
424.50
Hour
Rs.
140.09
239.10
Hour
Rs.
78.90
117.00
Hour
Rs.
38.61
38.61
Rs.
0.00
73.20
165.40
Rs.
Rs.
Rs.
Rs.
Rs.
257.60
330.80
330.80
165.40
23.16
Rs.
188.56
Rate
Per
Amount
320.00
280.00
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
19.20
420.00
439.20
0.00
439.20
439.20
424.50
Hour
Rs.
424.50
239.10
Hour
Rs.
239.10
117.00
Hour
Rs.
117.00
117.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
780.60
1219.80
1219.80
609.9
85.39
Rs.
695.29
609.90
Per
Amount
Hour
Rs.
46.51
280.70
Hour
Rs.
30.88
140.40
Hour
Rs.
15.44
422.80
Hour
Rs.
25.37
280.70
Hour
Rs.
16.84
140.40
Hour
Rs.
8.42
23.86
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
143.46
143.46
26.08
3.65
Rs.
29.73
26.08
Rate
Per
422.80
Hour
Rs.
33.82
280.70
Hour
Rs.
22.46
140.40
Hour
Rs.
11.23
11.23
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
67.51
67.51
12.27
1.72
Rs.
13.99
12.27
Amount
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
a) Machinery:
0.17 Hrs. hire charges of Tipper 10 Tonnes
capacity @ Rs.
Rate
Per
422.80
Hour
Rs.
71.88
280.70
Hour
Rs.
47.72
140.40
Hour
Rs.
23.87
422.80
Hour
Rs.
50.74
280.70
Hour
Rs.
33.68
140.40
Hour
Rs.
16.85
40.72
Rs.
Rs.
Rs.
Rs.
Rs.
0.00
244.74
244.74
44.5
6.23
Rs.
50.73
44.50
Amount