100% found this document useful (2 votes)
2K views2 pages

SPC SMT Defects Chart Template

The document appears to be a statistical process control chart used to track defects over time at a manufacturing facility. It includes headings for time of day, work station name, operator initials, work order number, serial number, reference designator, and number of defects. The chart is divided into hourly intervals from 1:00 AM to 10:00 PM and can be used to monitor defects and identify potential issues during specific shifts or with individual operators.

Uploaded by

smtdrkd
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views2 pages

SPC SMT Defects Chart Template

The document appears to be a statistical process control chart used to track defects over time at a manufacturing facility. It includes headings for time of day, work station name, operator initials, work order number, serial number, reference designator, and number of defects. The chart is divided into hourly intervals from 1:00 AM to 10:00 PM and can be used to monitor defects and identify potential issues during specific shifts or with individual operators.

Uploaded by

smtdrkd
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

TIME

0
1
2
3
4
5
6
7
8
9
10
9:00 AM
8:00 AM

12:00 AM
11:00 AM
10:00 AM
8:00
WORK
STATION
NAME

OPERATOR
9:00 INITIALS

WORK ORDER
NO
10:00

SERIAL NO

11:00
REFERENCE
DESIGNATOR

12:00 NUMBER OF
DEFECTS

TIME
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM

1:00
WORK
STATION
NAME

OPERATOR
2:00 INITIALS
STATISTICAL PROCESS CONTROL CHART

WORK ORDER
NO
3:00
1

SERIAL NO

4:00
REFERENCE
DESIGNATOR

5:00 NUMBER OF
DEFECTS
SHIFT #
_________________
TODAY'S DATE:
TIME

9:00 AM
8:00 AM
7:00 AM
6:00 AM

10:00 AM

0
1
2
3
4
5
6
7
8
9
10
6:00
WORK
STATION
NAME

OPERATOR
7:00 INITIALS

WORK ORDER
NO
8:00

SERIAL NO

9:00
REFERENCE
DESIGNATOR

10:00 NUMBER OF
DEFECTS

TIME
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 AM

11:00

WORK
STATION
NAME
STATISTICAL PROCESS CONTROL CHART

12:00
OPERATOR
INITIALS

WORK ORDER
1:00
1

NO

SERIAL NO

2:00

REFERENCE
DESIGNATOR

3:00
NUMBER OF
DEFECTS
_________________
TODAY'S DATE:

You might also like