Airbus A320 MLG Doors Gvi
Airbus A320 MLG Doors Gvi
Airbus A320 MLG Doors Gvi
Manual : AMM
Type : TF-N
Selected applicability : ALL
Rev. Date : Aug 01, 2015
52-81-18 PB 801 CONF 00 - DOOR - MAIN
LANDING GEAR, COMMON RAMP - REPAIRS
52-81-18 PB 801 CONF 00 - DOOR - MAIN LANDING GEAR, COMMON RAMP - REPAIRS
TASK 52-81-18-300-802-A
Main Landing-Gear Door - Replacement of the Central-Ramp Teflon Paint
WARNING:
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN
CAUSE DAMAGE TO THE EQUIPMENT.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
GEAR.
CAUTION:
DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF CARBONFIBER REINFORCED PLASTIC.
1.
B.
QTY
1
AR
AR
AR
AR
AR
1
1
AR
DESIGNATION
ACCESS PLATFORM 2M (6 FT)
CLOTH-EMERY (GRADE 240)
CLOTH-EMERY (GRADE 280)
CLOTH-EMERY (GRADE 400)
SAFETY BARRIER(S)
SAFETY CLIP - CIRCUIT BREAKER
SCRAPER - NON METALLIC
VACUUM CLEANER
WARNING NOTICE(S)
Consumable Materials
REFERENCE
(Material No. 04-DAB2)
(Material No. 04-EAC2)
DESIGNATION
Primer Epoxy Paint-- Corrosion Inhibiting Structure
Primer Polyurethane Paint-- Corrosion Inhibiting Structure
Page 1 of 6
Customer : AEE
Manual : AMM
Type : TF-N
Selected applicability : ALL
Rev. Date : Aug 01, 2015
52-81-18 PB 801 CONF 00 - DOOR - MAIN
LANDING GEAR, COMMON RAMP - REPAIRS
REFERENCE
(Material No. 04-PAD2)
(Material No. 06-ABB1)
(Material No. 08-BBF1)
(Material No. 10-ABC1)
DESIGNATION
Polyurethane Coating-- Abrasion Resistant Structure
Polysulfide Sealant-Fuel Tank Fillet Non Aqueous Cleaner-- Methyl-Ethyl-Ketone Surface Pretreatment-Light Alloys Chemical Conversion Yellow -
C. Referenced Information
REFERENCE
(Ref. 12-34-24-869-002-A).
DESIGNATION
Aircraft Bonding and Grounding (Earthing) for the Maintenance Operations
(Ref. 12-34-24-869-002-A-01).
Aircraft Grounding (Earthing) during Transit, Turnaround or Overnight
Stop
(Ref. 29-10-00-864-001-A).
Depressurize the Green Hydraulic System
(Ref. 32-00-00-860-001-A).
Flight Configuration Precautions with Electrical Power
(Ref. 32-00-00-860-001-A-01).
Flight Configuration Precautions without Electrical Power
(Ref. 32-12-00-010-001-A).
Open the Main Gear Doors for Access
(Ref. 32-12-00-410-001-A).
Close the Main Gear Doors after Access
Main Landing-Gear Door - Replacement of the Central-Ramp Teflon Paint SHEET 1
A
MLG DOOR
CENTRAL RAMP
RAMP
BLISTER
T-SECTION
T-SECTION
A A
15 mm
(0.591 in)
TEFLON PAINT
N_MM_528118_8_AEN0_01_01
Page 2 of 6
Customer : AEE
Manual : AMM
Type : TF-N
Selected applicability : ALL
Rev. Date : Aug 01, 2015
52-81-18 PB 801 CONF 00 - DOOR - MAIN
LANDING GEAR, COMMON RAMP - REPAIRS
Figure 52-81-18-991-00300-A / SHEET 1/1 - Main LandingGear Door - Replacement of the Central-Ramp Teflon Paint
** ON A/C 001-018, 025-025, 027-028, 053-104, 201-500, 513-700
Page 3 of 6
Customer : AEE
Manual : AMM
Type : TF-N
Selected applicability : ALL
Rev. Date : Aug 01, 2015
52-81-18 PB 801 CONF 00 - DOOR - MAIN
LANDING GEAR, COMMON RAMP - REPAIRS
3.
Job Set-up
Subtask 52-81-18-941-052-A
A.
Safety Precautions
(1) Make sure that the aircraft is electrically grounded (Ref. AMM TASK 12-34-24-869-002) .
(2) Put the safety barriers in position.
(3) Put the WARNING NOTICE(S) in the flight compartment to tell persons not to operate the main
landing-gear (MLG) doors in case not properly secured the door levers.
(4) Put the WARNING NOTICE(S) in the flight compartment to tell persons not to operate the hydraulic
systems.
(5) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 734 for the left (LH) MLG door and/or
zone 744 for the right (RH) MLG door.
(6) Prevent the damage to the anti-ice heat elements (Ref. AMM TASK 32-00-00-860-001) .
Subtask 52-81-18-860-052-A
B.
Subtask 52-81-18-865-054-A
C.
DESIGNATION
FIN
L/G/LGCIU/SYS1/NORM
1GA
HYDRAULIC/BRAKING AND STEER4GG
ING/SYS2/SPLY
HYDRAULIC/BRAKING AND STEER3GG
ING/SYS2/CTL
HYDRAULIC/BRAKING AND STEER1GG
ING/SYS1/CTL
HYDRAULIC/BRAKING AND STEER2GG
ING/SYS1/IND AND/SPLY
HYDRAULIC/Y HYD/PUMP ENG2/MONG 3700GD
HYDRAULIC/Y HYD/PUMP ENG2/CTL 3701GD
HYDRAULIC/LGCIU/SYS2
2GA
HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA
HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK
HYDRAULIC/G HYD/PUMP ENG1/
1702GK
MONG
LOCATION
C09
M36
M35
M34
M33
Q37
Q36
Q35
Q34
R35
R34
Subtask 52-81-18-010-052-A
D.
Get Access
(1) Open the MLG door of the each side (Ref. AMM TASK 32-12-00-010-001) .
4.
Procedure
(Ref. Fig. Main Landing-Gear Door - Replacement of the Central-Ramp Teflon Paint SHEET 1)
Subtask 52-81-18-370-050-A
A.
Page 4 of 6
Customer : AEE
Manual : AMM
Type : TF-N
Selected applicability : ALL
Rev. Date : Aug 01, 2015
52-81-18 PB 801 CONF 00 - DOOR - MAIN
LANDING GEAR, COMMON RAMP - REPAIRS
NOTE: The following procedure gives the replacement for the LH side. Replacement for the RH side is
equivalent.
(1) Remove the damaged teflon paint:
(a) Remove the damaged teflon paint from the ramp blister and the T-sections with a SCRAPER NON METALLIC.
(b) Remove the bonding primer of the ramp blister and the T-sections with a CLOTH-EMERY
(GRADE 240).
(c) Remove all unwanted material using a VACUUM CLEANER.
(d) Clean the mating surfaces of the ramp blister and the T-sections with Non Aqueous Cleaner-Methyl-Ethyl-Ketone - (Material No. 08-BBF1).
(2) Replace sealant:
(a) Fill any gaps between the ramp blister and the T-sections with Polysulfide Sealant-Fuel Tank
Fillet - (Material No. 06-ABB1).
(b) Cure the sealant (refer to the manufacturer's instructions).
(c) Sand the surface of the sealant with CLOTH-EMERY (GRADE 280) and finish with CLOTHEMERY (GRADE 400).
Make sure that you do not remove the remaining sealant from the gaps between T-sections.
(d) Remove all the unwanted material using a VACUUM CLEANER.
(e) Clean the mating surfaces of the ramp blister and the T-sections with Non Aqueous Cleaner-Methyl-Ethyl-Ketone - (Material No. 08-BBF1).
(3) Paint the central-ramp:
(a) Apply Surface Pretreatment-Light Alloys Chemical Conversion Yellow - (Material No. 10-ABC1).
(b) Apply Primer Polyurethane Paint-- Corrosion Inhibiting Structure (Material No. 04-EAC2) or
Primer Epoxy Paint-- Corrosion Inhibiting Structure (Material No. 04-DAB2) to the mating
surfaces of the ramp blister and the T-sections.
(c) Apply Polyurethane Coating-- Abrasion Resistant Structure (Material No. 04-PAD2) to the
surface of the ramp blister and the T-sections.
(d) Let the paint dry (refer to the manufacturer's instructions).
5.
Close-up
Subtask 52-81-18-410-052-A
A.
Close Access
(1) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001) .
Subtask 52-81-18-865-055-A
B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANEL
49VU
121VU
121VU
121VU
DESIGNATION
L/G/LGCIU/SYS1/NORM
HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY
HYDRAULIC/BRAKING AND STEERING/SYS2/CTL
HYDRAULIC/BRAKING AND STEERING/SYS1/CTL
FIN
1GA
4GG
LOCATION
C09
M36
3GG
M35
1GG
M34
Page 5 of 6
Customer : AEE
Manual : AMM
Type : TF-N
Selected applicability : ALL
Rev. Date : Aug 01, 2015
52-81-18 PB 801 CONF 00 - DOOR - MAIN
LANDING GEAR, COMMON RAMP - REPAIRS
PANEL
121VU
121VU
121VU
121VU
DESIGNATION
HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY
HYDRAULIC/LGCIU/SYS2
HYDRAULIC/G HYD/PUMP ENG1/CTL
HYDRAULIC/G HYD/PUMP ENG1/
MONG
FIN
2GG
M33
LOCATION
2GA
1701GK
1702GK
Q35
R35
R34
Subtask 52-81-18-942-052-A
C.
Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
End of document
Page 6 of 6