C-54 Noc
C-54 Noc
Rev
Date
Description
1999
Checked
Approved
DL
GES C.54
Page 2 of 18
Rev 0 1999
INDEX
SEC
TITLE
1.0
SCOPE OF SPECIFICATION
1.1
1.2
1.3
Introduction
Other NOC Specifications
Functional Test Sheets
3
3
4
2.0
DEFINITIONS
2.1
2.2
Technical
Contractual
4
5
3.0
DESIGN
3.1
3.2
3.3
3.4
3.5
6
7
8
8
14
4.0
QA/QC
14
5.0
15
6.0
DOCUMENTATION
16
6.1
6.2
16
16
7.0
17
PAGE
GES C.54
Page 3 of 18
Rev 0 1999
1.0
SCOPE OF SPECIFICATION
1.1
Introduction
1.1.1
This specification covers the minimum requirements for the factory testing checks, operability testing and
site testing of microprocessor based instrument systems, leading to their field commissioning.
1.1.2
This General Specification together with the Scope of Work defined for the project, will form part of the
Purchase Order/Contract and applies to microprocessor based instrument systems for refineries, onshore oil
and gas installations and processing facilities including items purchased either directly or part of a package.
Depending on the project scope for some packages the testing and commissioning of these instrument
system may be in the package Vendor/Contractor's scope of work.
1.1.3
In the event of any conflict between this specification, the Purchase Order/Contract and any other
applicable Codes and Standards, the Vendor/Contractor shall inform the Owner. Written clarification on
how to proceed shall be obtained from the Owner before proceeding with the affected portion of the works
as failure to do so shall indicate full compliance; any remedial work then necessary shall be at the
Vendor/Contractor's expense.
1.1.4
The Vendor/Contractor and/or the Vendor/Contractor's Commissioning team shall comply fully with the
provisions laid down in this specification. Any exception must be authorised in writing by the Owner.
It is the Vendor/Contractor's responsibility to ensure that the complete system is inspected and tested
throughout all stages to ensure a smooth, damage and trouble free start of the plant and without any danger
to the operations personnel.
1.1.5
This is a General Specification and as such it must be tailored to the project specific or system specific
requirements.
1.1.6
This specification does not include the field commissioning of Management Information Systems which is
covered by GES J.25. Also, this specification does not cover the training of various personnel on
microprocessor based instrument systems.
1.2
Site Data
GES B.01
GES C.55
GES J.12
GES J.16
GES J.17
GES J.20
GES J.22
GES J.23
GES J.24
1.3
GES J.25
GES J.29
GES L.07
GES L.27
GES C.54
Page 4 of 18
Rev 0 1999
2.0
DEFINITIONS
2.1
Technical
The technical terms used in this specification are defined as follows:
DCS
Distributed Control System or an acronym often used to describe a generic, microprocessor based,
regulatory control system.
ESD
An abbreviation for Emergency Shutdown Systems.
Factory Acceptance Test (FAT)
A formal factory tests designed to demonstrate that the system fulfils the requirements of the Design
Specification. The FAT is developed jointly between the Vendor/Contractor and the Owner.
Fault Tolerance
A system which includes hardware or software fault detection features and redundant hardware, which
allows the system to continue performing its specified function after faults have been detected.
HAZOP
Acronym for Hazards and Operability study which is a systematic, detailed, hazards analysis technique
applied to processes to identify and qualify deviations from the intended design or normal operation which
have the potential to place the plant or personnel at risk.
I/O (Input/Outputs)
The discrete inputs or outputs connected to the field elements.
GES C.54
Page 5 of 18
Rev 0 1999
Contractual
The commercial terms used in this specification are defined as follows:
Owner
The oil and gas company, an associate or subsidiary, who is the end user of the equipment and facilities.
Vendor
The company supplying the equipment and material.
Contractor
The main contractor for a defined piece of work
Sub-Contractor
A company awarded a contract by a Contractor to do part of the work awarded to the Contractor.
Inspection Authority
The organisation representing the Owner or Vendor/Contractor that verifies that the equipment and
GES C.54
Page 6 of 18
Rev 0 1999
facilities have been designed, constructed, inspected and tested in accordance with the requirements of this
specification and the Purchase Order/Contract.
Inspector
A qualified individual representing the Owner, Vendor/Contractor or the assigned Inspection Authority,
who verifies that the equipment and facilities have been designed, constructed, inspected and tested in
accordance with the requirements of this specification and the Purchase Order/Contract.
3.0
DESIGN
3.1
Transmission Systems
API RP 554
3.2
3.2.1
General
The following notes apply to all microprocessor based instrument control systems. Field commissioning of
the instrument systems will not be initiated unless it has been verified that all the following tests have been
completed during the FAT stage. Any incomplete tests or checks shall be completed at site and
GES C.54
Page 7 of 18
Rev 0 1999
An inventory check to verify the existence of all parts, modules, cables, interface equipment and
other associated equipment.
(b)
Database checks to verify the Vendor/Contractor's system design capabilities. It should be possible
to build, load and modify a system or sub-system database.
(c)
Simulation and testing of system monitoring and security features. Tests shall include component
failures, cable breaks and power failures.
(d)
Demonstration to check the capabilities of all operator interfaces. System architecture including
external serial interfaces and devices shall be verified in accordance with the job specification.
(e)
All database configuration and displays and features shall be tested for operation in accordance
with their job specification.
(f)
(g)
Testing of all hardware and software custom options considered as part of Vendor/Contractor's
Purchase Order/Contract.
(h)
A power supply test to verify the ability of the system to compensate for input power variations.
System performance should not be affected or impaired by such variations. Maximum/minimum
input voltage and (if possible) frequency levels shall be simulated and system satisfactory
performance verified. Satisfactory performance is relevant to the ability of the system to function
normally during the specified and agreed supply input variations.
(i)
An error free, Owner specified (48 minimum to 100 hour maximum) heat soak test to identify the
failures, if any.
(j)
Fault tolerant tests to verify the operation of redundant processors, PSU's, I/O's, cables,
communication links, bridges/routers, storage devices and operator interfaces such as VDU,
printer etc.
(k)
A check to verify that the system start up can be implemented using the Vendor/Contractor's start
up procedure.
(l)
A check to verify that the trouble shooting can be carried out by using the Vendor/Contractor's
supplied trouble shooting manual.
(m)
A check to verify that, if relevant, the equipment meets the requirements of the associated
hazardous area classification.
3.3
3.3.1
These tests and checks may be conducted either at Vendor/Contractor's works or at another location agreed
between the Vendor/Contractor and the Owner. Tests shall include tests of all data links and transfer of all
data sets between different systems. Proper functioning of all communication links and information
transfer between various databases shall be verified by using either actual equipment (preferred) or
Vendor/Contractor supplied simulators. The test procedure for this shall be approved by the Owner.
3.3.2
As a minimum the following characteristics shall be checked for the communication of data sets and
GES C.54
Page 8 of 18
Rev 0 1999
communication links:
Compatibility/conformity;
Correctness of the information being transmitted;
Completeness;
Testability;
Standardisation;
Sufficiency of the information being transmitted;
Efficiency;
Speed/Loading;
Resilience;
Exception responses;
Action on responses;
Conversation structure;
Data structure;
Data status structure;
Communication errors operator interface i.e. fault reporting;
Fault tracing methodology;
Transmission distance capability.
3.4
3.4.1
3.4.2
(a)
If the project schedule requires an early shipment of the system, then arrangements shall be made
to provide air conditioned storage facilities for the system.
(b)
Prior to the start of system installation, a check shall be made by the Vendor/Contractor that:
-
Control room or other appropriate flooring has been checked for adherence to specific
coating, weight load, channelling and similar requirements.
Cable routing and wireways have been checked for proper placement.
Air conditioning system and the fire detection and fire protection system is operating.
The environmental conditions in equipment and in the control room and equipment room
are within the constraints specified by the Vendor/Contractor
All building work is complete and that the environment is dust free.
(c)
(d)
Control building Fire and Gas detection systems must be functional before the testing and
commissioning of any other systems is undertaken.
System Installation
(a)
Installation shall be co-ordinated by the Owner for the Vendor/Contractor responsible for the
installation.
(b)
If the control room has computer room type modular raised floor, field wiring, power cables,
grounding conductors, wiring harness sets, etc., should be placed in position before installing the
floor tiles.
(c)
3.4.3
GES C.54
Page 9 of 18
Rev 0 1999
(d)
The Vendor/Contractor shall be responsible for making field wiring, power and ground
connections.
(e)
The termination cabinets shall normally be installed before the installation of any system, so that
field cables can be pulled and terminated.
(f)
The system interconnection cables and connection cables to other devices, e.g., annunciators,
DCS/SCADA systems, shall then be connected. All I/O "knife" switches within the termination
cabinets shall have been set to the open position before connecting the termination cabinets to the
system.
(g)
Each step in the installation shall be checked and a final inspection made to ensure that all
connections have been made properly.
(h)
The system can then be handed over to the Owner's team for operability tests and loop checking
on a point basis.
(i)
Unless otherwise previously agreed, no radio transmitter or walkie talkies are allowed in the
vicinity of the system panel.
Operability Tests
(a)
These tests shall be witnessed by the Owner but carried out by the Vendor/Contractor.
(b)
The Vendor/Contractor shall be responsible for supplying all estimated necessary spare parts and
all the test equipment including input signal generators, output signal, indicator calibration
equipment and any other specialised test equipment.
(c)
(d)
All electrical equipment such as UPS and isolation transformers shall be tested and completely
operational prior to the start of the Operability Testing. Proper power distribution shall be verified
and proper allocation and usage of breakers and fuses shall be checked before powering up any
component. Checks shall be carried out to make sure that:
-
Not too many users have been placed on a single breaker or a fuse.
Loss of single breaker or a fuse will not jeopardise the facility. The same check shall be
carried out for terminal strip and I/O cards etc.
(e)
Before connecting the power supplies, the correct and stable operation of the UPS system, the
integrity of all earthing systems and the allocation and rating of protection fuses and relays shall
have been checked.
(f)
Depending on the system and subject to decision by the Owner some or all of the following
Operability Tests/Checks shall be carried out by the Vendor/Contractor and witnessed by the
Commissioning team:
-
Inventory checks and hardware examination to ensure that all modules are in
their correct location and are firmly fixed and secure.
(g)
3.4.4
3.4.5
GES C.54
Page 10 of 18
Rev 0 1999
The system architecture and hardware functionality checks shall be carried out
by exercising the capabilities of all system components.
Error free Owner agreed (48 to 100 hours) heat soak test procedure originally
carried out at the FAT stage shall be repeated, to demonstrate that the system is
fully functional.
Proper operation of any UPS type of supply shall be verified by simulating failure scenarios and
monitoring the response of the system.
Site Acceptance Tests will consist of two parts; stand alone Operability Tests (Section 3.4.3) and
actual Acceptance Tests. After this the system can be handed over to Operations.
(b)
Site acceptance tests shall be witnessed by the Owner but conducted by the Vendor/Contractor.
(c)
Prior to the final Site Acceptance Tests the system under test shall be fully integrated with the field
sensors, output devices and all direct and communication links. However, at the stage of loop
testing without power these shall be disconnected using knife edge or other approved isolators.
(d)
All field devices shall be installed, cabled and calibrated prior to the start of SAT.
(e)
Any hardware and software revisions must, if at all possible, be implemented prior to FAT. These
revisions shall include all high priorities discrepancies identified during the previous FAT and
Operability Testing.
(f)
(g)
The SAT procedure shall consist of an error free test with all interfaces operational. The system
shall be exercised as if it is operating in the normal plant environment but without process fluid
taking into account due differences when using alternative fluids. The duration of the test shall be
as specified in project specification.
(h)
Any change made to any version of the software or hardware from the previous testing shall
require retesting of the appropriate procedure as defined in Section 5.0 of this specification.
(i)
Full records shall be kept of any proposed modifications, punch lists and similar documentation.
It is assumed that power is available and it is isolated at the withdrawable fuses or miniature
circuit breakers etc. The loops themselves are not powered but this can be implemented by lifting
loop fuses, unplugging remote terminal panel cables or similar disconnection actions.
(b)
High voltage circuit testing methods shall not be used for testing circuits involving connected
components. If high voltage test methods are proposed, all instruments are to be removed or
electrically isolated.
3.4.6
3.4.7
GES C.54
Page 11 of 18
Rev 0 1999
Check glands and terminations are properly made off, sealed, labelled and
numbered;
Check voltage and polarity of the supply to each loop, the supply is not to be
connected to the loop;
With the microprocessor system isolated, the loop test shall be conducted from
the computer input/output (I/O) back to the instrument terminations;
Check freedom of loop and screen cabling from earth faults, stray voltages etc;
Check correct fitting of any applicable end of line provisions such as resistors,
diodes etc. and that no unrecorded modifications have been made to instruments
or junction boxes;
The serial link from I/O to the system processor typically to the controller on the Distributed
Control System (DCS) shall not be connected. At this stage the field measurement will not be
displayed, and the outputs to the field shall be injected at the disconnected DCS I/O. The purpose
is to prove the operation of the field devices and any installed barrier systems through to the I/O,
under power.
(b)
The system shall then be powered one loop at a time and the functions of each loop input/output
checked. Field signal simulation shall always approximate to actual conditions whenever possible
i.e. For a pressure instrument, pressure shall be applied at the instrument, an injected 4-20 mA
signal shall not be used for simulation. Thermocouple and Resistance Temperature Device (RTD)
simulation shall be by millivolt generator and decade resistance box respectively. Outputs shall be
directed to the actual field valve or other device to prove the correct operation.
This is a confirmation of the Factory Acceptance Test under loop powered conditions. Reference
shall be made to the Functional Test Sheets attached to this specification.
(b)
When all I/O interfaces have been proved, the system shall be powered down and the I/Os
connected to the DCS input cards. Vendor/Contractor shall prove by simulation (from the
instrument in the field wherever possible) the operation of the control loops, alarm functions, line
break and signal viability functions, recording and printer functions, failure modes, trending,
paging up and down and updating, soft and hardware redundancy and all other features of the
system and graphics configuration.
GES C.54
Page 12 of 18
Rev 0 1999
Since the functioning of the I/Os has been proved, reversion to signal and output simulation at the
I/O interface is permissible to aid fault finding of the computer faceplate and graphics functions.
Where convenient, valve outputs can be fed back as measured variable inputs through a software
delay. However, after all fault finding, the complete system shall be powered up and the full
system check undertaken with signals on all I/Os in a simulated plant running mode. The actions
of the system under field signal/output conditions must then be reconfirmed.
The functions of each loop, pages of alarms, printer operation, trend storage etc. shall be listed on
individual check-lists and a positive checking procedure adopted. General statements are not
acceptable.
3.4.8
3.4.9
3.4.10
3.4.11
A check for the commissioning/start-up spare parts shall be carried out to make sure that these are
all present before any checks are carried out.
(b)
The flow computers shall be powered for a minimum of one week before any field tests and
checks are carried out.
(c)
All features of the flow computer shall be checked. These shall include such as system behaviour
following power failure, system diagnostics, programming features.
(d)
All inputs to the flow computer shall be actuated at the source and the results shall be checked at
the system display at the computer as well at the operator workstation/terminal.
(e)
3.4.12
3.4.13
GES C.54
Page 13 of 18
Rev 0 1999
(a)
The total electrical load and power factor shall be measured for the complete system and the
various isolated sub-systems. All values shall be recorded and checked against the relevant
fuse/MCB. The fuses shall be checked that they are of the correct rating for the service, it shall be
confirmed that only the correct sections of the plant are isolated when the fuse/MCB is withdrawn,
and that fuse/MCB failure on redundant items does not cause loss of plant operations.
(b)
Tests shall be made to confirm that sections of the plant can be brought 'on' and 'off load' without
causing voltage changes in the system to a level that affects the normal operation.
These tests will be conducted upon completion of the installation by the Vendor/Contractor and
satisfactory site tests of the individual systems.
(b)
These tests will include verification of correct system operation under varying communication
conditions for both the normal and standby links.
(c)
Proper operation of all application oriented functions will be verified in the real environment,
including system response times and system loading performance.
(d)
3.5.1
Handover Philosophy
GES C.54
Page 14 of 18
Rev 0 1999
A handover procedure for handing over instrument systems from Commissioning to the Owner shall be
developed as a project specific basis. The procedure shall try to optimise the aims listed below:
3.5.2
3.5.3
To ensure that systems are handed over at the most convenient time;
To ensure maximum co-operation and interface between the Commissioning team and the Owner
so as to minimise the use of site personnel and to minimise disruptions to start up schedule;
Complete instrument systems may be handed over, or these may be split along the process system
lines in which case the handover may be on sub-system basis.
(b)
(c)
3.5.4
Handover to Operations
After the completion of signatures the system will come under the care and custody of the Owner.
4.0
QA/QC
4.1
The QA/QC requirements listed in the appropriate system specification also apply to the commissioning of
instrument systems.
4.2
The Vendor/Contractor shall comply with the requirements of the relevant British Standards outlined in
Section 3.1 of this specification. The Vendor/Contractor shall also be required to comply with his own inhouse procedure for software development and documentation.
4.3
The Vendor/Contractor shall have ISO 9000 registration and comply with ISO 9001/3.
4.4
The number of audits/monitoring periods is not fixed, therefore the Vendor/Contractor shall agree with the
Owner the frequency of these tasks following placements of order.
GES C.54
Page 15 of 18
Rev 0 1999
5.0
5.1
A formal procedure shall be developed on a project basis for controlling the access to, modification of,
issuing of and implementation of the software associated with various instrument systems.
5.2
Access to all software shall be limited to qualified, competent and authorised personnel.
5.3
Levels of authorisation shall be developed. Embedded software and software related to safety critical
system shall required the highest level of authorisation. Changes such as a control set point change or other
minor changes may be at the lowest level.
5.4
The procedure shall specify and name the people who will be responsible for checking and authorising
changes at various levels.
5.5
A record shall be maintained of the degree of assessment of the proposed changes to ensure that the
original level of safety and integrity level is maintained.
5.6
The procedure shall also specify the required documents that need to be produced to record all aspects of
the change.
5.7
The control of software version in use and the update of it shall be strictly controlled.
5.8
If there are any spare parts which contain software in permanent memory (firmware) the procedure shall
incorporate steps to make sure that only the original software version is used. Alternatively the version
used shall be totally compatible with the original software (i.e. upwardly compatible) and with other
hardware and software.
5.9
The procedure shall detail the method of checking the version number of the software.
5.10
All consequences of incorporating new, enhanced version of the embedded software shall be fully
considered before use.
5.11
`Buddy' checking shall be prohibited when carrying out any safety related software modification. Only a
qualified, experienced and nominated person may carry out the checking function. All safety related
software modifications shall be subjected to a HAZOP review before the modification is actually carried
out.
5.12
If errors are found in the embedded software, these shall be reported to the Vendor/Contractor or the
manufacturer. The corrections shall be incorporated into the system only after checking and testing of the
corrected code.
5.13
5.14
Security copies of the software shall be held on a `grandfather', `father' and `son' basis. Two copies of each
version shall be generated. These will be stored in different locations in a fire safe environment.
5.15
Unless otherwise stated, Vendor/Contractor shall place two identical copies of the commissioned master of
his software in an escrow, the details of which shall be agreed with the Owner.
6.0
DOCUMENTATION
6.1
GES C.54
Page 16 of 18
Rev 0 1999
The Vendor/Contractor shall make available for use during the test, two complete copies of all relevant
drawings and documents. It is preferred that one copy is in roll-file format for ease of access. As a
minimum, these shall include:
Instrument Schedule/List:
Instrument data sheets.
Cable Schedule.
Cause and Effect Charts.
Loop diagram.
Loop schedules.
Control circuit diagrams.
Single Line Diagrams.
Screen Hierarchy.
Junction box termination schedules.
Functional configuration block diagrams.
Parameter listings e.g. DCS configuration Data Sheets, set point schedules etc.
Process Description (DCS).
Ladder logic diagrams for the Programmable Logic Controller (PLC) for ESD, Process Logic,
F&G.
Instrument layout drawings
P&IDs
Operating Manuals
6.2
6.2.1
All problems related to the systems encountered during testing will be documented on a Test Discrepancy
Report Form (see Section 7.0 for sample).
GES C.54
Page 17 of 18
Rev 0 1999
Priority
1
2
3
4
5
6
6.2.2
Authorised signatures by the Vendor/Contractor and Owner are required when the above report is filled and
again when it is signed off.
6.2.3
6.2.4
All final documentation provided by the Vendor/Contractor shall accurately reflect the system as operated.
The documentation must include revisions resulting from Acceptance and Operability Testing. If there are
any contradictions between documentation and the system as tested, these will be reported as a discrepancy
on the report.
6.2.5
Each category of system testing; (FAT, SIT, OT and SAT) will only be considered successful when all test
procedures have been implemented and all the following conditions have been met.
a)
The system has been tested continuously for at least 100 hours with no failures which result in the
loss of total system functions.
b)
c)
d)
Performance of all hardware and software has been satisfactory as defined in the job specification.
6.2.6
Previous acceptance or approval of equipment by the Owner shall in no case be constructed as a guarantee
of the acceptance of the system.
6.2.7
Generally failure of the system shall constitute grounds for a test restart. The Owner shall decide which
component failure constitutes grounds for test restart.
7.0
GES C.54
Page 18 of 18
Rev 0 1999
Process Display
Gas Detector
Fire & Gas Digital Loop
Fire & Gas Logic
Fire & Gas Display
ESD Digital Loop
ESD Analogue Loop
ESD Logic
ESD Display
Single Machine Control Logic
Selective Operation Control Logic
Valves (ESDV/BDV/XV)
Supervisory Computer Database
Data Communication Link
Earthing Segregation
Functional Test Discrepancy Report
Functional Test Observations Continuation Sheet
S:\NOC9077\ADMIN\SPECIFICATIONS\C-SERIES\C-54\GESC54RF
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
of
REVISION
CABINET
PID No.
CAL
ASSOCIATED TAGS
UNIT
LOOP TYPE
OPEN
ADDRESS
CLOSED
CHANNEL
SIGNAL TYPE
ANALOG
INPUT:
SETTING
DIGITAL
0%
50%
100%
SETTING
CONSOLE
ALARM SETTING HIGH/HIGH HIGH
ALARM RESET
ALARM SETTING LOW/LOW LOW
ALARM RESET
CONDITIONS:
NORMAL:
OPEN:
CLOSED:
TRIP/ALARM:
CONTROL/TRIP
OUTPUT:
FAILSAFE POSITION:
CONDITIONS:
NORMAL:
OPEN:
CLOSED:
OPEN:
CLOSED:
ALARM
OPEN:
CLOSED:
OPEN:
CLOSED:
TRIP/ALARM:
DISPLAY:
MIMIC
CONTROL UNIT
DCS
*
GROUP
ALM TABLE
ALM RESN
PRINTER
NOTE:
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5401r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
ITEM No.
PROJECT :
SYSTEM :
PRIORITY :
of
DISCREPANCY NUMBER :
1 2 3 4 5 6 (SEE NOTES)
ABSTRACT OF PROBLEM :
SUBMISSION DATE :
VENDOR / CONTRACTOR :
COMMISSIONING :
OWNER :
VENDOR / CONTRACTOR :
COMMISSIONING :
OWNER :
DISCREPANCY REPORT :
CONTRACTOR) :
COMMISSIONING RESPONSE :
OWNER RESPONSE :
NOTES :
1. PRIORITY CATEGORIES :
DESCRIPTION
PRIORITY
MINOR PROBLEM
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5421r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
of
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
No.
No.
No.
:
:
:
I.S. EARTH
COMPUTER EARTH
TEST RESULTS:
TO
MECHANICAL
EARTH
FROM
CLEAN
EARTH
I.S.
EARTH
CLEAN
I.S.
COMPUTER
OBSERVATIONS:
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5420r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
FROM :
LOCATION :
TO :
ITEM No.
LOCATION :
SYSTEM:
SYSTEM:
CABINET:
CONSOLE:
MODULE:
CABINET:
CONSOLE:
MODULE:
SPECIFY
of
LINK TYPE :
TEST RESULT:
TEST
LINK FAILURE
CARD FAILURE
PROCESSOR FAILURE
CHANGE OVER
ALARM
ORIGIN
DISPLAY
PR. OUT
ALARM
DESTINATION
DISPLAY
PR. OUT
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5419r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
of
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
DESCRIPTION
VERIFICATION
SOURCE
UNITS
RANGE
DCS
ADDRESS
COMPUTER
ADDRESS
COMMENTS
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5418r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
PID No.
of
ITEM No.
ASSOCIATED TAGS
TESTING CHANNEL:
TRAY:
SLOT:
CHANNEL:
FAULT MONITORING:
CONSOLE DIAGNOSTIC
ASSOCIATED TAGS
TAGS
VALVE:
TEST RESULTS
XV
ESDV
TRAVEL TIME
LIMIT STOP
(BDV)
FIELD RESET:
DISPLAY TYPE:
FAULT MONITORING
BDV
ACCUMULATOR OPERATION
FAILSAFE POSITION:
OPEN
CLOSED
OVERRIDE OP.
NORMAL POSITION:
OPEN
CLOSED
STAT.DISCREP.
REMOTE POSITION:
OPEN
CLOSED
ALARM
PRINTER
ESDV = EMERGENCY SHUTDOWN VALVE ; BDV = BLOW DOWN VALVE ; XV = MISCELLANEOUS VALVE
OBSERVATIONS: (USE CONTINUATION SHEET IF REQUIRED)
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5417r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
PID No.
of
ITEM No.
REV
TYPE
CHECKED
BASIC FUNCTION
TYPE
CHECKED
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5416r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
PID No.
of
ITEM No.
REV
TYPE
CHECKED
BASIC FUNCTION
TYPE
CHECKED
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5415r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
of
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
DISPLAY No.
CONFIGURATION DRG No.
REV
DISPLAY TYPE:
OVERVIEW
MIMIC
TABLE
ALARM
DETAIL
STATUS
GAS HISTOGRAM
TEST RESULT:
BACKGROUND CHECK
SPECIAL FUNCTIONS:
RESET
DISCREPANCIES
OVERRIDE
TARGETS CHECK
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5414r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
of
ITEM No.
REV
REV
INPUT TAGS
BF
CHECKED
OUTPUT TAGS
BF
CHECKED
SIGNATURE
DATE
PRINT NAME
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5413r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
PID No.
of
ITEM No.
ASSOCIATED TAGS
TESTING CHANNEL:
TRAY:
SLOT:
FAULT MONITORING:
C
CHANNEL:
CONSOLE DIAGNOSTIC
SYSTEM ADDRESSES:
ADDRESS
TAGS
PLC
DCS
TEST RESULT
FAULT MONITORING
TRANSMITTER
0%
50%
100%
100%
50%
0%
METER / CONSOLE
READING
TRIP
HIGH
LOW
ALARM/SETTING
ANALOG.HISTO.
RESET
ACCEPT
INHIBIT
DISPLAY TYPE:
LOCAL
CONSOLE
ALARM
PRINTER
CHECKED
YES
NO
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5412r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
PID No.
of
ITEM No.
ASSOCIATED TAGS
TESTING CHANNEL:
TRAY:
SLOT:
FAULT MONITORING:
C
CHANNEL:
CONSOLE DIAGNOSTIC
SYSTEM ADDRESSES :
ADDRESS
TAGS
CARD
DCS
FAULT MONITORING
TEST RESULT
TEST RESULTS:
INPUT:
NORMAL CONDITIONS
TRIP/FAULT CONDITIONS
OPEN
OPEN
CLOSED
CLOSED
INHIBIT
OUTPUT:
NORMAL STATUS:
NC
NO
OVERRIDE
POWER STATUS:
ON
OFF
OPEN
CLOSED
FAILSAFE POSITION:
ON
OFF
OPEN
CLOSED
ALARM
PRINTER
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5411r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
of
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
DISPLAY No.
CONFIGURATION DRG No.
REV
DISPLAY TYPE:
OVERVIEW
MIMIC
TABLE
ALARM
DETAIL
STATUS
GAS HISTOGRAM
TEST RESULT:
BACKGROUND CHECK
SPECIAL FUNCTIONS:
DELUGE
FANS / DAMPERS
FIREWATER PUMPS
TARGETS CHECK
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5410r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
of
ITEM No.
REV
REV
FIRE AREA
DETECTION :
INPUT TYPE
ALARM
TRIP
VOTING
DELUGE
SPRINKLER
HALON SUBSTITUTE / CO2 / CA
PROTECTION:
SHUTDOWN
BLOWDOWN
HVAC
*
*
* SPECIFY
INHIBIT
SPECIAL FUNCTIONS:
*
* SPECIFY
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5409r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
PID No.
of
ITEM No.
ASSOCIATED TAGS
TESTING CHANNEL:
TRAY:
SLOT:
FAULT MONITORING:
TAGS
ADDRESS
PLC
CARD
CHANNEL:
DCS
CONSOLE DIAGNOSTIC
FAULT
MONITORING
TEST
RESULT
OPEN
CLOSED
CLOSED
INHIBIT
TEST RESULTS:
INPUT:
NORMAL CONDITIONS
TRIP/FAULT CONDITIONS
OPEN
OUTPUT:
NORMAL STATUS:
NC
NO
OVERRIDE
POWER STATUS:
ON
OFF
OPEN
CLOSED
FAILSAFE POSITION:
ON
OFF
OPEN
CLOSED
ALARM
PRINTER
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5408r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
FIRE AREA
ASSOCIATED TAGS
DATA SHEET
TESTING CHANNEL:
TRAY:
SLOT:
CHANNEL:
CARD (100% LEVEL)
1st FLOOR
DETECTOR:
CARD METER
ALARM CARD
ALARM CONSOLE
GAS HISTOGRAM
ITEM No.
FAULT MONITORING:
of
CONSOLE DIAGNOSTIC
2nd FLOOR
FAULT
1st LEVEL
ACCEPT CONSOLE:
RESET CARD:
RESET CONSOLE:
2nd LEVEL
ACCEPT CONSOLE:
RESET CARD:
RESET CONSOLE:
INHIBIT :
GAS SAMPLE:
TYPE
* SPECIFY
DISPLAY TYPE:
ALARM
HISTOGRAM
PRINTER
LOCAL CONSOLE
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5407r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
DISPLAY No.
of
ITEM No.
REV :
TEST RESULTS:
BACKGROUND CHECK
TARGETS CHECK
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5406r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
of
REVISION
CABINET
PID No.
CAL
ASSOCIATED TAGS
UNIT
LOOP TYPE
OPEN
CLOSED
SYSTEM ADDRESSES:
TAGS
ADDRESS
TEST RESULTS
TRANSMITTER
ANALOG
INPUT:
DIGITAL
TRANSMITTER:
0%
50%
METER / CONSOLE
ALARM SETTING LOW / HIGH
ALARM READING METER / CONSOLE
CONDITIONS:
OPEN:
CLOSED:
CONTROL/TRIP:
ALARM:
OPEN:
CLOSED:
OPEN:
CLOSED:
FAILSAFE POSITION:
CONDITIONS:
50%
0%
/
/
NORMAL:
OUTPUT:
100%
NORMAL:
MIMIC
DISPLAY:
TRIP/ALARM:
OPEN:
CLOSED:
VALVE TYPE:
TRIP/ALARM:
GROUP
OPEN:
CLOSED:
STATUS
NOTE:
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5405r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
of
REVISION
CABINET
PID No.
CAL
ASSOCIATED TAGS
UNIT
LOOP TYPE
DIRECT
REVERSE
CASCADE
SPLIT RANGE
SYSTEM ADDRESSES:
TAGS
ADDRESS
TEST RESULTS
TRANSMITTER
VALVE 1
VALVE 2
TRANSMITTER:
0%
50%
METER / CONSOLE
ALARM SETTING LOW / HIGH
ALARM READING METER / CONSOLE
100%
/
/
CONTROL VALVE:
0%
50%
100%
OPEN
FAILSAFE POSITION
CLOSED
LOCKED
LIMIT SWITCHES
OPEN
CLOSED
VALVE 1.
VALVE 2.
MIMIC
DISPLAY:
GROUP
STATUS
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5404r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
of
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
PID No.
CAL
ASSOCIATED TAGS
UNIT
LOOP TYPE
DIRECT
REVERSE
CASCADE
SPLIT RANGE
TAGS No.
TAG NUMBERS
DESCRIPTION
RANGE / SETTING
0%
CONSOLE
ALARM SETTING LOW / HIGH
ALARM READING CONSOLE
RISING
50%
UNITS
FALLING
50%
100%
0%
/
/
CONTROLLER
ALIGNMENT CHECK:
TAG No.
0%
50%
100%
50%
0%
OPEN
FAILSAFE POSITION
CLOSED
LOCKED
LIMIT SWITCHES
OPEN
CLOSED
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5403Br0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
of
ITEM No.
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
CABINET
PID No.
CAL
ASSOCIATED TAGS
UNIT
LOOP TYPE
DIRECT
ASSOCIATED TAGS
TAG/ASS. TAGS
REVERSE
SYSTEM ADDRESS
PLC
CASCADE
/2 RACK
POSN
SPLIT RANGE
CHANNEL
RESULTS
TRANSMITTER:
RISING
50%
CONSOLE
ALARM SETTING LOW / HIGH
ALARM READING CONSOLE
CONTROL VALVE:
VALVE TAG
0%
50%
FALLING
50%
100%
/
/
100%
DISPLAY:
PCS:
OTHER:
50%
MIMIC
0%
OPEN
FAILSAFE POSITION
CLOSED
LOCKED
GROUP
LIMIT SWITCHES
OPEN
CLOSED
STATUS
NOTE:
NO
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5403Ar0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
of
ITEM No.
REVISION
CABINET
PID No.
CAL
ASSOCIATED TAGS
UNIT
LOOP TYPE
OPEN
ADDRESS
CLOSED
CHANNEL
SIGNAL TYPE
TEST RESULTS
CHOKE VALVE: HV
TAG
HS *
PT
*
PT
*
ZI
*
OPEN
0%
50%
100%
CLOSED
ALARM SETTING
ALARM READING
DISPLAY:
MIMIC
CONTROL UNIT
DCS
*
GROUP
ALM TABLE
ALM RESN
PRINTER
NOTE:
PRINT NAME
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5402r0.xls
CLIENT
PLANT
LOCATION
SHEET
SERVICE
VENDOR / CONTRACTOR
SUBSYSTEM
DESCRIPTION
LOCATION
SERVICE
TASK No.
DRAWING No.
REVISION
PRINT NAME
of
ITEM No.
SIGNATURE
DATE
TESTED BY
ACCEPTED BY
VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-54\DC5422r0.xls