1.4.1 Classification of pile with respect to load transmission and functional behaviour
1.4.2 End bearing piles
1.4.3 Friction or cohesion piles
1.4.4 Cohesion piles
1.4.5 Friction piles
1.4.6 Combination of friction piles and cohesion piles
1.4.7 .Classification of pile with respect to type of material
1.4.8 Timber piles
1.4.9 Concrete pile
1.4.10 Driven and cast in place Concrete piles
1.4.11 Steel piles
1.4.12 Composite piles
1.4.13 Classification of pile with respect to effect on the soil
1.4.14 Driven piles
1.4.15 Bored piles
1.5 Aide to classification of piles
m,
n, Rd
Timber piles were driven in to the ground by hand or holes were dug and filled
with sand and stones.
In 1740 Christoffoer Polhem invented pile driving equipment which resembled to
days pile driving mechanism. Steel piles have been used since 1800 and
concrete piles since about 1900.
The industrial revolution brought about important changes to pile driving system
through the invention of steam and diesel driven machines.
More recently, the growing need for housing and construction has forced
authorities and development agencies to exploit lands with poor soil
characteristics. This has led to the development and improved piles and pile
driving systems. Today there are many advanced techniques of pile installation.
1.3 Function of piles
As with other types of foundations, the purpose of a pile foundations is:
to transmit a foundation load to a solid ground
to resist vertical, lateral and uplift load
A structure can be founded on piles if the soil immediately beneath its base
does not have adequate bearing capacity. If the results of site investigation
show that the shallow soil is unstable and weak or if the magnitude of the
estimated settlement is not acceptable a pile foundation may become
considered. Further, a cost estimate may indicate that a pile foundation may be
cheaper than any other compared ground improvement costs.
In the cases of heavy constructions, it is likely that the bearing capacity of the
shallow soil will not be satisfactory, and the construction should be built on
pile foundations. Piles can also be used in normal ground conditions to resist
horizontal loads. Piles are a convenient method of foundation for works over
water, such as jetties or bridge piers.
the soft stratum immediately above the firm layer to give an enlarged base. A
similar effect is produced with bored piles by forming a large cone or bell at the
bottom with a special reaming tool. Bored piles which are provided with a bell
have a high tensile strength and can be used as tension piles (see fig.1-3)
Timber
Concrete
Steel
Composite piles
into firm ground. As this can easily damage the pile. Keeping the timber below
the ground water level will protect the timber against decay and putrefaction. To
protect and strengthen the tip of the pile, timber piles can be provided with toe
cover. Pressure creosoting is the usual method of protecting timber piles.
Figure 1-4 a) concrete pile connecting detail. b) squared pre-cast concert pile
The Hercules type of pile joint (Figure 1-5) is easily and accurately cast into the
pile and is quickly and safely joined on site. They are made to accurate
dimensional tolerances from high grade steels.
required depth has been achieved the tube is raised slightly and the aggregate
broken out. Dry concrete is now added and hammered until a bulb is formed.
Reinforcement is placed in position and more dry concrete is placed and
rammed until the pile top comes up to ground level.
a) X- crosssection
b) H - crosssection
c) steel pipe
Task
1. Describe the main function of piles
2. In the introduction, it is stated that piles transfer load to the
bearing ground. State how this is achieved.
3. Piles are made out of different materials. In short state the
advantages and disadvantages of these materials.
4. Piles can be referred as displacement and non-displacement piles.
State the differences and the similarities of these piles
5. Piles can be classified as end-bearing piles cohesive or friction
piles. Describe the differences and similarity of these piles.
6. Piles can be classified as bored or driven state the differences.
LOAD ON PILES
2.1 Introduction
This section of the guide is divided into two parts. The first part gives brief
summary on basic pile arrangements while part two deals with load distribution
on individual piles.
Piles can be arranged in a number of ways so that they can support load
imposed on them. Vertical piles can be designed to carry vertical loads as well
as lateral loads. If required, vertical piles can be combined with raking piles to
support horizontal and vertical forces.
often, if a pile group is subjected to vertical force, then the calculation of load
distribution on single pile that is member of the group is assumed to be the total
load divided by the number of piles in the group. However if a group of piles is
subjected to lateral load or eccentric vertical load or combination of vertical and
lateral load which can cause moment force on the group which should be taken
into account during calculation of load distribution.
In the second part of this section, piles are considered to be part of the structure
and force distribution on individual piles is calculated accordingly.
Objective: In the first part of this section, considering group of piles with
limited number of piles subjected to vertical and lateral forces, forces acting
centrally or eccentrically, we learn how these forces are distributed on individual
piles.
The worked examples are intended to give easy follow through exercise that
can help quick understanding of pile design both single and group of piles. In
the second part, the comparison made between different methods used in pile
design will enable students to appreciate the theoretical background of the
methods while exercising pile designing.
Learning outcome
c) SYMMETRICALLY ARRANGED
PILES
Q = Vertically applied
load
H = Horizontally applied
load
Figure 2-1 Basic formation of pile groups
LOAD DISTRIBUTION
To a great extent the design and calculation (load analysis) of pile foundations
is carried out using computer software. For some special cases, calculations
can be carried out using the following methods?...For a simple understanding of
the method, let us assume that the following conditions are satisfied:
The pile is rigid
The pile is pinned at the top and at the bottom
Each pile receives the load only vertically (i.e. axially applied );
The force P acting on the pile is proportional to the displacement U due to
compression
P
= k.U
?????????????????3.1
Since P = E.A
E.A = k.U
?????????????????3.2
?????????????????3.3
where:
P = vertical load component
k = material constant
U = displacement
E = elastic module of pile material
A = cross-sectional area of pile
?????????????????3.4
where:
Pv = vertical component of the load on any pile from the resultant load Q
n = number of vertical piles in the group (see fig3.4)
Q = total vertical load on pile group
If the same group of piles are subjected to an eccentric load Q which is causing rotation around
axis z (see fig 3.1); then for the pile i at distance rxi from axis z:
?????????????????3.5
is a small angle tan see figure3.4.)
Pi = force (load on a single pile i
Ui = displacement caused by the eccentric force (load) Q
rxi = distance between pile and neutral axis of pile group;
rxi positive measured the same direction as e and negative when in the opposite direction.
e = distance between point of intersection of resultant of vertical and horizontal loading
with underside of pile (see figure 3.8)
The sum of all the forces acting on the piles should be zero
?????????????????3.6
If we assume that the forces on the piles are causing a moment M about axis z-z then the sum
of moments about axis z-z should be zero (see figure 3.1 a& b)
????????3.7
MZ = MZ
????????????????????..3.8
applying the same principle, in the x direction we get equivalent equation.If we assume that the
moment MX and MZ generated by the force Q are acting on a group of pile, then the sum of
forces acting on a single pile will be as follows:
??????????????3.9
if we dividing each term by the cross-sectional area of the pile, A, we can establish the working
stream :
Example 3.1
As shown in figure 3.2, A group of Vertical piles are subjected to an eccentric force Q,
magnitude of 2600kN. Determine the maximum and the minimum forces on the piles. Q is
located 0.2 m from the x-axis and 0.15 m from the z-axis.
Solution
1. Calculate Moment generated by the eccentric force
Mx = 2600 (0.2) = 520 KN
Mz = 2600 (0.15) = 390 KN
= 2600/12 = 217 kN
DIST.
r2xi
PILE
rzi
r2zi
MX
MZ
kN
kNm
rxi
m
a1,4
0.9
0.81*2
1.35
1.823*2
520
390
a2,3
0.9
0.81*2
0.45
0.203*2
520
390
c1,4
0.9
0.81*2
1.35
1.823*2
520
390
c2,3
0.9
0.81*2
0.45
0.203*2
520
390
b1,4
0.9
1.35
1.823*2
520
390
b2,3
0.9
0.45
0.203*2
520
390
6.48
12.153
Q/n
PILE
Mxrzi/ r2zi
Mzrxi/ r2xi
Pi
kN
kN
(520
rzi)/12.153
217
58
54
217-58-54 = 105**
a1
carried by pile a1
a2
19
54
217-19-54 = 144
a3
19
54
217+19-54 = 182
a4
58
54
217+58-54 = 221
b1
58
217-58-00 = 157
b2
19
217-19-00 = 157
b3
19
217+19-00 = 236
b4
58
217+58-00 = 275
c1
58
54
217+58-54 = 221
c2
19
54
217-19+54 = 252
c3
19
54
217+19+54=290
c4
58
54
Example 3.2
A pile trestle shown on figure 3-3 consists of four vertical piles surmounted by a
1.2m thick pile cap. It carries a horizontal load applied to the surface of the cap
of 400kN. The only vertical load exerted on the pile group is the weight of the
pile cup. Determine the loads on the piles.
Solution:
1. Determine the magnitude of the vertical force: For a pile cape 4.000m square, weight of pile
cap is:
4 x 4 x 12 x 4 = 461kN
3 . resultant of vertical load and horizontal load cuts the underside of the pile cup at a point
1.06m from N.A. pile group. This can be achieved graphically. E.g. On a millimetre paper, in
scale, draw the pile cup. Taking the top of the pile cup draw the vertical component downward
as shown in figure 2-3 then taking the tip of the vertical component as reference point draw the
horizontal component perpendicular to the vertical component. By joining the two components
establish the resultant force R. Measure the distance from the N.A to the cutting point of R at
the underside of the pile cup.
4. Using the following formula, calculate the load on each pile:
Figure 3-5 Load distribution for combined vertical and raking piles
To derive the formulae used in design, we first go through the following procedures:1. Decide the location of the N.A of the vertical and the raking piles in plan position.
(see example below).
2. Draw both N.A till they cross each other at point c, this is done in Elevation and move
Figure 3-6
Pv =
As shown in figure 3.6 the lateral force, H, is kept in equilibrium by the vertical and the raking
piles.
H = 0: H-m Pr sin = 0
V = 0: m Pr cosine - n Pv = 0
where:
Pr = H/(m sin)
Pv = H/(n tan )
Figure 3-7
as a result of moment M:
ri measured perpendicular to the N.A of both the vertical and raking piles
Example 3.3
Figure 3.7 shows a pile group of vertical and raking piles subjected to vertical load Q = 3000 kN
and lateral load H = 250 kN. Determine the forces acting on each pile. The raking piles lie at an
angle of 4:1.
Solution:
First we determine the location of the neutral axis, N.A, of both the vertical piles and the raking
piles. From figure 3.7 we see that the number of vertical piles = 8 and the number of raking piles
=4
1. N.A for the vertical piles is determined as follows:
Here we assume through piles a1, a2, a3, a4 as a reference point and start measuring in the
positive direction of the X axis, where it is denoted on figure 3.10 as X-X
= 0.75 m
The neutral axis for the vertical piles is located at 0.75 m from the line of pile a1, a2, a3, a4.
(1.0 -0.75 )m = 0.25m X = 0.25 m, the distance to the vertical load Q.
where:
neo = 8eO and the numbers 4, 2, 2 are number of piles in the same axis
2. N.A for the raking piles:
Here we can assume that the for the raking piles b1and b4 as a reference line and calculate
the location of the neutral axis for the raking piles as follows:
(2) 0 m + (2)1m = (m)e1
where: (m )e1 = 4 e1, 4 is the total number of raking piles.
4 e1 e1 =
3. Draw both neutral axis till they cross each other at point c. (see figure 3.9) and establish the
lever arm distance, Y, so that we can calculate the moment M, about C.
Pile inclination 4:1 Y = (0.75)4 - 0.6 = 2.4m
where 0.75 m is the location of N.A of raking piles from eo or from the N.A Of the vertical piles.
M =0 Q(X) - H(Y) = 3000(0.25) - 250(2.4) = 150kNm
4. Establish the angle and calculate sin, cos, and tangent of the angle
The inclination 4:1 = 14.04
tan = 0.25
sin = 0.24
cos. = 0.97
cos2 = 0.94
Raking piles
ri measured perpendicular
to the neutral axis
Figure 3-10
b" ,b" , ri = -0.5(0.97) = -0.485 m
c" ,c" , ri = 0.5(0.97) = 0.485
Vertical Piles
ri measured perpendicular to the neutral axis
PILE (k N)
b2, b3
c2, c3
b1, b4
c1, c4
ri
-0.75 m
0.25 m
1.25 m
0.485 m
0.485 m
Q (kN)
375
375
375
H (kN)
-125
-125
-125
260
260
23.29(0-0.75 =
23.29(0.25) =
23.29(1.25) =
23.29(0.485) =
23.29(0.485) =
-17.47
5.82
29.11
-11.3
11.30
233kN*
256kN
279kN*
249 kN
27kN
M (kN)
Q+H+M
*As we can see the maximum load 279kN will be carried by pile c1 and the minimum load
233kN is carried by piles in row a1
Figure 3-12
Figure 3-13
Pv = k (U)
pr = k (U cos. ) = PV cos.
V = 0 Q - n Pv - m Pr cos. = 0
Pr = Pv cos. Pv =
The symmetrical arrangement of the raking piles keeps the lateral force, H, in equilibrium and
it?s effect on the vertical piles is ignored.
With reference to figure 3.13 Horizontal projection of forces yield the following formulae.
H=0
Figure 3-14
NB the lateral force H imposes torsional stress on half of the raking piles.
Example3.4
Symmetrically arranged piles:
Determine the force on the piles shown in figure 3.15. The inclination on the raking piles is 5:1,
the vertical load, Q =3600 kN the horizontal load, H =200 kN and is located 0.6 m from pile
cutting level.
Solution
1. NA for the raking piles : 4" (0)+2" (0.9) = 6e er = 0.3 m
2. NA for the vertical piles: 2" (0)+2" (1) = 4e ev = 0.5 m
4. Establish the angle and the perpendicular distance r, of the piles from the neutral axis.
slope 5:1 = 11.3
sin = 0.196
cos = 0.98
cos2 = 0.96
tan = 0.20
Raking piles
For raking piles laying on axis a" ,
-ri = 0.3" (cos )
+ri = 0.6" (cos )
= (0.32" cos2 )
r2I = (0.32 " 0.96 ) " 4 = 0.346 m2
For raking piles laying on axis b" and b" ,
Vertical piles
ri = 0.5 m
vertical piles laying on axis b and c
Q PV =
Pr = Pv" cos = 232" 0.98 = 227kN
H Pr =
PILE
ar
br
bv
cv
cr
dr
(kN)
227
227
232
232
227
227
(kN)
-85
-85
85
85
force on
-50***
43**
-43**
50***
-25
91
275
189
313
287
0.98) = 25
Pi (kN)
167
where:
ar, br, bv, cv, cr, dr represent raking and vertical piles on respective axis.
After installation
Displacement of piles in the X-X direction measured, left edge of pile cap as reference point
(see figure 3.17)
Measured perpendicular to the new N.A, pile distance, ri, of each pile:
ri1 = 1.22-0.5 = 0.72
ri2 = 1.22-2.0 = -0.79
ri3 = 1.22-0.6 = 0.62
ri4 = 1.22-2.1 = -0.88
ri5 = 1.22-0.4 = 0.82
ri6 = 1.22-1.7 = -0.49
r2xi = 0.722 + 0.792 + 0.622 + 0.882 + 0.822 + 0.492 = 3.2 m
pile
Q/N (kN)
45.3 (rxi)
83.3
45.3 (-0.72)
51
45.3 (0.79)
49
45.3 (-0.62)
55
45.3 (0.88)
123
45.3 (-0.82)
47
45.3 (0.49)
105
Back to Top
Nevertheless, calculation method that can satisfy all of these conditions will be
complicated and difficult to carry out manually, instead two widely used
simplified methods are presented. These two methods are refereed as
geotechnical and dynamic methods. This section too has worked examples
showing the application of the formulae used in predicting the bearing capacity
of piles made of different types of materials.
Learning outcome
When students complete this section, they will be able to
No end-bearing is mobilised up to this point. The whole of the load is carried by the skin
The pile shaft is carrying its maximum skin friction and the pile toe will be carrying some
load
?
At this point there is no further increase in the load transferred in skin friction but the
Q = Qb + Qs - Wp or
Rc = Rb + Rs - Wp
Rt = Rs + Wp
Qb = Rb = base resistance
Qs = Rs = shaft resistance
Wp = weight of the pile
Rt = tensile resistance of pile
In terms of soil mechanics theory, the ultimate skin friction on the pile shaft is
related to the horizontal effective stress acting on the shaft and the effective
remoulded angle of friction between the pile and the clay and the ultimate shaft
resistance Rs can be evaluated by integration of the pile-soil shear strength a
over the surface area of the shaft:
= Ca + n/> tan
Where: n = Ks/>
a = Ca + KS />
v />
tan
and
where: p = pile perimeter
L = pile length
= angle of friction between pile and soil
Nevertheless, in practise, for a given pile at a given site, the undrained shear
strength Ca varies considerably with many factors, including, pile type, soil type,
and methods of installations.
Ideally, Ca should be determined from a pile-load test, but since this is not
always possible, Ca is correlated with the undrained cohesion Cu by empirical
adhesion factor so that the general expression in e.q. (4-1) could be simplified
to the following expression:
4.2
a (angle of friction between pile and soil) may also be taken as zero. In
addition, Nq = 1, N = 1, so that the eq in(4-1) reduces to:
4.3
Where: Nc, Nq, N ,= bearing capacity factors and are functions of the internal
angle of friction of the soil, the relative compressibility of the soil and the pile
geometry.
4.3.2 Drained load capacity (effective stress approach)
For piles installed in stiff, over consolidated clays, the drained load capacity is
taken as design criterion. If the simplified assumption is made that the drained
pile-soil adhesion C? a is zero and that the term in eq (4-1)involving Nc, N
ignoring the drained ultimate bearing capacity of the pile may be expressed as :
4.4
4.5
"
hammer
3 TON
4 TON
5 TON
fall height
0.055m2
0.073m2
fall height
0.055m2
0.073m2
0.3
420 kN
450 kN
0.4
390 kN
420 kN
0.4
490
520
0.5
450
480
0.5
560
590
0.6
520
540
0.3
470
510
0.4
440
480
0.4
540
590
0.5
510
550
0.5
610
680
0.6
550
610
0.3
580
640
0.4
550
600
0.4
670
740
0.5
610
660
0.5
760
840
0.6
670
730
Example 5.1
A concrete pile with length 26 m and cross-sectional area (235)/> (235) is
subjected to a vertical loading of 390 kN (ultimate) load. Determine appropriate
condition to halt hammering. Type of hammer Drop hammer activated by rope
and friction winch. Class 2, GC 2, pile length 20 m
solution:
? .
= 1.1 ( 103)
vertical load 390 kN /> ? (1.1)390/0.9= 477
Pile cross-sectional area /> 0.2352 = 0.055 m2 />
type of hammer: Drop hammer activated by rope and friction winch />
***For piles 20m - 30m length, the bearing capacity should be reduced by
10%
Table value (table 5-1): Hammer weight = 4 ton /> fall height 0.45m
(interpolation)
Hammer weight = 3 ton /> fall height 0.54 m
4 ton hammer with fall height 0.45m is an appropriate choice.
5.1
Example 5.2
Pile length 22 m, steel pile, friction pile, external diameter 100 mm, GC2,
Determine the ultimate bearing capacity of the pile
solution:
qc
Z? m( depth measured from
MPa
0m - 5 m
5.4
5 - 11
6.4
11 - 18
7.0
18 - 22
7.5
22 m
8.0
The values are slightly scattered then the usual while the rest of the condition is
favourable.
s = 0.5
m = 0.0025
5.2
Where:
a i = adhesion factor for earth layer
cudci = undrained shear strength of clay.
Ami = area of pile shaft in contact with the soil.
The adhesion factor is taken as 0 for the firs three meters where it is expected
hole room and fill material or week strata. For piles with constant crosssectional area the value of can be taken as 1.0 and for piles with uniform
cross-sectional growth the value of can be taken as 1.2 .
Example 5.3
18 m wood pile is installed small end down in clay. Pile diameter is 125 mm at
the end and 10 mm/m increase in diameter. The undrained shear strength of
the soil, measured from the pile cut-off level is: 0-6 m = 12 kP 6-12 m = 16 kPa
12-18 m = 19 kPa. Determine the ultimate load capacity of the pile. Pile cut-off
level is 1.5m from the ground level. Rd = 1.7
solution
decide the values for
= 0 for the first 3.0 meters
= 1.2 for the rest of the soil layer
divided the pile into 3 parts (each 6.0 m in this case)
calculate Average diameter at the middle of each section:
5.3
5.4
Example 5.4
Determine the design bearing capacity of a Steel pile of external diameter 100
mm, thickness of 10 mm. Treated against corrosion. pile. Consider failure in the
pile material. Cc of the soil is 18 kPa, favourable condition. S2
Steel BS 2172
solution :
n = 1.1
m = 0.9
==
The first formula gives us lower value, therefore, the design bearing capacity of
the pile is 0.3 MN
If we consider corrosion of 1mm/year />
==
Some times it is required to cut off and splice to adjust for different length.
Where part of pile is above ground level, the pile may serve as column.
If a concrete pile is supported by soil with undrained shear strength greater than
7 MPa in its entire length, the following formula can be used in determining the
bearing capacity of the pile :
5.5
5.6
Example 5.5
Concrete pile (0.235) /> (0.235) cross-section installed in clay with
characteristic undrained shear strength of 12 kPa. In favourable condition. C50.
Determine design load of the pile. Consider failure in the material.
Solution:
ef = 1.3
lc /h = 20
kc = 0.6, k = 0.24, ks = 0.62
fcc = 35.5 /(1.5/> 1.1) = 21.5 MPa
fst = 410/(1.15/> 1.1) = 324 MPa
FRd = m/> NU
m = 0.9 /> FRd = (0.9)0.769 = 0.692 MN
5.7
Where:
5.8
where: Am, = area of pile at each 3.5 m section mid point of pile
Cm = shear strength at each 3.5m section mid point of pile
dm = diameter of pile at each 3.5 m section mid point of pile
Pmi = pile load at the middle of each section
Example 5.6
Determine the design bearing capacity of a pile 12m pile driven in to clay with
characteristic undrained shear strength 10KPa and 1.0kPa increase per metre
depth. Piling condition is assumed to be favourable and the safety class 2. The
pile is cut at 1.5m below the ground level. Top diameter of the pile is 180mm
and growth in diameter is 9mm/m.
*Often it is assumed that cohesive strength of the soil in the fires three meters is
half the values at the bottom.
solution:
First decide which part of the pile is heavily loaded. To do so, divide the pile
which is in contact with the soil in three parts or sections (see fig.4.1) in this
example the pile is divided into three 3.5m parts
Calculate and decide diameter of the pile at the mid point of each 3.5m section
(0.180+0.009(yi) ; yi growth per meter from the end point.
Calculate the shear strength of the soil at the mid point of each 3.5m section Cmi
= (22 - 1(yi) ). Shear strength at the end of the pile = (10MPa + 1MPa
(12m))=22 MPa
ymi(see dmi=
Part
T(top)
fig. 5.4)
(0.180+0.009/>
8.75
0.259
13.3
16.9
5.25
0.227
16.8
18.7
1.75
0.196
20.3
19.5
section
M(middle)
section
B(bottom)
section
yti
Part
m
m
T(top)
55.1
10.5
0.275
M(middle)
38.2
7.0
0.243
824
B(bottom)
19.5
3.5
552
In consideration of failure in the pile material, the pile can be loaded up to 9.0
MPa
In consideration of cohesion force, the pile can be loaded up to 55 MPa
5.9
where:
As, surface area of block
Ab = base area of block (see fig.6-3)
Cb, Cs= average cohesion of clay around the group and beneath the group.
Nc = bearing capacity factor. For depths relevant for piles, the appropriate value
of Nc is 9
Wp and Ws = weight of pile respective weight of soil
a free-standing group, in which the pile cap is not in contact with the underlying soil.
a "piled foundation," in which the pile cap is in contact with the underlying soil.
pile spacing
independent calculations, showing bearing capacity of the block and bearing capacity of
individual piles in the group should be made.
relate the ultimate load capacity of the block to the sum of load capacity of individual
piles in the group ( the ratio of block capacity to the sum of individual piles capacity) the
higher the better.
In the case of where the pile spacing in one direction is much greater than that in
perpendicular direction, the capacity of the group failing as shown in Figure 6-2 b)
should be assessed.
SOLUTION
Calculate single pile bearing capacity:
Rs = /> Cs /> As = 0.8 /> 50 /> 18/> /> (0.4) = 904kN ?
(Wp +Wcap) - Ws = (60? 25+(600-20? 5.0? 5.0? 1.0)) - (20? 18 /> /> (0.2)2 /> 25
= 469kN ??
total load capacity of 25 piles = Ruc25 = (Rci = Rsi + Rbi) /> 25 - {(Wp +Wcap) - Ws} =
960/> 25 - 469 = 23531kN
calculate block load capacity :
= 4 ? (18? 4.4? 50/> 0.8)+ 50/> 4.4 ? 4.4 /> 9 =
25650kN
??
It is vital importance that pile group in friction and cohesive soil arranged that
even distribution of load in greater area is achieved.
Large concentration of piles under the centre of the pile cap should be avoided.
This could lead to load concentration resulting in local settlement and failure in
the pile cap. Varying length of piles in the same pile group may have similar
effect.
For pile load up to 300kN, the minimum distance to the pile cap should be 100
mm
for load higher than 300kN, this distance should be more than 150 mm.
In general, the following formula may be used in pile spacing:
End-bearing and friction piles: S =
2.5/> () + 0.02 .
...............7.1
...............7.2
where:
d = assumed pile diameter
L = assumed pile length
S = pile centre to centre distance (spacing)
Example 7-1
A retaining wall imposing a weight of 120kN/m including self-weight of the pile
cap is to be constructed on pile foundation in clay. Timber piles of 250mm in
diameter and each 14m long with bearing capacity of 90kN/st has been
proposed. Asses suitable pile spacing and pile arrangement.
Solution:
1. recommended minimum pile spacing:
= 1.33m
minimum distance to the edge of the pile = 0.1m /> B = 2/> 0.1 + 0.25 + 1.10 =
1.55m
here because of the descending nature of the pile diameter a lesser value can be taken , say 1.10m
Dropping weight
Explosion
Vibration
Jacking (restricted to micro-pilling)
Jetting
A hammer with approximately the weight of the pile is raised a suitable height in
a guide and released to strike the pile head. This is a simple form of hammer
used in conjunction with light frames and test piling, where it may be
uneconomical to bring a steam boiler or compressor on to a site to drive very
limited number of piles.
There are two main types of drop hammers:
lower flight of auger is avoided. This may lead to voids in filled with soil in
concrete.
The method is especially effective on soft ground and enables to install a variety
of bored piles of various diameters that are able to penetrate a multitude of soil
conditions. Still, for successful operation of rotary auger the soil must be
reasonably free of tree roots, cobbles, and boulders, and it must be selfsupporting.
During operation little soil is brought upwards by the auger that lateral stresses
is maintained in the soil and voiding or excessive loosening of the soil minimise.
However, if the rotation of the auger and the advance of the auger is not
matched, resulting in removal of soil during drilling-possibly leading to collapse
of the side of the hole.
8.3.2 Underreaming
A special feature of auger bored piles which is sometimes used to enable to
exploit the bearing capacity of suitable strata by providing an enlarged base.
The soil has to be capable of standing open unsupported to employ this
technique. Stiff and to hard clays, such as the London clay, are ideal. In its
closed position, the underreaming tool is fitted inside the straight section of a
pile shaft, and then expanded at the bottom of the pile to produce the
underream shown in fig. 8-3.Normally, after installation and before concrete is
casted, a man carrying cage is lowered and the shaft and the underream of the
pile is inspected.
8.3.3 C.H.D.P
Figure 8-4, Continuous helical displacement piles: a short, hollow tapered steel
former complete with a larger diameter helical flange, the bullet head is fixed to
a hallow drill pipe which is connected to a high torque rotary head running up
and down the mast of a special rig. A hollow cylindrical steel shaft sealed at the
lower end by a one-way valve and fitted with triangular steel fins is pressed into
the ground by a hydraulic ram. There are no vibrations.
Displaced soil is compacted in front and around the shaft. Once it reaches the a
suitably resistant stratum the shaft is rotated. The triangular fins either side of its
leading edge carve out a conical base cavity. At the same time concrete is
pumped down the centre of the shat and through the one-way valve. Rotation of
the fins is calculated so that as soil is pushed away from the pile base it is
simultaneously replaced by in-flowing concrete. Rates of push, rotation and
concrete injection are all controlled by an onboard computer. Torque on the
shaft is also measured by the computer. When torque levels reach a constant
low value the base in formed. The inventors claim that the system can install
a\ typical pile in 12 minute. A typical 6m long pile with an 800mm diameter base
and 350mm shaft founded on moderately dense gravel beneath soft overlaying
soils can achieve an ultimate capacity of over 200t. The pile is suitable for
embankments, hard standing supports and floor slabs, where you have a soft
silty layer over a gravel strata.
Figure 8 -4 C.H.D.P.
compression test
uplift test
lateral-load test
torsion-load test
the most common types of test loading procedures are Constant rate of
penetration (CRP) test and the maintained load test (MLT).
spread foundations;
raft foundations;
piled foundations;
walls and other structures retaining for supporting soil or water;
excavations;
bridge piers and abutments;
embankment and earthworks;
ground anchors and other tie-back systems;
tunnels in hard, non-fractured rock and not subjected to special water
tightness or other requirement.
refers to transient actions (e.g. wind loads), short-term actions (e.g. construction
loading) and long-term actions. In order to allow for uncertainties in the
calculation of he magnitude of actions or combinations of actions and their
duration and spatial distribution, Euorcode requires the design values of actions
Fd to be used for the geotechnical design either to be assessed directly or to be
derived from characteristic values Fk :
Fd = Fk
10.4 The partial factors m, n, Rd
The partial factor m: this factor is applied as a safety factor that the
characteristic values of the material is divided by this factor. (m = material
index) and covers :
Material property
Partial factor m
tan
1.1- 1.25
modules
1.2 - 1.8
other properties
1.6 - 2.0
Table 10-2 partial factors on material properties for conventional design situations for service limit state
Material property
Partial factor m
modules
1.2 - 1.8
other properties
1.6 - 2.0
Normally the design values, d , Ed, tan , can be decided using the following formulae:
fd = fk/( n/> )
Ed = Ek /( n/> )
tan d = tan k/( n/> )
Where:
f = reaction force
Class
1.0
1.1
1.2
pile
Concrete piles
0.5
0.005
Steel piles
0.5
0.002
0.5
0.009
NC
Nq
25
6.48
20.7
10.7
26
7.64
22.2
11.8
27
8.99
23.9
13.2
28
10.6
25.8
14.7
29
12.5
27.9
16.4
30
14.7
30.1
18.4
31
17.4
32.7
20.6
32
20.6
35.5
23.2
33
24.4
38.9
26.1
34
29.0
42.2
29.4
35
34.4
46.1
33.3
36
41.9
50.6
37.7
37
49.1
55.6
42.9
38
58.9
61.3
48.9
39
70.9
67.9
56.0
40
85.6
75.3
64.2
41
104
83.9
73.9
42
126
93.7
85.4
43
154
105
99.0
44
190
118
115
45
234
134
135