LO Extraction - Delta Failure
LO Extraction - Delta Failure
second scenerio:
for this already i am running delta. i am not uisng any process chain.
i want run again full delta
so can follow this steps.
delete all request from cube.
at r/3 system need deltas at RSA7, delete setup tables and initialize setup tables and run full update laster run
v3 job and use as delta.
same scenerio if i alreasy process chain what steps i need to follow
And is it is a DSO........then ur DSO activation will fail........since DSO does'nt support .......full upload and Delta
upload parallely..........in that case u hav to go for full repair.......Full repair and full upload is same...........we just
to full repair for DSO..........to this in the IP scheduler >> Scheduler tab >> Choose Repair full request.........and
check the box.........then ur request will be updated in the target as Full repair........Otherwise after full upload u
have to convert the request to Full repair using the program :RSSM_SET_REPAIR_FULL_FLAG..........
delete init flag......... at infopackge schduler (menubar and delete)
fill setup tables again run initialize with data transfer next delta
am i correct....
Yes u r right.................instead of init with data transfer...........u can also do full repair..followed by init without
data transfer..........
Hope this helps......
Regards,
Debjani.......
So without refilling the setup tables your full load wont end in red. But it will fetch the records from the setup
table that was filled with your last setup table fill run. Hence you will miss out all the changes happened after
your setup table was filled last time.
Thanks.