Final Report Expt10 (CHELAB1)
Final Report Expt10 (CHELAB1)
Final Report Expt10 (CHELAB1)
ARTICLE INFO
ABSTRACT
Keywords:
Sedimentation
Suspension
Coagulant
Settling Velocity
Date Performed
December 2, 2014
Date Submitted
December 9, 2014
Figure
2.1:
The
Sedimentation
Apparatus
Time
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
Interface Height
A
B
C
41.94
26.5
9.9
41.81
26.4
9.8
41.68
26.1
9.7
41.48
26
9.6
41.15
25.8
9.5
41.02
25.6
9.4
40.84
25.5
9.35
40.64
25.4
9.3
40.39
25.1
9.2
40.18
25
9.1
40.07
24.9
9.05
39.52
24.8
9
39.44
24.7
8.95
39.37
24.5
8.9
39.07
24.4
8.85
39.07
24.3
8.8
38.89
24.1
8.7
38.74
24
8.65
38.58
23.9
8.6
38.43
23.8
8.55
38.33
23.5
8.5
38.25
23.4
8.45
38.07
23.3
8.4
37.95
23.2
8.35
37.95
23.2
8.3
37.82
23
8.3
37.62
22.9
8.25
Interface Height
A
B
C
0
71.72
70
34.04
1
69.34
66
29.85
2
67.95
58
25.91
3
66.8
57
21.9
4
65.02
54.2
18.4
5
62.87
51.3
16.5
6
60.96
48.1
15.24
7
59.93
45.2
14.3
8
56.64
42.1
13.7
9
54.61
39.4
13.4
10
52.32
36.7
12.9
11
49.53
34.6
12.7
12
48.01
32.9
12.3
13
47.24
32.1
12.15
14
46.48
31.1
11.85
15
46.63
30.5
11.7
16
45.87
30
11.5
17
45.47
29.5
11.3
18
45.16
29.3
11.2
19
44.56
28.9
11.1
20
44.25
28.5
10.9
3. RESULTS AND DISCUSSION
21
44.07
28.3
10.7
22
43.82
28
10.6
23
42.98
27.8
10.45
24
42.9
27.5
10.3
The table below shows the data obtained
25
42.52
27.2
10.2
by observing the interface height of three
26
42.37
26.9
10.1
chalk suspensions:
27
42.27
26.8
10
Table 3.1: DataExpt.10
Gathered
| SETTLING VELOCITY (SEDIMENTATION APPARATUS) 4
Time
Time
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
Interface Height
A
B
C
37.47
22.8
8.2
37.29
22.7
8.2
37.16
22.6
8.15
37.16
22.5
8.1
36.98
22.4
8.1
36.91
22.35
8.1
36.83
22.3
8.05
36.75
22.2
8
36.53
22.1
8
36.53
22.05
7.95
36.35
21.9
7.9
36.35
21.9
7.9
36.27
21.8
7.9
36.2
21.7
7.9
36.04
21.6
7.9
35.86
21.6
7.85
35.86
21.5
7.8
35.71
21.4
7.8
35.71
21.3
7.8
35.64
21.3
7.8
35.56
21.2
7.75
35.56
21.1
7.7
35.41
20
7.7
35.26
19
7.7
35.26
19
7.7
35.26
19
7.7
35.26
19
7.7
35.26
19
7.7
Different Concentrations
Same Concentrations
80
80
70
70
60
60
50
50
Interface Height, m 40
30
Interface Height, m 40
30
20
20
10
10
0
0
0 10 20 30 40 50 60 70 80 90
Suspension B
0 10 20 30 40 50 60 70 80 90
Suspension B
Suspension C
60
Suspension B
50
Interface Height, m 40
30
Suspension C
20
10
0
0 20 40 60 80 100
height
of
the
suspensions
on
sedimentation rate.
The settling velocity of the three
suspensions decreases with time.
The
initial
concentration
of
suspensions is inversely proportional to
the sedimentation rate since there are
many particles in the suspension; the
velocity of the particle is slow, taking
some time before the particles reach the
bottom part of the vessel. The initial
suspension height of the suspensions is
inversely
proportional
to
the
sedimentation rate since the particles in
the lower suspension height is nearer the
bottom of the vessel and achieved the
ultimate height of the settled solids faster
compared with the higher one.
5. REFERENCES
Vanoni, V. A. 1975. Sedimentation
Engineering: Classic Edition. 1.
Julien, P. Y. 2010.
Sedimentation.
Erosion
24-25.
and
4. CONCLUSION
50. NUCEJ
Vol.16
No1
Mohammed 41
http://www.che.iitb.ac.in/online/system
/files/92/course_details/FM+304.pdf
http://lorien.ncl.ac.uk/ming/particle/cp
e124p2.html
6. ACKNOWLEDGEMENT
The group would like to thank God
for the talents and resources He
bestowed. The group would like to
thank Dr. Allan Soriano and the
laboratory
assistant
for
their
knowledge and guidance in the
experiments theory and procedures.