Control Chart (6 Sigma)
Control Chart (6 Sigma)
10
9
8
7
6
5
4
3
2
1
0
Controller:
Facility:
Equipment:
Desired Level:
A. Brown
A Facility
GD 1230
100
6.19
2.93
3.26
9.12
Daily Defe
Mean
Lower Con
Upper Co
Number of
Date of Control SS 1 SS 2 SS 3
1/1/2009
7
2
3
1/2/2009
4
5
3
1/3/2009
4
5
6
1/4/2009
1
2
4
1/5/2009
4
12
7
1/6/2009
1
5
7
1/7/2009
7
12
11
1/8/2009
6
7
8
1/9/2009
6
9
4
1/10/2009
7
5
6
1/11/2009
1
7
5
1/12/2009
7
5
6
1/13/2009
7
9
5
1/14/2009
10
11
4
1/15/2009
12
9
4
1/16/2009
8
5
5
1/17/2009
4
12
11
1/18/2009
6
9
8
1/19/2009
7
5
6
1/20/2009
1
11
9
Daily Mean of
Sample Sets
3.4
3
4.8
3.2
6.8
5.2
7.4
5.2
7.4
6.6
7.6
4.8
5.6
8.2
7.8
6.2
7.6
9
7
7
Daily Defections
Mean
Lower Control Limit
Upper Control Limit
Daily Mean of
Sample Sets
3.4
3
4.8
3.2
6.8
5.2
7.4
5.2
7.4
6.6
7.6
4.8
5.6
8.2
7.8
6.2
7.6
9
7
7
Daily Sta.
Deviation of
SSs
2.70
1.58
1.92
1.92
3.27
3.03
4.04
2.77
2.30
3.36
7.80
1.92
2.41
2.77
3.27
1.30
3.78
2.24
1.87
4.30
1
1
2
1
3
1
4
1
5
1
6
0
7
0
8
0
9
0
1
13
1
0.64
4.84
7.84
17.6
0.16
0.64
1.96
0.16
43.6
4.84
1.96
3.24
17.6
3.24
13
9
0
36
0
0
0
2
1.96
4
0.04
1.44
27
0.04
21.2
3.24
2.56
2.56
0.36
0.04
11.6
7.84
1.44
1.44
19.4
0
4
16
0
0
0
3
0.16
0
1.44
0.64
0.04
3.24
13
7.84
11.6
0.36
6.76
1.44
0.36
17.6
14.4
1.44
11.6
1
1
4
0
0
0
4
2.56
4
4.84
0.04
0.04
14.4
11.6
1.44
2.56
29.2
180
0.64
6.76
1.44
1.44
0.04
13
1
0
9
0
0
0
5
11.6
1
7.84
7.84
7.84
1.44
19.4
17.6
2.56
13
13
7.84
2.56
0.64
7.84
0.64
0.36
9
9
9
0
0
0
6
11.6
9
23
10.2
46.2
27
54.8
27
54.8
43.6
57.8
23
31.4
67.2
60.8
38.4
57.8
81
49
49
0
0
0
7
11.6
9
23
10.2
46.2
27
54.8
27
54.8
43.6
57.8
23
31.4
67.2
60.8
38.4
57.8
81
49
49
0
0
0
8
11.6
9
23
10.2
46.2
27
54.8
27
54.8
43.6
57.8
23
31.4
67.2
60.8
38.4
57.8
81
49
49
0
0
0
9
11.6
9
23
10.2
46.2
27
54.8
27
54.8
43.6
57.8
23
31.4
67.2
60.8
38.4
57.8
81
49
49
0
0
0
10
0
10 sdev
11.6 2.7
9 1.58
23 1.92
10.2 1.92
46.2 3.27
27 3.03
54.8 4.04
27 2.77
54.8 2.3
43.6 3.36
57.8 7.8
23 1.92
31.4 2.41
67.2 2.77
60.8 3.27
38.4 1.3
57.8 3.78
81 2.24
49 1.87
49 4.3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
24
25
26
27
28
29
30
31
6.19
6.19
6.19
6.19
6.19
6.19
6.19
6.19
3.26
3.26
3.26
3.26
3.26
3.26
3.26
3.26
9.12
9.12
9.12
9.12
9.12
9.12
9.12
9.12
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2)
Enter the number of samples that you want to analyze each day:
>>
>>
Your Control Chart is ready to use. Following steps are for online use.
3)
ABC, Inc.
http://www.spreadsheetweb.com/getting_started.htm
You will only need the username and password to create your Control Chart.
4)
5)
Click "Add Web Application" to upload this file. Check "Single Application Record". This w
Your Control Chart will be created automatically.
You can simply use the Control Chart from that link or place it on your website.
>>
When the "Save" button on the online file is used, the file will be saved with the equipm
files of different equipment names.
>>
http://www1.spreadsheetweb.com/SpreadSheetWeb/Output.aspx?ApplicationId=3405e6
>>
In order to see more online applications created with PSW you can check the link below:
http://www.spreadsheetweb.com/demos.htm
ntrol Chart.
5
Control Chart.
Application Record". This will allow you to edit and overwrite the file online.
on your website.
be saved with the equipment name. You can create a collection of control
spx?ApplicationId=3405e65b-2ae3-46c5-b878-1179ffd3f6eb
2
3
4
5
6
7
8
9
10