Vessel Sizing Calculation Data Sheets: Customer Name: Project Title: Cpe Job #: Document #

This document provides vessel sizing calculation data sheets for a custom process equipment project. It includes technical specifications like vessel dimensions, flow rates, material properties, and calculated values like volumes, residence times, and alarm heights. The document is identified as a data sheet for a specific job and includes approval signatures required before work can proceed.

Uploaded by

Michael Haise
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
339 views13 pages

Vessel Sizing Calculation Data Sheets: Customer Name: Project Title: Cpe Job #: Document #

This document provides vessel sizing calculation data sheets for a custom process equipment project. It includes technical specifications like vessel dimensions, flow rates, material properties, and calculated values like volumes, residence times, and alarm heights. The document is identified as a data sheet for a specific job and includes approval signatures required before work can proceed.

Uploaded by

Michael Haise
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

CUSTOM PROCESS EQUIPMENT

4727 NW Evangeline Thrwy


Carencro, La 70520
Phone: 337.896.3815 / Fax: 337.896.3816

[email protected]

VESSEL SIZING CALCULATION DATA SHEETS


Customer Name:
Project Title:
CPE JOB #:
DOCUMENT #
Issue Record
FOR APPROVAL

Rev

Date

Issue

DOC. TYPE

DATA SHEET

YEAR

By

JOB

I.D. #

Checked

Approved

SHEETS

Revision

Revision Date

VESSEL SIZING CALCULATION DATA SHEET

Document Title:

VENDOR DOCUMENT REVIEW


Purchasers review of Vendors documents does not relieve Vendor of the responsibility for correctness under the Purchase Order. Permission to proceed does not constitute
acceptance of design, detail and calculations, test methods or materials developed.

SIGNATURE:
DATE:
CODE F
CODE A
CODE R
CODE I

Final (Accepted). Work may proceed.


Qualified Release. Revise and re-submit, but work may proceed subject to the incorporation of Purchaser comments.
Rejected. Fully incorporate comments and resubmit documents as required. Work may not proceed.
Accepted for information only.

IMPORTANT
Should the Vendor consider that any comments made by the Purchaser change the Scope of Supply, the Vendor shall advise the price and delivery implications of such
changes within five working days of receipt. The Vendor must not incorporate such changes wi

S/S
ID
Wh
Wd
Heavy Flow rate
Light Flow rate
Gas Flow rate
K
Pop
Tot
S. G.gas
S. G.liquid
PMWAP

172
108
50
72
2000
2000
0.2
0.05
150
140
0.5
0.8

Total Volume
Separator Side
Bottom-LALL
LALL-LAL
LAL-Normal
Normal-LAH
LAH-LAHH
Residence Time

Inches
Inches
Inches
Inches
BBL/Day
BBL/Day
MMSCFD
psig
F
psig

Gallons
8248.75
Volume Between Alarm H
Gallons
371.06
329.90
332.60
361.78
437.22

Heavy Phase
Light Phase
Light and Heavy Phase
Surge Time

Minutes
17.72
18.51
18.11

Heavy Phase
Light Phase

Minutes
6.20
6.88

Gas Volumetric Flow Rate Actual


Gas Velocity Actual
Gas Velocity Allowable

0.24
0.03
0.57

Separation Section

LAHH
LAH
Normal
LAL
LALL

gas
liquid

Alarm Heights in Inches

45
37
30
23
15

Inches
Inches
Inches
Inches
Inches

54
0.384
49.94

Inches
lb/ft^3
lb/ft^3

Gallons
Barrels
8248.75
196.40
me Between Alarm Heights
Barrels
Weir Side
8.83
Bottom-LALL
7.85
LALL-LAL
7.92
LAL-Normal
8.61
Normal-LAH
10.41
LAH-LAHH

Gallons
197.90
230.53
353.42
401.10
427.52

Holdup Time
Heavy Phase
Light Phase

Minutes
5.70
6.06

Operator Intervention Time


Separator Side
Minutes
LAH-LAHH
7.50
LAL-LALL
5.66
ACFS
ft./sec.
ft./sec.

Heights in Inches
LAHH
LAH
Normal
LAL
LALL

Barrels
4.71
5.49
8.41
9.55
10.18

Weir Section
50
40
30
20
12

Inches
Inches
Inches
Inches
Inches

r Intervention Time
Weir Side
LAH-LAHH
LAL-LALL

Minutes
7.33
3.95

S/S
ID
Wh
Wd
Heavy Flow rate
Light Flow rate
Gas Flow rate
K
Pop
Tot
S. G.gas
S. G.liquid
PMAWP

172
108
50
72
2000
2000
0.2
0.05
150
140
0.5
0.8

Total Volume
Separator Side
Bottom-LALL
LALL-LAL
LAL-Normal
Normal-LAH
LAH-LAHH
Residence Time

Inches
Inches
Inches
Inches
BBL/Day
BBL/Day
MMSCFD
no units
psig
F

Sepa

LAHH
LAH
Normal
LAL
LALL

psig

Gallons
6821.08
Volume Between Alarm Hei
Gallons
Barrels
184.33
4.39
182.03
4.33
139.29
3.32
229.43
5.46
248.44
5.92

Heavy Phase
Light Phase
Light and Heavy Phase
Surge Time

Minutes
8.67
22.12
15.39

Heavy Phase
Light Phase

Minutes
3.93
1.97

Gas Volumetric Flow Rate Actual


Gas Velocity Actual
Gas Velocity Allowable

0.24
0.03
0.57

ACFS
ft./sec.
ft./sec.

Separation Section

LAHH
LAH
Normal
LAL
LALL

R
gas
liquid

Alarm Heights in Inches

32
26
20
16
10

Inches
Inches
Inches
Inches
Inches

54
0.384
49.94

Inches
lb/ft^3
lb/ft^3

Barrels
162.41
en Alarm Heights
Weir Side
Bottom-LALL
LALL-LAL
LAL-Normal
Normal-LAH
LAH-LAHH

Gallons
173.42
139.38
159.66
115.08
245.61

LAHH
LAH
Normal
LAL
LALL

Barrels
4.13
3.32
3.80
2.74
5.85

Weir Sectio

Holdup Time
Heavy Phase
Light Phase

Minutes
2.39
2.74

Operator Intervention Time


Separator Side
Minutes
Weir Side
LAH-LAHH
4.26
LAH-LAHH
LAL-LALL
3.12
LAL-LALL

nches
LAHH
LAH
Normal
LAL
LALL

Weir Section
36
28
24
18
12

Inches
Inches
Inches
Inches
Inches

on Time
Weir Side
LAH-LAHH
LAL-LALL

Minutes
4.21
2.39

You might also like