0% found this document useful (0 votes)
208 views3 pages

Estimation Engineer

The document is a curriculum vitae for Arsalan Shaikh that includes his education and experience. [1] Arsalan completed a Bachelor of Engineering in Mechanical Engineering in 2008-2009 from Mehran University of Engineering and Technology in Pakistan with 69% marks, as well as intermediate and matriculation studies in Pakistan. [2] His experience includes working as an Estimation Engineer for Abahsain Cope Saudi Arabia since 2013, as well as prior roles at OMS Pvt ltd Packages and Gatron Industries in Pakistan between 2009-2013. [3] His responsibilities have included preparing technical proposals, cost estimates, and reports for customers as well as overseeing

Uploaded by

junaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
208 views3 pages

Estimation Engineer

The document is a curriculum vitae for Arsalan Shaikh that includes his education and experience. [1] Arsalan completed a Bachelor of Engineering in Mechanical Engineering in 2008-2009 from Mehran University of Engineering and Technology in Pakistan with 69% marks, as well as intermediate and matriculation studies in Pakistan. [2] His experience includes working as an Estimation Engineer for Abahsain Cope Saudi Arabia since 2013, as well as prior roles at OMS Pvt ltd Packages and Gatron Industries in Pakistan between 2009-2013. [3] His responsibilities have included preparing technical proposals, cost estimates, and reports for customers as well as overseeing

Uploaded by

junaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

CURRICULAM VITAE

ARSALAN SHAIKH
[email protected]
19th cross , Al khobar Saudi Arabia
Cell # 00966-563717451

EDUCATION:
B.E (Mechanical) from Mehran University of Engineering and Technology Jamshoro
in 2008-09. (69%) from Pakistan.

Intermediate Pre Engr. from B.I.S.E Hyderabad in 2004. (70%)


Matriculation Science from B.I.S.E Hyderabad in 2002. (77%)
EXPERIENCE:
1)Abahsain Cope Saudi Arabia (17-04-13 to Till Dated)
2)OMS Pvt ltd Packages (BSPM) kasur from (01-01-2011 to 30-03-2013)
3)Gatron Industries Karachi from (01-01-2009 to 20-12-2010)
.

Abahsain Cope Saudi Arabia As Estimation Engineer


Use the Customer requirement Rfq including drawings, design Requirements.
Reviewing customer drawings, plans and other documents in order to prepare detailed
technical proposal for them.
Directly Contact with Technical team of client to solve the technical issues.
Attending the technical meeting & explain with Presentation for Clear the technical
clarification.
Site visit regarding the design issues with clients to discuss the issue.
Provide the timely response properly with out any delay.
After Technical clarification & contact with Client Procurement Team for commercial issue.
After Commercial process documentation Processing & provide them documents according to their
requirement.

Reporting to Manager on daily basis Provide them the Projects reports


Prepare the sales Report according to Projects wise on every month.
Prepare the costing sheets according to Project on each order on daily baisis.
Packages (BSPM) kasur 41MW Power Plant Capacity
1) Boiler capacity 200 TPH Pressure 96 barg & 65 TPH Pressure 13 barg
2) Steam Turbine 41MW with 3 extractions
Working as Shift Enginner (41 MW Thermal Power Plant)
Perform and supervise all the shift operations activities at Power Plant. Ensure the optimum
operation of all equipment within prescribed operating parameters.
Take necessary and quick measures to ensure the operational safety

Page 1 of 2

Responsible for exercising and implementing the safe work practices and procedures at
Power Plant. & Implement the job request, Log out / Tag out , and work permit procedure
. Responsible for Power House operations (Electrical Control Room, 41 MW CHP Unit, 65
TPH Boiler Operations, Water chest, Demineralization Plant and HFO unloading ,Storage and
handling areas.
Generate job requests for repair work required during the shift & maintain permit system

*Gatron Industries Pvt Ltd Working as Assistant Engineer (Maintenance) at Gatron


industry Hub Chowki Baluchistan, , Pakistan.
I was also acting as a Section Incharge of Plant Maintenance . Manage crew of 34 Nos. of
skilled staff that includes Junior Engineer , & workers staff.
Major Responsibilities
Planned Monthly & Yearly Maintenance Schedule & keep maintenance according to
schedule. Of Diesel engine, Positive displacement pump, Gear Pump, Extruder, impellor
balancing & other mechanical equipments.
Preparation of failure reports with recommendation / suggestion to overcome
recurring problems.
Ensure the availability of Machinery Spares and review of re-ordering levels in close
coordination with Material Management Department.
. Updating equipment maintenance history files and keeping all on-stream data upto date.
Try to solve major faults with the co-ordination of Manager & with other team member.

Additional responsibilities:
Preparing Capital budget of section with justification and cost estimations.
Preparing Standard Operating Procedures of Equipment Maintenance
Utilization of maintenance software to perform schedule & maintenance work
Strictly follow work permit system according to safety policies and procedures.
Active participation in trainings of junior staff regarding different maintenance work permit system
and safety during job.

Successfully Clear Internal Audit Course through ICS Middle East


1.ISO 9000:2008
2.ISO 14000:2004
3.OHSAS 18001:2007

Internship Detail:
1. 04 weeks, Practical training in PIA (engineering department) Karachi.
2.
06 weeks, Practical training in HERO MOTORS (pvt) Ltd, S.I.T.E
Hyderabad.
3. 1 month training in Singer Pakistan (pvt) Ltd Korangi Industrial area.

Professional Training
1. Introduction to Power Plant
2. Introduction to basic power plant chemistry
3. Power Plant Efficiency calculation

COMPUTERS SKILL:

Auto cad 2D & 3D


MS OFFICE
Internet browsing

Page 2 of 2

Page 3 of 2

You might also like