Labour Estimate For Various Items of Works
Labour Estimate For Various Items of Works
SN
.
ITEM DESCRIPTION
QUANTITY
1.
Concrete in Foundation.
10 m3
2.
R.C.C. M - 15 grade.
10 m3
Note: For each additional storey, the strength should be increased by 6 nos. for
volume of 10 cu.m to lift the materials.
3.
7 m2
Carpenter 1, Labour 2
4.
100 kg.
5.
100 m2
6.
10 m3
7.
8.
100 m2
9.
10 m2
9m
100 m2
100 m2
100 m2
100 m2
100 m2
100 m2
100 m2
10 m3
Labour 23
10 m3
Labour 33.5
10 m3
Labour 19.5
10 m3
Mason 6, Labour 25
1 no.
100 r.m.
100 r.m.
Fitter 1, Labour 8
20 r.m.
15 r.m..
Mason 1, Labour 2
1 no.
28. Sink.
1 no.
10 m2
Labour 1
10 m2
Labour 4
10 m3
Labour 7
20 m3
Labour 7
33. Surface
dressing/Bituminous
carpeting on roads
100 m2