261219
261219
261219
PART 1
GENERAL
1.1
RELATED WORK
.1
.2
Section 01 74 11 - Cleaning.
.3
.4
1.2
Page 1 of
REFERENCES
.1
.2
.4
1.3
1.4
.1
Indicate:
.1
.2
.3
.2
.3
.4
Product Data:
.1
1.5
Page 2 of
Provide operation and maintenance data for pad mounted distribution transformers for
incorporation into manual specified in Section 01 78 00 Closeout Submittals.
.2
1.6
WARRANTY
.1
Provide manufacturer product warranty against defects in operation and material for a
period of one (1) year from date of Substantial Completion.
PART 2
PRODUCTS
2.1
EQUIPMENT
.1
.2
.3
.4
Three phase dead front pad mounted distribution transformers: to CSA C227.4.
.5
.6
Oil filled pad mounted distribution transformers complete with primary and secondary
cable compartments, primary fused disconnecting switch options and accessories to form
complete factory assembled, self contained, steel fabricated unit for mounting on
concrete pad.
.7
High voltage bushings or high voltage bushing wells for connection to distribution
system through separable insulated connectors for dead front operation.
.8
.9
Primary cable terminals with hole for 9.5 mm dia 16 thread bolt for attachment of solder
lug or clamp connector in vertical plane.
.10
.11
.13
.14
.15
.16
.17
2.2
Page 3 of
TRANSFORMER CHARACTERISTICS
.1
.2
.3
.4
.5
.6
Impedance: standard.
.7
.8
2.3
VOLTAGE TAPS
.1
2.4
.1
2.5
Internally operated tap changer, with provision for padlocking on 3 phase units.
ACCESSORIES
.1
.2
.3
20 mm drain valve.
.5
25 mm filler plug.
.6
Tap switch.
2.6
Page 4 of
GROUNDING
.1
.2
2.7
FINISH
.1
2.8
Finish exterior of unit in accordance with Section 26 05 00 Common Work Results Electrical.
EQUIPMENT IDENTIFICATION
.1
.2
2.9
WARNING SIGNS
.1
Provide warning signs in accordance with Section 26 05 00 Common Work Results Electrical.
PART 3
EXECUTION
3.1
INSPECTION
.1
Check factory made connections of transformer unit for mechanical security and
electrical continuity.
.2
Check transformer insulating liquid for correct quantity and specification according to
manufacturer's instructions.
3.2
INSTALLATION
.1
.2
Set and secure transformer unit in place, rigid, plumb and square.
.3
Make connections.
.4
Page 5 of
.5
Wire one set of contacts on liquid temperature thermometer, liquid level gauge, to sound
alarm when unsafe condition reached.
.6
Ensure care is taken to prevent contamination of liquid and components when field filling
transformers.
.7
Use only metal hose when field-filling transformer with oil: never, under any
circumstances, use rubber hose.
.8
3.3
.2
Carry out following insulation tests using megger with 20,000 megohm scale and
resulting insulation resistance corrected to base of 20 o Celsius.
.1
.2
.3
.3
Inspect primary and secondary connections for tightness and for signs of overheating.
.4
.5
.6
.7
.8
.9
.10
Check for grounding and neutral continuity between primary and secondary circuits of
transformer.
3.4
CLEANING
.1
.2
END OF SECTION