Right-sized LNG
solutions
Gasfin introduction
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Caledonia Investments
Gasfin
CIMC
UK equity investor
TGE Marine
TGE Gas
4
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Required experience
Rationale
Gasfin / TGE
5
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Mid-Scale today
Liquefaction
Shipping
Multiple mid-size
liquefaction plants in China
Floating receiving
infrastructure is only area
not proven at the small/
mid-scale
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
US$/MWh Electricity
HFO
Gas
Lo-Su HFO
8
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Key Issues
Considerations
Supply
Route
Storage Location
Availability of jetty space fixed costs and frequency limit may affect size choice
Type C Cylindrical tanks dominate the smaller LNG market allows longer
storage times (i.e. pressures), no license, and de-skills yard/site work
Shell & tube (glycol loop) optimum but requires storage to be near plant
Tank system
Regas technology
9
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
EDF project:
1 x 25,000m3 LNG carrier, 2 x 25,000m3 FSRUs
25,000m3 FSRU for Martinique/Guadeloupe
Operational details
Depth:
18m;
Environmental details
Draft: : 7m
10
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
PROCESS PLANT
RISER
SPREAD MOORING
Promoor Limited
11
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Market depends on customised, right-size infrastructure to optimise storage and logistics costs
Purpose built equipment needs long term contracts to offset limitations on alternative use
Configuration of custom ships and FSRU means integrating of multiple steps and parties
Sequential risk and interdependency is a BIG issue, especially given weak credits
Mix of small markets and weak counterparties has been very detrimental to growth
Payment type
Performance hurdles
12
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Volume ~400,000tpa,
1x
2x
Ask unreasonable prices or terms for new buyer, expect US players to take up market
14
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
1.
$3.50*
2.
Liquefaction Cost
$3.50*
3.
Shipping
$1.00-$3.00
(depends on size/distance)
4.
$1.50-$3.50
(depends on size/distance)
$9.50-13.50
(alternatively = HH + $6-10)
* Note costs for Steps 1 & 2 v.similar for either mid-scale or world scale volumes
15
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Alt Fuel
Puerto Rico
LFO
500,000 x2
Jamaica (N)
LFO
250,000
St Lucia
LFO
100,000
HFO+
400,000
Bermuda
LFO
100,000
Cayman
LFO
100,000
Bahamas
Mix
500,000
St Barts/St Martin
LFO
30,000 x2
HFO
600,000+
Dom Rep
HFO
300 900,000
Barbados
HFO
150,000
Aruba/Curacao
(excl. refineries)
HFO
100,000 x2
Grenada et al...
Mix
50,000
Mart/Guad
16
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Above: Example of mid-scale LNG production plant developed by Gasfin affiliate, TGE in Urumuchi, China (2004)
18
This document is being furnished on a confidential basis and the information contained herein may not be reproduced or provided to others without the prior written consent of Gasfin
Captures long term premium market for T&T gas in Caribbean, before lost to US exports
Demonstrates genuine T&T commitment to fuel the region
Stimulates jobs and new investment
Provides unique opportunity for direct local participation in LNG chain
Will spur incremental exploration, will not crowd out other projects
Allows gradual regional gas adoption LNG production added as demand grows
Positions Trinidad as global pioneer in mid-scale LNG export
Financeable by private sector, with proven technology, 2.5 year build time
Has support of suppliers, investors, customers awaits sanction for 70mmscf/d gas