Recover Point Connectivity Diagram Overview
Recover Point Connectivity Diagram Overview
Recover Point Connectivity Diagram Overview
The array splitter driver intercepts the writes and sends a copy to the local RP and another
copy to the production lun
The original write is committed to the production LUN in the normal way
The splitter on receiving both ACK from local RP and production lun sends the ACK back to
the production host confirming the write
Local RP sends the compressed, sequenced and bookmarked writes to the remote RP at DR
site over IP links
Remote RP receives the write and commits the same into the remote Journal post
uncompressed
Data written to the journal volume is then distributed to the remote volumes on the DR array,
ensuring that write-order sequence is preserved for data consistency.
3) Enter the name for Consistency Group; Select the RPA on which you want this Consistency
Group to be created. Select the Compression level and Enable Deduplication.
4) Name the Production Copy and Select the Production Host OS.
5) Select the check box Create Remote Copy at DR_VNX5500. Name the Replica copy and
select the Remote Host OS.
7) Creating the Replication set. Select all the LUNs in the production site for a particular host
that you want to replicate to Remote site.
8) Select the LUN from Remote site that corresponds to the Production host LUNs.
9) Similarly select LUNs One by One. Each pair will form a Replication Set.
10) All the Replication Sets are displayed once all the LUN pairs are selected.
11) Select the Journal Volume for Production Site and Remote site. Click on Manually Select
Journal Volumes.
14) Verify the Replication sets and the Journal Volumes at Production and Remote site.
16) Right Click on the consistency group that you have created and Click on Start Transfer to
initiate the replication.
10
DR DRILL PROCEDURE:
1) Initial Verification, before application shut down: Ensure that Replication in Active state (
This means all the data is in synch with DR volumes), Proceed further only if this is in Active
State OR wait till that comes to active state
2) Stop application associated with the specific consistency group, Flush application data as
necessary and unmount the consistency group volume(s) on all attached hosts.
11
3) Creating Bookmark: Click on Bookmark icon on Right hand side-Top of the window.
12
5) Run the verify_group command, to verify that the bookmarked image has arrived in the
target-side journal. Or can also check in GUI. Make sure all the data is transferred to DR side.
No Lag showing in GUI.
6) Run the pause_transfer command OR pause the transfer in GUI. Run the verify_group
command Or check in GUI
7) Enable Image Access: Click on Enable Image Access
13
8) To access the latest image select Select the latest image. To access the image that you
have bookmarked, select Select an image from the list
14
15
12) Check the Storage Status at the Right hand side bottom of the screen. Status should be
Storage: Logged access(0% full)
13) Import vg and mount volumes on target host. Start DB and Application. Confirm the Data
consistency.
14) Check that you are able to bring up the host application with the replicated image at the
target side, and that the image meets your requirements for fail over (e.g., with regard to
the level of consistency). DBA and Application personal should confirm consistency of the
data.
15) If you are not satisfied with this image, shut down the application, unmount the volume(s),
and repeat this process for another image. In the Recover Point Management Console, use
the Change button (General tab, Group Properties box) to access a different image.
16
18) Click on Yes. This will erase the Journal in the Remote Site.
17
18
19
24) Release systems to Users. This means DR systems are in production and released to business
and reverse replication also been executed.
25) After Initialization (Active State): Wait over here till it completes Initialization and changes
the status to Active. Follow below failback steps when production requires to go back to
original site
20
Failback Steps: 26) Ensure that Replication in Active state ( This means all the data is in synch with DR ( Original
Production volumes), Proceed further only if this is in Active State OR wait till that comes to
active state
27) Stop application associated with the specific consistency group, Flush application data as
necessary and unmount the consistency group volume(s) on all attached hosts.
21
30) Verify that the bookmarked image has arrived in the target-side journal. Checked in GUI.
Make sure all the data is transferred to DR side. No Lag showing in GUI.
22
32) Enable Image access at current DR site(i.e Actual Production): To access the latest image
select Select the latest image. To access the image that you have bookmarked, select Select an
image from the list
23
34) Finish.
36) Import vg and mount volumes on target host. Start DB and Application. Confirm the Data
consistency.
37) Check that you are able to bring up the host application with the replicated image at the
target side, and that the image meets your requirements for fail over (e.g., with regard to
the level of consistency). DBA and Application personal should confirm consistency of the
data.
38) If you are not satisfied with this image, shut down the application, unmount the volume(s),
and repeat this process for another image. In the Recover Point Management Console, use
the Change button (General tab, Group Properties box) to access a different image.
24
39) Ensure that you select the correct active storage pool or replication direction. A mistake in
setting this parameter can result in the accidental loss of data at the source side.
40) Ensure that the preferred production side policy parameter is set correctly. Use "Failover to
Remote Copy" parameters. This will switch to remote replica. Transfer from Production will
stop. The original journal is erased, and the host application now has direct access to the
desired image on the storage at what is now the source side. This will start replication back
from current source / production to remote site
Click on Failover Icon. Uncheck the Start Transfer Check Box and Click on Yes.
26
27