Plot Plan Development
Plot Plan Development
Plot plan is the primary document in design of a plant. It takes lot of experience, knowledge
of international and local standards and regulations and Process Flow.
Index
1.
2.
3.
4.
Inter-distances of Units
5.
Details
PP-ID001
PP-ID002
PP-ID003
PP-ID004
PP-ID005
PP-ID006
Product receipt / despatch and mode of transport (rail, road and pipeline)
PP-ID-
Warehouses, storage areas for solid products such as petroleum coke, petroleum wax,
007
sulfur, bitumen / asphalt etc and other open storage areas like scrap yards and dumping
ground.
PP-ID008
PP-ID009
PP-ID010
Flares
PP-ID011
PP-ID012
Meteoroogical Data
PP-ID013
Bathymetric data (high tide level, surge wave height etc.) for installations in coastal areas.
PP-ID014
Seismic Data
PP-ID015
PP-ID016
PP-ID017
PP-ID018
PP-ID019
PP-ID020
Details
PP-GP001
PP-GP002
Plant layout arrangement should follow the general route of raw material to process
unit(s) with tankages interposed as required followed by storage & despatch facilities.
PP-GP003
PP-GP004
All process units and dyked enclosures of storage tanks shall be planned in separate blocks
with roads all around for access and safety.
PP-GP005
PP-GP006
PP-GP007
Pedestrian pathways should be provided / marked alongside the primary traffic roads.
PP-GP008
Alternative access shall be provided for each facility so that it can be approached for fire
fighting in the event of blockage on one route.
PP-GP009
Road widths, gradient and turning radii at road junctions shall be designed to facilitate
movement of the largest firefighting vehicle in the event of emergency.
PP-GP010
Rail spur shall be located close to the periphery of the plant to minimise road/pipe
crossings and blockage of roads during shunting.
PP-GP011
Layout of the facilities shall be made to minimise truck traffic ingress in the plant.
PP-GP012
Two road approaches from the highway / major road should be provided, one for
employees and other for product / material movement. Both these approaches should be
available for receipt of assistance in emergency.
PP-GP013
Presence of ignition source shall always be contemplated beyond the boundary wall of the
installation.
PP-GP014
Orientation of flares, furnaces & heaters, dusty operations (e.g. sulphur handling etc) and
cooling towers should be decided based on prevailing wind direction to avoid travel of
hydrocarbon vapour over sources of ignition.
PP-GP015
Erection methods shall be studied for all types of equipment / structures. Towers, reactors,
fired equipment etc should be located in such an area so to facilitate erection.
PP-GP016
Maintenance requirements for each type of equipment shall be identified and considered.
PP-GP017
PP-GP018
Details
PP-RL001
PP-RL002
All units and roads should be located on high ground to avoid flooding.
PP-RL003
If process units are operated in an intergrated way, and shutdowns are taken
simultaneously of these units, then they may be considered as single block for
interdistances and relative placement purpose.
PP-RL004
PP-RL005
Control room should be upwind of process plants, hydrocarbon storage and handling
facilities.
PP-RL006
Control room shall not be located at lower level than surrounding plants and tank farms to
avoid flooding with process fluids or contaminated rain water.
PP-RL007
There shall be no structrure that could fall on the control room in case of a blast.
PP-RL008
PP-RL009
If a power generation facility supplies steam to a process block also, locate it near that
process block.
PP-RL010
When external power grid is interconnected with plants own power generation facilities,
then either locate the power generation block near the plant boundary or run external
power transmission lines underground.
PP-RL011
Power transmission lines shall never be run above the plant as well as parking areas.
PP-RL-
Horizontal clearance between power transmission lines and plant shall be as per local
012
electricity rules.
PP-RL013
PP-RL014
Locate Low Tension substation in such a way that distance between distance between
distribution transformer and farthest motor is minimum.
PP-RL015
Cooling towers generate fog. They should be located downwind of process equipment and
substation so that fog will not cause corrosion, obstruct vison or short circuiting.
PP-RL016
Group storage tanks according to product classification as per relevant national standard.
PP-RL017
PP-RL018
Locate truck loading/unloading facilities close to the product movement gate, and orient in
such a way to provide one way traffic pattern for entrance and exit.
PP-RL019
PP-RL020
Sulphur recovery unit and sulphur loading area should be located close to product
movement gate and away from process units, hazardous and populated areas.
PP-RL021
Equipment drawing air (e.g. air compressors, air blower, FD fan etc) should be located
away from Sulfur recovery unit / Sulfur handling facility.
PP-RL022
PP-RL023
Petroleum coke storage and handling facilities should be located as far as possible away
from process units, air separation plants, populated and hazardous areas.
PP-RL024
Separate collection system should be provided for different types of waste generated in the
process plant such as oily water, caustic, acid effluents, fecal etc.
PP-RL025
Effluent Treatment Plant should be located minimum one block away from process unit
area, down wind of process units and important areas considering odour & emission of
volatile organic compound.
PP-RL026
ETP Plant should be closer to disposal point by the side of the boundary and at lower
grade to facilitate gravity flow of effluent.
PP-RL027
Flare should be located upwind of process units and the area around flare should be paved.
PP-RL028
Main pipe racks / pipe track shall not be routed through process units. Provide overhead
clearance for vehicles over roadways and railroads.
PP-RL029
Roads should be provided in a symmetric manner to serve all process areas requiring
access for the operation, maintenance and fire fighting. These roads should encircle the
process blocks/ process units.
PP-RL030
Smoking booths should not be provided in the hydrocarbon industry. However if required,
these shall be located at minimum distance of 60 meters from any hydrocarbon source.
PP-RL031
Fire station, firewater storage & firewater pump house shall be located at a safe place
away from hazardous areas.
PP-RL032
Fire station should be upwind of process units and hydrocarbon storage area with straight
approach to process units / other critical areas.
Inter-distances of Units
These interdistances are based on OISD Standard 118, Table 1.
[oisd118table1]
Relevant Notes :
1.
2.
3.
Note-7 The distances specified are for the elevated flare. For ground flare, these
distances shall be 150 m. For Exploration & Production installations, this shall be in line
with Oil Mines Regulations
4.
5.
Note 13: Separation distance of electrical substation was added in table 1 in January
2006 based on decision in 40th steering Committee Meeting in De05.
Information Required
Sr
Description
Done
Plot plan shows entire facility as per project scope, including any future expansions.
Plant North, True North, Wind Direction and Wind Rose Shown.
Separate gates are provided for Personnel movement and Material Movement.
Datum point for plants relative co-ordinate system is defined. It is located as per Project
Specification.
10
Units / Areas are given proper area codes e.g. PA01, PA02, UA01 etc.
11
Location of new facility w.r.t. existing facility is given in terms of distance or coordinates.
12
Distances between units/buldings/equipments are given and are as per relevant standard.
E.g. OISD
13
Buildings / Shelters inside the plant are shown as blocks with outlines.
14
15
16
True geo-graphical co-ordinates (UTM) of the datum point are defined in notes or at the
datum point.
17
18
Non-plant buildings e.g. Administration, Warehouse, Canteen etc. are shown as blocks.
19
Road and shoulder widths are as per project specification or relevant national standard.
20
Gridlines for co-ordinates are shown wherever applicable, along with Northing and
Easting Values.
21
Relaton of plant grade levels w.r.t. datum level e.g. mean sea level is given.
22
23
Main roads and auxilary roads are located with centre line and co-ordinates.
24
Major storm water drain trenches, Underground Corrodors for piping and cables are
shown with dimensions, grids.
25
26
Grade levels for all areas are given as per Civil Grading Drawings.
27
28
Sterile zone radius is shown for flare stack and no equipment is present within the sterile
zone.
29
Access roads around process units and tank farms are adequate.
30
Flare stack, Pig Receiver and launcher, Metering stations are provided with separate
fencing if requires as per project specification.
31
Drafting Related
Sr
Description
Drawing scale along with graphic scale marked and as per project specificaton.
Fonts sizes, types and styles as per project specification / company standard.
10
11
12
Done
13
14
15
16
Drawing title, Drawing Number and Revision number as per Project Document List
17
18
19