SurveyResurveyMethodology Project Status
SurveyResurveyMethodology Project Status
The activities involved for creating digital land parcel map database are as
follows:
I.
Satellite imagery and Land Parcel Map
Ortho-rectified Satellite data to be used for creating parcel boundary and
other spatial features. Parcels will be captured exactly following centre line
of bund using manual digitization through image interpretation and
analysis. Hybrid approach of ETS measurement to be used for creating
parcel map for canopy covered areas or areas which are not interpretable
from satellite imagery. Village wise parcel boundary along with other
spatial features will be captured and finalized.
II.
Overlay of existing parcel vector map & Village Boundary
Delineation
Rectified parcel vector data will be overlaid on ortho-rectified satellite
imagery. Village boundary will be surveyed and finalized through field
verification in presence of Govt. officials.
III.
Linking of RoR Database
RoR database of existing parcel map to be linked with corresponding
parcels.
IV.
Publicity & Field Camp office
It is required to provide due publicity regarding the dates and targeted
activities of the public interaction sessions. The public interaction session
shall be conducted at the field camp office established by the vendor at
the village
V.
Collection of RoR Data
RoR data will be collected through extensive survey work.
VI.
Preparation and distribution of parcel boundary Conformance
Statement
It is required to generate a conformance statement to list the degree of
conformance of the new data to the old data in terms of area of the parcel.
Overlay analysis of existing parcel and newly created parcels will be done.
Conformance statement to be prepared for each parcels as per given
format and acceptance statement to be registered from land owners.
Area given
in existing
RoR
database
VII.
VIII.
Area
of
existing parcel
from cadastral
map
Area of parcel
from
orthorectified
satellite
imagery
Surface area
of parcel (DEM
to be used)
Deviation of
Area to be
calculated
IX.
RoR data with New Parcel UID will be linked with final Parcel
boundary Vector data. Final Land Parcel Map (LPM) to be distributed
among the land owners.
X.
Project Status
Ground Control Network Creation
Primary GCP of 72Hrs observation at every 16Km X 16Km, Secondary GCP of
3Hrs observation at every 4Km X 4Km and Tertiary GCP of 45 minutes
observation at every 1Km X 1Km Km to be collected throughout MP State. The
GCP data will be used for processing the stereo satellite imageries and ETS
measurement activity. The Status of GCP Data collection is as follows:
S.N
o.
Div. Name
District
Ashoknag
ar
Shivpuri
Gwalior
3,992
36
496
6,855
7,387
149
2,257
2,415
27
288
4,650
4,965
17
233
2,512
2,762
17
250
3,244
3,511
17
300
3,860
4,177
28
271
2,391
2,690
11
164
2,300
2,475
35
457
5,853
6,345
24
396
5,884
6,304
26
391
5,010
5,427
28
474
6,325
6,827
30
319
4504
4,853
24
342
4775
5,141
18
243
2867
3,128
22
291
4276
4,589
17
216
3229
3,462
12
157
2270
2,439
22
380
5272
5,674
Alirajpur
15
211
2319
Badwani
Burhanpu
r
23
15
327
160
3702
1509
Datia
Gwalior
Morena
Bhind
Sheopur
Bhopal
10
Raisen
Bhopal
Rajgarh
12
Sehore
13
Vidisha
14
Dewas
15
Mandsaur
16
Neemuch
17
Ujjain
18
Ratlam
19
Shajapur
Agar
Malwa
20
Ujjain
21
22
23
Indore
Total
3,696
11
TGCPs
275
Guna
Chambal
SGC
Ps
21
PGC
Ps
2,545
4,052
1,684
Status
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work
Completed
Work is in
progress
24
Dhar
32
596
25
Indore
17
207
26
Jhabua
17
237
3056
27
Khandwa
Kharagao
n
216
2714
85
4405
Betul
98
8,22
9
1193
1,11,1
51
28
29
Narmadapur
am
Total
560
7002
3221
7,630
3,445
3,310
2,930
4,490
1,291
Work
Completed
Work
Completed
Work
Completed
Work is in
progress
Work is in
progress
Work is in
progress
1,19,9
40
1
2
3
4
5
6
7
District
Name
Sheopur
Shivpuri
Ashoknagar
Bhind
Guna
Gwalior
Morena
Datia
Rajgarh
10
Sehore
11
Bhopal
12
Raisen
13
14
15
16
17
18
Vidisha
Dewas
Ujjain
Ratlam
Agar Malwa
Shajapur
Total
S. No.
Area (Sq
Km)
6,606
10,277
4,673
4,459
6,390
4,560
4,989
2,691
6,153
6,578
2,772
8,466
7,371
7,020
6,091
4,861
2,725
3,470
1,00,152
Status
100% Data received
100% Data received
100% Data received
100% Data received
100% Data received
100% Data received
100% Data received
Approx. 90% Data
received
Approx. 20% Data
received
Approx. 60% Data
received
Approx. 40% Data
received
Approx. 40% Data
received
Approx. 20% Data
received
To be received
To be received
To be received
To be received
To be received